Text of the determination
Case No: 243868 Determination Page 1 of 10
Case number: 243868
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Insured Event - Storm - Exclusion / Condition - Landslip and
Landslide - Retaining Wall
04 July 2012
Background
1. The Applicant holds a home building insurance policy with the Financial
Services Provider (FSP).
2. On 21 March 2011, the Applicant lodged a claim with the FSP who recorded
the following claim description:
“[Applicant] advsd that the overflow from heavy rai n from neighbours house,
which is higher than his house, caused a landslide. SES and police unable to
stop landslide as too big… at the moment fence is damaged”. (sic)
3. The Applicant sought from the FSP the removal of the soil which fell on his
property, and the repair of the retaining wall and fence.
4. On 24 March 2011, the FSP‟s Builder A inspected the property and
concluded that “water over flow from a [neighbour‟s] tank and heavy rain”
“caused the landslide”.
5. On 31 March 2011, the FSP‟s Engineer D also in spected the property and
found that “(t)he landslip occurred due to general wetness of the land
following the heavy storms of the 19th to 21st March 2011… and the
additional concentrated flows from the overflow outlet, concentrating
significant waters to t he hill slope”.
6. On 7 April 2011, the FSP advised the Applicant that it will not cover the cost
of removing the soil which slipped to his property.
7. On 8 April 2011, the FSP:
denied the claim for damage to retaining wall on the ground that
“retaining walls” are specifically excluded from storm cover; and
accepted the claim for damage to the fence.
8. On 3 May 2011, upon review of the denial, the FSP informed the Applicant
that:
the policy excludes loss or damage as a result of landslip;
Determination
Case No: 243868 Determination Page 2 of 10
however, since its Claims Department had previously advised the
Applicant that it will cover the damage to the fence, the FSP, “as a
gesture of good faith”, will settle the fence on an ex gratia basis.
9. On 26 May 2011, the Applicant contacted the Financial Ombudsman Service
(FOS).
10. In the meantime, the FSP organised a preliminary geotechnical assessment
of the property by DP.
11. On 20 December 2011, the FSP:
maintained the denial of the claim for damage to the retaining wall;
“overturned” its “full denial of the claim for the restoration of earth” on
the basis that the policy states “ but we will pay the cost to restore soil
or earth to the extent that it is necessary to repair insured damage to
your home”. The “insured damage to your home” being the damaged
dividing fence and damaged metal fence which the FSP earlier
accepted, albeit in error; and
it said that “(d)ue to the extensive nature of the slip, further
investigation is required to determine the scope of work for rectification
of the slip site”.
Summary of Applicant’s position
12. With regard to the removal of the slipped soil, the Applicant says that the
FSP is wholly liable for the reinstatement of the slipped soil because it is
impossible to replace the affected fencing and retaining wall without
reworking the whole site.
13. He notes that the FSP‟s documents show that the cost involved in reinstating
the soil is between $200,000 and $300,000.
14. He believes that at this stage, a cash settlement of $100,000 for the
restoration of the soil and the repair of the fe nce is fair and reasonable. This
would allow him to rectify the problem himself and would put an end to the
whole matter. He has “borrowed a large amount of money and started
emergency remedial works on the soil to relieve the risk to [his] house and to
stay in line with the requirements of [the] policy”.
15. He also seeks compensation for his family‟s pain, suffering and
inconvenience for the past 14 months. He says that his family has “lived in
fear of further damage to [their] property for all this time and [is] unable to
use the southern end of [the] house because of the imminent danger”.
16. With regard to the retaining wall, he concedes that under the insured event
of storm and flood, the retaining wall is not covered. However, he says that
the FSP should pay his claim and then pursue his neighbour‟s insurance. He
Case No: 243868 Determination Page 3 of 10
further says that the policy is confusing and very misleading in its current
form.
Summary of FSP’s position
17. With regard to the removal of slipped soil, the FSP says that there is no
sufficient evidence that completion of the repairs of the damaged fence
requires the FSP to undertake the removal of all slipped soil. It says that
while the onus to substantiate his loss rests with the Applicant, it arranged
for DP to complete all required testing, investigation and design of the scope
of works in order to reach a settlement. However, the Applicant would not
allow further testing, etc.
18. It says that currently, there is no scope of works or quantum available for the
required rectification of the slipped site. Hence, no settlement offer could be
made to the Applicant to settle the matter at this point.
19. With regard to the retaining wall, the FSP says that the landslip was caused
by the insured event of storm and damage to retaining walls is specifically
excluded from cover under the insured event of storm.
20. The FSP relies on the following policy provisions contained on pages 38, 59-
60, and 122 of the Product Disclosure Statement (PDS):
“ What we do not cover as your home
Home does not include:
…
. loose or compacted soil, earth, gravel, pebbles, rocks or granular rubber
(eg. sand on tennis courts or a gravel driveway)
but we will pay
the cost to restore soil or earth to the extent that is necessary to repair the
insured damage to your home
…
Insured events 1 to 12
1. Storm and flood
…
We cover
Loss and damage caused by storm and flood.
We do not cover
…
i. retaining walls…
…
What is not covered under any part of your policy
We do not cover loss or damage:
Case No: 243868 Determination Page 4 of 10
…
Erosion or subsidence
Caused by or as a result of erosion, vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any other earth movement
but we will cover
subsidence damage to your home if it is caused by:
…
ii. these insured events if the damage occurs within 72 hours of the event
happening:
insured event 1 (storm and flood)
insured event 8 (explosion)
insured event 11 (earthquake and tsunami). ”
Issues
21. Whether the FSP must remove and reinstate the entire slipped soil.
22. Whether the Applicant is entitled to compensation for non-financial loss due
to the FSP‟s failure to immediately remove and reinstate the slipped soil.
23. Whether the FSP must indemnify the Applicant for the damaged retaining
wall.
Reasons for decision
24. Due to the nature of the dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determination will be issued in
this case.
Expert Evidence
Builder A’s Reports
25. Builder A inspected the insured property on 24 March 2011 and prepared a
“Builder Assessment – Report”. This report relevantly reads:
“ Cause / Circumstances (How damage occurred and causes)
Attended site on the 24/3/2011 at 16:00 to inspect a landslide beside the
house. [The Applicant] was present at the time of inspection and advised that
after a heavy storm on the 21/3/11, a section of land slid down on the left
hand side of the property also impacted the retaining wall with fence on top.
The client has advised that at the top of the landslide, the neighbour has a
Case No: 243868 Determination Page 5 of 10
concrete water tank. The over flow outlet on the tank has overflowed and is
pointed in the direction of the clients house….
Resultant Damage
The landslide has caused the retaining wall with metal fence on top to
collapse. There is a dividing wire fence that has also been damaged.
…
Reason for referral to insurer
Unsure if event is covered. It is a water overflow from a tank and heavy rain
that has caused the landslide.
Shared dividing fence is to be cash settled 50%. $1470.00 less 50% = $735
exc GST”. (sic)
26. On or about 15 September 2011, in response to a query by the FSP
regarding requirement to remove the soil in order to repair the fence, Builder
A wrote:
“As per the [FSP‟s] policy on page 8 of the . .. PDS, it states „but we will pay the
cost to restore soil or earth to the extent that it is necessary to repair insured
damage to your home.‟ If this is the case, then soil is required to be installed.
To install the soil, the entire area that has slipped, will need to be done as
compacting the soil needs to start from the bottom of the hill and be
compacted all the way into next doors property.” (sic)
Engineer D’s Report
27. Engineer D inspected the property on 31 March 2011. He issued a report
dated 1 April 2011 which states, in relevant part:
“B. OBSERVATION
…
2. The Sydney region experienced heavy rains on the 19 th , 20 th and 21 st
March 2011, and the land slip was apparently first noticed at about
5.30am on the morning of the 21 st March 2011. The land slip is
considered a major shift in land form, with the wedge of ground being
about 50 to 60 metres wide, about 30 metres deep, and a height from
zero to about plus 20 metres. The land slip is essentially on the
neighbour‟s land and has shifted downhill, or laterally some three
metres and has a vertical drop at the top of the failure zone of about
two and half metres.
…
4. Observing the photographs from immediately after the storm event
and the current slip zone, our opinion is that the land slip was caused
by total saturation of the land mass. This saturation was further
exacerbated by the water tank overflow and being directed on to the
top of the land slope and towards the insured‟s property….
5. The landslip has caused damage to the Tasman concrete block
retaining wall, sine 1.0 to 1.2 metres high as well as the metal fence
ab ove….
Case No: 243868 Determination Page 6 of 10
6. The reinstatement of the land slip will require heavy earth moving
equipment and the Tasman concrete retaining blocks may be able to
be re-used, subject to surface damage as a result of the collapse. The
metal fence needs replacing of the damaged panels.”
DP’s Preliminary Geotechnical Assessment
28. DP made a preliminary geotechnical assessment of the land area where the
insured property is located.
29. DP noted the “significant rainfall” from 18 March 2011 to 21 March 2011 and
identified four “possible causes of [land] instability”, including the elevated
groundwater levels from the preceding heavy rainfall and the discharge from
the water tank on the neighbour‟s land.
30. DP then wrote:
“ 5.3 Stabilisation Measures – Long-Term
Additional detailed inv estigation on the site and extending into [neighbour‟s
land] will probably be required to develop a methodology suitable for
permanent stabilisation and repair of the failed slope.
…
5.4 Additional Assessment Required
There is insufficient survey and geotechnical information currently available to
provide detailed design information for retaining wall and other stabilisation
works. The suggested work and approximate cost includes:
Detail of topographic site survey (estimated $5000)
Drilling of two geotechnical boreholes with in-situ sampling and testing
(estimate $10 000)
Detailed geotechnical assessment and design (estimate $7500)
Construction monitoring and advice (estimate $5000).”
Analysis
31. Based on the above expert reports, the Panel is satisfied that:
the storm or rainfall on 18 – 21 March 2011 caused or partly caused the
land slip / land slide / land instability;
the land slip / land slide / land instability then caused damage to the
retaining wall and the metal fence on top of the retaining wall; and
the land slip / land slide / land instability was first noticed by the
Applicant on 21 March 2011 and the Applicant contacted the FSP on
the same day.
Landslip and Landslide – Policy Exclusion
32. The Panel has carefully reviewed the following policy provision:
Case No: 243868 Determination Page 7 of 10
“We do not cover loss or damage:
…
Erosion or subsidence
Caused by or as a result of erosion, vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any other earth movement
but we will cover
subsidence damage to your home if it is caused by:
…
. these insured events if the damage occurs within 72 hours of the event
happening:
insured event 1 (storm and flood)
insured event 8 (explosion)
insured event 11 (earthquake and tsunami). ”
33. The Panel is of the opinion that loss or damage caused by landslip and
landslide is absolutely not covered under the policy.
34. The Panel has considered whether the exception “subsidence damage”
within 72 hours of the storm applies in this case as the landslip/landslide
occurred within 72 hours of the storm. It is of the view that the exception
“subsidence damage” refers only “subsidence” and does not include landslip
or landslide.
Damage to the Fence
35. As the landslide caused damage to the fence and landslide is excluded
under the policy, the FSP was not obliged to accept the Applicant‟s claim for
the fence.
36. However, it is noted that the FSP accepted the claim for the fence and has
correctly agreed to stand by its acceptance.
37. Therefore, the FSP must repair the fence.
Cost To Restore Soil or Earth to the Extent That is Necessary to Repair the Insured
Damage to Your Home
38. The Applicant says that the FSP is wholly liable for the reinstatement of the
slipped soil because it is impossible to replace the affected fencing and
retaining wall without reworking the whole site.
39. On the other hand, the FSP says there is not sufficient evidence that
completion of the repairs of the damaged fence requires the FSP to
undertake the removal of all slipped soil. The Panel does not agree with the
FSP.
Case No: 243868 Determination Page 8 of 10
40. As noted in paragraph 26 above, the FSP‟s own expert, Builder A, had
already stated that “To install th e soil, the entire area that has slipped, will
need to be done as compacting the soil needs to start from the bottom of the
hill and be compacted all the way into next door[’]s property.”
41. Therefore, the Panel determines that the FSP must remove and reinstall or
reinstate the entire soil area that has slipped in accordance with the policy
provision “ but we will pay the cost to restore soil or earth to the extent that is
necessary to repair the insured damage to your home”.
Cash Settlement - Quantum
42. The Applicant seeks $100,000 as cash settlement for the repair of the fence
and the restoration of the soil.
43. The Panel notes that neither party has submitted any quote for the repair of
the fence and restoration of the soil.
44. However, the FSP‟s claim messages on 7 September 2011 show that the
FSP‟s engineer estimates cost to be between $80,000 to $200,000, to wit:
“Called engineer at [D] ACTION: - asked en(gi)neer if possible to generate
SOW – he advised yes at a cost of 5 – 10K – asked for an estimate on
reinstating land – engineer advised very conservatively 80-100K more likely
150-200k – engineer advised you would need to trespass on neighbours land
to effec works – engineer advised that even if works carried out on land this
would still leave a gap behind on n eighbours property”. (sic)
45. The Panel further notes DP‟s Preliminary Geotechnical Assessment
recommending further assessment “to develop a methodology suitable for
permanent stabilisation and repair of the failed slope”.
46. The Panel appreciates that immediate action should be taken to repair the
fence and restore the soil because of a real threat of further landslide or
landslip that might result not only to additional damage to the Applicant‟s
home but also to injury to the Applicant and his family.
47. Under the circumstances, the Panel determines that it is fair and reasonable
that:
a) the FSP must organise a further assessment as suggested by DP and
noted in paragraph 30 above within 30 days from receipt of notice from
the FOS that the Applicant has accepted this Determination;
b) the FSP must organise the repair of the fence and the removal and
reinstatement of all the soil that slipped within 30 days from completion
of the further assessment;
c) the FSP must complete the repair of the fence and the removal and
reinstatement of all the soil that slipped within a reasonable time, but
not more than 6 months from the completion of the further assessment;
and
Case No: 243868 Determination Page 9 of 10
d) if the FSP fails to do either a), b) or c) or all of the three, or chooses not
to do a), b) and/or c), the FSP must accept the Applicant‟s offer to
agree to a cash settlement in the amount of $100,000 within 15 days
from non-compliance with a), b) or c).
Compensation
48. While the Panel appreciates the inconvenience and anxiety suffered by the
Applicant, it is of the opinion that no compensation is warranted in this case
because, as discussed above, the FSP was entitled to deny the Applicant‟s
claim for damaged fence due to landslide.
Retaining Wall
49. With regard to the damaged retaining wall, the Panel is of the opinion that
the PDS is clear and unambiguous that damage to a retaining wall due to a
storm is not covered under the policy.
50. The Applicant‟s reliance on the policy provision “Our right to rec over claims
we pay from those responsible” on page 154 of the PDS is misplaced.
51. Since the policy does not cover retaining wall, there is no obligation on the
part of the FSP to indemnify the Applicant and consequently, the FSP has no
obligation and/or righ t to pursue the Applicant‟s neighbour on behalf of the
Applicant for damages.
52. The Panel determines that the FSP is entitled to deny the Applicant‟s claim
for the damaged retaining wall.
Determination
53. On the basis of the available information and the above reasons, the Panel
determines that:
a) the FSP must organise a further assessment as suggested by DP and
noted in paragraph 30 above within 30 days from receipt of notice from
FOS that the Applicant has accepted this Determination;
b) the FSP must organise the repair of the fence and the removal and
reinstatement of all the soil that slipped within 30 days from completion
of the further assessment;
c) the FSP must complete the repair of the fence and the removal and
reinstatement within a reasonable time, but not more than 6 months
from the completion of the further assessment;
d) if the FSP fails to do either a), b) or c) or all of the three, or chooses not
to do a), b) and/or c), the FSP must within 15 days from non-
compliance with a), b) or c) accept the Applicant ‟s offer to agree to a
cash settlement in the amount of $100,000 in full and final settlement of
the claim.
Case No: 243868 Determination Page 10 of 10
e) the Applicant is not entitled to compensation; and
f) the FSP is entitled to deny the claim for the damaged retaining wall.