Home inundation during Queensland floods denied as flood; claim for flash flood and stormwater run-off cover
Text of the determination
Case No: 243069 Determination Page 1 of 11
Case number: 243069
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim – Flood – Section 35 Insurance Contracts Act 1984.
20 August 2012
Background
1. On the morning of 11 January 2011 the Applicant was evacuated from his
home as a result of rising flood water. His property was inundated sometime
later but the precise time of inundation is unknown.
2. A claim under the Applicant‟s home insurance policy for damage caused by
the inundation was denied by the Financial Services Provider (FSP) on the
ground that damage was caused by flood water as defined by the policy and
excluded from the cover.
3. The Applicant asserts that the cause for the inundation falls within the cover
provided by the policy for flash flood and that his claim should succeed.
Summary of Applicant’s position
4. The Applicant has appointed a representative to present his case to FOS.
Reference to the Applicant in this determination will include his
representative.
5. The Applicant states that the FSP had not met its burden under Section 35
of the Insurance Contracts Act 1984 (the Act) to make its flood exclusion
known to him. As a consequence standard cover applies and his loss is
covered.
6. The Applicant argues that the policy definition of flood is so wide that it
creates confusion for a reasonable consumer which is not clarified by the
disclosure in the Product Disclosure Statement (PDS).
7. The Applicant further argues that the FSP had not clearly informed him of
the cap on payment for damage caused by “Flash Flood and Stormwater
Run- off”.
8. In addition, the techniques used by the FSP prevent a consumer of average
intelligence and education from fully understanding all the information
contained within the policy and comprehending the inclusions and
exclusions. As a consequence, standard cover applies and the claim should
be paid.
Determination
Case No: 243069 Determination Page 2 of 11
9. The Applicant asserts that “Flash Flood and Stormwater Run - off” caused the
damage to his property.
10. The Applicant refers to the time frame for the damage occurring between
4.30pm and midnight on 11 January 2011. The Applicant argues the
elevated Bremer River level caused by heavy rain at 6.00am on 11 January
2011 would have reached his property at approximately 4.30pm causing the
inundation of his property from this time.
11. The Applicant refers to the time frame for damage occurring between
midnight and 4.00am on 12 January. In this case, the Applicant asserts that
in addition to inundation from the Bremer River flooding, the cause for
inundation after midnight was the rising level of the Brisbane River.
12. The Applicant argues that the heavy rain whic h fell during the morning of 11
January resulted in an escalation of the Wivenhoe Dam release strategy to
W4 which in turn increased levels in the Brisbane River and flooded his
property.
13. The Applicant submits that:
The heavy rain which occurred at Wivenhoe Dam from 4.00am until
8.00am on 11 January was the only reason for the operational decision
to escalate dam releases from strategy W3 to W4.
The implementation of strategy W4 resulted in progressively increased
releases of water from the dam which elevated the levels of the
Brisbane River causing the sudden flooding sixteen hours later to his
property.
The 24 hour period commencing with the heavy rain at 4.00am on 11
January includes the flooding that occurred at his property sometime
after midnight but before 4.00am on 12 January 2011.
Summary of FSP’s position
14. The FSP relies on the following policy provisions:
“Words/terms with special meanings
Word/term Meaning
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause. This
policy does not cover flood unless we have agreed and it
is shown on your certificate of insurance.
Flash flood and
stormwater run -
off
A sudden flood caused by heavy rain that fell no more than
24 hours prior to the flash flood or stormwater run - off.
...
Insured events you are covered for
Case No: 243069 Determination Page 3 of 11
Damage caused by weather...
What is covered What is not
covered
Flash flood and stormwater run - off
A sudden flood caused by heavy rain that fell no more than
24 hours prior to the flash flood or stormwater run-off
Loss or damage
caused:
x by flood
...
Your home
The most we will pay for home claims
What is covered What is not
covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum insured or
$25,000 whichever is higher.
...
Your Contents
The most we will pay for your contents
What is covered What is not
covered
Flash flood and storm water run - off
We will pay up to 50% of your contents sum insured or
$25,000 whichever is the higher, but not exceeding your
contents sum insured.
15. The FSP contends that the Applicant was clearly informed of the scope of
the policy‟s flood cover.
16. The FSP submits that when the definitions of “F lood” and “Flash Flood and
Stormwater run- off” are read together, the differences between the two are
clear. “Flash Flood and Stormwater run -off " is a category of flood, namely a
sudden flood caused by rain that fell not more than 24 hours earlier. The
policy makes it clear that this is the only type of flood that is covered and any
other kind of flood is not covered as part of the standard cover.
17. In relation to the cap on flash flooding claims the FSP notes:
(1) the PDS under the heading “the most we will pay you” sets out the
monetary limits applicable to all claims including those falling within the
cover for “Flash Flood and Stormwater run - off”.
(2) The table of contents in the PDS makes it clear at an early stage where
such information can be found.
Case No: 243069 Determination Page 4 of 11
18. The FSP contends that the Applicant‟s loss was not caused by “Flash Flood
and Stormwater run- off” as defined by the policy.
19. The FSP relies on hydrologist reports commissioned by it. The hydrologist‟s
report concluded the cause of inundation of the Applicant‟s pro perty was the
rising level of the Brisbane River which itself was caused by rain that fell
more than 24 hours earlier.
20. The FSP notes the report confirmed the property was not inundated by
stormwater run-off or other local run-off.
21. The FSP states that the fact that there was local rainfall before the
inundation does not mean that the inundation was “Flash Flood or
Stormwater run- off.”
22. The FSP states that the proximate cause, or at the very least a proximate
cause of the loss was the rain which fell in the Wivenhoe Dam catchment
from 9 January 2011 and earlier, which had the effect of raising the level of
the Brisbane River. That rain fell more than 24 hours prior to the inundation
of the Applicant‟s property. Therefore the inundation does not meet the
defini tion of “Flash Flood and Stormwater run - off‟.
Issues
23. Whether the FSP complied with Section 35 of the Act and clearly informed
the Applicant of the relevant terms of the policy.
24. Whether the inundation of the Applicant‟s home was a flash flood as defined
by the policy.
Reasons for decision
25. As advised to the parties, FOS has considered it appropriate to escalate the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
26. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment.
27. This determination has been made by a Panel consisting of an Ombudsman,
a representative with extensive experience in insurance industry matters and
a representative with extensive experience in consumer claims.
28. The submissions by both parties are extensive, comprehe nsive and cogently
argued. They covered a wide range of issues including but not limited to
proximate cause, application of the FOS Terms of Reference in relation to
the rules of evidence and previous determinations, and with considerable
references to case law.
Case No: 243069 Determination Page 5 of 11
The FSP’s obligation to clearly inform the Applicant of the relevant terms of
the policy
29. The Panel has considered the argument made in other matters involving the
FSP‟s household insurance policy to the effect that the product is unclear
and fails to meet the requirements set out in Section 35 of the Act.
30. Section 35 of the Act provides that, where a claim is made under a
prescribed contract and the event giving rise to the claim is a prescribed
event in relation to the contract, an insurer may not refuse to pay an amount
equal to the minimum amount of cover set out in the regulations made
pursuant to the Act unless it can prove that before the contract was entered
into, the insurer clearly informed the insured in writing of the relevant
provisions of the contract, or that the insured knew or a reasonable person in
the circumstances could be expected to have known of such provisions.
31. In this matter the Applicant relies on an academic paper prepared by two
behavioural psychologists to argue that a person of average intelligence and
education would have difficulty in locating and understanding the relevant
terms of the policy.
32. This paper was considered by the Panel in Determination 245470. In that
matter the same policy terms applied as are applicable in this matter.
33. Having considered the issues raised in the paper and having reviewed the
terms of the policy, the Panel found that the structure of the policy allowed a
reasonable person to locate the sections of the policy of interest and that the
relevant terms of the policy were clear and unambiguous.
34. In addition, the Panel also reviewed the FSP‟s policy documentation in
Determination 239722 and found that the FSP had clearly informed the
policyholder of the related terms of the policy.
35. The Panel has no reason to adopt a contrary view in this matter.
36. Accordingly the Panel is of the opinion that the FSP has complied with the
provisions of Section 35 of the Act and that the Applicant‟s claim may be
assessed according to the relevant policy terms.
Cause of the damage claimed
37. The policy provides cover for damage arising from flash flood and
stormwater run- off. “Flash Flood and Stormwater run - off” is defined as a
sudden flood caused by heavy rain that fell no more than 24 hours prior to
the inundation.
38. In order to determine this dispute, it is necessary to determine firstly whether
the Applicant‟s property was inundated by flash flood and stormwater runoff
as defined within the terms of the policy or not. This is an issue that is
current in a number of disputes and to assist in the determination of this
dispute, a site inspection was conducted by the Panel Chair Ombudsman on
6 February 2012 with the Applicant and the FSP‟s representative present.
Case No: 243069 Determination Page 6 of 11
39. The Applicant‟s property is set approximately 700 to 800mm off the ground
with the street dipping near the front of their property. According to the
Applicant, all water in the area pools at each end of the street. The Applicant
thought it was water from the Bremer River that had inundated their property.
In fact, the Br isbane River is closer to the Applicant‟s property than the
Bremer River. The Applicant maintains they (he and his wife) were
evacuated at approximately 11.00am on 11 January 2011, at that stage,
there was water at both ends of the street and you could no longer drive
through. The Woogaroo Creek at the front of the Applicants‟ property had
flooded by this time.
40. The Applicant believes it was raining heavily and it continued to rain heavily.
The Applicant was not present when the property was inundated, b ut
advised that water eventually rose above roof level of the home. Following
the loss, the Applicant received a compassionate payment of $12,500 from
the FSP together with payment from the Queensland Relief Fund.
41. It is clear from the information exchange d that the Applicant‟s property was
not inundated by stormwater exiting the stormwater drains. The Applicant‟s
property is 700-800mm off the ground and it is unlikely that stormwater
runoff of itself would have been sufficient to inundate the property. The
central issue for determination in this dispute is therefore whether the
inundation of the Applicant‟s home was due to flash flood as defined within
the terms of the policy, that is, whether the heavy rain that fell no more than
24 hours prior to the inun dation of the Applicant‟s property was the
proximate cause of the inundation.
42. The Applicant has argued that heavy rain falling in the Bremer River
catchment on the morning of 11 January 2011 elevated the Bremer River,
subsequently causing the Brisbane River to rise and inundate his property,
sometime after 4.30pm on 11 January 2011.
43. The Applicant further argues that heavy rain which fell on 11 January 2011
over the Wivenhoe Dam catchment resulted in escalation of the Wivenhoe
Dam release strategy to W4 which led to vastly elevated levels in the
Brisbane River and flooded his property sixteen hours later between
midnight and 4.00am on 12 January 2011. The Applicant contends the only
reason for the decision to escalate the dam release to W4 was the heavy
rain which fell over the dam from 4.00am to 8.00am on 11 January 2011.
44. On the other hand the FSP submits the evidence does not support a finding
that Bremer River flows were responsible for flooding the Applicant‟s
property.
45. The Panel suspended issuing determinations relating to this question after
the Queensland Flood Commission of Inquiry had been recalled to hear
further evidence from the Wivenhoe Dam operating engineers. Once the
final report was released, all relevant stakeholders were invited to put further
submissions to the Panel relating to the impact of the heavy rainfall that
commenced falling over the Wivenhoe Dam around 4.00am on 11 January
Case No: 243069 Determination Page 7 of 11
2011 and in particular the impact this had on the decision to adopt the W4
release strategy which was adopted at 8.00am on 11 January 2011.
46. On 21 May 2012, FOS issued a memorandum to all relevant stakeholders
advising that after a considerable deliberation of all material available to it,
the Panel had formed a broad view that the heavy rain that commenced
falling from approximately 4.00am on 11 January 2011 and in particular the
heavy rain that fell between approximately 4.00am and 8.00am on 11
January 2011 over the Wivenhoe Dam was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
47. At the time the Panel noted that each individual dispute would depend upon
the individual and unique factors relevant to the dispute and in that regard,
the parties were invited to make further submissions in relation to disputes
before FOS.
48. In view of this, the FSP provided detailed further submissions to FOS on 12
January 2012 in relation to this dispute. Included with the submissions were
the following documents:
A Reference Document for disputes relating to „Queensland Floods‟
(this is a general reference document) relating to the various
submissions that the FSP makes in relation to a number of issues. Not
all issues raised in the Reference Document appear in the current
dispute;
Letter from the FSP‟s hydrologist attaching a key information sheet for
the Applicant‟s property;
Hydrologist‟s report “Investigations of January 2011 inundation event –
Brisbane” dated March 2011;
Statement from a hydrologist dated 7 June 2012.
49. A further submission with a revised Reference Document dated 11 July 2012
has also been provided by the FSP. The revised Reference Document
supersedes the Reference Document dated 12 June 2012.
50. Essentially, it is the argument of the FSP and consistent with its earlier
arguments, that the hydrology reports from its hydrologist and the ICA
reports support the view that the rainfall on 11 January 2011 was not the
cause of the inundation of properties along the Brisbane River but it was the
rain that fell more than 24 hours earlier that was the proximate cause of the
inundation. The FSP argues that the proximate cause of inundation of the
properties, that is, the real or effective cause of the damage caused to
properties downstream of the dam, on any reasonable view must be
considered to be the combined effect of all of the rainfall and not just the rain
that had fallen from 4.00am on 11 January 2011 leading to the
implementation of the W4 strategy from 8.00am that day.
51. There are some inconsistencies between the site specific hydrology provided
and the key information sheet for the Applicant‟s property. The Panel
Case No: 243069 Determination Page 8 of 11
accepts the information provided in the key information sheet is more
accurate and accepts the comments made by the hydrologist in that sheet.
52. According to the conclusions reached, the Applicant‟s property had a
minimum land level of 9.1m AHD and a maximum land level of 10.8m AHD.
The approximate benchmark level of the Applicant‟s home (that is the lowest
point of the structure of the house on the land) is 11.1m AHD. The effect of
the W4 releases from the Wivenhoe Dam would have first reached the
vicinity of the property at 12.51pm on Tuesday 11 January 2011. This is
consistent with the Applicant having been evacuated from the area with
water pooling at each end of the street by 11.00am on that day.
53. The Brisbane River reached the benchmark level, that is, the height of 11.1m
AHD at approximately 7.17pm and by 4.00am on 12 January 2011, the
Brisbane River level would have been 14.5m AHD which is approximately
3.4 metres above the benchmark level of the Applicant‟s property.
54. In other words, according to the hydrologist the Applicant‟s property would
have been inundated to a level of 3.4 metres above benchmark level by
4.00am on 12 January 2011.
55. The Panel accepts that whilst these calculations may not be precise, in the
absence of any alternative information and given the further review
conducted by the hydrologist that this information should be accepted.
Based on this information it is reasonable to conclude that the Applicant‟s
property had been inundated as a result of the effects of the W4 release to a
height of 3.4 metres above benchmark level by 4.00am on 12 January 2011.
56. There is no dispute that there were two significant rainfall spikes that
occurred. As identified by the FSP in its material, the first rainfall spike
occurred from 9-10 January 2011 whilst the second rainfall spike occurred
from approximately 4.00am on 11 January 2011. It is not disputed between
the parties that the rainfall from the first spike contributed significantly to the
increase in the level of the Wivenhoe Dam. The hydrology suggests that the
rainfall leading to the first spike is likely to have led to greater runoff, whilst
the rainfall from the second spike is more likely to have fallen more directly
over the dam area.
57. The Panel also notes that the FSP‟s hydrologist has concluded that not only
was there heavy rain that fell over the Wivenhoe Dam catchment area and
over the Brisbane River from approximately 4.00am on 11 January 2011, but
there was heavy rain over the Bremer River which commenced at 6.00am on
11 January 2011 and influenced the level of the Brisbane River.
58. Information exchanged and relied upon from SEQWater dated 2 March 2011
confirms that was a rapid increase in the inflows to the Wivenhoe Dam from
4.00am on 11 January 2011. The SEQWater report identifies the inflows into
the dam had been steadily decreasing from as early as 8.00am on 10
January 2011 and in particular from 3.00pm on 10 January 2011 until
2.00am on 11 January 2011.
Case No: 243069 Determination Page 9 of 11
59. Prior to 4.00am on 11 January 2011 and in fact prior to 8.00am on 11
January 2011, the dam releases were being managed at the W3 strategy
level. Whilst it is accepted that the W3 strategy led to an increase in the
levels of the Brisbane River, the W3 strategy was designed to avoid, where
possible, inundation of property below the Wivenhoe Dam by flooding from
the Brisbane River. The FSP‟s hydrologist has speculated that if the W3
strategy had been maintained then the river level would have first inundated
the benchmark level of the Applicant‟s property at 8.02pm on Tuesday 11
January 2011 and by 4.00am on 12 January 2011 would have been 1.8
metres above the benchmark level.
60. The Panel is concerned that to reach such a conclusion as to the continued
impact of the W3 strategy, it must be speculated that the releases from the
dam would have continued at the same rate at the W3 strategy level in the
absence of any additional rainfall.
61. The available information indicates the W3 strategy that was in place prior to
8.00am on 11 January 2011 had been successful in limiting the outflows and
therefore flooding below the Wivenhoe Dam. The information confirms that
the inflows into the dam had been reducing until approximately 2.00am. The
significant increase in inflows into the dam only occurred after the heavy
rain. Whether the W3 level outflows would have been maintained in the
event that the inflows continued to reduce is unknown and has not been
addressed in the hydrology information.
62. There is no dispute that following the second spike the W4 strategy was
adopted. Whilst the FSP has argued that the switch of strategy to W4 was
not the natural and ordinary consequence of the rain that fell and in fact the
move to W4 strategy was not taken in accordance with the Wivenhoe Dam
manual, in the Panel‟s view, the Queensland Flood Commission of Inquiry
final report does not support this. In the Panel‟s view, a fair reading of the
Queensland Flood Commission of Inquiry final report does not find that the
adoption of the W4 strategy at 8.00am on 11 January 2011 was inconsistent
with the manual. Although there may be issues as to how the Wivenhoe
Dam had been managed prior to this time, there is nothing in the material
provided to the Panel to suggest that the earlier management of the
Wivenhoe Dam influenced to any significant degree the adoption of the W4
release strategy at 8.00am on 11 January 2011.
63. According to the information exchanged, and again not disputed, as a result
of the increased inflows into the Wivenhoe Dam it was no longer feasible to
maintain the W3 strategy and the W4 release strategy was adopted. The W4
release strategy was adopted from 8.00am on 11 January 2011. Again, the
Panel accepts based on the information exchanged and in particular the
information supplied through the ICA hydrology and the FSP‟s hydrology that
as a result of the adoption of the W4 strategy, a flood wave occurred which
subsequently caused the significant inundation of areas downstream from
the Wivenhoe Dam. The Panel accepts the levels of the Brisbane River were
influenced by the W4 releases and consistent with the hydrology provided by
the FSP, by the rainfall over the Brisbane River at that time and the heavy
Case No: 243069 Determination Page 10 of 11
rainfall commencing at approximately 6.00am over the Bremer River which
eventually flows through to the Brisbane River.
64. As indicated earlier, the FSP‟s hydrology evidence which is accepted by the
Panel indicates that the property was inundated to a level of 3.4 metres
above benchmark level by 4.00am on 12 January 2011.
65. The question still arises as to whether the proximate cause of this inundation
was rainfall that fell no more than 24 hours before the inundation
commenced. The FSP argues that the overwhelming evidence points to t he
conclusion that the cause of the inundation and the adoption of the W4
strategy was the rain that fell over the period from 9 – 11 January 2011 and
earlier; and that this therefore is flood as defined within the terms of the
policy. Further, the FSP submits that if the rain which fell within 24 hours of
the inundation was a proximate cause of the W4 release strategy being
adopted, then equally rain that fell outside the 24 hours was also a proximate
cause and would fall outside the scope of the policy. T he “Wayne Tank”
principle would apply in these circumstances to exclude the Applicant‟s
claim.
66. The Panel agrees with the FSP‟s general submission that the proximate
cause is a cause determined by commonsense evaluation of the relevant
facts. It is the dominant, effective, direct or efficient cause of the loss and not
necessarily the last event or final trigger that must be considered. In the
event that there are two or more proximate causes, one within the policy and
the other excluded, the policy will not respond. The FSP‟s argument is that to
find the rainfall that had fallen from 4.00am on 11 January 2011 is the
proximate cause would be a finding without foundation, as such an approach
would produce an entirely artificial outcome.
67. The Panel has considered the FSP‟s arguments and has regard to the
relevant legal principle terms of the policy and industry practice. Whilst the
Panel accepts there has been a significant impact on the level of the
Wivenhoe Dam by the rainfall that commenced falling on or about 9 January
2011 or earlier, the Panel in this dispute is satisfied having regard to the
information that has been exchanged and the relevant legal principles that
the heavy rain that commenced falling at or about 4.00am on 11 January
2011 was the proximate or effective cause of the adoption of the W4
strategy.
68. The Panel is satisfied that whilst the level of the Brisbane River may have
been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that fell over the Wivenhoe Dam
causing the need to adopt the W4 strategy and the heavy rainfall that fell
over both the Brisbane River and Bremer River on that same day that led to
the inundation of the Applicant‟s property. To this extent, the Panel is
satisfied that the inundation of the Applicant‟s property to a level of 3.4
metres above benchmark level occurred within 24 hours of the
commencement of the heavy rainfall and accordingly is covered under the
terms and provisions of the policy.
Case No: 243069 Determination Page 11 of 11
69. Insofar as the Applicant‟s property was damaged after 4.00am on 12
January 2011, the policy does not extend to cover such loss. The policy
wording in the Panel‟s view is clear. It will only cover the loss or damage that
occurred within 24 hours of the heavy rainfall. Any loss or damage that
occurred after the 24 hour period does not fall within the terms of the policy.
Having found this, the Panel notes however that the majority of the damage
to the Applicant‟s property would have been sustained as a result of
inundation to the level of 3.4 metres above benchmark by 4.00am on 12
January 2011.
70. The policy does not provide full cover but provides limited cover of up to 50%
of the building sum insured or $25,000 whichever is the higher. The Panel
notes the building sum insured according to the information exchanged is
$276,000. The policy provides limited contents cover of 50% of the contents
sum insured or $25,000 whichever is higher. Again the Panel notes the
contents sum insured is $70,000.
71. The Panel has not been provided with detailed assessment of the loss and
to this extent the parties are asked to work cooperatively together to
determine the extent of the loss. Insofar as the FSP has made a
compassionate payment, that sum is outside the jurisdiction of the Service,
but the Panel accepts, given the nature of the payment, that it may be taken
into account when determining the final pay out.
Determination
72. For the reasons expressed above the Panel determines that the FSP is to
indemnify the Applicant according to the terms of cover provided by the
policy for loss or damage caused by “Flash Flood and Stormwater run - off”.
73. Insofar as the FSP determines to cash settle the Applicant‟s claim, the FSP
is to pay interest in accordance with Section 57 of the Insurance Contracts
Act from 8 April 2011 being the date of rejection of the Applicant‟s claim to
date of payment of the claim.
74. Should the parties be unable to agree on the extent of the insured loss, then
the parties may return to the Service and the Panel will determine the
settlement amount after further submissions.