Text of the determination
Case No: 243240 Determination Page 1 of 8
Case number: 243240
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
21 December 2011
Background
1. The Applicants‟ home contents suffered damage when their duplex home was
inundated with water on 12 January 2011. They had home contents insurance
with the Financial Services Provider (FSP), and a separate policy covering the
home building and common property with a different insurer (the Building
Insurer).
2. They lodged a claim with the FSP for the damage to their home contents, and
the damage to their home building was the subject of a separate claim with the
Building Insurer under the relevant home building policy.
3. The FSP denied liability for the damage to their home contents on the basis
that it was caused by flood water which had back-flowed from the Brisbane
River through the stormwater system.
4. The Applicants are disputing the FSP‟s denial of their home contents claim, as
they have had their claim for the home building damage accepted.
Summary of Applicants ’ Position
5. Although their home building policy is with a different insurer, they say that the
wording in relation to flood in both the home building policy and the home
contents policy is the same.
6. The Building Insurer obtained a report from a hydrologist, who concluded that
the damage to their home building was caused by stormwater, not flood.
7. They cannot understand how one insurer can decide that the damage caused
by the event was flood related, while a different insurer decides the damage
caused by the same event was not flood related.
8. They believe that they have provided ample proof that the damage to their
property was caused by an insured event.
Determination
Case No: 243240 Determination Page 2 of 8
9. They believe that the FSP has still not proven that the damage to their contents
was caused by the excluded event of flood.
Summary of FSP’s Position
10. The FSP has obtained several reports regarding the damage to the Applicants‟
contents, including an Assessment Report and two hydrology reports, and all of
these points to the cause of damage being flood, which is excluded under the
policy.
11. Specifically, rising water from the Brisbane River backed up through the
stormwater drainage system and spilled out into the local depression and
inundated the Applicants‟ home.
12. In addition, the Area hydrology report commissioned by the Insurance Council
of Australia and produced by a panel of established hydrology firms,
corroborates the FSP‟s conclusion that flood was the cause of damage.
13. Further, the FSP refutes the evidence put forward by the Applicants that the
damage to their contents was caused by stormwater run-off, and stands by the
evidence it has obtained regarding the cause of the damage.
14. The FSP considers the decision by the Building Insurer to accept the
Applicants‟ claim for damage to the home building is irrelevant to the operation
of the FSP‟s insurance contract with the Applicants, and to this disput e.
15. As such, the FSP says that they are entitled to deny the Applicants‟ claim for
damage to their contents.
16. The FSP relies on the following policy provisions:
“ Storm
If you home or contents suffers loss or damage caused by
a violent wind, cyclone or tornado
thunderstorm or hail which may be accompanied by rain or snow, or
a sudden, excessive run-off of water as a direct result of a storm in your
local area
we will under contents insurance
► replace or repair your damaged contents
we will under home buildings insurance
► rebuild or repair that part of your home that was damaged
► rebuild or repair that part of any gate, fence or free-standing wall that was
damaged by wind, unless
they were not kept in good order and repair, that is, they were not
structurally sound or well maintained.
...
Case No: 243240 Determination Page 3 of 8
however
we will NOT cover loss or damage caused by flood
...
What you are not covered for
- general exclusions
we will NOT cover
► loss, damage, injury or death that occurs as a result of
flood
…
Glossary
…
flood
is the covering of normally dry land by water escaping or released from the normal
confines of a watercourse or lake, whether or not it is altered or modified. Flood
also includes water escaping from the confines of any reservoir, channel, canal or
dam.
Flood is not covered by this Policy.
…
storm
is a violent wind, cyclone, tornado, thunderstorm or hail which may be accompanied
by rain or snow, or a sudden, excessive run-off of water as a direct result of a storm
in your local area. It does not include persistent rain by itself.”
Issues
17. Whether the Applicants have established prima facie that the cause of damage
to their home contents was caused by an insured event under the policy.
18. Whether the FSP has proven that the damage was caused b y an event that is
excluded under the policy.
Reasons for Decision
19. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
20. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
21. There has been an exchange of information between the parties and the Panel
is satisfied that each party has had an opportunity to address the issues raised.
Case No: 243240 Determination Page 4 of 8
22. There is no dispute that the damage to the Applicants‟ home contents was
caused by water inundation.
23. Regardless of any similarities that may exist between the wordings of the
policies covering the Applicants‟ hom e building and their home contents, the
Panel accepts that the FSP is entitled to make its decision regarding the home
contents claim, independent of the Building Insurer‟s decision.
Stormwater Damage – Applicants’ Case
24. According to the Applicants, the stormwater drains were at capacity on 10, 11
and 12 January 2011 leading to the drains overflowing to approximately 1metre
inside the unit.
25. According to the assessors‟ reports, the Applicants left the property around
11.30am on 12 January 2011.
26. As evidence that the damage was caused by stormwater rather than flood, the
Applicants have offered the hydrology report produced by “M”, which was
obtained by the Building Insurer to establish the cause of the damage to their
home building.
27. The report by “M” was not s pecifically produced to establish the cause of the
damage to the Applicants‟ home contents. However, there is little doubt that the
water inundation event that caused the damage to the Applicants‟ home
building was the same event that also caused the damage to their home
contents. The Panel therefore accepts that the hydrology report by “M” can be
used to shed light on the water inundation event, and is relevant to this dispute.
28. The report by “M” provides information regarding the rainfall and river water
levels over the period up to and during the time of the loss. The author of the
report examined the terrain in the vicinity of the Applicants‟ home, as well as
providing an opinion about the source of the water.
29. According to “M”:
The rainfall recorded for the city of Brisbane for 10, 11 and 12 January
2011 was 111mm, 15mm and 40mm respectively (noting that these figures
relate to the 24 hour periods from 9 .00am on the day prior to the day of the
recording, to 9.00am on the day of recording).
Although there was heavy rainfall over the city over this period, the rainfall
figures (noted in the bullet above) were not particularly high with average
recurrence intervals (ARIs) generally less than one year for storm
durations up to 12 hours, and only up to two years for longer durations.
It is assumed that the stormwater drainage system normally discharged in
to the Norman Creek.
When the water level in the Norman Creek is higher than the drain outfall
level, the capacity of the local stormwater drainage system to deliver its
Case No: 243240 Determination Page 5 of 8
local run-off to the Creek is reduced; the drain becomes surcharged and
can overflow into the streets.
In extreme cases, if the water level in the river is higher than the local
ground level, river/creek water can travel back up the drains and f lood out
of the drain outlet.
The Brisbane River peaked at 4.46m AHD at the city Gauge at 3.00am on
13 January 2011, with a corresponding peak at the mouth of the Norman
Creek of 3.27m AHD at 3.55am the same day.
The Applicant s‟ property is located in a local low point in the street.
The ground levels at the Applicant s‟ property, according to the Brisbane
City Council‟s „FloodWise‟ property search, are between 2.2m and 2.4m
AHD.
It is the author‟s opinion that the initial inundation of the Applicant s‟
property resulted from overflow from the stormwater drainage system,
together with overland flow from local surface run-off, at a time when the
discharge capacity of the stormwater drainage system was compromised
by high water levels in the Brisbane River/Norman Creek.
Near the peak of the Brisbane River flood, the Applicants‟ property was
also affected by back-water flooding through the stormwater drainage
system from the Brisbane River/Norman Creek. However it was outside
the scope of the „M‟ report to determine the depth of initial inundation that
occurred prior to any back-water flooding occurring.
30. The Panel also notes that the author of the “M” report is of the opinion that the
inundation of the property should be classified as stormwater flooding.
31. Although it is not clear from the evidence provided by the Applicants that the
water inundation of their property was the direct result of a storm in their local
area, the Panel is satisfied that they have established a prima facie case that at
least the initial damage to their home contents was caused by the event of
„Storm‟ as listed on page 15 of the policy.
32. The onus therefore shifts to the FSP to prove that the damage was caused by
an excluded event under the terms and conditions of the policy.
Flood Damage – FSP’s case
33. The FSP has stated that the damage to the Applicants home contents was
caused by flood, which is excluded under the policy. In support of this position,
the FSP has presented several reports including:
An Assessors Report.
A Hydrology Repor t for the city of Brisbane, produced by hydrologist „W‟.
A Hydrology Report specific to the Applicants property in Norman Park,
also produced by hydrologist „W‟.
Case No: 243240 Determination Page 6 of 8
A Hydrology Report for the Brisbane Local Government Area (LGA),
produced by a panel of three hydrology firms, and commissioned by the
Insurance Council of Australia (ICA).
34. It is evident from these reports that:
There were three significant rainfall events across the Brisbane LGA over
the period 9 to 14 January 2011, the last of these occurred bet ween
6.00am and 4.00pm on 11 January 2011.
The rainfall that fell in the local area of the Applicants‟ property after about
3.00pm on 11 January 2011 had reduced significantly, and by 6.00pm had
effectively ceased.
The timing of the peak inundation came approximately 35 hours after the
end of significant rainfall in the area (at 3 .00pm on 11 January 2011).
The timing of the initial inundation (12.00pm on 12 January 2011) came
18 hours after the rain has effectively ceased.
The Brisbane River was at elevated levels, primarily due to dam releases
from the Wivenhoe Dam over the period 9 to 14 January 2011.
The peak river level of the Brisbane River at the Norman Creek mouth,
approximately 3.5km upstream of the Applicants‟ property, was 3.4m AHD
at 3:30am on 13 January 2011.
The Applicants‟ property is in a local depression, and the property
elevation is between 2.2m AHD and 2.4m AHD, and sloping towards the
rear of the property.
35. The information outlined above is broadly consistent with the “M” report,
however there are points of difference between the two sources of information,
namely:
The „W‟ site -specific hydrology report estimates the area of the depression
in which the Applicants‟ property sits is approximately 25 hectares ,and
describes the local catchment as being „of limited size‟; while the “M”
report estimates the local catchment at 40 hectares and describes it as
being „significant‟.
The „W‟ site -specific report concludes that due to the limited size of the
catchment (and the relatively low rainfall intensity), it is unlikely that there
was sufficient local stormwater run-off for this to be a contributing factor in
the inundation of the Applicants‟ property. By contrast, the “M” report
concludes that water overflowing from the stormwater drainage would
have inundated the Applicants‟ property — at least initially — at a time
when the capacity of that system was compromised by the high water
level of the Brisbane River/Norman Creek.
The „W‟ site -specific report concludes that the inundation of the
Applican ts‟ property was (entirely) caused by flow escaping through
normal confines of the Brisbane River and backing up through the local
Case No: 243240 Determination Page 7 of 8
sub surface drainage system. The “M” report states that back -flooding of
the Brisbane River/Norman Creek would have occurred only near the
peak of the Brisbane River flood, after the initial inundation by stormwater
run-off.
36. The hydrologists, in reaching opposing views, have clearly explained their
positions. Despite this there is little doubt the cause of inundation was water
escaping from the storm water drain. Whether this was storm water “run - off” or
backflow through the storm water drains from the rising creek and river is far
more difficult to determine. In attempting to reconcile these different facts and
points of view, the Panel has reviewed the information regarding the water
levels in the Brisbane River and its tributary the Norman Creek. The Panel
notes that both the hydrologists‟ reports agree that the Applicants‟ property was
in a low point or depression with elevation between 2.2 metres and 2.4 metres
AHD. The Panel also notes that around 12.00pm (the time when the Applicants
reported their home inundated) Norman Creek water level was approximately
2.5 metres AHD.
37. The information provided by M suggests he believes the initial inundation
resulted from the overflow from the storm water drainage compromised by the
fact that the high water levels in the Norman Creek and Brisbane Rivers
adversely affected the discharge of the storm water drainage system. M notes
that the drains could also have been partially blocked.
38. The Panel notes M specifically addresses the issue of back flooding through
the storm water drainage from the Brisbane River and the Norman Creek and
concedes this would occur near the peak of the flood.
39. W in contrast considered that due to the limited size of the catchment area and
relatively low rainfall intensity, it was unlikely that there was sufficient local
storm water run-off for this to be a contributing factor to the inundation. W
assessed the inundation directly relating to the rising flood level from the BoM
rainfall data referred to in the reports. Whilst heavy rainfall was recorded in the
area, there was no substantial rainfall after about 11.00pm on 11 January 2011.
That is at least 12 hours before the Applicants left the property.
40. The Panel accepts that in these circumstances, it is most likely any storm water
run- off would have impacted on the Applicants‟ property before the time the
Applicants claim the property was inundated.
41. The Panel having considered the information as a whole accepts that on the
balance of probabilities, it is most likely that the Applicants‟ property was
inundated as a result of the backflow of water through the drainage system
caused by the elevated levels of the Brisba ne River and Norman Creek. This
view is reinforced by the hydrology information that the Norman Creek was at a
higher level than the drain consistent with the inundation being due to a
backflow of the flood waters from the Brisbane River and the Norman Creek
through the drainage system.
Case No: 243240 Determination Page 8 of 8
Determination
42. Accordingly, in the circumstances, the Panel is satisfied that the FSP has
established the application of the exclusion to the policy and the FSP is entitled
to refuse payment of the claim.