Home / Financial Firm (Unknown - Insurer) / Determination 243738

Determination 243738

Flood exclusion relied on to decline commercial property claim

FirmFinancial Firm (Unknown - Insurer)
Decided2011-10-28
ProductGeneral Insurance · Business / commercial
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$150,000
SourceAFCA PDF

Summary

The applicant sought the $150,000 sum insured for flood damage to his business premises in January 2011, arguing the water was flash flood from Toowoomba. AFCA found the water was overflow from the Bremer River, which the policy defines as flood, and the FSP declined the claim.

Water escaping a natural watercourse that inundates normally dry land is flood under the policy definition, even if flash flood contributed to the river overflow.

Issues

Subjects and remedies

natural disastersmall businessno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 243738 Determination Page 1 of 7 Case number: 243738 General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of claim 28 October 2011 Background 1. The Applicant holds a Commercial/Retail/Industrial policy of insurance with the Financial Services Provider (FSP) covering business property. 2. In the afternoon or the night of 11 January 2011 the locale of the Applicant‟s property was inundated by water causing damage to the building and to contents. It should also be noted that alternative dates of 12-14 January 2011 have been provided. 3. After obtaining an assessment and hydrological reports, the FSP declined the claim on the basis the loss was caused by flood which is an excluded event under the policy. 4. The Applicant disputes the FSP‟s declinature on the basis that the inundation was caused by flash flood. Summary of Applicant’s Position 5. The area of Ipswich was flooded on 14 January 2011. 6. The Applicant submits the previous storms in Toowoomba on 10 January 2011 caused flash flooding which then continued to Ipswich. Accordingly, if the Toowoomba flash flood had not caused water to rise in the Bremer River, then the Bremer River would not have broken its banks and flooded the commercial property. 7. The Applicant contends that one hydrologist report differs from another depending on the insurance company which commissioned the report. 8. The reports should all contain the same facts regarding the ca use of water ingress to his property and others in the same vicinity. 9. The Applicant submits that if one insurance company can offer compensation to flood victims in the same area as that which affected his property, then all should do the same. The Applicant has referred to payouts made by another FSP to a selected number of its insureds affected by the same water inundation in the same area as his property. Determination Case No: 243738 Determination Page 2 of 7 10. The Applicant seeks a payout of the sum insured of $150,000 as set out in the property section of the Policy Schedule as the business suffered a total loss. Summary of FSP’s Position 11. The FSP relies on the following policy terms and conditions: “General definitions applying to all sections of this Policy: ... Flood The inundation of normally dry land by water escaping from or released from the normal confines of any natural water course or lake (whether or not altered or modified) or any dam, reservoir or canal. ... 2. Cover We will indemnify you up to the limit specified in the Policy Schedule in respect of physical loss of or damage to: (a) Buildings (b) Contents (c) Other interests as defined in the Policy Schedule, directly caused by an insured event. ... 3.3 Wind and water Wind and water including water and any other liquid discharged from mains, pipes, gutters, drains, tanks or fixed apparatus used to hold or carry liquids, but not loss or damage: (a) By sea, tidal wave, high water, flood, erosion, subsidence, landslide, mudslide or settling. ... 3.11 Accidental damage (a) Loss of or damage to buildings or contents caused by any accident except loss or damage caused by: (i) Insured events 3.1 to 3.10 or by any event or circumstance excluded therein.” 12. The FSP has enclosed a copy of the Policy Schedule which provides property contents cover up to $150,000. 13. The FSP relies on the following Insurance Council of Australia commissioned report (Volume 3) from which the Panel notes the following:  Overland flow is the name given to surface runoff (or stormwater runoff) as it makes its way overland towards a defined waterway or before it ends up in a surface depression (See Section 2). An overland flow flood occurs when overland flows inundate property, possessions and infrastructure. In urban areas, overland flow flooding is exacerbated when the intensity of Case No: 243738 Determination Page 3 of 7 stormwater runoff exceeds the capacity of the piped drainage system causing surface runoff to flow down gutters, streets, footpaths and across properties.  Under intense rainfall conditions the steep upper reaches and possibly flatter middle reaches can experience flash flooding.  Water levels in the receiving waterway can influence flooding behaviour along lower tributary reaches. A receiving waterway flood passing downstream will increase water levels at the confluence. This „backwater‟ will in turn impede any tributary flood flows entering the receiving waterway and so increase tributary flood levels along lower tributary reaches (the „backwater effect‟). Note that if there is no upstream tributary flood, receiving waterway floodwaters flowing upstream can flood lower tri butary reaches (“backwater flooding”).  In the absence of flash flooding and backwater effects and flooding, „normal‟ waterway flooding will occur along the tributary, dictated by waterway steepness, channel capacities and discharges.  Mainstream Floods can influence flooding behaviour along the lower reaches of tributaries through „backwater‟ effects.  The relative timing of „local‟ rainfalls and water level rises in areas of interest can indicate the cause of any resultant inundation.  In the area of interest, rain is falling but there is no waterway flooding. In this situation, it is clear that any inundation will be caused by overland flow floodwaters.  Rain is not falling in the area of interest, but the waterway is flooding. In this situation, it is clear that any inundation will be caused by water flow floodwaters.  The most severe rainfalls in the Ipswich City LGA occurred in the north western area of the catchment. In the eastern parts of the LGA, severities were less than 5-Year ARI for all durations up to 24-hours.  There was no effective rainfall in Central Ipswich after about 6pm on Tuesday 11 January 2011. Further, there was very little rainfall across Ipswich City after 6pm.  Heavy and intense rainfall fell over the north western parts of the Bremer River catchment between 6am and 6pm on 11 January 2011. Rainfall elsewhere in the catchment was much less intense.  Peak water levels resulting from this rainfall event occurred in the afternoon and evening of 11 January 2011 in concert with high releases from Wivenhoe Dam. Whilst backwater flooding from the Brisbane River was occurring along the lower reaches of the Bremer River, a significant flood event in the Bremer was trying to exit into the Brisbane River.  Any inundation in this area after about 7pm on 11 January 2011 will have been caused by a combination of backwater flooding from the Brisbane River and a „normal‟ flood moving down and attempting to exit the Bremer River. Case No: 243738 Determination Page 4 of 7  Releases from Wivenhoe Dam caused a flood wave in the Brisbane River (dam release flooding). As this flood wave moved downstream, water levels in the lower reaches of the Bremer River and its tributaries and in other Brisbane River tributaries driving Ipswich City LGA were affected by backwater flooding.  The influence of backwater effects from the Brisbane River penetrated considerable distances up the Bremer River. Water levels as far upstream as the Walloon Alert stream gauge may have been so influenced. 14. The FSP relies on its assessor report from which the Panel notes the following:  T he Applicant‟s business property was inundated to a depth of 5.6m.  The property was inundated on 11 January 2011 in the “PM”  The Applicant was evacuated and as a consequence could not provide an exact time of inundation and when the inundation peaked.  The water came from the Bremer River (a northerly direction).  The water was dirty.  The entire contents at the property were destroyed by the flood. 15. The FSP has enclosed the claim form which states the loss occurred on either 12 or 13 January 2011. The Panel notes the claim form states the loss occurred as follows: “RAIN WATER RUNOFF FROM THE RECENT TOOWOOMBA FLASH FLOOD ON 10/1/11 CONTINUED DOWN TOOWOOMBA RANGE THROUGH LOCAL VALLEY EVENTUALLY INUNDATING IPSWICH AREA.” 16. The FSP contends that its policy does not include cover for flash flood or provide a distinction between flash flood and river flood. The question is whether the Applicant‟s property was inundated by flood as defined by the policy. 17. The Applicant‟s property is within the area inundated by the floo d waters from the Bremer River in January 2011. Further the satellite inundation map prepared by the Queensland Reconstruction Authority and Nearmap photograph taken on 13 January 2011 shows the Applicant‟s property was inundated 1 day prior to the date claimed by the Applicant. 18. The FSP notes the findings of the Insurance Council of Australia hydrology report (“the hydrology report”). The FSP contends this hydrology report provides sufficiently detailed information to enable a proper consideration of the Ap plicant‟s claim. 19. The hydrology report supports the conclusion that the Applicant‟s property was inundated when the Bremer River overflowed as a result of heavy rainfall in the north-western, upper catchment areas in the days preceding the flood and deliberate release of large volumes of water from the Wivenhoe Dam which caused backwater flooding. Case No: 243738 Determination Page 5 of 7 20. The FSP contends the hydrological evidence is that the inundation was caused by flood from the Bremer River. This is particularly so given that the rainfall data does not support the cause of flood being stormwater runoff. 21. The FSP notes the Applicant has not contested this version of events and has in fact indicated to the assessor that waters entered his property from the direction of the Bremer River. This is cons istent with the FSP‟s submissions. 22. The Applicant has not denied that his property was flooded but argues that because the floodwaters flowed to Ipswich from Toowoomba that cover should be extended. A clear consideration of the definition of flood reveals that this event is still within the ambit of the policy definition of flood. Accordingly, the loss is excluded. 23. The FSP contends that as the property was inundated when water normally contained in the Bremer River increased due to heavy rainfall in the preceding days combined with backwater flooding from the Brisbane River caused by releases of large volumes of water from the Wivenhoe Dam which then overflowed onto land that is not normally covered by water. Again, the FSP contends this set of circumstances clearly falls within the policy definition of flood and the loss is excluded from cover. 24. The FSP is unaware of the hydrological reports expressing different conclusions as it is not in possession of the reports to which the Applicant refers. 25. The FSP acknow ledges the Applicant‟s contention that “if one insurance company can offer compensation...then all should do the same”. In response the FSP states the following:  It is not aware of the details of compensation allegedly offered by other insurers.  There is no evidence before the Service as to the circumstances or reasons for payments allegedly made by other insurers, nor the precise terms of the policies of insurance which were issued by those insures.  Any compensation offered or payments made by other insure rs are, in any event, irrelevant to the FSP‟s obligations under the policy with the Applicant. Issues 26. Whether the FSP is liable to make payment of the Applicant‟s claim for damage caused by inundation of the insured property. Reasons for Decision 27. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute Case No: 243738 Determination Page 6 of 7 has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 28. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 29. There has been an exchange of material between each party, and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 30. The Panel has read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 31. The Panel confirms that any Determination will be based on the policy terms and conditions between the Applicant and FSP together with relevant evidence and law. 32. The Panel cannot rely on policy terms and conditions in place between other insurers and insureds. This is because these contracts of insurance will have different terms which cannot be implied into the contract of insurance between the Applicant and FSP. 33. The question before the Panel is, whether the Applicant‟s pro perty was inundated as a result of an event for which cover is provided by the policy, or whether the loss was caused by flood, as defined by the policy. 34. First, the Panel notes it has been provided with varying dates for the inundation of the property being 11th, 12th, 13th and 14th January 2011. The Panel notes the Applicant has provided the dates of 12th and 13th of January 2011 in his claim form and 14th January 2011 in his submissions. In contrast the FSP‟s assessor records the Applicant as providing the date of 11 January 2011 for the date of inundation. It is possible the confusion has arisen from the fact the Applicant was evacuated from the insured property. 35. The Panel has referred itself to the satellite imaging of the flooding taken on 13 January 2 011 which depicts the Applicant‟s property as already inundated. The Panel considers that 14 January 2011 can effectively be ruled out as the date of inundation. 36. The Panel has further considered the hydrologist report which suggests the waters commenced peaking on the evening of 11 January 2011. This would corroborate the information provided to the assessor that the inundation commenced in the afternoon/evening (“PM”) of 11 January 2011. 37. The Panel concludes the most likely date of inundation was late eveni ng on 11 January 2011. 38. The Applicant and the FSP do not appear to dispute that the water came from the Bremer River. In fact the Applicant has submitted that the Toowoomba flash-flood caused the water levels in the Bremer River to rise and break its banks. The hydrological evidence and the FSP‟s submissions concur that the water which inundated the property came from the Bremer River, but attribute Case No: 243738 Determination Page 7 of 7 the breaking of banks to the back-flooding from the Brisbane River, rainfall and releases from the Wivenhoe Dam. 39. Based on the evidence before it, the Panel finds on the balance of probabilities that the water which inundated the insured property was overflow from the Bremer River. 40. The Panel notes the policy definition of flood includes any water escaping from the natural water course which then inundates normally dry land. This definition would encompass the circumstances before the Panel in which the Bremer River overflowed and inundated land which was normally dry such as the insured property. 41. The Panel notes that the hydrological evidence suggests the back -water flooding from the Brisbane River, release of waters from the Wivenhoe Dam and rainfall has caused the Bremer to overflow. There is no evidence in the hydrological report to support the Applicant‟s submiss ion that the water solely came from Toowoomba flash-flood. 42. The Panel confirms that even if the Toowoomba flash-flood was the major cause of the Bremer River breaking its banks, the policy does not provide cover for flash-flood in the circumstances described by the Applicant. Further there is substantial case law which suggests that had flash-flood reached the Bremer River and become part of the River and any later flood waters, the combined water would all be deemed floodwater. Accordingly, the Applicant is not assisted by the proposition that the Toowoomba flash-flood causing the Bremer River to break its banks. Determination 43. On the basis of the available information the Panel determines that the FSP is not liable to make payment of the Applicant‟s claim for damage caused by inundation of the insured property.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.