Home / Financial Firm (Unknown - Insurer) / Determination 243816

Determination 243816

Denial of contents claim for flood inundation

FirmFinancial Firm (Unknown - Insurer)
Decided2011-10-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$80,000
SourceAFCA PDF

Summary

Floodwater from the Bremer River and Bundamba Creek inundated a home in January 2011 and the contents claim was declined as flood. AFCA found the flood exclusion applied and that the PDS had been supplied, but referred the claim-handling concerns to its systemic team.

The inundation was caused by backflow and overflow of named watercourses, which the policy defines as flood and excludes.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 243816 Determination Page 1 of 12 Case number: 243816 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim - Flood 6 October 2011 Background 1. The Applicants hold a Home Contents policy with the Financial Services Provider (FSP). The policy insures contents up to $108,000 subject to a $300 excess. 2. At 9.00pm on 11 January 2011 the Applicants were evacuated by Police due to the rise in floodwaters from the Bremer River and Bundamba Creek. 3. On 12 January 2011 floodwater entered the home damaging contents. The Applicants subsequently made a claim under the policy for their loss. 4. The FSP declined the claim on the basis that the damage was caused by flood which was excluded from cover. 5. The Applicants dispute the declinature on the basis that the loss arose from stormwater run-off and/or flash flood. Summary of Applicants’ Position 6. The Applicants state that they never received the Product Disclosure Statement (PDS) as required by law. The Applicants note that their address had changed and that a mail re-direct was in place but still no PDS was received. 7. The Applicants contend the flooding was caused by stormwater/rain, but for the storm the inundation would not have occurred. 8. The water came up from the drains due to the large amount of rain that had occurred. 9. The Applicants were unaware that the insured residence, built with council approval, was known to be in an area of overflow from the Bremer River. 10. The Applicants have enclosed news articles from which the Panel notes the following:  News Mail dated 8 February 2011. The article indicated the lowering of the Wivenhoe Dam by 10% before the floods would not have saved Ipswich from extensive damage. Determination Case No: 243816 Determination Page 2 of 12  Queensland news article dated 11 March 2011. The article states “.. It may be more appropriate to assign flood causation to succeeding storm events over the catchment area of the dam, each characterised by exceptionally heavy rainfalls and massive surface runoff volumes ”. The Insurance Council of Australia (ICA) report stated that some properties which were inundated further away from the river, may have been hit initially by flash flooding caused by heavy rains.  Article from unknown newspaper and of unknown date. The article states that another insurer has made payments for the Bremer River properties under „flash flood‟.  Courier Mail article dated 2 August 2011. The article states that new hydrologist information has confirmed the real cause of the inundation to these properties was the rain that fell within 24 hours.  News.com article dated 2 August 2011. The article states the claims have been accepted by the other insurer for „flash flood‟ and „stormwater run - off‟. Further, the new hydrological advice indicates the properties were damaged by flash flooding not riverine flooding. 11. The Applicants have enclosed a copy of a hydrologist report from which the Panel notes the following:  The exact time of the inundation of the insured property on 12 January 2011 is unknown.  It rained heavily on 11 January 2011 and the peak 1 hour rainfall intensity of 16.3mm/hr occurred at 2.00pm.  The peak stormwater runoff from the surrounding catchment would have occurred within 10-30 minutes after the peak rainfall.  No significant rainfall was recorded after 5.00pm on 11 January 2011.  The recorded local rainfalls in the vicinity of the subject property were not particularly severe for short durations. The Ipswich region regularly experiences higher peak rainfall intensities.  The property is located 300m from the Bremer River and 280m from the Bundamba Creek.  Based on observed depth of inundation, the property would have been inundated above floor level at approximately 7.00am on 12 January 2011.  Initial inundation above the floor level would not have occurred until about 14 hours after rainfall in the area had ceased.  Inundation of approximately 1.2m above floor level was caused by floodwaters from the Bremer River backing up along Bundamba Creek. 12. The Applicants have complained that an employee of the FSP was unhelpful when they were distressed with having to relocate co ntents. 13. The Applicants have provided photographs of the damage to the home and contents. Case No: 243816 Determination Page 3 of 12 14. The Applicants seek no less than $80,000 to settle their claim. Summary of FSP’s Position 15. The FSP relies on the following policy terms and conditions: “ General Exclusions of this Insurance The insurance we offer to you under the policy provides cover for certain events. There will be situations where the policy provides no cover at all. Those situations are set out in the policy wording and in some cases in your policy schedule. The following is a list of some of the general exclusions of the policy: ... • flood. ... Words that have special meanings ... Flood means the covering of land that is not normally under water by: (a) water that overflows or escapes from a naturally occurring or man made inland watercourse (such as a river, creek, canal or storm water channel) or a water pool (such as a lake, pond or dam), whether it is in its original state or has been modified; or (b) water released from a dam whether it be accidentally released or intentionally released to control, mitigate, regulate, or otherwise respond to excess water; or (c) water that cannot drain or run off as a result of water that is overflowing or escaping from an inland watercourse or water pool preventing the escape of water. ... Rainwater means rain falling naturally from the sky onto buildings and/or the ground including run-off. ... Run-off means rainwater that has collected on or flowed across normally dry ground or has overflowed from swimming pools or spas. ... Storm means violent weather and high winds (including cyclones and thunderstorms) which may be accompanied by rain, hail or snow. ... Section 2B – Your Contents: What is Covered ... We will not pay for ... 14. Loss or damage caused by or arising out of flood; ... Section 2F – Exclusions Case No: 243816 Determination Page 4 of 12 These exclusions apply to all sections of the policy. We will not pay for any accidental loss, damage, injury or liability for, occurring from or arising out of: ... 21. flood.” 16. The FSP submits that it is not in dispute that the policy excludes cover for loss and damage caused by flooding. Accordingly, the question for determination is whether the flooding was caused by „flood‟ as defined by the policy. 17. The FSP relies on the ICA Hydrology Panel report dated 20 February 2011, from which the Panel notes the following:  There were four distinct rainfall periods across Ipswich City LGA during 9 January 2011 to 13 January 2011. (p1 para 2)  The first occurred from around 10:00 hours to 12:00 hours on 9 January 2011.  The second occurred from around 15:00 hours to 21:00 hours on 9 January 2011.  The third occurred from around 07:00 hours to around 11:00 hours on 10 January 2011.  The fourth occurred from 06:00 hours to 15:00 hours on 11 January 2011.  The final three rainfall events generated small floods in the Bremer River and its tributaries, the final flood being the largest.  Overland flow inundation  Is generally associated with intense rainfalls of short duration. In general, such rainfalls did not occur across the built up areas of Ipswich City LGA in January 2011, either before waterway flooding or during waterway flooding if it was still raining. (9.2 p63 para 2)  It is possible that overland flow may have caused initial inundation in some low-lying areas subsequently inundated by water flow. This initial inundation would have been caused by overland flow making its way to the receiving waterways (in some instance, because it was unable to enter the pipe drainage system due to high tailwater levels in the receiving waterways) before the water levels in these waterways rose sufficiently to inundate areas with water flow.  Bundamba Creek (8.4.4 p49)  Bundamba Creek is a tributary of the Bremer River.  Peak flooding behaviour along Bundamba Creek up to Blackstone Bridge Alert mirrors flooding behaviour in the Brisbane River in terms of both timing and peak water levels.  Up to Blackstone Creek it can be concluded that peak flood levels along Bundamba Creek were caused by backwater flooding from the Case No: 243816 Determination Page 5 of 12 Brisbane River, backwater effects swamping the small runoff event trying to pass down Bundamba Creek.  Flooding along the lower reaches of the Bremer River (8.2.2 and 8.2.3) – There were three local flood events down the Bremer River over the period 9-11 January 2011. – It was concluded that upstream of the Walloon Alert station, peak water levels in the Bremer River were caused solely by a local flood event rather than backwater effects from the Brisbane River. – After about 9.00am on 11 January 2011, water levels at One Mile Bridge Alert and Ipswich Alert begin to rise rapidly due to Brisbane River water flowing back up along the Bremer River (backwater flooding). The peak water level at these stations occurred on 12 January 2011 and was caused by backwater flooding from the Brisbane River and a Bremer River flood attempting to flow downstream. – The flooding in the lower reaches of the Bremer River was caused by a combination of upstream surface run off (local floodwaters) and backwater effects from the Brisbane River. The relative contribution of local floodwaters and backwater effects from the Brisbane River on flood levels along the lower reaches of the Bremer River is beyond the scope of this Report and has not been assessed.  Wivenhoe dam release (9.3)  Large releases were made from Wivenhoe Dam over the period from 06:00 hours, possibly as early as 03:00 hours on 11 January 2011 until around 03:00 hours on 12 January 2011.  Releases from Wivenhoe Dam caused a flood wave in the Brisbane River. Water levels in the lower reaches of the Bremer River and its tributaries draining Ipswich City LGA were affected by backwater flooding and backwater effects from the Brisbane River.  It was concluded that the dam release flood from Wivenhoe Dam was the immediate cause of flooding along the reach of the Brisbane River downstream of the dam and along tributaries through the Ipswich City LGA.  Water flow inundation (9.4)  On 11 and 12 January 2011 the lower reaches of the Bremer River and its tributaries suffered water flow inundation caused by backwater associated with releases from Wivenhoe Dam (dam release flooding). The influence of backwater effects from the Brisbane River penetrated considerable distances up the Bremer River and its tributaries and up tributaries draining directly to the Brisbane River. 18. The FSP contends that the hydrologist specifically states that the inundation of approximately 1.2m above floor level was caused by floodwaters from the Bremer River backing up along Bundamba Creek. Further, the FSP is entitled Case No: 243816 Determination Page 6 of 12 to rely on the h ydrologist‟s evidence in the absence of any expert information from the Applicants. 19. The FSP further submits that the flood definition includes the Bremer River and Bundamba Creek which are naturally occurring inland watercourses. Accordingly, any damage arising from the overflow from the Bremer River and Bundamba Creek are excluded from cover. 20. The FSP also contends that it is entitled to refuse indemnity under the terms and conditions of the policy on the basis that the claim related to damage caused by flooding (whether from the creek or drains) which is excluded from cover under the policy. 21. The FSP acknowledges the Applicants‟ contention regarding the other insurer which paid for „flash flooding‟. In response, the FSP notes that the other insurer‟s policy defines flash flooding as flooding from any source if it occurs within 24 hours of rainfall which caused the flash flood. The FSP submits that its policy contains no such definition. 22. The FSP relies on section 69 of the Insurance Contracts Act (1984) (“the Act”) and states that it fulfilled its obligation to provide the Applicants with the policy and a cooling off period of 21 days to assess whether the cover is adequate. 23. The Panel notes that section 69 provides that section 22 will be deemed to have been complied with if it is not reasonably practicable to give the information in writing before the contract is entered into but it is reasonably practical to give the information orally. If the insurer gives the information orally, the insurer is deemed to have complied with section 22 if the information is given in writing within 14 days after the contract of insurance (including an interim contract) has been entered into. Provided the oral information is confirmed in writing within 14 days, compliance with section 22 will be established. Where a loss occurs after the contract was entered into but before written confirmation of the duty of disclosure has been provided, the insurer will only be able to avail itself of the remedies set out in Section 28, if it can prove that the information was given orally. 24. The FSP has provided the following evidence to confirm the PDS was posted to the Applicants:  Copy of letter dated 8 September 2009 enclosing the new Schedule of Insurance, a copy of their responses to the „application for insurance‟ questions together with a copy of the PDS.  Copy of letter dated 4 March 2010 enclosing an amended Schedule of Insurance for the Applicants‟ residence which also requested the Applicants to review their PDS.  Copy of letter dated 11 August 2010 enclosing the Schedule of Insurance which also requested the Applicants to review their PDS.  Copy of mail audit confirmation that the document was sent to the Applicants. Case No: 243816 Determination Page 7 of 12  Copy of telephone records contacting other FSP insureds in the same mail out batch as the Applicants. The Panel notes the document was not provided to the Applicants as it contained other insureds‟ private details. The Panel confirms that the records indicate that these insureds have stated the renewal documents were received. 25. The FSP has provided a map of the property indicating that the Applicants‟ premise was between the Bremer River and Bundamba Creek. 26. The FSP has enclosed an email dated 11 March 2011 regarding a discussion with the employee to determine what was stated to the Applicants. The employee notes he does not specifically remember this call but states that under no circumstance would he ever say to an insured that “it is your problem”, particu larly given what the Applicants went through. The FSP suggests that the Applicants may have understood this to be what the employee meant when he advised them that he could no longer assist them. Issues 27. Whether the FSP complied with its obligation to provide the Applicants with a copy of its PDS thereby enabling it to rely on the policy exclusion for flood related damage. 28. Whether the FSP has appropriately declined the Applicants‟ claim relating to the inundation of the property. 29. Whether the FSP‟s employee behaved inappropriately during the claims handling process. Reasons for Decision 30. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 31. There has been an exchange of material between each party, and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 32. The Panel Chair Ombudsman attended on site with the Applicants and a representative of the FSP. The Applicants confirmed the details she had previously provided to the Service. 33. The Panel has read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised where necessary. 34. The Panel also notes s ection 35 of the Insurance Contracts Act (1984) (“the Act”). Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to Case No: 243816 Determination Page 8 of 12 the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 35. The Panel also notes section 77 of the Act. Section 77 of the Act provides that a notice or other document that is by the Act required or permitted to be given may be given to a natural person, personally or by post to that person at his last known address. 36. The Panel considers there are three separate issues (as listed above) to be dealt with in considering the matter. Can the FSP rely on the policy exclusion for flood related damage 37. The Panel confirms that the FSP can only rely on an exclusion if it has provided written notice to the Applicants (as insureds) of that exclusion. The provision of the PDS to the Applicants would constitute written notice of the exclusion. 38. The Applicants have claimed the FSP failed to send a PDS document to them and accordingly the policy should revert to the standard provisions provided in the Insurance Contracts Regulations (19 85) “the Regulations” which includes coverage for flood. 39. The Applicants have noted that they had moved residential addresses. However, even with a mail re-direct service, the document was not received. 40. The FSP has enclosed a copy of the letter dated 4 March 2010 which encloses the new policy schedule plus the PDS. The letter is addressed to the residence which was inundated and was presumably provided due to the change of address given the renewal notice was not due until August 2010. 41. The FSP has enclosed a copy of the letter dated 11 August 2010 providing the renewal schedule. The letter refers the Applicants to the PDS and the renewal policy schedule and suggests the Applicants should read same to ensure it meets their needs. The letter further invites the Applicants to contact the FSP for a further PDS if required. 42. The mail batch check appears to only relate to the letter dated 11 August 2010 and renewal document. The mail batch check does not confirm whether the PDS went with this renewal document. Similarly the due diligence check with other insureds confirms they received the policy renewal document and not the PDS. 43. The FSP has provided an exact copy of a letter dated 8 September 2009 enclosing the new Schedule of Insurance, a copy of their responses to the „application for insurance‟ questions together with a copy of the PDS. . The Applicants state that they never received any such documents. 44. The Panel also notes that the Applicants contacted the FSP in March 2010 to notify the FSP that they had changed their address, which was confirmed by Case No: 243816 Determination Page 9 of 12 way of the FSP‟s letter of 4 March 2010. The FSP also issued a renewal notice to the Applicants on 11 August 2010. 45. The Panel notes that the letter of 8 September 2009 draws the Applicants‟ attention to the Certificate of Insurance and the PDS. The letters of 4 March and 11 August 2010 also enclose new Certificates of Insurance and request the Applicants to refer to their PDS. The Panel is also mindful of the effect of section 11(10)(a) of the ICA which relev antly states: “…..at or before the original entering into, or the renewal, extension or reinstatement, of a contract of insurance, the insurer has given information to the insured as required by sections 22, 35, 44, 49 or 68, the requirement by that sectio n to give information to the insured shall be deemed to be satisfied at or before any subsequent renewal, extension or reinstatement of the contract. ” 46. In this instance, the Panel is satisfied on the balance of probabilities, of the FSP supplying a PDS with the Certificate of Insurance at policy inception in September 2009. Having so determined, section 11(10)(a) then operates to relieve the FSP of the obligation to provide a PDS at policy renewal for the relevant risk period, namely September 2010 to September 2011. 47. Accordingly, the Panel accepts the FSP is entitled to rely on the policy terms and conditions. Whether the FSP has appropriately declined the Applicants’ Claim 48. The PDS and the policy schedule form the basis of the agreement for cover, being the insurance contract. The FSP and the Applicants are precluded from importing other terms and conditions from other insurers into their contract of insurance. Accordingly, the Panel can have no regard to the „flash flooding‟ provision contained in another i nsurer‟s policy. 49. This Determination is required to be decided in accordance with the insurance contract in place between this FSP and the Applicants together with any applicable law. 50. The relevant issues to be considered by the Panel are the circumstances giving rise to the inundation of the property and whether these circumstances fall under the policy definition of flood. 51. The Panel notes the following evidence has been presented in relation to the cause of the inundation: (a) The Applicants were forced to evacuate the property at approximately 9.00pm on 11 January 2011. (b) The precise timing of the inundation of the property is unknown but is believed to have been on 12 January 2011. (c) The Applicants stated there was water coming back up through the drains. (d) The hydrology report enclosed by the Applicants stated the inundation of approximately 1.2m above floor level was caused by floodwaters from the Bremer River backing up along Bundamba Creek. Case No: 243816 Determination Page 10 of 12 (e) The Applicants‟ property is approximately 1.5 metres above the roadway. (f) The hydrology report further considers the impact of local rainfall. The peak rainfall intensity was recorded as 16.3mm at 2.00pm, with no significant rainfall recorded after 5.00pm on 11 January 2011. This rainfall intensity is not considered particularly severe. The effect of the stormwater runoff from the surrounding catchment should have occurred within 10-30 minutes after this rainfall. The inundation however did not occur until 14 hours after the rainfall in the area had ceased. (g) The ICA hydrology report enclosed by the FSP states the following: (i) Peak flood levels along Bundamba Creek were caused by backwater flooding from the Brisbane River, backwater effects swamping the small runoff event trying to pass down Bundamba Creek. (ii) The flooding in the lower reaches of the Bremer River was caused by a combination of upstream surface run off (local floodwaters) and backwater effects from the Brisbane River. The relative contribution of local floodwaters and backwater effects from these watercourses was outside of the report parameters. 52. Whilst the Panel has read the news articles provided by the Applicants , it is unable to give the same weight to this evidence as it has to the Applicants‟ direct evidence and the expert hydrology evidence. The parties expressing opinions regarding the cause of damage in the newspaper articles are not necessarily professionally qualified to provide such opinions. Further, the site specific data of rainfall and cause must be relied upon rather than a general overview. 53. The Panel accepts the hydrologist evidence which states that the Bundamba Creek and Bremer River both overflowed due to backwater flow from the Brisbane River. That is, when the Brisbane River water levels rose, the volume of water was higher than the volume of water flowing from the Bremer River and Bundamba Creek which caused the waters to backflow up these water courses. 54. The Panel further accepts the Applicants‟ evidence that the storm water drains overflowed. This evidence suggests the water was unable to escape along the normal stormwater channel due to the high water volumes experienced in the drainage courses. 55. The rainfall intensity in the Applicants‟ locale does not suggest that the rainfall by itself was sufficient to inundate the property. Further, the rainfall occurred much earlier than the flooding and the peak stormwater run-off should have occurred 10-30 minutes later rather than 14 hours. On this basis, the Panel does not accept that local stormwater run-off has caused the inundation to the property as argued by the Applicants. 56. The Panel accepts that the water volume in the relevant watercourses has increased due to the rainfall. However, the direct cause of the inundation to the Applicants‟ property was backflow and then overflow of the Bremer River and Bundamba creek. Case No: 243816 Determination Page 11 of 12 57. The Panel has reviewed the flood definition contained within the FSP‟s policy terms and conditions. The Panel notes that the flood definition includes any water which overflows or escapes from naturally occurring or man-made water course which includes a river, creek or storm water channel. It further includes water that cannot drain or run off as a result of water that is overflowing or escaping from an inland watercourse. 58. The Panel notes the definition of flood is broad enough to include the overflow from the Bremer River and Bundamba Creek as naturally occurring water courses and the overflow from stormwater drains as a storm water channel. Essentially the evidence is that all of these water courses overflowed due to the significant increase to water volumes in the water courses. 59. The Panel considers that the damage for which the Applicants have claimed was caused by flood as defined by this FSP‟s policy. Unfortunately, there is no cover provided by the FSP for flood, which is specifically excluded from cover. Claims Handling 60. The Applicants have made a complaint regarding an employee who allegedly stated “it is your problem” when asked for further assistance in what can only be described as an extremely stressful situation. The Applicants do not believe they have misinterpreted the meaning of the employee‟s statements. 61. The FSP‟s employee does not recall the specific telephone call but claims he would not have made such a statement given the Applicants‟ circumstances. The FSP has suggested the Applicants have misinterpreted a statement from the employee when he noted he could no longer assist them. 62. There are no contemporaneous records from either the Applicants or FSP regarding this conversation to assist the Service in considering this complaint. 63. The Panel holds some concerns that the FSP has not provided any claim file records to verify what appeared to be a verbal denial of the claim and discussions surrounding same. These records should be readily available and are ordinarily provided to the Service when disputes regarding a telephone conversation are raised. 64. The Panel has also reviewed the denial letters from which it notes the following:  Letter dated 11 February 2011 to the inundated address provides a formal denial in writing. It is uncertain whether the FSP was aware of any new address of the Applicants.  Letter dated 2 March 2011 to the inundated address refers to a complaint regarding the outcome of the claim. The letter notes that the Applicants are aware of the flood exclusion from previous verbal advice and letter mailed on 16 February 2011. It is uncertain if this means the letter dated 11 February 2011, and if so, why there was a delay of 5 days in sending same. Case No: 243816 Determination Page 12 of 12  Letter dated 14 March 2011 to the Applicants‟ current address noting the IDR process and exclusions of cover. The letter refers the Applicants to the Service if dissatisfied.  Letter dated 31 March 2011 to the Applicants current address noting that the Hydrologist Report had not been received and this was delaying the outcome of the IDR decision.  Letter dated 5 May 2011 to the inundated address provides the IDR department‟s formal declinature of the claim and reasons for same. 65. Whilst the Panel accepts the natural disaster events of December 2010 and January 2011 posed unprecedented demands on the Insurance industry and in particular the availability of hydrology services, the Panel considers it inappropriate to deny a claim prior to confirming the source of inundation. 66. The Panel has received a large number of flood disputes and notes that site specific information is crucial in determining the cause of inundation and hence cover. 67. The Panel consider it appropriate in the circumstances to refer this matter to the Code & Systemic Manager to determine whether further investigation is required. Determination 68. On the basis of the available information the Panel determines that the FSP was entitled to rely on its policy terms and conditions. 69. On the basis of the available information the Panel determines that the FSP was entitled to decline t he Applicants‟ claim on the basis that the inundation of the insured property was a result of flood which is specifically excluded under the policy. 70. The Panel refers this matter to the Code & Systemic Manager to determine whether further investigation is required.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.