Background
1. The Applicants held a home and contents insurance policy with the Financial
Services Provider (FSP), which was in force at the time of the loss.
2. On 5 January 2011, the Applicants lodged a claim for fire damage to their
property.
3. The FSP accepted liability and offered a cash settlement of $664,590, less the
applicable excess and already paid demolition cost, to cover the cost of
demolishing and rebuilding a new house.
4. The Applicants are dissatisfied with the offer because they believe the
settlement amount does not genuinely reflect the cost of rebuilding their house.
Summary of Applicants ’ Position
5. Their property was fire damaged on 4 January 2011. They were in the process
of moving to another address, so there was no contents loss.
6. The sum insured reflects the value of their house, which was a large old
Queenslander with ornate features.
7. However, the amount offered is significantly lower than the sum insured and
does not reflect the house features or all the building materials. This arises
because the scope of works to obtain quotations was not addressed with them
to ensure it accurately reflected the characteristics of their house.
8. The difference in price between the quotations provided to rebuild the house
makes them believe the building companies may not be quoting on the same
standards of materials and specifications.
9. Communication has been generally poor throughout the claim process with
very limited information provided. The FSP has also delayed the process due to
various reasons and conducted an intrusive investigative process.
Determination
Case No: 243071 Determination Page 2 of 8
10. They do not want to rebuild as they had already moved out, but would like a
cash settlement that allows them to rebuild the house as it was in another
location.
11. They would like the settlement to be for the sum insured as they believe it
correctly represents the building cost. Alternatively, the settlement offer should
be higher to genuinely reflect the cost of their house including all its features.
Summary of FSP’s Position
12. The FSP‟s assessor “S” attended the property on 6 January 2011 and
organised a forensic expert to provide their opinion as to the cause of the fire. S
also arranged emergency temporary fencing around the property.
13. It had the option to rebuild, pay the amount it would cost it to rebuild or pay the
sum insured. Paying the sum insured was not its only option. As per the policy,
it is entitled to pay up to the sum insured at its own discretion.
14. Since the Applicants had expressed their wish not to rebuild the property, it
opted for paying the cost of rebuilding the property.
15. In order to do this, S provided various building companies with a scope of
works and photographs in order to obtain quotations to rebuild the property.
16. As per the Applicants‟ concern about the price difference in quotations, it notes
the builders varied each quotation based on mark-ups and margins they added.
However, if rebuilding had been authorised, the builder would not have been
allowed to modify the scope of works provided.
17. “SB” provided a tender to perform the work for $664,590. The quotation was
reviewed and the FSP determined the amount was competitive and reasonably
within the scope of works.
18. Accordingly, it informed the Applicants of its decision to cash settle the claim as
per SB‟s quotation. However, the Applicants argued the house could not be
rebuilt for anything less than the sum insured.
19. The claim was reviewed by the Internal Dispute Resolution (IDR) Committee
and concluded the settlement offer was in accordance with the terms of the
policy.
20. The investigation of the claim followed the FSP‟s standard procedure to ensure
that only customers with a legitimate claim are paid. The investigation did not
mean the FSP believed the claim was not genuine.
21. The FSP does not believe any of the alleged delays has affected the overall
claim process.
Case No: 243071 Determination Page 3 of 8
22. In conclusion, it considers SB‟s quotation was the most competitive to reinstate
the property and the settlement offer is in accordance with the terms and
conditions of the policy.
23. The FSP relies on the following policy provisions:
“ Calculating your sum insured
Help with calculating your home sum insured
Your home building sum insured needs to be sufficient to cover the cost of rebuilding
your home in the unfortunate circumstance of total destruction by an insured event.
The cost of rebuilding is based on the materials and labour needed - not your home
real estate market value.
...
Your home
Settling your claim
If your certificate of insurance shows that you have home insurance we will cover your
home for loss or damage as a result of an insured event occurring during the period of
insurance.
We may choose at our option to:
rebuild or repair your home as new; or
pay you the cost to us of rebuilding or repairing your home as new including any
additional costs (relating only to that part of the home that was damaged)
necessary to comply with government or local government laws existing at the
time of damage occurring, provided that at the time of original construction the
laws and by-laws prevailing then were complied with; or
pay you the home sum insured; or
...
We will pay up to the home sum insured shown on your certificate of insurance less
any applicable excess. ”
Issues
24. Whether the FSP failed to provide an appropriate quality of service during the
handling of the claim.
25. Whether the FSP‟s settlement offer reflects the cost of rebuilding the house
according to the terms and conditions of the policy.
Reasons for Decision
26. As advised to the parties, due to the nature of the dispute and the amount
claimed, the Financial Ombudsman Service (FOS) has considered it
appropriate to expedite the dispute to Determination in accordance with the
Operational Guidelines to the FOS Terms of Reference.
Case No: 243071 Determination Page 4 of 8
27. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address all
the issues raised.
28. The Panel has reviewed the submissions of the parties in relation to the dispute
and the terms and conditions of the policy. The Panel observes there is no
dispute that the insured property was fire damaged beyond repair and the FSP
is liable for the loss.
29. The central issues in dispute are whether the FSP complied with its obligation
to provide an appropriate quality of service and whether the FSP‟s settlement
offer reflects the appropriate cost to rebuild the house.
Whether the FSP failed to provide an appropriate quality of service during the
handling of the claim
30. The Applicants allege the FSP handled the claim poorly, delayed the settlement
and did not communicate appropriately with them and its agents. They also say
the claim investigation was intrusive.
31. On its submission of 18 August 2011, the FSP provided a detailed explanation
of the communications it had with the Applicants and its agents.
32. On their submission of 9 September 2011, the Applicants mentioned periods
during which there was no communication from the FSP. They also indicated
how the information provided was disjointed and prevented them from seeing
the whole claim handling process. The Panel notes the Applicants have not
presented any evidence to support these allegations.
33. Upon review of the parties‟ material, the Panel is of the opi nion the FSP kept
constant communication with the Applicants in regard to the progress of the
claim. The Panel also accepts the FSP liaised constantly with its agents in
regard to the assessing, investigation and settlement of the claim.
34. Accordingly, the Panel considers the FSP has acted in accordance with good
insurance practice and standard claim handling procedures.
35. The Applicants have also alleged the FSP did not involve them in the process
of establishing the scope of works or obtaining quotes from the building
companies. The Panel will deal with this particular issue in the following sub-
section.
Whether the FSP ’s settlement offer reflects the cost of rebuilding the house
according to the terms and conditions of the policy
36. The Applicants allege that the settlement offer does not represent the real cost
of rebuilding the house. The FSP says that it has based its offer on a
reasonable assessment of the scope of works and has chosen the most
competitive quotation as reference for the settlement offer.
Case No: 243071 Determination Page 5 of 8
37. Further, the FSP says that it is its option to rebuild, pay the amount it would
cost the FSP to rebuild or pay the sum insured. It notes the Applicants are not
automatically entitled to the sum insured, mainly because it has established
that a smaller settlement amount would suffice to rebuild the property.
38. The Panel agrees that the FSP is entitled to choose the option it considers best
to settle the claim.
39. However, the Panel considers that the Applicants‟ argument is not focussed on
necessarily obtaining a higher settlement offer or to be paid the sum insured.
Instead, the Applicants‟ position centres on the opinion that the scope of works
and quotation provided do not accurately reflect all the features of their house.
40. As such, the Panel‟s attention will fo cus on the appropriateness of the scope of
works and the allegation that the Applicants should have been involved in
establishing the scope of works and obtaining quotations.
Scope of works
41. The Applicants have provided a list of features and items that the y claim have
not been accurately detailed or have been omitted altogether from the scope of
works and SB‟s quotation.
42. The Applicants have also provided a quotation from ARP in the amount of
$989,300. This document is based on the scope of works, the report provided
by the assessor S and the Applicants‟ list of features and items. Despite this,
the quotation is not detailed and therefore makes it difficult for the Panel to
consider its suitability to determine the cost to build a similar house.
43. The Panel not es the discrepancies between the scope of works, SB‟s quotation
and the Applicants‟ list could potentially make a considerable difference in the
claimed amount.
44. The FSP states that the scope of works is a reasonable reflection of the
property. It does not dispute the house had the additional features mentioned
by the Applicants; but argues it cannot be expected to reflect in a scope of
works every single detail or features the house had. As an example of a detail,
the FSP mentions the number of telephone points that the scope of works
should quote for.
45. The Panel notes that in saying this, the FSP is accepting that the scope of
works presented is not fully detailed.
46. Based on the parties‟ materials, the Panel observes the following as examples
of features, noted by the Applicants and not detailed in the scope of works:
Cypress pine boards for the veranda as opposed to hoop pine floors.
Two air conditioners as opposed to one.
Ceiling fans in five rooms.
Built-in pantry and linen cupboard.
Case No: 243071 Determination Page 6 of 8
Windows - timber casement.
47. Although, the Panel agrees that the scope of works cannot reflect every single
detail of the property; the Panel notes it is the FSP‟s obligation under the policy
to pay for the cost of rebuilding the house as new, and as such it should ensure
that the scope of works reflects the main features and characteristics of the
property.
48. Accordingly it will address “The Concerns with the scope of Works” as
described by the applicants:
1. “The scope of works failed to mention the presence of asbestos…
2. While features are described in general accurately, there are no
specifics regarding the number of door and windows, or sizes of rooms.
3. The casement windows were not specified. There were no aluminium
sliding windows at all in the house and many, many casements – many
of which were silky oak. We do not want sliding windows.
4. The bay window feature was not included.
5. There isn‟t any description of the fittings in the house, nor was there
any request for information regarding these.”
49. The Panel notes that asbestos removal is not relevant to this dispute as the
removal has taken place with the cost paid by the FSP
50. Although the items mentioned in 2, 3, and 4 are not specifically included in the
Scope of Works it is noted that the Scope describes the rebuild as: “Main
Dwelling : To match existing as close as possible”. Although the Panel has
some reservations it accepts as noted above, the “features are described in
general accurately”.
51. Supporting the „general accuracy‟ of the Scope of Works , the Panel notes that
each room is specified, as are the construction materials and the total
authorized squarage. Moreover, the quoting builders were supplied with eleven
photographs to enhance their ability to quote accurately on the Scope of Works
with which they were provided.
52. In relation to item 5 above, the Panel agrees there is no description of the
fittings in the Scope of Works. Notwithstanding, the FSP‟s preferred builder has
provided with his quote detailed “Inclusion Allowances” which list what appears
to be its standard house inclusions. Items listed are for the kitchen, bathroom,
ensuites, and laundry. In addition it specifies details of electrical/appliances,
sundry, ceramic tiling, painting floor coverings air-conditioning and television
points. The allowances as stated therein by the builder are included in its quote
for the replacement.
Case No: 243071 Determination Page 7 of 8
53. The FSP however, in relation to the list argues somewhat unconvincingly that
the list should not have been included as “the builder wouldn‟t be allowed to
submit any variations from the things that have been mentioned on the scope of
works provided” ; a statement which completely overlooks the fact that many of
the items are not mentioned in the Scope of Works.
54. This latter matter is most concerning, leaving the Panel far from satisfied the
FSP has appropriately addressed all of the Applicants‟ concerns. It accepts
therefore that the scope of works provided may not have elicited quotes that
fully reflect the correct cost of rebuilding the house.
55. Pursuant to clause 8.2 of the FOS Terms of Reference, the Panel can rely on
what it considers to be fair in all circumstances. In the circumstances of this
dispute, the Panel considers a flexible approach needs to be taken.
56. In doing so, the Panel considers that eighty percent of the quoted amount can
be accepted as accurately reflecting the cost of rebuilding that portion as it sees
little scope for error in quoting for the concrete ground floor, the stumps, the
frame, the whole of the roof and many, many other such items. It does,
however, have some reservations regarding the remaining twenty percent
which comprises some of the less straightforward items, particularly as raised
in detail by the Applicants, but not specifically or adequately dealt with by the
FSP to the Panel ‟ s satisfaction.
57. Thus, the Panel considers an amount of ten percent of the twenty percent
portion of the quote should be paid by the FSP to adequately respond to the
concerns expressed by the Applicants in relation to the Scope of Works and t he
FSP‟s preferred quote which is based thereon.
58. The cost of construction in the preferred quote is $621,770. A twenty
percent portion of that amount is $124,354, of which ten percent is $ 12,434.40
being the amount the FSP must add to the part payment of $639,985.45 which
it has already made.
59. Further, the Panel notes there are some items such as fixed wall coverings
which were not allowed for at all in the preferred quote or the Scope of Works.
60. The Panel therefore considers it fair and reasonable that a further payment of
three and a half percent of the cost of construction be added to the settlement
figure to allow for items altogether overlooked in the settlement process.
61. The additional figure is $21,761.95 (i.e. 3.5% of $621,770).
62. Accordingly, the total amount payable to the Applicants by the FSP as full
settlement (and representing the cost to it of replacement of the dwelling) is
$674,181.80, it being made up of the $639,985.45 part payment already made
plus the amounts of $12,434.40 and $21,761.95 as referred to above.
Involvement of the Applicants in the establishment of the scope of works
Case No: 243071 Determination Page 8 of 8
63. The Panel considers an insurer is entitled to handle a claim according to its
established procedures. As such, if an insurer is satisfied that it has all the
elements necessary to establish a scope of works, then it is not obliged to
involve the insured in this process or request further information from them.
64. In a strict procedural sense, the FSP was entitled to not involve the Applicants
in this procedure, as it seems it was satisfied that it had sufficient elements to
establish the scope of works on its own.
65. In this particular case, the Panel considers that it would have been advisable
for the FSP to involve the Applicants in order to eliminate any doubt as to the
appropriateness of the Scope of Works.
Determination
66. On the basis of the available information, the Panel determines that the FSP
has provided an appropriate quality of service during the handling of the claim.
67. Further, the Panel determines that the FSP is to pay the Applicants an
additional amount of $34,196.35 which with the $639,985.45 already paid
provides a total settlement amount of $674,181.80.
68. Interest is to be paid on the settlement, in accordance with section 57 of the
Insurance Contracts Act 1984, from 13 May 2011, being the date of the FSP‟s
IDR final decision to date of full payment of the claim.
69. If the Applicant accepts the Determination, the FSP is to settle the claim within
30 days of notification from FOS of the acceptance.