Home / Financial Firm (Unknown - Insurer) / Determination 244117
Determination 244117
Flood contents claim denied as flood rather than flash flood
Summary
The Applicant's contents were damaged when the Brisbane River rose after dam releases. AFCA found the inundation was caused by heavy rain within 24 hours, so it was flash flood covered, and ordered cash settlement of about $20,000 plus interest.
The dominant or effective cause of the flooding was heavy rain on 11 January 2011 that triggered the dam release, which is within the 24 hour flash flood definition.
Issues
- Claim denial primary · upheld“the Panel accepts the Applicant is entitled to cover in accordance with the terms of the policy for flash flood.”
- Failure to disclose secondary · not upheld“the Panel is satisfied the Applicant has been clearly informed in accordance with section 35 of the Act.”
Subjects and remedies
natural disasterpay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 244117 Determination Page 1 of 11
Case Number: 244117
General Insurance – Home Contents – Flash flood and stormwater run-off –
Policy exclusion - Flood – Insurance Contracts Act 1984 Ss35 and 69
22 December 2011
Background
1. The Applicant insured his home contents against loss or damage caused by
insured events for $33,000 with a $300 policy excess. The policy was current
for the period 27 December 2010 to 27 December 2011. The policy also
covered flash flood and stormwater run-off up to 50% of the contents sum
insured or $25,000 whichever is higher.
2. The Applicant ‟s property is situated approximately seven kilometres south of
Brisbane and about 300 metres from the Brisbane River.
3. The Applicant reported that on 11 January and 13 January 2011 his property
was inundated by water. He contends that the inundation of his property on 11
January was the result of flash flood and stormwater run-off while the 13
January inundation was the result of flood. On 12 January 2011 he submitted a
claim for the water damage to his contents as a result of the flash flood.
4. The Financial Services Provider (FSP) appointed a hydrologist to report on the
inundation of the Applicant ‟s property. The hydrologist reported the Applicant ‟s
property was inundated by flood waters on both the 11 and 13 January 2011.
5. In view of the hydrologist‟s report, the FSP relied upon the policy exclusion in
respect to flood damage to deny indemnity to the Applicant.
6. The Applicant disputes the FSP‟s decision and contends that the FSP did n ot
provide him with a copy of a Product Disclosure Statement (PDS) until after he
had reported the damage to his contents.
7. The FSP disputes the Applicant ‟s contention.
Summary of Applicant ’s Position
8. The Applicant states his residence was flooded as a result of flash flooding of
the Brisbane River on 11 January 2011. On 12 January he reported the
inundation to the FSP and also warned it that additional flooding could occur.
Additional flooding did occur on 13 January 2011.
Determination
Case No: 244117 Determination Page 2 of 11
9. He contends that his policy of insurance covers loss or damage caused by flash
flooding and the FSP should indemnify him for his loss.
10. He disputes the FSP‟s decision to reject his claim because:
Full and proper disclosure of his cover was only provided following the
initial flood event. The FSP provided a „Policy Change – Certificate of
Insurance‟ on 12 January 2011, the day after the initial flooding.
Flash flooding versus „Riverine‟ definition – there is no doubt that his
property was affected by the riverine rising (water rising) from the
Brisbane River; however, the initial flash flooding of his residence
occurred first.
11. In view of the FSP not providing him with full and accurate details of his cover
prior to the flash flooding event, he considers the FSP should honour the
contents cover for his residence.
12. While he accepts that „flash flooding‟ cover is 50% of the total cover, adequate
disclosure was not provided prior to the event.
13. The Applicant considers the FSP should settle his claim for the flash flooding
level (50% of overall cover) and also consider the implication of not providing
full and adequate disclosure of his cover. He would consider negotiation down
from 100% of his contents sum insured.
Summary of FSP’s Position
14. On 12 January 2011, the Applicant submitted a claim under the policy in
relation to damage to his contents caused by inundation of water on 11 January
2011.
15. Section 35 of the Act provides that, where a claim is made under a prescribed
contract and the event giving rise to the claim is a prescribed event in relation
to the contract, an insurer may not refuse to pay an amount equal to the
minimum amount of cover set out in the regulations made pursuant to the Act
unless it can prove that before the contract was entered into, the insurer clearly
informed the insured in writing of the relevant provisions of the contract, or that
the insured knew or a reasonable person in the circumstances could be
expected to have known of such provision.
16. Section 69 of the Act provides for situations where it is not reasonably
practicable to give the information in writing before the contract is entered into,
but it is reasonably practical to give the information orally; if the insurer gives
the information orally, the insurer is deemed to have complied with its
obligations if the information is subsequently given in writing, within 14 days
after the contract of insurance (including an interim contract) has been entered
into.
17. The FSP contends the PDS is sufficient to clearly inform the insured about the
scope of flood cover. The PDS clearly states the policy does not cover flood.
Case No: 244117 Determination Page 3 of 11
18. Further, the Certificate of Insurance was sufficient to clearly inform the
Applicant as to the scope of cover. The FSP also contends the Applicant was
aware of the scope of cover.
19. The FSP denied that the Applicant did not receive the PDS until 12 January
2011. PDS documents are automatically sent along with the Certificate of
Insurance at the time of policy inception. Further, each year the Applicant would
have received policy renewal documents which would include any updated
PDS or Supplementary PDS.
20. The FSP forwarded a copy of the PDS to the Applicant, along with the
Certificate of Insurance, within 14 days of the date the policy was entered into.
Alternatively, the PDS would have been sent to the Applicant at least before the
Applicant ‟s loss arose.
21. The FSP submits that this is sufficient to „clearly inform‟ the Applicant for the
purposes of section 35 of the Act when read together with section 69 of the Act.
22. Page 18 of the PDS clearly juxtaposes the events which are covered with those
which are not covered. Under the heading „What is covered‟, the term „flash
flood and stormwater run- off‟ appears along with the definition of that term.
Immediately adjacent to this, under the heading „What is not covered‟, the term
flood is listed.
23. Throughout the PDS it states that „This policy does not cover flood unless we
have agreed and it is shown on your Certificate of Insurance ‟ .
24. The Applicant has submitted that the definition of „flood‟ is too broad. The FSP
submits that when the definitions of the terms „flood‟ and „flash flood and
stormwater run- off‟ are read together, the diffe rence between the two is clear.
25. Flash flood and storm water run-off is a flood that occurs when a sudden flood
is caused by rain which has fallen not more than 24 hours earlier. The policy
makes it clear that this is the only type of flood which is covered and that any
other kind of flood is not covered as part of the standard cover.
26. The PDS also clearly informed the Applicant the monetary limits applicable to
all claims including flash flood and stormwater run-off.
27. The FSP engaged the services of a hydrologist to report on the cause of
flooding in the Brisbane area. The hydrologist dealt with the cause of flooding in
Brisbane on a regional area basis.
28. The hydrologist reported:
A substantial amount of rain fell in the Brisbane River catchment above
Wivenhoe Dam both before, but particularly over the period 9, 10 and 11
January 2011 commencing at 9.00am o n 9 January 2011.
The rain caused significant flows into the Wivenhoe Dam, the level of
which peaked late in the evening on 11 January 2011.
Case No: 244117 Determination Page 4 of 11
There were significant discharges of this water from the Wivenhoe Dam
which flowed into the Brisbane River. This wa ter worked its way down the
Brisbane River towards Brisbane.
A small proportion of the overall depth of the Brisbane River prior to
6.00am on 12 January 2011 may be partially attributable to the rain that
fell in the Bremer River catchment on 11 January 2011. However, the
overwhelming influence on the flooding of the Brisbane River was the rain
which fell some days earlier over the Wivenhoe Dam catchment and its
subsequent release from Wivenhoe Dam.
29. The FSP also relies upon an Insurance Council of Australia (ICA) report. In the
report‟s Summary of Findings section it states:
„There were three generally distinct and significant periods of rainfall between 9
January and 13 January 2011: the first rainfall event occurred over the period from
about 1400 hours to 2100 hours on Sunday 9 January, the second event over the
period from about 0900 hours to 1200 hours on Monday 10 January, and third event
from about 2100 hours on Monday 10 January to 1500 hours on Tuesday 11
January. The third rainfall event delivered the heaviest falls. The first and third of
these rainfall events caused two major floods in the upper Brisbane River catchment
draining directly into Wivenhoe and Somerset Dams.
...
Floodwaters moving down the Brisbane River over the period 9 to 14 January were
made up of releases from Wivenhoe Dam and floodwaters from Lockyer Creek and
the Bremer River. The water level response to these normal flood events in lower
Lockyer Creek, in the lower Bremer River and in the lower Brisbane River was
dwarfed by the subsequent water level rise associated with releases from Wivenhoe
Dam over the period 0600 hours on Tuesday 11 January to 0300 hours on the
morning of Wednesday 12 January 2011.
30. The hydrologist‟s report confirms that the Applicant ‟s property does not appear
to have been inundated by stormwater run-off or other local run-off.
31. The hydrologist‟s reasons for this opinion are:
The terrain does not suggest that the Applicant ‟s property is particularly
vulnerable to stormwater or other local run-off during rainfall intensities
experienced during the January 2011 flood event;
The rainfall around the time of the inundation of the Applicant ‟s property
was not sufficient to cause inundation by stormwater run-off or other run-
off; and
The timing of the rise of the Brisbane River was consistent with the time of
inundation reported by the Applicant.
32. A graph of the Brisbane River Water levels near the Applicant ‟s property shows
that the Brisbane River would have reached a level sufficient to inundate the
minimum property level of the Applicant ‟s property between approximately
1.00am and 2.00am on 12 January 2011.
Case No: 244117 Determination Page 5 of 11
33. This is several hours later than the time reported by the Applicant. However,
the Applicant ‟s report is based on other residents‟ accounts of the inundation of
his complex; these observations may not be entirely accurate.
34. The hydrologist stated that the Applicant ‟s contention as to the inundation of his
property is broadly consistent with the timing of the rise of the Brisbane River.
35. The Applicant contends the initial inundation of his property on 11 January
2011 was as a result of a flash flood. The rainfall record at the Corinda High
Alert gauge shows that the last rainfall occurred between 4.00pm and 5.00pm
on 11 January 2011.
36. The hydrologist states that inundation resulting from stormwater or other local
run-off generally requires intense levels of rain, sufficient to overcome the
stormwater drainage system, and will generally occur at the same time as that
intense rain or immediately after, that is, within one hour for localised
stormwater inundation.
37. The Corinda High Alert gauge shows that the rainfall ceased five hours prior to
the time on inundation reported by the Applicant, that is, 10.30pm. This is
inconsistent with inundation caused by stormwater run-off or other local run-off
and further supports the hydrologist‟s conclusio n that the Applicant ‟s property
was inundated by the rising level of the Brisbane River and not by stormwater
or other local run-off.
38. The hydrologist concluded that the cause of the inundation of the Applicant ‟s
property was the rising level of the Brisbane River, which was itself caused by
rain which fell more than 24 hours earlier.
39. The FSP contends the evidence indicates that the proximate cause (or at the
very least a proximate cause) of the loss was rain which fell in the Wivenhoe
Dam catchment from 9 January 2011 (and earlier) which had the effect of
raising the level of the Brisbane River. That rain fell more than 24 hours prior to
the inundation of the Applicant ‟s property. Therefore, the inundation does not
meet the policy definition of „Flash flood and stormwater run- off‟.
40. The FSP states that the loss was not caused by Flash flood and Stormwater
run-off as defined in the policy but was caused by flood as defined in the policy.
Therefore, it is entitled to deny indemnity to the Applicant for the damage to his
contents.
41. The FSP relies on the following policy/contract provisions:
‘Words / terms with special meanings
Flood
Rising water which enters your home as a result of it running off or overflowing from
any origin or cause. This policy does not cover flood unless we have agreed and it is
shown on your certificate of insurance.
Flash flood and stormwater run-off
A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash
flood or stormwater run-off.
Case No: 244117 Determination Page 6 of 11
...
Storm
A violent disturbance of the atmosphere associated with strong winds including a
cyclone, lightning, heavy rain, hail or snow, but not continuous bad weather by itself.
...
Insured events you are covered for
Damage caused by weather...
What is covered
Storm
What is not covered
Loss or damage:
× caused by rain, hail or snow after it has reached the ground;
× caused by rain or wind entering the home unless it enters through an opening in
the windows, walls or roof made by a storm;
...
What is covered
Flash flood and stormwater run-off
A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash
flood or stormwater run-off
What is not covered
Loss or damage caused:
× by flood;
...
The most we will pay you for home claims
What is covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum insured or $25,000 which ever is higher.
...
Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you have
asked for them and we agree to cover you. Additional premiums apply for each
cover. Your certificate of insurance will show which covers operate. All optional
covers are subject to the terms and conditions of this policy.
What is covered
Flood and storm surge
This does not cover flood unless we have agreed and it is shown on your certificate
of insurance.
Home and/or contents cover
We cover you for loss of or damage to your home or contents caused by flood or
storm surge which happens during the period of insurance at the property address.
Case No: 244117 Determination Page 7 of 11
We will pay up to the :
home sum insured, if your home is insured;
contents sum insured, if your contents are insured for damage caused by
flood or storm surge.
We will pay for loss or damage in the same way and in the same amounts as we do
under insured events cover.‟
...
‘Renewal – Certificate of Insurance
...
Period of insurance
from 27 Dec 2010 to midnight 27 Dec 2011
...
Contents Insurance
What optional covers are included and not included
...
Flood and storm surge not included
Please refer to your Product Disclosure Statement (PDS) and any Supplementary
product Disclosure Statement (SPDS) for full details of the optional covers available.
If you would like to vary your cover please call us on [telephone number]‟
Issues
42. Whether the Applicant‟s property was inundated by flash flood and stormwater
run-off on 11 January 2011 so as to fall within the scope of cover.
Reasons for Decision
43. The onus of proof is on the Applicant to establish, on the balance of
probabilities, that he has suffered a loss caused by a risk insured against. Once
the Applicant has established that the loss was prima facie caused by a risk
insured against, the onus shifts to the FSP to show, on the balance of
probabilities, that the loss falls within an exclusion in the contract of insurance.
44. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Servi ce‟s Terms of Reference.
45. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
46. There has been an exchange of material which the parties rely on. Each party
has had access to the material on which the other party bases its case. The
Case No: 244117 Determination Page 8 of 11
Panel has had regard to the material exchanged and the detailed submissions
made on behalf of the parties.
Provision of PDS to the Applicant
47. The Applicant has stated the FSP did not provide him with a copy of the PDS
until after the flood event. The FSP disputes this allegation.
48. In support of its contention that it did post a copy of the PDS to the Applicant,
the FSP has submitted records confirming that a Renewal Notice and a copy of
the PDS was posted to the Applicant for the 2008/2009 renewal period.
49. To assist FSPs meet their obligations demonstrating despatch of relevant
documents, including PDSs, to their insured clients, FOS has distributed
Circular 3, outlining the preferred methodology which will permit a Panel to
determine, on the balance of probabilities that the relevant despatch took place.
In this instance the FSP has satisfactorily complied with the requirements of
Circular 3.
50. In reaching this conclusion, the Panel has reviewed the records submitted and
is satisfied the FSP did post a copy of the PDS to the Applicant at his recorded
mailing address on or about 27 November 2008. Further, the FSP also
provided evidence that a Renewal Notice was posted to the Applicant for the
renewal periods 2009/2010 and 2010/2011.
51. The Panel has looked at the PDS. Whilst the wording of the PDS is quite broad,
it is apparent from a reading of the documentation that it is indexed, has
appropriate references to the various definitions relied upon with respect to
storm, flash flooding and flood, and that it clearly identifies that it is not intended
to cover flood, unless specifically included on the Certificate of Insurance.
52. The Panel is satisfied in the circumstances of this dispute the Applicant has
been clearly informed in accordance with section 35 of the Act.
Cause of Applicant ’s Loss
53. The Applicant has stated that on Tuesday, 11 January 2011, he left his home at
about 10.30pm due to rising water that was about to inundate his home. He
returned on Wednesday, 12 January with the water still flooding his home. He
subsequently returned on Saturday, 15 January 2011 when the water had
receded.
54. The Applicant contends that his property is situated on sloping land which runs
down towards the Brisbane River approximately 300 metres away. In the days
leading up to 11 January 2011 there had been extremely heavy rainfall over the
Brisbane area and the catchment area of the Wivenhoe Dam.
55. In determining this issue, the Panel has been considerably assisted by the
hydrology information exchanged and the Interim Report of the Queensland
Flood Commission of Inquiry, in particular evidence attributable to Mr Ayre, a
water engineer at the Wivenhoe Dam.
Case No: 244117 Determination Page 9 of 11
56. The Panel notes at 2.7.7 of the Interim Report, the Commission found the
inflows into the dam continued to decrease until approximately 2.00am on 11
January 2011. In the early hours of 11 January 2011 however, intense rainfall
again began to fall over the dam ca tchments. The intensity of the rainfall was
not captured by the rain gauges, but the duty water engineers at Wivenhoe
Dam realised heavy rain must have been falling because of the increase in
Wivenhoe‟s lake level. The hydrologic model was not matching wel l with the
lake level rises. A reverse process was carried out which estimated the rainfall
which must have occurred to cause the observed rise in the lake level. The
estimate was over 700mm, an enormous amount.
57. As a result of that rain the inflow estimates increased sharply up to 8,060 cubic
metres by 8.00am. At 7.00am two other engineers received advice from BoM to
confirm that heavy rain being experienced over the dam‟s catchment areas
would continue. The rate of rise in the lake level and inflows and the
confirmation of continuing heavy rain finally ended the hope that the dam‟s
water level could be contained by Strategy W3 and so Strategy W4 was
invoked.
58. The Interim Report confirms that the flood gates were open to 6 metres by
12.00pm then all five gates opened to 7 metres by 1.00pm, 7.5 metres by
2.00pm and 8.5 metres by 3.00pm. This increase continued with the gates
being opened by 12 metres from 7.00pm to 9.00pm.
59. An argument can be made that the heavy rain that began and fell over a
number of hours on the morning of 11 January 2011 can be differentiated from
the rain that fell in the preceding days, particularly given, up to that point, dam
inflow had decreased significantly and outflow was stable; Mr Ayre‟s evidence
supports this conclusion. The Panel notes the FSP‟s hydrologist whilst
accepting the heavy rain on the morning of 11 January 2011 was a factor,
believes the cumulative effect of the rainfall from 9 January 2011 (and earlier)
was the cause of the change in strategy from W3 to W4.
60. The Panel notes the rainfall between 4.00am and 8.00am on 11 January 2011
was the onset of the second and highest peak of inflow to the Wivenhoe Dam,
as further attested by Mr Ayre. This is agreed to by the FSP although the FSP
argues the first peak contributed significantly to the increase in the dam level.
61. Having considered all of the information in particular the hydrologist statements
and the Interim Report and Mr Ayre‟s evidence as duty water engineer at
Wivenhoe Dam, the Panel accepts that heavy rainfall in the early hours of 11
January 2011 was directly related to the decision to increase the outflows from
the Wivenhoe Dam to Strategy W4 and that this led directly to the rapid
increase in the level of the Brisbane River.
62. Consistent with the ICA Hydrology findings, the releases from the Wivenhoe
Dam caused a flood wave in the Brisbane River and the dam release flood was
the immediate cause of flooding along the reaches of the Brisbane River,
downstream of the dam.
Case No: 244117 Determination Page 10 of 11
63. The Panel must now consider this in the context of whether this heavy rain was
the proximate cause of the loss. The FSP submits: “The evidence indicates that
the proximate cause (or at the very least a proximate cause) of the loss was
rain which fell in the Wivenhoe Dam catchment from 9 January 2011 (and
earlier) which had the effect of raising the level of the Brisbane River. That rain
fell more than 24 hours prior to the inundation of the Applicant ‟s property.
Therefore, the inundation does not meet the definition of „Flash flood and
storm water run- off‟.” The FSP also argues, in considering proximate cause, it is
not necessarily the cause which was the most recent in time but instead the
cause which a reasonable person would conclude was the cause of the loss.
The FSP argues a reasonable person would rela te the loss to the whole rainfall
from 9 January 2011 or earlier, that is, that the cumulative effect of the rainfall
from 9 January 2011 or earlier was the proximate cause of the flooding. As this
is outside the relevant 24 hour period, the policy would not respond.
64. The Panel accepts that in determining the proximate cause, it is necessary to
determine as a matter of fact the cause that was the dominant or effective
cause of the loss and not necessarily the “last in time”.
65. The Panel accepts that the cumulative effects of the rainfall from the 9 January
2011 (and earlier) directly impacted on the level of the dams. The dams had
reached near capacity and releases held at the W3 level. The evidence from Mr
Ayre is that prior to 2.00am on 11 January 2011, the inflow into the dam was
reducing. The inflows increased dramatically with the heavy rain that fell after
4.00am on 11 January 2011. The heavy rain and increased inflow necessitated
the change in strategy.
66. There is no doubt the significant weather events in Queensland in the periods
up to 11 January 2011 impacted on the levels of water within the dams and saw
the ground at saturation levels, leading to exaggerated storm or rainwater run-
off. This cannot be denied. Nevertheless, based on the information that has
been exchanged, it is highly unlikely that the releases from the Wivenhoe Dam
would have been increased or the W4 Strategy invoked at 8.00am on 11
January 2011 but for the extreme rainfall that fell from 4.00am on 11 January
2011. That rainfall can be directly linked to the decision to increase the water
flow from the dam.
67. The Panel needs to consider this is the context of the FSP‟s policy wording.
The policy wording provides cover in the event of a flash flood, being a sudden
flood caused by heavy rain that fell no more than 24 hours prior to the flash
flood or stormwater run-off.
68. There is no denying the flooding of the Applicant ‟s property and consequent
contents‟ damage occurred within 24 hours of the heavy rain that fell over the
Wivenhoe Dam. The Applicant claims water was about to inundate his property
at 10.30pm on 11 January 2011. The hydrologist suggests the property would
have been inundated between 1.00am and 2.00am on 12 January 2011. In
either case, this is within 24 hours of the heavy rain that fell over the Wivenhoe
Dam. In the Panel‟s view as a result of this heavy rain, the dam release
strategy increased from W3 to W4 and that this was the proximate cause of the
flooding to the Applicant ‟s property and ensuing contents‟ damage. That is the
Case No: 244117 Determination Page 11 of 11
heavy rain on 11 January 2011 was the dominant or effective cause of the
increased release and this directly led to the flooding downstream of the dam.
69. In the circumstances the Panel accepts the Applicant is entitled to cover in
accordance with the terms of the policy for flash flood.
Determination
70. Accordingly, the Panel determines the FSP settle the Applicant ‟s claim in
accordance with the terms of the policy as relates to contents cover pursuant to
the provisions for flash flood. The Applicant has provided an itemised list of
contents destroyed by the flash flooding; he claims a total of (approximately)
$20,000. The FSP has not disputed the list. In light of the passage of time since
the losses, it would not be „fair in all the circumstances‟ to require of the
Applicant that he provide any further proof of his claimed losses or the costs
associated with replacement. As the figure of $20,000 is within the minimum
monetary limits available under the flash flood policy provision, the FSP is
directed to cash settle the Applicant accordingly.
71. Interest is also payable, on that sum, in accordance with section 57 of the
Insurance Contracts Act 1984 from 31 March 2011 being the date of final claim