Home / Financial Firm (Unknown - Insurer) / Determination 243189
Determination 243189
Flood exclusion used to refuse building damage and loss of rent claim
Summary
The applicant's three landlord units were inundated in January 2011 and the FSP refused both the building damage and loss of rent claims as flood. The Panel found the water was Brisbane River flood water, not stormwater, so the flood exclusion applied and loss of rent was not payable.
The policy excludes flood, and loss of rent is only payable where the damage results from a defined insured event, which flood is not.
Subjects and remedies
natural disasterno remedy
Text of the determination
Case No: 243189 Determination Page 1 of 9
Case number: 243189
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Flood - Denial of claim
14 September 2011
Background
1. The Applicant held a Landlord Home Building policy of insurance (the policy)
with the Financial Services Provider (FSP).
2. On 12 and 13 January 2011 the property, comprising three residential units was
inundated with water during a severe weather event experienced in the region
causing extensive damage to the building and its contents. The Applicant
contacted the FSP and lodged a claim seeking indemnity under the policy for
her loss.
3. The Financial Services Provider (FSP) denied the claim on the ground that the
loss was as a result of the “Flood” and as such , was excluded from cover.
Summary of Applicant’s Position
4. After the significant flood event that occurred on 12 January 2011, the Applicant
contacted the FSP and lodged a claim seeking indemnity for damage to three
units insured under the policy.
5. The Applicant was provided with a copy of the hydrologist report obtained by
the FSP, however, she does not agree with the findings of the consultant.
6. The Applicant maintains the property is located at the low side of Park Road.
Due to the heavy rainfall and storm in the area, large amounts of rainwater
were already concentrated in this area prior to the water from Brisbane River
reaching the property.
7. The drains and [sewers] on the street had already been filled up by rainwater
which had run down from higher areas. Rainwater which was blocked from
escaping through the drainage network, due to overflowing water from the river,
accumulated and then entered the three units owned by the Applicant.
8. As such, the property was inundated by rainwater and not flood water from the
Brisbane River.
Determination
Case No: 243189 Determination Page 2 of 9
9. The Applicant is seeking indemnity for loss of rent and the cost of repairs
required to restore the insured properties to the condition they were in prior to
the loss.
10. The height (level) of Brisbane River referred to by the FSP and its appointed
hydrologist, on 12 and 13 January 2011, was not sufficient to reach the floor
level of her property and therefore is not an accurate position.
11. On Wednesday 12 January 2011 water at the height of 2.5m above road level
entered the Applicant’s units causing the inundation. The water level increased
by a further 0.6m, into the top unit.
12. Based on the data from [Brisbane] City Council the height of the property at
ground level is between 4.2m and 5.2m above sea level. The concrete house
floor at the insured property was built at the height of 4.9m above sea level.
13. According to government reports and the news, the Brisbane River peaked at
4.46m above sea level, which is lower than the Applicant’s propert y floor level
of 4.9m above sea level. Therefore it is impossible for that water from the
Brisbane River to inundate the property.
14. Stormwater drainage has been a potential problem in the area. This has been
mentioned in an official report provided by the C ouncil “Residential Flood
Survey”.
Summary of FSP’s Position
15. Torrential rainfall in the upper reaches of Brisbane River catchment area from 9
January 2011 combined with massive releases of water from Wivenhoe Dam
caused river levels downstream to rise rapidly over the period 10 – 13 January
2011.
16. In the Applicant’s case the water inundated units 1, 2 and 3 located at the
insured property.
17. After undertaking an assessment of the insured property the FSP’s assessor
“C” submitted a report. It was concluded tha t, given the proximity of the
property to the Brisbane River and the level of inundation, it was flood water
which was the primary cause of inundation.
18. On 4 February 2011, a hydrologist “W” appointed by the FSP inspected the
insured property. “ W ” submitted a report which concluded that the inundation of
the Applicant’s property was consistent with the property being inundated by
floodwater from the Brisbane River. Further, the water which inundated the
property was floodwater backflow which flowed back along the easement and
stormwater draining network onto the property; therefore it was inundated by
floodwater from the Brisbane River and not stormwater.
19. The Applicant contacted the FSP on 22 February 2011, and authorised “Mr D”
to make inquiries in respect to her claim. “ Mr D ” questioned the FSP in respect
Case No: 243189 Determination Page 3 of 9
to “loss of rent” cover. He was informed that entitlement to loss of rent cover is
subject to the loss occurring as a result of an insured event, in this instance
flood was not an insured event.
20. The policy terms are clear and unambiguous in their meaning and application.
Flood is specifically excluded under “Building cover” offered by the FSP.
21. The Insurance Council of Australia (ICA) hydrology panel concluded that any
area adjacent to the Brisbane River or a long its tributaries inundated after
6.00pm on 11 January 2011 would have been inundated by flood water.
22. The estimated time of inundation for the insured property is that it occurred
after 11.30pm on 11 January 2011 and more probably at least 12 hours after
that time.
23. Even if there had been some inundation by stormwater run-off, which the FSP
disputes is the case, the “Wayne Tank” principle would allow the declinature of
the claim.
24. There is reference to an “Additional Benefit” for limited flood cover to con tents
under the policy, however, the Applicant only held a building cover policy.
25. The FSP notes that it is the Applicant’s opinion that the property was inundated
by stormwater run-off as the local drains and sewage had already been filled by
water that could not escape through the drainage network. The FSP maintains
that there is no evidence of this and even if this were the case, it would be
entitled to decline indemnity under the “Wayne Tank” principle.
26. The FSP relies on the following policy provisions:
“ Page 1 – IMPORTANT CUSTOMER INFORMATION
What you need to read 3
DEFINITIONS 8
DEFINED EVENTS 10
GENERAL EXCLUSIONS 22
…
Page 3 – IMPORTANT CUSTOMER INFORMATION
What you need to read
To determine if this insurance is appropriate for you, it is important that you read:
this Important Customer Section – it contains information on important matters
you need to be aware of before applying for this insurance;
the Definitions Section – it sets out what we mean by certain defined terms in
this insurance;
the Defined Events Section – it sets out the Defined Events we will provide
cover for under Cover Sections 1 and 2;
the General Exclusions Section - it sets out what we do not cover under any
of the Cover Sections;
Case No: 243189 Determination Page 4 of 9
…
Page 8 – “Flood” means the inundation of normally dry land by water escaping or
being released from the normal confines of any natural water course, lake, reservoir,
canal or dam.
…
Page 13 – SECTION 1 (continued)
1.4 Additional Benefits and Limitations:
(d) Loss of rent for tenanted properties
(i) If the Building is a tenanted property under a lease and becomes uninhabitable
following loss or damage covered under Section 1.2 above, we will pay you rent for the
period it takes to repair or rebuild the Building, up to a maximum of 12 months or an
amount not exceeding 10% of Building Sum Insured, whichever is less.
…
Page 22 and 23 – SECTION 7 GENERAL EXCLUSIONS
These General Exclusions apply to the whole of your Policy unless otherwise stated.
Your Policy does not cover:
7.15 . Flood damage except as provided in Section 2. Contents Cover under Additional
Benefits “Flood damage to Contents”.”
Issues
27. Whether the damage claimed by the Applicant was caused by flood as defined
by the policy.
28. Whether the Applicant is entitled to indemnity i n respect to “Loss of Rent” in line
with the terms of the policy.
Reasons for Decision
29. The Panel is satisfied that a full exchange of information has taken place
between each party and each party has had the opportunity to address any
issues raised.
30. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the FOS Terms of Reference. This is due to the
circumstances of the dispute. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
31. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
32. The Panel Ombudsman attended at the site of the insured premises. Neither
the Applicant nor the FSP attended as the Panel Ombudsman’s attendance
was arranged at a time when it was not possible to give notice to the parties.
Case No: 243189 Determination Page 5 of 9
The Panel Ombudsman is satisfied that the description of the premises and
surrounding locality is consistent with the details provided by the Applicant and
the FSP.
33. According to the evidence submitted, the two units on the ground floor of the
insured building were inundated on 12 January 2011, while the first level unit
was inundated on 13 January 2011.
34. The Applicant maintains that the units were inundated by stormwater run-off
and not flood water as:
The peak height of Brisbane River (according to media and government
announcement) was not high enough for the water to enter the insured
property.
It was stormwater run-off and not flood water that entered the property as
it was unable to enter the stormwater drains due to these already being
full with water coming down from higher areas and an overflow from the
rising Brisbane River.
The insured property is located in the low part of Park Road and there
was already a large amount of water accumulated there prior to
floodwater from Brisbane River reaching the property.
35. The FSP disputes the A pplicant’s contention that the damage is the result of
stormwater inundation and maintains it was flood water from the Brisbane River
that was the proximate cause of the loss.
36. In support of its position the FSP relies upon evidence made available by its
assessor, its appointed hydrologist W and information made available in the
ICA hydrology reports.
W’s WATER DAMAGE ASSESSMENT REPORT
37. The following are relevant matters contained within this report:
Rainfall data at the Toowong High alert station about 5.5km away from the
insured property showed 198mm rain fell over the area between 9-13
January 2011.
Peak rainfalls in the area were at 4.00pm on 9 January 2011 (rainfall
intensity of 26.9mm/hr) and at about 11.00am on 11 January 2011 (rainfall
intensity of 19mm/hr).
The rainfalls recorded in the vicinity of the insured property were not
particularly severe for short durations and even higher peak rainfalls are
regularly experienced in Brisbane.
Peak stormwater run-off from the surrounding catchment area would have
occurred within 10 to 30 minutes after peak rainfall intensity (4.00pm on
9/1/2011 and 11.00am on 11/1/2011). The property was not inundated
until 12 January 2011.
Case No: 243189 Determination Page 6 of 9
Contour information and debris marks observed from aerial photographs
taken shortly after the event indicate that flooding in the vicinity of the
insured property reached a height of approximately 7.2m AHD.
The insured property was inundated to a depth of approximately 3m
above floor level by floodwater from the Brisbane River.
The water that inundated the property was flood water backflow from the
Brisbane River travelling back along the grassed easement and
stormwater drainage network.
ICA Hydrology Panel report (ICA report) “Flooding in the Brisbane River
Catchment January 2011, Volume 1 & 2”.
38. The following are relevant matters contained within this report:
There were three distinct rainfall periods across Brisbane City LGA (Local
Government Area) during the period of 9 January 2011 to 13 January
2011. (pi Para 2)
The first occurred from around 0900 hours to 2100 hours on 9 January
2011.
The second occurred from around 0600 hours 1000 hours on 10
January 2011.
The third occurred from around 0600 hours to around 1600 hours on
11 January 2011.
Wivenhoe dam release (9.3 p60)
Large releases were made from Wivenhoe dam over the period from
0600 hours, possibly as early as 0300 hours on 11 January 2011 until
around 0300 hours on 12 January 2011.
It was concluded that the dam release flood from Wivenhoe Dam was
the immediate cause of flooding along the reach of the Brisbane River
downstream of the Dam.
Any inundation in the Brisbane City LGA along tributaries draining to
lower Brisbane River will also have been caused by water flow
inundation, again principally associated with the dam release flood
from Wivenhoe Dam.
There was little or no rainfall across the LGA after about 1800 hours
on Tuesday 11 January 2011 ( 9.1 p59 )
Damage by rainwater - Inundation from surface runoff rainwater
39. The ICA hydrology report states inundation from surface run off rainwater is
generally associated with intense rainfalls of short duration.
40. It was reported that the inundation of water into the Applicant’s home occurred
on 12 and 13 January 2011. Water had not entered the property on 11 January
2011.
Case No: 243189 Determination Page 7 of 9
41. According to the hydrological evidence three rainfall periods were experienced
across the area of the Applicant’s property between 9 and13 January 2011.
The third event being between 0600 and 1600 hours on 11 January 2011.
42. There was no rainfall in western suburbs around Yeronga after about
1800hours on Tuesday 11 January 2011. Any inundation in the area after this
time would have been due to backwater flooding from the Brisbane River (8.4
p47).
43. Based on the available information, it is reasonable to co nclude the water
inundation to the Applicant’s home occurred at a significant period after the last
peak rainfall or distinct rainfall event.
44. As there were three significant rainfall events in the area between 9 January
2011 and 13 January 2011, it is also reasonable to conclude that had surface
run-off rainwater entered the home, it would have done so contemporaneously
to the distinct rainfall periods experienced over the previous days. There is no
evidence to support this happening.
45. For these reasons the Panel is of the opinion that the evidence does not
support a finding that surface runoff rainwater alone entered the Applicant’s
properties.
Location of the Applicant ’ s property
46. Maps of the area show the Applicant’s home is located in reasonably close
proximity to the Brisbane River.
47. Maps forming part of the hydrological reports confirm that the Applicant’s
property fell well within the area inundated by flood water between 12 January
2011 and 13 January 2011.
48. The Applicant reported that the bottom leve l of her property was inundated by
rising water on 12 January 2011, and subsequently reached the upper level on
13 January 2011.Therefore, on the balance of probabilities and in line with the
experts’ opinions, the Panel is not persuaded that it was storm water rather
than flood water that resulted in the inundation.
Flood water
49. According to the hydrological evidence a number of factors contributed to the
Brisbane River overflow. These included intense rainfall in the catchment areas
and large releases from Wivenhoe Dam. These releases occurred between
about 0600 on 11 January 2011 and 0300 on 12 January 2011.
50. The Applicant ’ s property is located in close proximity to the Brisbane River.
51. The ICA report concluded that Brisbane River flooding was caused by intense
rainfalls, releases from Wivenhoe Dam and flood waters from Lockyer Creek
and Bremer River. However, it is clear that the dam release flood from
Wivenhoe Dam was the immediate cause of flooding in Brisbane City LGA.
Case No: 243189 Determination Page 8 of 9
52. The water inundation to the Applic ant’s property which occurred on 12 and 13
January 2011 is consistent with the times of the Wivenhoe dam releases on 11
and 12 January 2011 and resultant down river flooding.
53. In considering the evidence as a whole, the Panel is of the opinion that the
water which gave rise to the claim was flood water from Brisbane River.
54. The policy defines “flood” to include water that escapes or is released from the
normal confines of any natural watercourse, lake, reservoir, canal or dam.
55. The policy does not cover loss or damage caused by flood. It follows that the
Applicant’s claim does not succeed.
Overflowing of the stormwater drainage network
56. The Panel has also considered the Applicant’s contention that the inundation
was the result of stormwater not being able to escape through the drainage
network, as the drains were already full from water coming down from higher
areas and overflowing due to the rise in the Brisbane River.
The available evidence provides that flooding experienced prior to the Brisbane
River breaking would, in all probability, be the result of back flow from the
drainage infrastructure due to the rising level of the river.
57. While the intense rainfall may be regarded as the initial cause for the rivers
and creek flooding and the release of water from the dam, it is established law
that, such water although it may not have come directly from within the banks of
the watercourse (river, canal, tributary etc), is still classed as flood water when
it otherwise would have drained into the watercourse but is not able to because
the watercourse is full. The relevant case that dealt with this issue is K Sika
Plastics v Cornhill Insurance (1982) 2NZLR 50(CA).
58. Further, when a mixture of river water and rainwater causes damage to
property, the FSP is entitled to rely on the clause which excludes loss or
damage caused by flood water, this being the principle established in the
Wayne Tank case.
Loss of Rent
59. The Applicant is seeking indemnity for her loss due to loss of rent resulting from
the inundation of the three tenanted units insured under the policy.
60. The FSP maintains that although indemnity for loss of rent is available under
the Appl icant’s policy, that benefit is only payable when the event which gave
rise to the loss is an event insured under the terms of the policy.
61. The Panel has considered the position of the parties to this dispute in relation to
entitlement of cover for loss of rent. It has been established that the inundation
of the insured property was the result of floodwater as opposed to stormwater.
Case No: 243189 Determination Page 9 of 9
62. The policy under “Additional Benefits” does provide cover for loss of rent for
tenanted properties. This cover is however subject to the properties becoming
uninhabitable following loss or damage due to one of the listed defined events
for which the policy provides cover.
63. In this instance, as “Flood” is not a listed defined event the Panel is satisfied
that the policy does not respond to the loss claimed by the Applicant in respect
to loss of rent.
Having considered the evidence made available by the parties to this dispute, the
Panel is satisfied that, on the balance of probabilities, the inundation of the
Applicant’s property wa s initially due to backwater flooding due to the rising
level of the Brisbane River and subsequently also flooded after the Brisbane
River breaking its banks.
64. In the Panel’s opinion the evidence leads to the conclusion that, on the balance
of probabilities, the FSP has discharged the onus that rests with it to show the
damage claimed does not fall within the cover provided by the policy.
Determination
65. On the basis of the available information the Panel determines that the FSP
was entitled to deny liability for the building damage portion of the claim.
66. Further, the Panel determines that the FSP was entitled to deny liability for the
“Loss of Rent” portion of the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.