1. The Applicants purchased a house (the New Property) for $580,000. On 16
June 2010, they obtained a loan for $913,400 (the Loan) from the Financial
Services Provider (the FSP). The Loan comprised funds to purchase the
New Property, pay out several smaller loans and to provide bridging finance.
2. This dispute arises from the F SP’s refusal to advance additional funds under
the Loan to enable the Applicants to demolish the existing house and build a
house on the New Property.
Summary of Applicants’ p osition
The Applicants say that:
3. During April 2010, they had inspected the New Property with the intention of
purchasing it, demolishing the house on it, and building another house (the
Development).
4. On 24 April 2010, Mr Applicant entered into a contract for the sale of a
property he owned (the Old Property), and in which they were then living, for
$456,000.
5. On 7 May 2010, and prior to purchasing the New Property, they had
discussions at the local branch with the FSP’s Ms EG. She recommended
they obtain bridging finance to enable them to settle the purchase of the New
Property prior to settling their sale of the Old Property, and then, after
repaying the bridging finance, they could increase or “top up” the Loan (the
Additional Funds) to enable the construction of a new house on the New
Property.
6. Ms EG told them that they would need additional security for the Loan. To
satisfy this condition, Ms Ap plicant’s parents (the parents) agreed to
guarantee the Loan, supported by a mortgage over a block of land they
owned (the Vacant Land).
Determination
Case No: 244536 Determination Page 2 of 20
7. Ms EG told them that the Additional Funds would be placed in their FSP
account upon which they could draw as required for the Development. If Ms
EG had not assured them that could obtain the Additional Funds as a top up
of the Loan in order to build a new house, they would not have purchased
the New Property.
8. On 10 May 2010, and in reliance on Ms EG’s assurances, they paid an initial
deposit of $1,000 for the New Property. On 11 May 2010, they signed a
contract for the purchase of the New Property, and on 12 July 2010, they
settled their purchase of the New Property.
9. On 24 July 2010, they settled the sale of the Old Property.
10. After paying the net proceeds of sale of the Old Property to the FSP, they
were left with a residual Loan debt of $472,000.
11. On 5 August 2010, they met Ms EG to finalise the amount of the Additional
Funds. Ms EG told them that they would not have to pay mortgage
insurance on the Additional Funds and that the process would not take long.
12. When the Additional Funds did not appear in their account, they called Ms
EG who told them not to worry and that the Additional Funds were coming.
13. After a further month, during which they had not received the Additional
Funds, the Applicants became increasingly worried. They telephoned Ms EG
who did not return their calls. Over the next two months, they attempted to
telephone Ms EG many times and emailed her several times. Ms EG
emailed them once, saying she would call them, but she did not do so.
14. Ms EG eventually told them that there was an issue with the Additional
Funds and their top up application may not be approved.
15. Ms EG was then transferred from the FSP’s local branch and in her
absence, they contacted another loans officer at the branch – Mr PN - who
reviewed their application and told them within two days that the FSP would
not approve the Additional Funds.
16. After they complained to the FSP about Ms EG’s conduct, it offered to waive
the exit fee if they wished to refinance with another financial services
provider. Mr PN admitted that Ms EG was at fault but that it was not
possible to provide them with the Additional Funds.
17. At about this time, the p arents visited the FSP’s branch to collect their title to
the Vacant Land. While there, they spoke to a number of FSP employees
who all agreed that Ms EG had handled the Loan incorrectly and told them
that the FSP had received numerous complaints about Ms EG who, they
said, had made mistakes on just about every case she handled.
18. Although they owned the New Property, they did not have the Additional
Funds they had been promised, and needed, to build a new home. They had
spent money on stamp duty, architect and engineering plans, council
permits, insurance, road and asset protection, soil testing, demolition etc,
Case No: 244536 Determination Page 3 of 20
expecting and believing that the FSP would advance the Additional Funds.
They had also paid a year’s worth of interes t for no benefit, and were living
with family members during the period when they were unable to commence
construction of the new house . The FSP’s mishandling of the Loan caused
them a great deal of stress and anxiety.
19. In late July 2011, they refinanced the Loan with another financial services
provider (the incoming financial services provider) and in October 2011,
commenced building a new house on the New Property.
20. The FSP misled them to believe that it would advance the Additional Funds,
and they seek to recover the interest, fees and charges which they paid
(unnecessarily) to the FSP as a result of its misleading conduct. They also
seek compensation for the stress and inconvenience they have suffered
because of the FSP’s conduct.
Summary of FSP’ s position
In response, the FSP says that:
21. On 7 May 2010, the Applicants discussed the Loan with Ms EG and told her
that they had sold the Old Property and were looking to purchase the New
Property. To do this, they said they required bridging finance and an
additional amount, estimated at $250,000, for renovations.
22. In September 2010, the Applicants attended the local branch to discuss their
borrowing capacity for the renovations. Ms EG gave them indicative figures
showing their borrowing capacity under various circumstances, but as they
did not know how much they needed to borrow, no application was made or
submitted. Ms EG told the Applicants that the FSP had not approved the
indicative figures she gave them.
23. When the Applicants told her they required up to $300,000, Ms EG asked
them for documents showing how they intended to use the Additional Funds.
At this point, the Applicants told Ms EG that they intended to demolish the
house at the New Property, and build another house and install a lap pool.
24. Ms EG declined the Applicants ’ request for the Additional Funds as the
purpose for which they proposed to use the Funds was unacceptable to the
FSP under its lending policy. Specifically, Ms EG told them the FSP does
not provide owner-builder loans.
25. It rejects the Applicants ’ request for compensation.
Issues
The Recommendation and the parties’ responses
Case No: 244536 Determination Page 4 of 20
26. On 15 November, the case manager delivered a Recommendation in which
he concluded, on balance, that:
a. The FSP misled the Applicants to believe that it had approved their
application for the Additional Funds and that their intended use of the
Additional Funds - to demolish the existing house and build a new
house on the New Property - would not prevent them from obtaining the
Additional Funds;
b. The FSP unreasonably delayed telling the Applicants it would not
provide the Additional Funds;
c. The FSP’s misleading conduct and then its delay in telling them of its
decision to decline their application for the Additional Funds led to the
Applicants’ delay in seeking finance fro m the incoming financial
services provider to demolish and build at the New Property. There
was a period of “downtime” during which the Applicants were incurring
interest charges on the Loan with no net benefit;
d. The FSP is not required to compensate the Applicants, as they
requested, for the Loan costs and for all interest on the Loan from its
drawdown in July 2010 to its refinance in July 2011. The Applicants
applied for the Loan in May 2010, and learnt in early December 2010
that the FSP would not advance the Additional Funds. The Applicants
lodged a complaint with the FSP in early January 2011, and the FSP
responded in mid February 2011. Allowing the Applicants
approximately three weeks to consider their position after the FSP had
rejected their claim in February 2011, and a further two months to apply
for and then obtain approval from another financial services provider
and settle a refinance, the Applicants are entitled to compensation for
nine months ’ of interest paid to the FSP, plus the other Loan costs.
The FSP is accordingly required to pay the Applicants $31,971.77 for
their financial loss, together with interest at the FSP’s 12 month term
deposit rate for such amounts, calculated from 12 May 2011 until the
date of payment; and
e. The FSP is required to compensate the Applicants for their non
financial loss, comprising significant stress and inconvenience, by
paying them $750 each.
27. On 19 November 2011, the Applicants accepted the Recommendation.
28. On 21 December 2011, the FSP rejected the Recommendation on the
following bases:
a. The case manager reached his views on the “balance of probabilities ”
only. The Recommendation is not supported by factual evidence and is
very speculative in nature;
b. It “has been formed on a notion that any application for finance and/or
additional funds can be assumed to be approved until the customer is
informed otherwise by the [FSP] . This is not the case”; and
c. The methodology used to calculate the compensation for the
Applicants’ financial loss is incorrect. The case manager awarded a
Case No: 244536 Determination Page 5 of 20
100% refund of interest on the Applicants’ base Loan amount, not the
Additional Funds they sought in order to build, between July 2010 and
May 2011. The Applicants would have paid interest on the debt
regardless of the FSP’s alleged delay and when they subsequently
refinanced to the incoming financial services provider, they did not
repay the Loan in full.
The Recommendation states that on 6 December 2010, the FSP told
the Applicants that it declined to advance the Additional Funds. “This is
inconsistent with awarding a further approx. 3 months of interest
refunds”.
Even if the FSP delayed notifying the Applicants that it declined their
request for the Additional Funds, “their loss is only any difference
between the interest amounts charged by [the FSP] and the amount of
interest that they would have been charged by [the incoming financial
services provider] on the amount refinanced”.
Issues for consideration
29. The issues raised in response to the Recommendation are:
a. Did the case manager apply the correct standard of proof in reaching
his conclusions in the Recommendation?
b. Did the case manager incorrectly conclude that, until notified to the
contrary, the Applicants could assume their application for the
Additional Funds had been approved? Did the FSP mislead the
Applicants to believe it had approved, or would approve, their request
for the Additional Funds?
c. Did the FSP delay telling the Applicants that it had not approved, or
would not approve, the advance of the Additional Funds?
d. What loss, if any, have the Applicants suffered as a result of the FSP’s
conduct for which it should compensate them?
30. In preparing my Determination, I have reviewed all the available information
including information provided after delivery of the Recommendation. The
FSP says that Mr PN has left its employ and it is therefore unable to provide
a statement from him. I have accordingly been unable to obtain his
recollection of the matters the subject of this dispute.
Reasons for decision
Did the case manager apply the correct standard of proof in reaching his
conclusions in the Recommendation?
31. The Operational Guidelines to the Financial Ombudsman Service’s Terms of
Reference set out our approach to assessing information when deciding a
dispute. The Operational Guidelines to paragraph 8.1 of the Terms of
Reference state that “FOS gives due weight to the information it receives
Case No: 244536 Determination Page 6 of 20
and reaches conclusions based on the balance of probabilities. This means
FOS is likely to place more weight on reliable information”. The Operational
Guidelines go on to explain how FOS assesses the reliability of documentary
information which I will not set out here.
32. Butterworth’s Australian Legal Dictionary defines “balance of probabilities” as
“[t]he weighing up or comparison of competing possibilities. A fact is proved
to be true on the balance of probabilities if its existence is more probable
than not, or if it is established by a preponderance of probability”.
33. FOS is a dispute resolution service offered as a free alternative to the courts
for the purpose of considering individual disputes regarding loss or damage
caused by a financial services provider’s actions. FOS is not a court of law.
Information provided to us by parties is not given on oath and is not able to
be tested by cross-examination under oath. My case manager correctly
stated these matters, and that our approach does not mean we are unable to
thoroughly investigate a dispute and assess the merits, and in most cases
we are able to do so. We give the appropriate weight to the information we
receive and reach conclusions based on the balance of probabilities. In
assessing information and its relative reliability, we will take into account the
source of documentary information, the statements of the parties and all the
circumstances to reach a view about what is more likely than not to have
occurred.
34. Our approach means that we are likely to place more weight on unequivocal
documentary information, particularly when it is created contemporaneously
with events, than on unsupported statements of recollection. If unsupported
statements of recollection are evenly weighted, and a determination could
only reasonably be made by the testing of the parties’ recolle ctions by cross-
examination under oath, we may be unable to find that the claim is
established or made-out.
35. In reaching his conclusions in the Recommendation, the case manager had
regard to, and gave appropriate weight to: the parties’ statements; emails
e xchanged between the parties at the relevant time; the FSP’s electronic
decision comments and file contents ; the Applicants’ building plans and
associated documents created contemporaneously with events; and the
Applicants’ conduct. The cas e manager quite properly stated in his
Recommendation that although the position was “ not clear- cut”, on weighing
the available information, he preferred the Applicants’ version of events in
relation to critical matters and found, on balance, that the FSP had engaged
in misleading conduct and had delayed notifying the Applicants that it would
not provide the Additional Funds.
36. Having reviewed all the available information, and the Recommendation, I
disagree with the FSP’s statements that the Recommendation is “not
suppor ted by factual evidence and is very speculative in nature”. I am
satisfied that in reaching his conclusions stated in the Recommendation, the
case manager had regard to the then available information and correctly
assessed, what, on balance, he considered was more likely to have
occurred. Further, I am satisfied the case manager set out his reasons for
Case No: 244536 Determination Page 7 of 20
reaching his assessment (including an analysis of the then supporting
information) in the Recommendation.
37. I set out below the bases for my conclusions in this dispute.
Did the case manager incorrectly conclude that, until notified to the contrary,
the Applicants could assume their application for the Additional Funds had
been approved?
38. The FSP says it did not tell the Applicants “ that their application for
Additional Funds was approved. The customers proceeded with their
business plans of their own accord and without first ensuring that the finance
they needed to construct had been approved...”.
39. Having reviewed the Recommendation, I am satisfied that the case manager
did not suggest that the Applicants simply assumed that their request for
Additional Funds had been approved; rather, he concluded, on balance, that
by its conduct, the FSP had misled the Applicants to believe that it had
approved their request for the Additional Funds (to be used to demolish the
old house and rebuild on the New Property) and acted on this belief to their
detriment.
40. I accept as a general proposition that without more, applicants for finance (or
additional funds) cannot simply assume that an application they have
submitted has been approved until they are told otherwise by their financial
services provider. However, I accept there will be occasions where a
financial services provider (mis)represents that an application has been
approved, the proposed borrower reasonably relies on that
misrepresentation and acts accordingly, and suffers loss for which the
financial services provider is liable to compensate him.
Did the FSP mislead the Applicants to believe it had approved their request for
the Additional Funds?
Did the FSP delay telling the Applicants that it had not approved, or would not
approve, the advance of the Additional Funds?
41. I have summarised the Applicants ’ version of events in paragraphs 3 to 20,
above. The Applicants say:
At all relevant times, including before they purchased the New
Property, they intended to demolish and rebuild. They purchased the
New Property because it was in a "great" location, contained a derelict
house suitable for demolition, and provided an ideal site for the pre-
cast concrete panels they proposed to use in construction.
They told Ms EG of their intentions and she told them the FSP “no
longer financed owner-builder loans. ... [W]e therefore needed to
obtain bridging finance first, and then once this was processed and
settled, we could apply for a top-up on our home loan to provide us
with the funds to rebuild the property. Ms [EG] explained that [the
FSP] did not ask ... lenders how they would spend their top-up funds,
Case No: 244536 Determination Page 8 of 20
and for this reason we could obtain the finance and do with it what we
pleased”.
Ms EG “advised us not to ‘knock down’ the existing dwelling until the
top-up was in our account... we [did not, as alleged] intentionally seek
to deceive [Ms EG] of our building intentions ... we bought the [New
P]roperty after being assured by [Ms EG] that we could [obtain
bridging finance] and ... a top-up [loan] to knock-down and rebuild
the dwelling ”.
When they met with her on 5 August 2010, following settlement of the
sale of the Old Property and payout of the bridging finance portion of
the Loan, they discussed with Ms EG how much of a top up they
could obtain. Given that the maximum top up they could obtain
before they were required to obtain lender’s mortgage insurance was
$200,000, they decided to apply for a $200,000 top up and Ms EG
completed a Debt Servicing Test for Individuals on this basis. They
later sent Ms EG up to date wages statements so she could complete
the processing for the top up. Ms EG told them the top up application
process would not take long and they would soon see funds in their
account.
Contrary to what she says, they did not tell Ms EG in September 2010
that they required $300,000 for “ renovations ” which in fact comprised
a demolition and rebuild – rather, Ms EG “was aware of our intention
to knock-down and rebuild the property from the start, we had not at
any point applied, or wanted to apply, for an owner builder loan. We
were given the wrong information about what funds we could obtain,
and at no time did [Ms EG] tell us that we could not obtain a top up ”.
When Mr Applicant finally made telephone contact with her in early
December 2010, Ms EG told them there was an issue and they might
not be approved for the top up. On 8 December 2010, about 48 hours
after they had attended the same branch and applied, again, for a top
up, Mr PN of the branch told them they could not get a top up to the
Loan.
What do the documents show?
43. The FSP’s file, including its contem poraneous “interaction comments” on Mr
Applicant’s customer profile, and contemporaneous application and decision
comments for the Loan and for another loan advanced to Mr Applicant,
solely, show the following:
On 7 May 2010, Mr Applicant met with Ms EG who noted on his
customer profile that he had sold his existing property, that is, the Old
Property, which was scheduled to settle on 24 July 2010 and “is
looking at a new ppty for purchase price of $580k plus stamps as he
requires bridging finance + additio nal 250k for renovations etc...”.
On 10 May 2010, Ms EG commenced the Application for the Loan.
Case No: 244536 Determination Page 9 of 20
On 24 May 2010, Ms EG entered data in relation to the Loan
application, and also commenced, for Mr Applicant solely, an
application for a home loan for $301,000. This was to refinance Mr
Applicant's home loan over the Old Property (in respect of which he
had entered into a contract of sale) and to provide $42,000,
approximately, extra funds. Mr Applicant says he used these extra
funds to pay credit card debts.
On 29 May 2010, the FSP sent Mr Applicant a letter of offer for the
$301,000 loan which he signed on 31 May 2010. The FSP advanced
this loan on 9 June 2010, thereby refinancing the home loan on the Old
Property.
On 8 June 2010, the FSP sent the Applicants a letter of offer for the
Loan which they signed on 16 June 2010. The FSP advanced the
Loan on 12 July 2010, enabling the settlement of the Applicants ’
purchase of the New Property.
On 31 July 2010, Mr Applicant’s sale of the Old Property settled, and
following the crediting of the net proceeds of sale, the Loan balance
reduced to $472,000.
On 6 December 2010, when the Loan balance was $471,000,
approximately, Mr PN commenced a top up application for $252,000,
comprising $100,000 f or “boat, caravan, trailer”, $100,000 for
“alterations and additions to dwelling” and $52,000 for “new car/station
wagon”. In relation to the loan purposes disclosed in this application,
the Applicants say that Mr PN input this information, after they had
explained their previous dealings with Ms EG, and following the format
of the top up recommended by Ms EG. Mr PN referred the application
to Credit for a decision on that day.
On 7 December 2010, the top up application was “not proceeded with”
and closed.
The A pplicants’ position
44. The Applicants have provided email and other contemporaneous records
which support their timeline and are inconsistent with the FSP’s stated
timeline and version of events. I note the following:
Save for the amount of the Additional Funds to which I refer below,
the Applicants have been steadfast in their recollection of events –
and in particular, that it was at all times their stated intention to knock
down the existing house and build a new house at the New Property
and they required funds for that purpose. Their recollection of events
has not changed since they first complained about events to the FSP
in January 2011. Ms EG noted as early as her first meeting with Mr
Applicant on 7 May 2010 that he sought an “additional 250k f or
renovations etc”, and I am satisfied the Applicants disclosed their
intentions to Ms EG at this time.
Case No: 244536 Determination Page 10 of 20
The Applicants say it was “never [their] intention to renovate the
[existing] house ” at the New Property. They have provided a copy of
building plans dated in early May 2010 after they had inspected, but
before they had purchased, the New Properly which I accept are
inconsistent with retaining and renovating the existing “derelict”
house. Mr Applicant is a builder and the Applicants had stated that
their “objective wa s to purchase a property that would allow us to take
advantage of [Mr Applicant’s] expertise in order to benefit financially
from the property's resale... [The New Property] satisfied these
requirements. The house was in a great location, and although it was
... derelict ... it provided a lucrative opportunity for us to knock it down
and rebuild [from] pre-cast concrete panels [which] provide a better
opportunity for profit” and would limit the constraints of a renovation. I
accept that the Applicants’ objectives were inconsistent with a
renovation.
Very shortly after settlement of the sale of Mr Applicant’s Old Property
and the payout of the bridging loan on 31 July 2010, the Applicants
attended upon Ms EG to discuss the Additional Funds. Having regard
to the dates of their email to Ms EG, and the print date of the “Debt
Servicing Test for I ndividuals” which Ms EG created for them, I accept
that this meeting occurred on 5 August 2010. Apparently in response
to her request, and following the August 2010 meeting, the Applicants
emailed pay slips to Ms EG on 20 September 2010 and emailed her
on 26 October 2010, and 10, 18, 23 and 30 November 2010,
enquiring about the Loan top up.
All the while, the Applicants were modifying their drawings and
construction plans for the new house (the dates of issue of these
plans being 2 May, 23 June and 16 October 2010), registering their
planning application (confirmed by the local council on 4 November
2010), obtaining a quote for the demolition on 7 November 2010, and
engaging with the council about obtaining a street protection permit
and paying a council advertising fee for the planning application (the
date of the council letter and receipt, respectively, being 30 December
2010 and 11 January 2011).
Mr Applicant says he telephoned Ms EG many times, without
success, save for a brief conversation with her in September 2010
when she told him not to worry, the application was going through
Credit, and the Additional Funds would be coming, and then in early
December 2010, when she told him there was an issue with the top
up and they might not be able to get it.
The FSP did not discharge its mortgage over the parents’ Vacant
Land and release them from their guarantee after the pay out of the
bridging finance portion of the Loan in July 2010. In fact, the FSP did
not release this additional security until August 2011, after the
Applicants had refinanced the Loan. I accept that the FSP’s retention
of this additional security is consistent with an expectation that the
Case No: 244536 Determination Page 11 of 20
Applicants would seek a top up after the pay out of the bridging
finance.
45. I accept that the Applicants ’ conduct is consistent with their belief that the top
up would be approved and the Additional Funds would be available to them
to demolish the old house and build the new house at the New Property.
The FSP’s position
46. Ms EG says that:
The Applicants had told her they wanted the Additional Funds to
renovate the house at the New Property, and they did not disclose
their plans to demolish and rebuild until sometime later. Mr Applicant
“came to see me ... in September to work out his maximum borrowing
capacity for renovations (it was never divulged this was an owner
builder). I provided him the figures verbally as he requested as [Mr
Applicant] was still unsure of the amount required to borrow. 2 – 3
weeks later the client advised me he required approximately
$300,000, I then contacted [Mr Applicant] to ask ... what he plans to
use the funds for given the high amount, the client advised he was
knocking down the house and placing the lap pool without a builder. I
advised the client the loan purpose was unacceptable as [the FSP
does] not complete owner builder” loans.
S he did not speak “to the client since mid September 2010 when I
advised that the loan could not be completed”.
47. None of the electronic application or decision comments made for the Loan
contain any information about the top up. The last decision comment for the
Loan is dated 27 August 2010 and merely confirms the completion of
stamping and registration of security documents for the Loan. I accept
therefore that Ms EG did not submit an application for the top up. There are
also no notes of Ms EG’s alleged meeting with the Applicants in September
2010 and I do not know on what Ms EG relies to support her recollection of
this date.
Analysis
48. In my view, Ms EG’s recollection of the timeline and relevant events is, in
part, mistaken. Given the email dated in August 2010 and more critically,
the date of the Debt Servicing Test for Individuals, I am satisfied the
Applicants met with Ms EG and discussed the top up on 5 August 2010. On
that date, Ms EG performed the debt servicing test on the basis of a
$200,000 top up. In her statement provided to this office, Ms EG did not
refer to a meeting with the Applicants in August 2010 and I believe that Ms
EG may have mistaken this August 2010 meeting to have occurred in
September 2010.
49. The Applicants have provided a handwritten note of alternate top up
amounts, and associated Lenders Mortgage Insurance premiums and
monthly repayments – for amounts of $150,000, $220,000, and $250,000.
Case No: 244536 Determination Page 12 of 20
They say Ms EG wrote this note during their meeting on 5 August 2010. I
accept, however, it is possible they had another meeting with Ms EG in
September 2010 in which, as she says, she ran through alternate top up
scenarios. This is consistent with the Applicants emailing her wages
information on 20 September 2010 (which is some six weeks after their
August 2010 meeting with Ms EG, but obviously closer in time to a meeting
held in September 2010). I accept that it is also possible, as Ms EG says,
that Mr Applicant later told her he wanted a $300,000 top up, but the
contemporaneous information and the Applicants ’ behaviour is inconsistent
with Ms EG having rejected the top up application at that time, or indeed at
any time prior to early December 2010.
50. In this regard, I note that on 5 October 2010, about two weeks after the
Applicants had sent her their wages information, Ms EG emailed the
Applicants (possibly in response to a call from them) that she was to have
surgery the following day, and “do you mind if I finish this when I get back
next Monday”. Following the Applicants’ persistent email contact about the
top up, on 18 November 2010, Ms EG emailed the Applicants that she would
be “in and out of the office this afternoon. Will call tomorrow if that’s ok”.
Had she told the Applicants, as she states, that the FSP would not provide
the top up – whether for $200,000 or $300,000 or for any other amount – in
or about September 2010, there would have been nothing for Ms EG to
“finish’’ in October 2010, nor any reason for her to call the Applicants in mid
November 2010.
51. Further, had Ms EG told the Applicants in or about September 2010 that they
were ineligible for the top up as owner builders, I would not have expected
the Applicants to continue to refine their building plans or to undertake other
work on the project. I would also have expected Ms EG to respond – in the
negative – to the Applicants ’ persistent email enquiries during October and
November 2010 as to the status of the top up. In short, I do not accept that
Ms EG told the Applicants there was a problem with the top up until early
December 2010 (after their final email enquiry of 30 November 2010), and a
day or so before they met with Mr PN of the FSP on or about 6 December
2010.
Conclusions
52. I have reviewed the available information in this dispute and am satisfied, on
balance, and for the reasons set out above, that:
from the outset, the Applicants told Ms EG they wanted finance to
demolish and rebuild at the New Property;
Ms EG suggested as a strategy when the Applicants were considering
purchasing the New Property that the FSP advance bridging finance
for the period between the settlements of the Properties, and following
repayment of the bridging finance, advance a top up to fund the
demolition and rebuild;
Case No: 244536 Determination Page 13 of 20
following the payout of the bridging portion of the Loan, the
Applicants met with Ms EG about a top up to the Loan and gave her
financial information to process this application;
despite their many requests for updates about the top up application,
it was not until early December 2010 that Ms EG told the Applicants
there was a problem with the proposed top up;
in early December 2010, the FSP told the Applicants it would not
provide the top up funds; and
the FSP – via Ms EG - delayed telling the Applicants that it would not
provide the top up, and therefore delayed the demolition of the old
house and construction of the new house.
53. I am unable to conclude that at any time, Ms EG told the Applicants that the
FSP had approved the top up. In reaching this view, I have had regard to
the fact that the Applicants submitted supporting financial information to the
FSP in September 2010, and thereafter, continued to email Ms EG, asking
about the status of the application. In their emails, the Applicants asked how
the application was proceeding and what further was required, rather than
simply asking when the (approved) top up funds would appear in their
account.
54. Although Ms EG may have given them favourable indications about the
prospects of success of the top up application, the emails indicate the
Applicants were awaiting news of the approval of the top up. In this regard, I
note that on 6 October 2010, when responding to Ms EG’s explanation that
she would be absent from the office for medical reasons and would “finish
this when” she returned the following week, Mr Applicant said that he hoped
Ms EG would not need anything further from Ms Applicant as she would be
overseas for a couple of months. Later in October 2010, Mr Applicant asked
how Ms EG was “going with the top up”. In mid November, Mr Applicant
said he “just would like to get the matter sorted” an d in late November 2010,
asked Ms EG to contact him, as “I need to know if you can’t do it as I will
need to make arrangements to go elsewhere. Can you please get back to
me ASAP”. I am satisfied the Applicants understood there was more work to
do on the application, and no approval had been given to the top up.
55. I note there was some uncertainty around the amount of the required
Additional Funds or the top up. The Applicants say they always wanted or
“began with” $300,000 for the demolition and rebuild, estimating they would
need $270,000, approximately to build the new house, and allowing some
“fat” for overruns and extras, etc. They say they scaled this figure down to
$200,000 after “tossing up options and receiving advice from” M s EG. In
particular, they said that after meeting with Ms EG in August 2010, during
which she outlined the LMI and repayment figures on three alternate top up
amounts, they decided to apply for a $200,000 top up, as that was the most
they could obtain without paying LMI. The Applicants say that, when added
to some savings they had, plus $21,000, approximately left in the Loan
Case No: 244536 Determination Page 14 of 20
account after the bridging loan had been paid out, and on the basis they
would cut back on costs, this would be enough to knock down and rebuild.
56. I note, however, when they first complained to the FSP in January 2011, the
Applicants said that Ms EG had told them during the August 2010 meeting
that they could obtain a $300,000 top up without LMI. They made the same
comments when they lodged this dispute in June 2011. However, when
they provided additional information in this dispute in December 2011, the
Applicants said that after meeting with Ms EG in August 2010, they in fact
decided they would apply for a top up of $200,000 on the bases set out in
paragraph 55 above. They say they had previously mistakenly said that Ms
EG had told them they “could get $300,000, approximately” without LMI.
They say they had stated “approximately” because they could not recall the
exact figure, and that was the amount they initially thought they would need
to rebuild. However, after checking their documents, they are satisfied they
applied for a $200,000 top up which, with their savings and the remainder of
the Loan, and some cost-cutting, would be enough. The Applicants say they
never told Ms EG they wanted $300,000 for “renovations” - they always told
her they wanted finance to demolish and rebuild. As it has eventuated, they
have allocated, via the incoming financial services provider, $385,000 for the
build.
57. In my view, however, it does not really matter how much money they wanted
to demolish and rebuild at the New Property because it is clear the FSP was
never going to fund them as owner-builders. I am satisfied that Ms EG
unreasonably delayed telling the Applicants that the FSP would not approve
the top up, given that they proposed to use it for an owner-builder project. I
accept that from the outset, the Applicants disclosed that they wanted
finance to demolish and rebuild and Ms EG was aware that irrespective of
the amount, the FSP would not advance funds for this purpose.
58. I think it is likely that Ms EG considered she could “manage” or “massage”
the top up application through to approval in order to assist the Applicants,
but this was not to be. I am unable to determine when Ms EG became aware
she would not be able to get the top up approved, but I am satisfied that she
did not tell the Applicants that there was a problem with the application until
early December 2010, and the Applicants did not learn of the fate of their
application until 7 or 8 December 2010. As a result, they were delayed in
commencing the rebuild at the New Property. I consider below their loss
incurred as a result of this delay.
What loss, if any, have the Applicants suffered as a result of the FSP’s conduct
for which it should compensate them?
Approach to misleading conduct claims – the Applicants’ financial loss
59. Where, as here, FOS is satisfied that a financial services provider has
engaged in misleading conduct on which an applicant has relied, reasonably,
our approach to assessing the applicant's loss is not to make the alleged
statement or promise come true. The measure of damage is the loss
suffered by relying on the (mis)representation.
Case No: 244536 Determination Page 15 of 20
60. We ask how much worse off is the applicant as a result of relying on the
(mis)representation compared to the position the applicant would have been
in had the misrepresentation not been made. We compare the position the
applicant is now in and the position he/she would have been in had there
been no misrepresentation.
61. The Applicants say that:
They sold the Old Property (in a suburb further from the city) in late
April 2010, and spoke with Ms EG about their banking needs before
putting a deposit on the New Property.
Before speaking with Ms EG, they had been weighing up two options
– one was to benefit financially from buying, rebuilding and selling a
home in a location closer to the city, and the other was to purchase a
larger home in the same suburb as the Old Property, and maintain a
better lifestyle. Because they had sold the Old Property for a good
price “it would have been possible to purchase a new home and have
a smaller mortgage, leaving ... more funds for luxuries like travel....”.
After they spoke with Ms EG, and she had assured them that once
the bridging finance had been repaid, they could apply for a top up to
demolish and rebuild, they decided to purchase a property that would
allow them to take advantage of Mr Applicant’s building expertise in
order to benefit financially from the property’s resale. After their
conversation with her, they put a deposit on the New Property.
If Ms EG had told them at the outset there “would h ave been any
issues in obtaining finance to knockdown and rebuild the home, [they]
would have gone with the other option... to purchase a larger home in
the area they were living and have a smaller mortgage”; and
If the FSP had told them sometime after advancing the Loan but
before early December 2010 that it would not advance a top up
sufficient for them to demolish and rebuild at the New Property, they
“would have immediately begun looking for finance from another
financial institution”.
What does the information show?
62. The Applicants have provided information – including loan offer documents
and loan statements - which shows that:
In April 2011, they obtained from the incoming financial services
provider a loan for $624,000, which they used to refinance the Loan
and for the demolition and rebuild at the New Property. This loan has
owner-builder terms and conditions;
In June 2011, Mr Applicant and his brother obtained from the incoming
financial service provider a loan – stated to be for “other purposes” - for
$220,000, secured over a property owned jointly by Mr Applicant and
his brother; and
Case No: 244536 Determination Page 16 of 20
On 18 July 2011, they credited $20,000 to the Loan account and on 21
July 2011, they used, apparently, $450,959.68 of the incoming financial
services provider’s loan funds to pay out the Loan.
The Applicants say that once amalgamated, the incoming financial
services provider’s loans gave them $844,000 and after paying out the
Loan, they had $385,000 funds to build the new house.
63. The Applicants say:
Following their meeting with Ms EG in August 2010, they expected the
top up funds would be in their account before long, and they proposed
to demolish at the New Property in September 2010, and to continue
with the building permit application process thereafter.
Between August and December 2010, they obtained documents
required for the building permit, but given Ms EG’s failure to respond to
their enquiries about the top up application, they slowed down the
building permit application process. They demolished the old house in
November 2010.
Had they received the top up in September 2010, they would have
obtained a building permit by January 2011 at the latest and would
have proceeded with the build “at full speed”. They estimate the house
would have taken between 6 to 12 months to build, on the basis that
the top up funds would have been in their account to draw upon as
needed, and Mr Applicant would not have been distracted by
commencing his own construction business. They expected to live with
family and friends for a year to 18 months (that is, between July 2010
to December 2011).
After they learnt on 8 December 2010 that the FSP would not provide
the top up, they began looking for finance elsewhere, and stopped the
building permit application and construction processes pending
obtaining finance.
They did not take steps to obtain the remainder of the documents they
needed for a building permit application until after the incoming
financial services provider had approved the $220,000 loan (in June
2011). The various documents and approvals they needed amounted
to over $4,000, and they delayed incurring these costs until they had
confirmation of this second loan. Once they had confirmation, and had
obtained the necessary documents and approvals, they applied for a
building permit which issued in October 2011, and commenced building
on 17 October 2011.
They have since made seven claims on their owner-builder loan and
the new house is between fixing and completion stage, and should be
completed in approximately two months ’ time . There have been delays
with the new house construction, given: their requirement to outlay
funds for construction up front and then make a claim at each stage;
the unusual design and construction of the new house; and the
demands on the time of Mr Applicant, who has constructed most of the
new house and has done so whilst initially working full time as an
Case No: 244536 Determination Page 17 of 20
employee of a construction company, and then after commencing his
own construction business, whilst simultaneously caring for and
assisting Ms Applicant. (This is explained in more detail below). As a
result of these matters, they have been required to live with family and
friends for two and a half years (from July 2010 to December 2012).
They are presently living in a portion of the new house. They have not
decided whether they will sell the new house immediately after
completion or will live it for some time, depending on the property
market and what offers they receive after the house is completed
Paying interest on the Loan in circumstances where they were unable
to commence the demolition and rebuild represented “dead money”,
with no benefit to them.
Had Ms EG told them at the outset that it could not provide a top up
loan to demolish and rebuild, they would not have bought the New
Property.
Had Ms EG told them sometime after advancing the Loan but before
early December 2010 that it would not or could not provide the top up,
they would have immediately sought finance to demolish and rebuild
from another financial services provider.
64. Having considered all the available information, I am unable to conclude, on
balance, that even had Ms EG not assured them at the outset that the FSP
would consider a top up loan to demolish and rebuild, the Applicants would
have nonetheless bought the New Property. This is because I am satisfied
the Applicants considered the New Property represented a unique
opportunity to find a derelict home in a “great” location, and they were eager
to start a development to generate wealth and to present them with an option
to live at a location closer to the city. In this regard, I note the date of
creation of the Applicants ’ first drawings for the new house at the New
Property is 2 May 2010. This is before they had met with Ms EG, and
certainly before they had paid a deposit on the New Property or signed the
purchase contract for it. I think it more likely that, had Ms EG not assured
them it would consider a top up for them to complete an owner-builder
project, the Applicants would have sought and obtained finance elsewhere –
even if, as has occurred, they required Mr Applicant’s brother to provide, with
him, joint additional security.
65. I accept, however, that had Ms EG told them sometime after advancing the
Loan but before early December 2010 that it would not provide the top up,
the Applicants would have sought and obtained finance elsewhere to
demolish and rebuild, and this, indeed, is what occurred. If the FSP had told
them it would not provide the require funds sooner, they would have
refinanced sooner, and commenced building sooner and completed their
new home sooner.
66. In assessing their financial loss, I am satisfied the Applicants would always
have incurred the costs associated with obtaining the Loan (and its bridging
component) in order to purchase the New Property, and the costs associated
Case No: 244536 Determination Page 18 of 20
with refinancing to the incoming financial services provider in order to obtain
finance to build. Had the FSP told the Applicants when it met with them in
early August 2010, immediately following payout of the bridging component
of the Loan, that it would not provide finance for the demolition and rebuild, I
am satisfied the Applicants would have taken steps at that time to refinance
the Loan and obtain finance for the build. I consider that it would have taken
the Applicants about two months to put together the material required for an
owner-builder loan of the kind they ultimately obtained from the incoming
financial services provider.
67. I accordingly consider that the Applicants ’ financial loss comprises, from
October 2010, the interest differential, if any, between the Loan, and the loan
the Applicants obtained from the incoming financial services provider in April
2011 (and upon which they drew in late July 2011). The Applicants have
confirmed that they were not required to pay rent during this time, and
although I am satisfied they suffered various privations by being forced to
live away from a permanent home and by prevailing on family and friends for
accommodation for longer than expected, and for which they should be
compensated, I am satisfied that they did not incur a financial loss in the
form of the payment of rent.
68. I have had FOS ’s Banking Adviser review the interest rates and other
charges which applied to the Loan from time to time from October 2010, and
the interest rates and other charges which applied to the product the
Applicants ultimately obtained from the incoming financial services provider
and upon which they in part drew to refinance the Loan in July 2011. With
the Banking Adviser, I reviewed the Loan contract and statements issued on
the Loan, and the loan contract the Applicants entered into with the incoming
financial services provider. Under the Loan contract, the FSP charged the
Applicants its Standard Variable Rate, less a margin of 0.70%. Under its
contract with them, the incoming financial services provider agreed to charge
the Applicants a nominated variable rate, less a margin of 0.80%.
69. I accept the Banking Adviser’s advice that between October 2010 and mid
November 2010, the F SP’s interest rate was less than the interest rate the
incoming financial services provider would have applied to the Loan balance
of $472,000, but after mid November 2010, the FSP's interest rate was
higher than the incoming financial service’s interest r ate. I accept the
Banking Adviser’s advice that overall, for the period between 1 October 2010
and 30 April 2011, the Applicants paid $79.64 more interest than they would
have paid had they refinanced, sooner, to the incoming financial services
provider. After allowing for interest accruing on that amount to date, I assess
at $100 the Applicants’ loss suffered by rea son of their delay in refinancing
to the incoming financial services provider. I accordingly require the FSP to
compensate the Applicants for their financial loss by paying them $100. It
should pay this amount to the Applicants at their election by cheque, or into
an account nominated by them, within 14 days of notification of their
acceptance of this Determination.
The Applicants’ non financi al loss
Case No: 244536 Determination Page 19 of 20
70. The Applicants say they have suffered significant hardship and ongoing stress
as a result of the FSP’s conduct. In particular they say:
Over the last two years, they have been forced to live with their
parents, and with Mr Applicant’s brothers. During “ transition periods”
between living with relatives, they have lived with friends. They have
found moving between accommodation, whilst trying to work in the
case of Mr Applicant, and study in the case of Ms Applicant, very
stressful;
Ms Applicant has suffered “ongoing psychological effects”, for which
she has been treated, as a result of not having a home of their own,
not having any pr ivacy, “not knowing where [their ] financial position
would lead [them] and ... living like a nomad moving from one place to
another”;
As a result of the stress caused by the FSP’s conduct, Ms Applicant
has been unable to complete her doctorate in the time she expected,
and is no longer eligible for a scholarship stipend. Mr Applicant has
missed work to care for Ms Applicant, and this has caused him
tension and anxiety;
Because of uncertainty about their finances, they postponed their
plans to marry in December 2010, and Ms Applicant sold her car and
has not purchased another; and
They have spent considerable time in bringing this dispute and
responding to FOS’s requests for information, none of which would
have been necessary had the FSP not engaged in misleading
conduct.
71. FOS is unable to consider Ms A pplicant’s claim for compensation for the
“ongoing [adverse] psychological effects” she says the FSP caused her. In
order to consider such a claim, medical evidence would be required.
Because w e cannot test an expert’s opinion by cross-examination under
oath, it is FOS’s view that these claims are best dealt with in a court.
Further, FOS does not award compensation for the time spent pursuing a
dispute in this office.
72. I accept, however, that the Applicants have suffered significant stress,
disappointment, and frustration as a result of the FSP’s conduct and all that
has flowed from it. Although the Applicants would always have had to find
alternate accommodation after Mr Applicant sold the Old Property, and whilst
they were rebuilding at the New Property, I accept that the considerable
delay before the rebuild commenced meant that they were without a home of
their own for much longer than they had expected. I also accept that this led
to compromise, lack of privacy and other privations. I am satisfied that the
Applicants experienced considerable uncertainty as to their ability to
commence and complete the rebuild, and this impacted adversely on their
personal, study, and work plans.
73. In all the circumstances, I require the FSP to compensate the Applicants for
their non financial loss by paying each of them $3,000. The FSP is to pay
this amount to each Applicant at his and her election by cheque, or into an
Case No: 244536 Determination Page 20 of 20
account nominated by each Applicant, within 14 days of their acceptance of
this Determination.
Determination
74. On the basis of the available information, I determine that the FSP should
compensate the Applicants for their
a. financial loss by paying them $100; and
b. non financial loss by paying each of them $3,000.
It should pay these amount s, at the Applicants’ election, by cheque, or into
an account or accounts nominated by them, within 14 days of their
acceptance of this Determination.