Text of the determination
Case No: 243778 Determination Page 1 of 9
Case number: 243778
General Insurance - Domestic Insurance - Home Building - Service - Delay in
claim handling
30 January 2012
Background
1. The Applicants own a ground floor unit, which is part of a complex of six, and is
rented out to tenants.
2. The unit is covered by a residential strata insurance policy, held in the name of
the body corporate for the unit complex, with the FSP. For convenience, this
insurance policy wi ll herein be referred to as the Applicants’ policy.
3. During the severe weather event in south east Queensland in January 2011,
the Applicants’ unit was inundated with water.
4. The Applicants lodged a claim with the FSP for the damage caused by the
inundation.
5. The FSP denied the claim on the basis that the information it had gathered
indicated that the damage was caused by flood, which is excluded under the
Applicants’ policy.
6. The Applicants asked for the FSP to review the claim decision. During the
review process, they provided the FSP with further information about the
circumstances surrounding the claim. In particular, the Applicants provided
details about their opinion that stormwater, not flood, was responsible for the
inundation of their unit.
7. In light of the further information provided, the FSP sought to engage an
independent hydrologist, to inspect the Applicants’ unit and report on the cause
of the damage.
8. The Applicants refused to allow the FSP’s appointed hydrologist to inspect the
unit, as they believed that the FSP has taken far too long to make its claim
decision and review the matter after they complained.
9. Without the independent hydrologist’s report, the FSP’s review of the claim
decision stalled. The Applicants subsequently lodged their dispute with the
Financial Ombudsman Service (FOS).
Determination
Case No: 243778 Determination Page 2 of 9
Summary of Applicants’ Position
10. The Applicants say that the land upon which their unit is situated is regularly
subject to stormwater run-off.
11. The Applicants say that the FSP has denied their claim, even though its own
loss assessor’s report points to the contribution of backed -up stormwater in the
inundation of their unit.
12. They also say that the second report used by the FSP to deny their claim (an
Area Hydrology Report, commissioned by the Insurance Council of Australia),
is general in nature and not specific enough to be used to establish the cause
of inundation at the site of their unit.
13. One of the Applicants, an engineer with some experience in hydrological
modelling, has said that hydrology is not an exact science and that not all
conclusions drawn by the Area Hydrology Report are necessarily correct.
14. The FSP had ample opportunity to obtain a site-specific hydrology report to
establish the cause of the damage, but chose to deny the claim without
justification, and delayed the entire process at every stage.
15. When it finally conceded that it needed to obtain a site- specific hydrologist’s
report, the FSP proposed to do so without seeking any input from them as to
any aspect of the report (including its scope or terms of reference). As such, the
process being followed by the FSP lacks transparency and fairness.
16. Given this and the time taken by the FSP to decide on the need for a hydrology
specific site report, the Applicants say that allowing for such a report will simply
delay the process further and they will not agree to it.
17. They say that the FSP has not been fair, transparent and timely in the
management of their claim, which contravenes the General Insurance Code of
Practice (the Code) to which the FSP is a signatory.
18. The Applicants maintain that based on their experience of the behaviour of the
water in the vicinity of their unit and their analysis of the rainfall and
hydrological data available to them, it is clear that stormwater run-off was
involved in the inundation of their unit and an appropriate amount of
compensation needs to be negotiated.
Summary of FSP’s Position
19. After the claim was lodged by the Applicants, the FSP arranged for a loss
assessor to inspect their unit and to report on the extent of the damage.
20. The FSP also obtained an Area Hydrology Report, produced by the Insurance
Council of Australia (ICA), to help establish the cause of the damage to the
Applicants’ unit.
Case No: 243778 Determination Page 3 of 9
21. In addition, the FSP has examined the satellite imagery of the Applicants’ unit,
as provided by the Queensland Government.
22. Based on these reports and the satellite imagery, the FSP concluded that, on
the balance of probabilities, the cause of the damage to the Applicants’ unit
was flood and as such denied liability under the App licants’ policy for the
damage.
23. After the Applicants disputed the claim decision and provided alternative
information about the circumstances surrounding the claim event, the FSP
decided that it needed a site-specific hydrology report to confirm the cause of
damage.
24. The Applicants have provided their opinion regarding the cause of the damage
to their unit, based on their past experience of behaviour of the water and their
alternative analysis of the data available through existing reports.
25. Unfortunately, th e Applicants objected to the FSP’s engagement of an
independent hydrologist, primarily because they believe that such an
appointment should have been made earlier.
26. However, without being able to obtain additional expert information to shed light
on the cause of damage, the decision regarding liability for the damage can
only be made on the basis of the information currently available.
27. As this information demonstrates that flood was the cause of the damage, the
FSP holds that its original decision to deny liability for the damage was correct.
28. The FSP acknowledges that it did not meet the normal Code of Practice
timeframes for dispute resolution. However, it holds that the information
provided by the Applicants early in June 2011 changed its perspective on the
possible cause of the inundation and necessitated the procurement of the site-
specific report; had this information been available earlier, the delays would not
have occurred.
29. The Applicants’ allegations about lack of fairness and transparency in the cla im
process are not supported by the facts.
30. The FSP relies on the following policy provisions
“ General definitions – the meaning of some words
Flood
means when water that is normally contained in a Water Catchment System
increases because of rainfall or snow melt (whether in the immediate region or
elsewhere) or is deliberately released by an authority, and the water overflows
onto land that is not normally covered by water.
...
Water Catchment System
means:
Case No: 243778 Determination Page 4 of 9
a a river, creek, other natural watercourse or lake, whether they are in their
original state or have been modified, are named or unnamed, or normally
dry that only run during periods of rain;
b a dam, reservoir, stormwater channel or canal.
...
Policy 1 – Insured Property
What we insure
We insure you up to the Sum Insured shown for Policy 1 in the Schedule, against
ACCIDENTAL LOSS or DAMAGE to Your Property which occurs during the
Period of Insurance.
...
Exclusions – what we do not insure
1 We will not pay for loss or damage:
a caused by Flood.”
Issues
31. Whether the cause of the damage to the Applicants’ unit was flood, or
stormwater.
32. Whether FSP’s handling of the claim and subsequent dispute has prejudiced
the Applicants’ interests.
Reasons for Decision
33. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service’s Terms of Reference.
34. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
35. There has been an exchange of information between the parties and the Panel
is satisfied that each party has had an opportunity to address the issues raised.
36. The Panel Chair Ombudsman attended on site to meet with the male Applicant
and a representative of the FSP.
37. The site visit confirmed the Applicants’ statement that the land slopes from front
to back and the balco ny at the rear of the Applicants’ unit is approximately 1.5
metres above the natural surface level of the property. The land continues to
fall to the rear of the property by a further approximate 0.3 metres.
38. That the Applicants’ unit was damaged by water i nundation is not in dispute.
Case No: 243778 Determination Page 5 of 9
39. The main dispute is in relation to the contribution of stormwater, if any, to the
inundation of the Applicants’ unit and whether any such contribution means that
the FSP is required to indemnify the Applicants for their loss.
40. The FSP says that based on the information it has available, flood from the
Brisbane River was the cause of the inundation and resulting damage to the
Applicants’ unit.
41. Initially, the Applicants did not dispute that floodwaters arrived at their property
and were involved in the inundation of their unit, but say that these floodwaters
mixed with stormwater and this combined body of water caused the damage.
42. The FSP decided, on the basis of additional information received from the
Applicants about the possibility of stormwater involvement in the inundation of
their unit, to arrange for a hydrologist to inspect and report on this matter.
Site-Specific Hydrologist Report
43. The Panel understands the frustration the Applicants must have experienced as
a result of bot h the damage caused to their unit and the FSP’s denial of their
claim.
44. However, the Panel finds it unfortunate that the Applicants refused, and
continued to refuse, access to their unit so that the FSP’s appointed hydrologist
can inspect and report on the cause of the inundation.
45. The Panel believes that such a report, particularly if it provided information
about the contribution of any stormwater to the inundation, would have been
helpful to the equitable resolution of this issue.
46. It is also noted that the FOS Case Manager contacted the Applicants in
November 2011 (prior to the matter proceeding to the Panel) and gave the
Applicants another opportunity to reconsider their position about a hydrologist’s
inspection; however, the Applicants chose to maintain their stance.
47. That said, the Panel respects the Applicants’ right to refuse permission for an
inspection of their unit for this purpose.
48. This Determination has necessarily been written without the benefit of any such
hydrology report.
Stormwater
49. Even though neither the Applicants nor their tenants were present at the time
the unit was inundated, the Panel is prepared to accept the opinion of the
Applicants that stormwater came onto the rear of the property sometime on 11
January 2011 and continued until sometime on 12 January 2011.
50. The Panel notes that the Applicants’ opinion has been informed by their
knowledge of the slope of the land upon which their unit is situated, their
previous experience of stormwater run-off during significant rain events when
Case No: 243778 Determination Page 6 of 9
the unit was owner-occupied and their analysis of the rainfall and other data
that is available about the event.
51. Further, the Panel notes that one of the Applicants has stated that he is an
engineer, with some experience in hydrological modelling and assessment.
52. Initially, the Applicants have said that the water that entered their unit contained
some of this stormwater, mixed with the floodwater.
53. The FSP has argued that the involvement of stormwater in the inundation is
extremely unlikely, as rainfall recorded at official rain gauges located nearest to
the Applicants’ unit prove that rainfall was not sufficiently intense to generate
the stormwater run-off.
54. The Panel has reviewed the information regarding rainfall occurring in the
vicinity of the Applicants’ unit and finds the Applicants’ argument that
stormwater inundation of their unit’s land commenced on 11 January 2011 is
not strongly supported by the rainfall data available.
55. Further, the rainfall data provides even less support for the Applicants’
assertion that this stormwater inundation continued until the following day, 12
January 2011 (on which date they say the water inundated the habitable
ground level of their unit).
56. Assuming the dates of inundation provided by the Applicants are correct, the
Panel considers it highly likely that some factor, other than stormwater run-off,
was involved.
57. On the other hand, the observations of the Panel Chair Ombudsman in relation
to the block itself confirm for the Panel that stormwater run-off is likely to have
passed through the rear yard at some point following the earlier recorded
rainfall.
58. However, on the basis of the rainfall data, the Panel is of the view that this
stormwater run-off through the rear yard is likely to have occurred at a date
earlier than th e unit’s inundation.
Loss Assessor Report
59. The Applicants’ have said that the loss assessors’ report clearly states:
“It would appear that a combination of backup of the stormwater drains and rising
floodwater from the Brisbane River have resulted in the inundation of the
floodwater throughout the ground floor units and garages...”
60. The Applicants then further allege the FSP seems to have totally disregarded
this statement by its own loss assessor in deciding to deny their claim.
61. The FSP has explained that th e loss assessor’s role was to provide, on a
without prejudice basis, a preliminary assessment as to the extent of damage to
the Applicants’ property, noting also that the loss assessor was not a
Case No: 243778 Determination Page 7 of 9
hydrologist and not in a position to determine the cause of damage in these
circumstances.
62. The Panel has reviewed the loss assessor’s report and also notes that it states:
“Owner of the ground floor unit [name] advised that the overland flow from the
neighbour’s property and stormwater drains in the vicinity of the property
overflowed causing water inundation.’
63. The Panel believes that as the Applicants advised the loss assessor of his
opinion of the cause of inundation, the statement (appearing at paragraph 59)
is appropriate, although it must be seen in the context of the overall report.
64. It is also noted that the report includes the following words immediately after the
quoted statement appearing in paragraph 59:
“...however in our opinion the primary cause remains overflowing of the Brisbane
River.”
65. The Panel is s atisfied that the Applicants’ concern that the FSP has
(inappropriately) disregarded the report’s reference to stormwater involvement
is not supported by the written evidence.
Stormwater Unable to Escape
66. The FSP has pointed out that the Applicants have clearly stated the following:
“I also wanted to be clear that at no point have I ever asserted that it was only
stormwater run-off that ended up on our block, but it is my assertion that this
water contributed to the extent of the flooding by not being able to fully escape in
its normal manner causing the stormwater backup that damaged the property”.
67. According to the FSP, if the Applicants’ arguments are to be accepted, then
because of the application of the relevant legal authorities, the proximate cause
o f inundation of the Applicants’ unit is flood, which is excluded from cover under
the Applicants’ policy.
68. The Panel has considered the arguments on both sides of the policy wording
and in particular the definition of ‘flood’.
69. When the Panel Chair Ombudsman met with the male Applicant onsite, the
male Applicant advised that the stormwater was unable to escape in its normal
manner as water was coming up from the Brisbane River, preventing the
stormwater from continuing to flow or drain in the direction of the Brisbane
River.
70. The Panel is satisfied that this is the likely reason for the build up of water at
the Applicants’ location and inundation of their unit.
71. The Panel recognises established case law which provides that:
if there are two causes of a loss where one is subject to cover and the
other is not, an insurer is not liable for the loss (refer to Wayne Tank and
Case No: 243778 Determination Page 8 of 9
Pump Co Ltd v Employers Liability Assurance Corp Ltd [1974] QB 57);
and
a watercourse is said to overflow its normal banks when all the water that
would otherwise drain into it cannot be contained in it because it is full,
and all the surplus water is then overflow (refer to K Sika Plastics limited v
Cornhill Insurance Co Limited [1982] 2 NZLR 50, 53 )
72. Accordingly, the Panel considers that the proximate cause of the damage to the
Applicants’ unit was flood as defined under their policy.
73. The Panel notes that in correspondence of 5 September 2011, the Applicants
maintain that the application of the Wayne Tank principle is irrelevant as the
stormwater was on the property prior to the floodwater. This appears to the
Panel to be an alteration of the Applicants’ earlier position that it was “mixed
waters that caused the damage to the unit.”
74. Nonetheless, the Panel has already indicated that it is satisfied some other
factor, other than stormwater run-off, was involved.
75. The Panel is satisfied that floodwater from the Brisbane River was involved and
that stormwater alone was not the cause of the inundation.
76. As such, the Panel finds that the FSP is not required to indemnify the
Applicants for their loss.
FSP’s Handling of Claim and Dispute
77. The Applicants’ have said that the FSP’s dealings with them during the
handling of the claim and the subsequent dispute have not been fair,
transparent or timely and it therefore has not met the requirements of the Code,
to which it is a signatory.
78. The FSP has admitted that the timeframes for responding to the Applicants’
complaint were outside those normally required by the Code.
79. However, the FSP has noted that due to the Brisbane flood event in January
2011, a large number of claims were generated and this inevitably led to delays
in claims processing and subsequent reviews.
80. Further, the FSP has highlighted the section of the Code that recognises that
during catastrophes, FSPs may not be able to meet the timeframes mandated
by the Code in ordinary circumstances.
81. The Panel has considered the issues raised by the Applicants, as well as the
response from the FSP and is of the view that under the circumstances, the
FSP has not unduly delayed the claim.
82. Further, the Panel is satisfied that the FSP’s conduct with respect to the claim
and the dispute has been fair and has not lacked transparency.
Case No: 243778 Determination Page 9 of 9
83. On balance, the Panel is not persuaded that the Applicants’ interests have
been prejudiced by the conduct of the FSP.
Determination
84. On the basis of the available information the Panel determines that the FSP is
entitled to deny liability for the damage to the Applicants’ unit
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.