Denial of subfloor mould remediation and associated costs under mould exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-03-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$280,000
SourceAFCA PDF

Summary

The insured sought subfloor mould remediation and related costs after stormwater events, and the FSP denied the claim under its mould, damp and dampness exclusion. AFCA found the FSP entitled to deny the claim, refused non-financial loss compensation, and noted the FSP's offer to clean contents remained open.

The applicant could not link the sub-floor dampness and mould to a defined insured event, and the policy excludes loss arising from mould, damp or dampness.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 244292 Determination Page 1 of 12 Case number: 244292 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 6 March 2013 Background 1. The Applicant‟s wife incepted a home building and contents insurance policy with the Financial Service Provider (FSP) on 14 July 2001. The policy provided cover for loss or damage caused by insured events. 2. On 6 February 2011 the Applicant contacted the FSP to report he had observed damage to his home. The Applicant believed this damage related to a previous claim in October 2010 that had been accepted by the FSP. The FSP noted the damage the Applicant had observed was cracking damage to the kitchen cornice and ceiling. The previous claim was damage to contents in the underground store room caused by stormwater run-off. 3. The FSP arranged for an assessor to attend the property and he confirmed cracking damage to the ceiling, bulkheads and cornices and attributed this to the previous claim of October 2010. The FSP arranged for the repair of this damage. 4. On 11 March 2011 the Applicant contacted the FSP to report that the house was starting to smell musty and after inspecting the subfloor he noticed what appeared to be mould growth. The Applicant believed the mould growth was related to his previous water inundation claim. 5. The FSP‟s assessor attended the property and inspected the subfloor but did not believe the growth was consistent with mould. Arrangements were made for tests to be conducted on the soil. However the Applicant was concerned that action was not occurring as quickly as he expected. The FSP agreed to allow the Applicant to make arrangements for his own expert to inspect the subfloor and report on the mould. 6. The Applicant raised health issues for him and his wife and the FSP agreed to offer tem porary accommodation. The Applicant‟s expert, following inspection of the property, confirmed that it should be vacated due to health issues with the mould. The FSP also agreed to allow for temporary accommodation of pet dogs. 7. The FSP arranged for further inspections on the property to report on the cause of the mould to determine its liability. The FSP agreed to cover the Determination Case No: 244292 Determination Page 2 of 12 Applicant for costs associated with having clothing professionally cleaned as well as costs associated with purchasing new clothing due to access to the property not been available because of the mould. 8. The Applicant complained to the FSP about the time it was taking in settling the claim. The Applicant lodged a complaint with the Financial Ombudsman Service (FOS). However, the FSP did not believe it had sufficient information to make a decision on liability at that time. It arranged for an engineer to attend the property and report on the cause of damage. 9. On the availability of the engineer‟s report the FSP determined it was not liable for the mould growth and declined to clean or rectify the damage as a result of the mould. The FSP referred to a policy exclusion in this regard. 10. The Applicant disagrees with the FSP‟s decision not to cover him for costs associated with mould remediation, temporary accommodation and other associated costs. 11. The Applicant has referred this matter to the Service with the assistance of legal representation. Summary of Applicant’s position 12. The Applicant says the value of his claim ranges between $83,433-$432,433 depending on the remedial works required for the mould removal from the subfloor and removal of mould spores from contents items. 13. The Applicant acknowledges the Service‟s jurisdictional limit is $280,000 and is happy to limit his claim to this amount. Therefore, any liability found in his favour is limited to $280,000. 14. The Applicant says following the October 2010 rain event he expected the FSP to attend to the drying of the subfloor and install drainage as required. The Applicant says the significant level of dampness and mud in the floor space underneath the property extended to various parts of the substructure of the property such as floor joists, chipboard flooring, the plywood packers, etc. He also indicated that there was further building dampness and mud resulting from subsequent inundations and from the February 2011 rain event. 15. The Applicant says when the assessor attended the property on 18 February 2011 it was indicated to him that the FSP would cover him for damage to the subfloor. 16. The Applicant says he holds the FSP responsible for the mould growth as it did not attend to the drying of the subfloor which later caused health issues for himself, his wife and dogs. The Applicant says the FSP was tardy in arranging for a health report on the mould growth and indeed, it was he who arranged to have someone attend. Case No: 244292 Determination Page 3 of 12 17. The Applicant says the mould spores have affected a vast number of content items. 18. The Applicant is also concerned with the FSP relying upon policy exclusions; not only about mould but about defects. He says the FSP has an obligation to act in good faith towards him. The Applicant says the FSP has failed to apply commercial standards of decency and fairness, with due regard to his interests. 19. He says the FSP should be estopped from relying on the defect clause. The Applicant also says the law of estoppel applies to the contract of insurance. He says the FSP did not rely on any defect clause when it paid damage as a result of the October 2010 rain event. 20. The Applicant says when the loss assessor attended the property he advised the damage to the subfloor would be covered. The Applicant says he placed great reliance on what he believed this statement represented and as a result he did not take the opportunity to make alternative arrangements in respect of protecting the property from future events and potential mould. 21. The Applicant says the FSP should have advised him as soon as possible that it was not going to accept the claim for mould damage. 22. The Applicant says the repair clause in his policy implies that repairs will be done properly and the quality clause provides a lifetime guarantee in respect of repairs on the quality of workmanship undertaken by the FSP. 23. He says the FSP‟s failure to undertake appropriate repairs in October 2010 with the drying out of the subfloor has contributed to the development of mould. On this basis the terms of the repair clause and/or the quality clause have been breached and he has suffered as a result of this. 24. In addition, the Applicant says the FSP has failed in respect of its duty of utmost good faith in respect of its handling of the claim and as a result, he has suffered loss by reason of this breach of contract. 25. The Applicant is also seeking compensation of non-financial loss as this claim has caused stress and health concerns to him and his wife. Summary of FSP’s position 26. The FSP submits it as a general principle of insurance law that it is up to the policyholder to prove that the damage in respect of which a claim is made is covered under the terms of the policy. It says the home building policy is a defined events policy, which does not cover all risks. It only provides cover for loss or damage caused by the events specified in the policy, which occurred during the period of insurance, subject to any exclusions. 27. The FSP says the policy provides cover for loss or damage resulting from storm and rainwater, including stormwater run-off from areas surrounding the Case No: 244292 Determination Page 4 of 12 site, or water escaping from, any water main, drain, pipe, street gutters, guttering or surfaces. 28. It says the Applicant suffered damage and loss during the storm events on 31 October 2010. It submits it has indemnified the Applicant for damage to contents. 29. It has subsequently accepted some limited costs associated with internal damage to the kitchen ceiling and plasterboard on the basis that damage resulted from the insured event of October 2010. 30. The FSP says it is the Applicant‟s belief that the FSP‟s handling of the claim contributed to the mould growth in the subfloor of his home, and that this in turn led to mould and spores spreading to the interior of the home and his contents. It disputes this and submits that the cause or causes giving rise to the mould growth are excluded from cover as it has not occurred as a result of an insured event. 31. The FSP submits the policy provides there is no cover under any section of the policy for loss, damage, cost or liability caused by or arising from or involving mould, wet or dry rot rising from damp or dampness. 32. The FSP says when the assessor attended the property following the Applicant‟s contact on 6 February 2011 there was no evidence of mould growth in the subfloor. The assessor at that time prepared an initial scope of works which only identified internal damage to the ceiling and plasterboard. 33. The FSP says principally a dispute has arisen between it and the Applicant as to whether or not it is obliged to indemnify him for the costs associated with remedying the cause giving rise to the mould growth in the subfloor and the costs associated with the remediation work. 34. The FSP submits that due to the complex nature of the matter, it arranged for various suitably qualified experts to inspect and report on the causes and extent of the damage to assist it in determining the extent of its liability. 35. It has relied on the report by consulting engineer (JJ) who concluded in his expert opinion; the most likely cause of the damp resulting in the mould growth was due to inadequate waterproofing or drainage of the east wall and poor subfloor ventilation around the perimeter of the house. 36. The FSP submits that the policy is clear in stating that it will only respond to loss or damage where loss or damage has resulted from an insured event. 37. The FSP reiterates that the mould growth has occurred as a result of design defects and inadequate drainage to the property and has not occurred as a result of an insured event. It submits the policy clearly and unambiguously states there is no cover under any section of the policy for loss or damage arising from mould, wet or dry rot, rising damp or dampness. 38. Therefore it states it is entitled to reject the Applicant‟s request to be indemnified for further associated costs as outlined in his submission. Case No: 244292 Determination Page 5 of 12 39. The FSP submits that the Applicant‟s request for compensation does not fall within the scope of cover provided by his policy and therefore it is not obliged to indemnify him. 40. The FSP submits that it has at all times assisted the Applicant in a professional manner, addressing each issue raised by him and going above and beyond normal expectations in offering assistance to him and agreeing to cover the costs of temporary accommodation, (until such time as his dispute has been reviewed by the Service), costs associated with transporting plants from his home, providing him with emergency funds and agreeing to cover him for various other costs, such as accommodation for his pets even though he has failed to establish that a valid claim exists. 41. The FSP says the delay in the Applicant not being able to return to his home is the result of him failing to commence the necessary remedial works and not as a result of its handling of the claim. 42. The FSP relies on the following policy provisions: “ What we cover-insured events ... Yes ... Storm and rainwater including stormwater run-off from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. ... No ... Damage or loss caused by water seeping into or otherwise entering your building due to: a defect or fault in the design, structure or construction of your building where you could reasonably be expected to be aware of the defect or fault, ... What we do not cover-general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: ... Mould, wet or dry rot, rising damp or dampness, ... We help with... The cost of temporary accommodation When an insured event has caused damage or loss to your building, we will help with the cost of temporary accommodation to you and, where necessary Case No: 244292 Determination Page 6 of 12 for your domestic pets provided: we are satisfied your building is no longer habitable, and you are living permanently in it at the time, and you have claimed on this policy and we are satisfied everything is in order. We will pay the reasonable cost incurred by you for comparable accommodation to 12 months while your building is being rebuilt or repaired. ” Issues 43. Whether the mould growth has been caused by an insured event covered by the policy. 44. Whether the FSP is obliged to indemnify the Applicant for the costs associated with mould remediation. 45. Whether the Applicant is entitled to compensation for distress and inconvenience arising from the FSP‟s handling of the claim. Reasons for decision 46. FOS has considered it is appropriate to expedite the dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is because of the substantial quantum involved. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 47. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 48. There has been an exchange of material between the parties. For the sake of brevity, the Panel does not intend to recite material in this Determination except where considered relevant to the FSP‟s decision to deny the claim. 49. The Panel notes the arguments put forward by the Applicant in regards to the many concerns raised, including the FSP‟s handling of the claim. The Panel has chosen not to comment on many of the concerns as they do not go to the crux of the dispute. 50. The Panel notes the FSP has agreed to continue to cover the temporary accommodation costs whilst this dispute is before the Service. 51. The Panel accepts the onus is on the Applicant to show that the damage has been caused by an event covered by the policy. Once the Applicant has done so, the onus then reverts to the FSP to show that the policy is not covered by way of policy condition or exclusion. 52. The courts have determined that in order to decide whether the damage is covered by the policy the proximate cause of the damage must be Case No: 244292 Determination Page 7 of 12 established. The proximate cause is not necessarily an occurrence which is last in the point of time but rather the dominant factor in the damage. 53. It is also well established law ( Wayne Tank and Pump Co. Ltd v Employers’ Liability Assurance Corp. Ltd. [1973] 3 AII E.R. 825) that where there are two effective causes of a loss, one of which is excluded and one which is included in an insurance policy, the excluded clause operates to over-ride the included clause and defeats the claim. 54. The Applicant is claiming for remediation costs for the removal of mould growth and other associated costs required because of this work. The Applicant holds the FSP responsible for the mould growth as, in his view; it failed to take appropriate action following the October 2010 rain event in drying the soil in the subfloor. 55. The Applicant also says the FSP failed to take appropriate action following contact with the FSP in February 2011, at which time he says he was advised by the assessor that damage to the subfloor would be covered. 56. The FSP says the mould growth has not been caused by an event covered by the policy but is the result of causes which are not covered by the policy. 57. The FSP says it has endeavoured to identify the cause of the mould growth, but ultimately based on the available expert reports, decided it was not caused by an event covered by the policy. During the investigation process it provided temporary accommodation to the Applicant and his wife as well as providing accommodation for pet dogs. This was done to assist the Applicant without any admission of liability. 58. According to the FSP‟s records the Applicant contacted it on 6 February 2011 as he noticed cracking occurring to cornices and ceiling in the kitchen area. The Applicant believed at that time this damage may have resulted from the storm water flooding that occurred to the underground store room in late October 2010. . 59. It is not disputed the FSP accepted a claim for stormwater runoff damage to contents in the underground storeroom resulting from a rain event on 31 October 2010. The claim at that time was only for contents damage. 60. The Applicant says when the assessor attended the property on 18 February 2011 to inspect the damage to the cornices and ceiling he indicated that damage to the subfloor would be covered. However the scope of works submitted by the assessor only listed internal damage to the kitchen. 61. The Applicant contacted the FSP on 11 March 2011 and raised concerns about a musty smell in the house. He says he looked into the subfloor at that time and saw what looked like snow, but believed it to be mould. The FSP advised it would send out on assessor to inspect. 62. The assessor did not believe it looked like mould and suggested testing be done to identify what it was. The Applicant was in constant contact with the Case No: 244292 Determination Page 8 of 12 FSP raising concerns with his health, his wife‟s and that of his dogs. Because of concerns with the time taken by the FSP in arranging the testing, it allowed the Applicant to obtain his own expert to determine whether it was mould growing in the subfloor space. 63. Following the inspection by the Applicant‟s expert it was deemed the growth was mould related and it was inappropriate for the Applicant and his wife to remain at the property until such time remediation of the mould was completed. Although the FSP had not accepted liability at that stage and informed the Applicant of this, it agreed to provide temporary accommodation for him and his wife as well as accommodation for the pet dogs until such time the cause of the mould, from an insurance perspective was established. 64. The FSP arranged for experts to attend the property to determine the cause of the mould growth, as to whether it would have been caused by an insured event. However, based on the available expert reports it was established that the mould growth was not specifically related to an insured event but was caused by poor ventilation and drainage issues. 65. The FSP submits the policy does not cover for loss or damage caused by or arising from mould, wet or dry rot, rising damp or dampness. 66. In the Panel‟s analysis of the material, the Applicant says the FSP failed to take appropriate action following the rain in the October 2010 event as it failed to dry out the subfloor. However, the Panel is unsure as to what damage there was to the subfloor at that time as it was only assessed as a claim for contents damage. 67. The Applicant believed the FSP should have installed drying fans and heaters to dry out the soil. The Applicant says there was water damage to the subfloor structure arising from the October 2010 event, but there is no evidence to support this. However, the Panel considers such actions would only be undertaken by an FSP if it considered the dampness in the sub-floor was directly caused by the insured event of stormwater run-off. 68. The Applicant says the subfloor has been subject of several water inundations. However, pursuant to his onus of proof obligations he bears the prima facie obligation of linking the dampness and the ensuing mould in the soil of the sub-floor area, with the defined event of stormwater run-off; in the Panel‟s opinion he has failed, on the balance of probabilities, to establish this link. 69. In this regard the P anel has considered the FSP‟s engineer‟s report „H‟ dated 24 May 2011, the FSP‟s building consultant‟s report „S‟ dated 4 July 2011 and the report by the Victorian „Building Commission‟ pursuant to a site inspection on 9 November 2011. None of these reports link the sub-floor dampness and ensuing mould with a defined policy event such as stormwater run-off. Other putative causes are tentatively identified by these reports; none of those potential causes would result in the Applicant‟s insurance policy being enlivened. Case No: 244292 Determination Page 9 of 12 70. The Panel notes the Applicant‟s argument he is prevented under the policy from undertaking repairs. The Panel opines that this would apply to repairs covered by the policy. Nevertheless, the policy requires the Applicant to take reasonable steps in the prevention of further damage or loss. 71. There is no evidence of damage to the subfloor when the Applicant contacted the FSP on 6 February 2011. Approximately, one month later mould was found to be growing in the subfloor space. The policy excludes loss or damage arising from mould, damp or dampness. The Applicant says the October 2010 rain event is the cause. The Panel, after very carefully considering the Applicant‟s arguments in this regard, determines the chain of causation potentially linking the October 2010 stormwater run-off event with the sub-soil mould growth and associated smell, detected by him in March 2011, extends too long in time to be sustainable; therefore the Applicant is unable to establish a prima facie case for policy indemnification. 72. In the alternative, as the Applicant is seeking remediation costs for the removal of mould growth, which is excluded by the policy, the Applicant must also fail in this regard. 73. The Panel notes the other arguments put forward by the Applicant in regards to good faith and estoppel and will address these separately even though the FSP has not provided any succinct argument as to these issues raised by the Applicant. Good faith 74. The Applicant submits the FSP did not act with such commercial standards of decency and fairness, with due regard to the interests of the insured that enables it to fulfil its duty of good faith in respect of Section 13 of the Insurance Contracts Act 1984 (the Act). 75. The Applicant says that in not dealing expeditiously with the claim as required, the FSP did not adequately discharge its duty of good faith and as a result breached the contractual term that is implied by Section 13 of the Act. The Applicant says it is further submitted that this breach of contract has led to the loss described. 76. The Panel notes the Applicant‟s reference to the quality clause and repair clause. The Applicant says the work done following the October 2010 rain event was of insufficient quality and the loss incurred; that is the mould growth was a breach of its commitment in the repair clause. 77. The Applicant says the proper repair following the October 2010 rain event should have involved the subfloor space been properly dried out and ventilated. This could also have included introducing some limited further drainage to the sub floor area, installing solar energy fans to increase ventilation and using commercial gas heaters to dry out the subfloor with the aid of electric exhaust fans. Case No: 244292 Determination Page 10 of 12 78. However, the Panel has already determined the Applicant as being unable to factually link the wet sub-soil with the October 2010 stormwater run-off event. 79. Further, the Panel notes the attempts by the FSP in establishing whether the cause of the mould was caused by an event covered by the policy. Pending such resolution, the FSP agreed to cover costs such as temporary accommodation when its liability had not been determined. 80. The Panel is not satisfied there was any breach of good faith by the FSP towards the Applicant in the way it handled and conducted the claim. Estoppel 81. The Applicant has made reference to previous FOS determinations. 82. The doctrine of estoppel, broadly put, is concerned to ensure that a person who leads another to act to his or her detriment in reliance on a statement made by that person should be held responsible to the person who so acts; or as Dixon J so elegantly enunciated in „ Thompson v Palmer (1933 – 49 CLR 507 : „The object of estoppel is to prevent an unjust departure by one person from an assumption adopted by another as the basis of some act or omission which, unless the assumption be adhered to would operate to that other‟s detriment‟. The statement may take the form of an express promise or representation or may be inferred from the conduct of a person. 83. The Applicant submits the FSP is estopped from relying on the defect clause as well as the mould clause. Although there were many defect issues identified with the Applicant‟s property, the Panel notes the FSP is not relying on the defect clause, but the Applicant‟s inability to link the sub -floor dampness, the ensuing mould and a defined policy event. Additionally, the FSP relies on the specific exclusion in regards to mould. 84. It is noted in the Applicant in his submissions states the assessor advised that the subfloor for damage would be covered. However, the Panel notes in his correspondence of 2 July 2012 he says: “I certainly got the impression (particularly in the context of me seeing this as part a continuation of the assessment events that started after the October rain event) from our conversation in the previous interactions that the water damage to the subfloor area was covered, and that (FSP) would take action to dry out the subfloor space.” 85. Further the Applicant says because it was his belief he was covered he did not take the opportunity to make alternative arrangements in respect of protecting the property from future rain events, eliminating the mould or undertaking further works. The Applicant says the policy clauses actively discouraged him from undertaking on-site repairs where there is an indication that the FSP will accept liability. 86. The Panel on reading the FSP‟s file notes and also taking into consideration what the Applicant has written does not accept the FSP, nor any of its Case No: 244292 Determination Page 11 of 12 representatives, advised the Applicant he would be covered for the mould growth in the subfloor. If the Applicant has taken the view that he was covered, he has done so on his own volition. 87. The Panel is not satisfied the Applicant has made a case that estoppel applies to this circumstance. Compensation 88. The Applicant is also seeking compensation for non-financial loss. The FSP says the request for compensation does not fall within the scope of cover provided by the policy. The FSP submits it has at all times assisted the Applicant in an official manner, addressed each issue raised and going above and beyond normal expectations in offering assistance including agreeing to cover the costs of temporary accommodation as well as other costs. 89. It says it has acted appropriately and reasonably in advising the Applicant it would not indemnify him for the costs associated with him remedying the cause of the water ingress problem, the delay in returning home and him failing to commence the necessary remedial works required to remedy the mould growth problem which it says is not as a result of its handling of the claim. 90. The FOS Terms of Reference relevant to this are: “ 9.3 Other compensation a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for consequential financial loss or damage up to a maximum amount of $3,000 per claim made in the Dispute. b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for non-financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference wi th the Applicant‟s expectation of enjoyment or peace of mind has occurred; or (ii) in the case of a Dispute pertaining to an individual‟s privacy rights - injury has occurred to the Applicant‟s feelings or humiliation has been suffered by the Applicant. The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute. c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation for: (i) consequential financial loss; or (ii) non-financial loss, in a Dispute arising as a result of a claim on a General Insurance Policy that expressly excludes such liability. d) The cap on liability in paragraph 9.3 a) does not in any way restrict FOS‟s ability to make an interest award under paragraph 9.5. ” Case No: 244292 Determination Page 12 of 12 91. The Panel notes the Applicant‟s policy does not exclude consequential financial loss or non-financial loss. However, the Panel notes the FSP has provided costs during its investigation of the claim to determine its liability. The FSP has continued to provide temporary accommodation costs whilst the Applicant has referred his dispute to the Service. 92. Therefore, the Panel sees no reason for the Applicant being entitled to any non-financial compensation. 93. After analysing the material, it is established the crux of the claim is in regards to remediation costs of mould which the Applicant sought from the FSP under his policy. The policy provides cover for loss or damage caused by an event described in the policy. 94. The Panel accepts, based on the available evidence, the cause of the mould is related to poor ventilation and drainage issues at the property. 95. The policy does not cover loss or damage resulting from or involving mould, damp or dampness. 96. Therefore, the Panel is satisfied the FSP was entitled to rely upon the policy exclusion to deny the claim. Determination 97. On the basis of the available information the Panel determines the FSP was entitled to deny the Applicant‟s claim. 98. The Panel notes the FSP‟s offer of cleaning of contents is still available and the Applicant has indicated he is prepared to take this offer up. Arrangement should be made between the Applicant and FSP to arrange the cleaning of the contents. However this may not be able to take place until the mould growth problem in the subfloor has been attended to by the Applicant at his expense.