Home flood damage claim declined as flood; first inundation from stormwater drains

FirmFinancial Firm (Unknown - Insurer)
Decided2011-11-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$366,700
SourceAFCA PDF

Summary

The insured's home and contents claim for January 2011 flood and storm damage was declined as floodwater. AFCA found that water first entered from stormwater drains, which is covered, and ordered the insurer to pay 50 per cent of the loss, cash settled after a scope of works, with accommodation costs and interest at the statutory rate.

Stormwater escaping from drains before floodwater arrived is covered, but the policy's flood exclusion applies to the share of loss caused by floodwater, so AFCA apportioned the loss.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 244059 Determination Page 1 of 10 Case number: 244059 General Insurance - Domestic Insurance - Home Building - FSP Decision – Damage Caused by Flood or Storms 24 October 2011 Background 1. The Applicant held a home and contents policy with the Financial Services Provider (FSP) from 1 April 1996 on his property in Queensland. 2. On or about 12 January 2011, the Applicant’s property was damaged in the flood event that affected much of the Brisbane and Ipswich area. 3. A claim was lodged with the FSP. It retained the services of an assessor to inspect the property and provide a report, whilst it investigated the cause of the damage. The FSP ultimately declined the claim on the basis that the loss was caused by a flood, which is not covered by the policy. 4. The Applicant rejects this outcome and seeks indemnity for the damage sustained to his home, which he estimates at $366,700. Summary of Applicant’s Position 5. The Applicant says that his home was damaged as a result of the extreme storm activity that affected the local area and stormwater runoff into the property. 6. He contacted the FSP on the 13 January 2011 and was informed that he would be covered for his loss. This was subsequently rescinded. As a result he has been significantly prejudiced by the FSP’s withdrawal of indemnit y. 7. The FSP has not provided sufficient evidence for its reliance on the cause of the loss being floodwater and its policy insufficiently describes the distinction between this and stormwater runoff. 8. The FSP has failed to provide him with a PDS for several years. Summary of FSP’s Position 9. The FSP says that the cause of the Applicant’s loss was flooding from the local creek and other floodwater. Determination Case No: 244059 Determination Page 2 of 10 10. It relies upon specific evidence from its assessor and a hydrologist who both performed site inspections and the general material provided by the experts retained to investigate the cause of the disaster. 11. The FSP relies on the following policy provisions: Pages 8-13 of the Home Building Product Disclosure Statement (Home PDS) and pages 16-21 of the Home Contents Product Disclosure Statement (Contents PDS) “ What we cover – insured events This section describes under the heading: Yes – the insured events you are covered for, No – the conditions and exclusions that specifically apply to particular insured events. ... Yes Storm and rainwater including stormwater runoff from areas surrounding the site or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. ... No Damage or loss caused by flood . Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface.” Page 14 of the Home PDS and page 22 of the Contents PDS “ What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: ... flood...” Issues 12. Whether the cause of damage to the Applicant’s home can be attributed to an insured event. Case No: 244059 Determination Page 3 of 10 13. Whether the Applicant was prejudiced by the alleged promise of cover provided to him on or about 13 January 2011. 14. Whether the FSP clearly informed him of its flood exclusion by provision of a recent and current PDS. 15. Whether the FSP’s policy wording is adequate to def ine flood and how it is excluded from cover. 16. Whether the FSP is obliged to cover the Applicant for the damage. Reasons for Decision 17. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the amount of the claim and the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 18. This decision has been made by a Pa nel consisting of an Ombudsman, a representative with significant experience in insurance matters and a representative with extensive experience in consumer claims. 19. The Applicant seeks indemnity for up to $366,700, inclusive of:  Building repairs estimated at $200,000.  Contents cover to the extent of the policy, being $56,700.  Lost accommodation costs of $12,000.  Project management and repair costs of $50,000.  Compensation for hardship, duress and stress, totalling $50,000. 20. The FOS Terms of Reference provided that the Service can consider disputes up to the value of $500,000 although the maximum remedy that can be awarded under the Terms of Reference General Insurance claim is $280,000. Plus compensation for non financial loss of $3,000. 21. Noting that the building repairs and project management costs have not yet been quoted, the Panel is satisfied that the general grounds of the dispute can be considered with respect to whether indemnity should be provided or not. Receipt of the PDS Documents 22. The Applicant’s so licitor contends that the Applicant did not receive a copy of the FSP’s PDS until after the inception of the policy and this is contrary to section 35 of the Insurance Contracts Act 1984 (the Act) and limits the FSP’s Case No: 244059 Determination Page 4 of 10 entitlement to rely upon the specified provisions for the flood exclusion within the contract. 23. Section 35 provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such a provision. 24. T he Applicant’s solicitor contends that the FSP is unable to rely upon the flood exclusion unless it is able to establish that it provided the Applicant with a copy of the PDS prior to the inception of the policy. 25. The FSP agrees that the policy was incepted in 1996, with new PDS documents provided where appropriate. The policy has a “cooling off” period of 14 days. The Applicant does not suggest that the PDS documents were not received, but argues he was not provided a PDS for several years and it is unreasonable to expect him to recall the details of the PDS since that time. 26. The FSP has provided a statutory declaration from BB to attest to the sending of the most recent copy of the PDS and the renewal documents for the relevant period on 18 February 2007. The policy was due for renewal on 1 April of that year and the Applicant provided a copy of the FSP’s customer charter, the PDS and a return envelope. These documents were forwarded to and received by its mailing house on 22 February 2007. No returns were recorded for this date. 27. A second statutory declaration from BB attested that a new Contents PDS was sent to its mailing house on 24 February 2008 and forwarded to the Applicant on 28 February 2008. The Contents PDS is dated 30 April 2007. 28. The Panel accepts that the Statutory Declarations establish that the Applicant was provided with a copy of the respective PDS documents in early 2007 and 2008. In the absence of anything to the contrary the Panel accepts on balance that the FSP has established that the documents were provided to the Applicant. Flood Definition for the “Reasonable Person” 29. The Applicant argues that the FSP’s policy provi des cover for water escaping from a drain and relies upon eyewitness evidence that the water that first entered his home came from the local drainage system. 30. The relevant clause for “storm and rainwater damage” clearly informs the Applicants that they are covered in the event of an escape of water from “any water main, drain, pipe, street gutter, guttering or surface.” 31. Whilst the policy is subject to the relevant terms and conditions and excludes flood cover, it clearly defines what is not a flood, specifyi ng that: Case No: 244059 Determination Page 5 of 10 “ Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. ” 32. The FSP has submitted : “For the avoidance of doubt, [FSP] confirms that its policy wording responds to claims of this nature, even if the water escaping the drain is sourced from a nearby flooding watercourse, itself separated from the policyholder’s property by higher ground. 33. Accordingly in accepting the FSP’s submission, the issue in dispute in this claim is whether the inundation of the Applicant’s property was first cau sed by water escaping the drain, pipes, guttering or service at the front of the Applicant’s property or wh ether the inundation was caused by water escaping from the nearby Oxley creek. Cause of the Loss 34. Some damage was caused to the roof which the FSP agreed to cover as it was obviously attributable to the storms. The Applicant agrees that this portion of the claim has been resolved. The majority of damage was due to water inundation and this was examined by the FSP’s experts and deemed to be floodwater. 35. The Applicant contends that the water inundation first came from “backflow water” issuing out from the front (western side) of his property through the overflow of stormwater drains. He states in his statutory declaration: “On 12 January 2011, water back flowed out of the storm water drain at the front of [the Applicant’s address]. Initially the water filled the gutter area of [the street] and then flowed into the driveway of [the Applicant’s home] and down the right hand side of the house towards the rear of the house where the main body of the flood was encroaching from. The backflow water then entered the garage of the house and began to flow around the left hand side of the house. At this point in time, the flood water encroaching from the rear of the property had reached the patio. The water entered the garage at the front of the house from [the street] before it entered from the rear of the house. The street water flowed around both sides of the house prior to the flood water reaching there. The backflow water began to inundate the air-conditioning units and the hot water system before floodwater arrived from the rear of the property.” 36. LH provided a statutory declaration, in which she stated: “I was at [the Applicant’s home] or standing in [the street] at the front of the house for most of Wednesday 12 January 2011 watching the water rise. During the afternoon of 12 January 2011, water began back flowing out of the storm water drain at the front of [the Applicant’s home]. Initially the water filled the gutter area of [the street] and then flowed into the driveway of [the Applicant’s home] and initially down the right hand side of the house towards the back of the house. Case No: 244059 Determination Page 6 of 10 The backflow water then entered the garage of the house and began to flow around the left hand side of the house. At this point in time, the flood water encroaching from the rear of the property had reached the edge of the patio. The water entered the garage at the front of the house from [the street] before it entered from the rear of the house. The street water flowed around both sides of the house prior to the flood water reaching there. The backflow water began to inundate the air-conditioning units and the hot water system before flood water arrived from the rear of the property.” 37. Further statutory declarations were provided from JRP and SC to confirm that water was back- flowing out of the drains in the vicinity of the Applicant’s home on the 12 January 2011. 38. The FSP has relied upon a report from an assessor (CL). The Panel has considered this report and notes that CL believed the water inundation was flood water from the Oxley creek, which is approximately 300 metres from the Applicant’s house. According to CL, water inundation started through the Applicant’s backyard on the morning of January 2011. According to CL “from known information and information provided by the insured, it appears that the Oxley creek flooded the house and peaked at 4.00am on Thursday, 13 January 2011. At its peak the water inside the house was 1.3 metres de ep.” The Panel notes that CL has not commented on the impact of water from the drains inundating the property. 39. The FSP has also relied upon the Insurance Council of Australia (ICA) hydrology reports. The Panel does not propose repeating the information fro m those reports in the body of this Determination. The Panel notes however that the report suggests that rainfall had ceased in the local area well before the flooding of the property, but that “backwater flooding” occurred through the Brisbane River and tributary creeks. This flooding was caused by the overflow of water from the Wivenhoe Dam. When considered in conjunction with the report from W, it implies that the water in the stormwater drains was overflow from the flooding. 40. A site specific hydrology report has now been provided by the FSP. That report is dated 23 August 2011, although the Panel notes that it based on a review of rainfall, water level and topographical data but has not been based on either a site inspection or discussion with the Applica nt. The report appears to have relied upon the rainfall data and drainage network to form a view that the inundation of the house above floor level would have been due to flood waters and commenced at about 1100 hours on Wednesday 12 January 2011. The report also notes that peak storm water runoff would have occurred within an hour of the peak rainfall intensity record at 1100 hours on 11 January 2011. Again the report does not appear to have addressed the issues raised by the Applicant that water was observed escaping the storm water drains at the front of the property prior to the inundation from the Oxley creek. 41. It is the A pplicant’s position that the water inundation was caused through “backflow water from the stormwater drain” entering the property from the western side (noting that the nearby Oxley Creek was located to the east). Case No: 244059 Determination Page 7 of 10 42. The Applicant is adamant that the property was not inundated solely from the rear (nearest the creek), but that water from the front (nearest the drains) entered from first. 43. The Applicant and others have provided statutory declarations supporting these observations. The FSP has not addressed this in the information provided by CL, the hydrologist or the evidence from the ICA (which is not site specific). The FSP has not disputed that the water came from the drains but has chosen to focus on the inundation of water from the Oxley creek. 44. Although the Panel does not question the integrity of the information provided by CL, the Panel is of the opinion that the first hand evidence provided by the Applicant and his witnesses to the effect that water first entered the property from the western side and water was observed escaping from the drains should be preferred. 45. There is no doubt that some time after this and most likely soon after, water also entered the property from the eastern side and the Oxley creek. This is also supported by the information provided by the Applicant and his witnesses. 46. Based on the evidence it is likely that part of the home was first inundated by water escaping from the drains prior to floodwaters entering the premises. 47. Having considered the information exchanged, having regard to the relevant legal principles, terms of the policy, good insurance practice and prior Determinations the Panel considers it fair in all the circumstances, that the FSP pay 50% of the Applicant’s loss for damage to his home and contents. 48. In establishing the amount of the loss, the FSP is entitled assess the damage and settle the extent of its liability in accordance with the term of its policy. Of particular note is that some contents which were disposed of may well have been recoverable, and the FSP is entitled to fairly assess the extent of the loss in this respect. 49. However the Panel encourages the parties to work together cooperatively to establish the scope of loss and cost of settlement. Accommodation 50. The Panel also determines that as even a partial inundation by water escaping from the drains would have caused the Applicant to evacuate his home, he is entitled to the cost of emergency accommodation in line with the terms of the policy. Advice provided by FSP 51. The Applicant states that he contacted the FSP on 13 and 14 January 2011 to discuss the claim. He informed it of the presence of sewerage-tainted water (black water) in his home as he lived near a sewerage treatment plant and was advised to dispose of items that were likely to cause a “health issue”. The FSP advised him to keep close records of his losses. The Applicant states that he Case No: 244059 Determination Page 8 of 10 was informed at this time he was covered and his subsequent actions after being informed of this were to his detriment. 52. The Applicant, through his solicitor, described his recollections of these conversations: “On 13 January 2011 we visited the house at about 7am. There was about 90cm of water throughout the house... I called [the FSP]... and... they told me that this was a storm event and that the damage to my property would be covered under my policy. I was offered assistance... to find emergency accommodation, however... we... evacuated [and]... were ok in the short term. I didn’t think I was covered for flood, this is why I rang to clarify my position and I was tol d it wasn’t flood and that it was storm water and that I would be covered. ... I was later told to throw out things and on that basis I also believed that I would be covered. We threw out a lot of contents that we would have been able to salvage on the advice that [the FSP] gave us. Our behaviour was predicated on the advice that we had received from [the FSP].” 53. The Applicant further specified that Customer Service Representatives (CSRs) RL and AC from the FSP had specifically misled him on 13 and 14 January 2011. He states that RL informed him on 13 January 2011 that: “[The FSP] were treating the event of 12 January 2011 as a storm event and that the property... is [to] be covered for building and contents damage”. 54. Further, on 14 January 2011, the Applicant alleges that AC informed him to: “... dispose of water soiled and damaged contents.” 55. The Applicant alleges that he suffered prejudice as a result of the advice given to him by the respective CSRs. He further contends that he was not aware that he did not have cover under the policy. He states that it was not until 17 January 2011 that he first became aware that there might be some doubt over his claim, after being informed as such by the FSP. 56. Several statutory declarations were provided by friends of the Applicant, which attested to his conversations with them about his conversations with the FSP. It is accepted that these recollections are consistent in reporting the view that the Applicant was of the opinion that he had been informed that he had cover. 57. The FSP’s file notes from the relevant period reveal that the Applicant had been in contact on the relevant dates. He spoke with RL on 13 January 2011 and the file notes were brief: “[THE APPLICANT WAS] EVACUATED ..LIVING SHORT TERM ONLY WITH FAMILY ..MAY REQUIRE EM[ERGENCY] ACCOMM[ODATION] SHORTLY ..ADVISED TO CALL 24/7 IF HELP IS NEEDED.” 58. On 14 January 2011, further contact was had with AC at the FSP, who recorded (in part): Case No: 244059 Determination Page 9 of 10 “... [THE APPLICANT] ASKED IF [THE FSP] HAS MADE A DECISION ON CLAIM COVERAGE, ADV[ISED THE APPLICANT] WE HAVE NOT BEEN GIVEN AN UPDATE YET SO NO NEW DETAILS TO PROVIDE...” 59. Although the Panel accepts the Applicant may have misunderstood the information provided to him on 13 January 2011 and 14 January 2011, the Panel is not satisfied that the Applicant has established that he has acted to his detriment as a result of that misunderstanding. It is possible that the Applicant considered following the discussions of 13 January 2011, that he may have had cover. It is clear however, from the claim notes recorded by the FSP that he was informed on 14 January 2011 that no decision had been made. 60. The Panel notes the CL report, indicated that CL informed the Applicant that it was necessary to strip some parts of the house at their own cost to avoid further possible damage. This is not unreasonable advice at that time from the assessor. The Panel further notes the Applicant concedes that volunteers stripped out more than he requested. The Panel is satisfied that the advice by CL was not unreasonable to protect against wood rot or possible long term damage and was done to mitigate the potential loss for the Applicant in the event that he was not covered. 61. Having considered all of the information presented with respect to this issue the Panel is of the opinion that there is insufficient evidence to conclude that the Applicant was either informed by the FSP that he had cover had it acted to is detriment based on this advice or that further damage has been sustained as a result of what the Applicant believed were assurances provided by the FSP. Non financial Loss 62. The Panel has further considered the compensation claim for “hardship, duress and stress”, noting that the limit provided for under the Terms of Reference is $3,000. Whilst it is conceded that the Applicant has suffered through a very distressful period as a result of a catastrophic event, it is not satisfied that the FSP should be compelled to provide compensation for this. The Panel is satisfied in this dispute that the FSP has responded to th e Applicant’s claim within a reasonable period given the nature of the catastrophic event that occurred. Determination 63. On the basis of the available information, the Panel determines that the Applicant is entitled for cover from the FSP for 50% of his losses from the event, including those incurred during the cleanout of his home. 64. The FSP should prepare a scope of works for the loss to establish a final settlement figure, which should be cash settled. 65. The Panel further determines that interest at the statutory rate of 8.25% from the 23 May 2011 until the date of settlement. Case No: 244059 Determination Page 10 of 10 66. The Panel determines that the FSP is to pay the cost of alternative accommodation to the extent that such costs have been or will be incurred in line with the terms of the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.