Text of the determination
Case No: 242947 Determination Page 1 of 12
Case number: 242947
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
25 January 2012
Background
1. The Applicants’ home has been insured with the Financial Services Provider
(FSP) since October 2009.
2. They lodged a claim for damage caused by a leaking shower combination in
2010.
3. The FSP accepted liability and sought to cash settle the claim for $2,830 (net
of the policy’s $800 excess).
4. The Applicants considers the offer inadequate because they believe:
The damage to their home is more extensive than what the FSP had
assessed it to be.
They are entitled to temporary accommodation for the duration of
repairs.
They are entitled to $3,000 in compensation because the FSP had
mishandled the claim and was slow in processing it.
Summary of Applicant’s position
5. The FSP did not properly assess the damage and consider all available
relevant evidence. Its internal review process was also flawed.
6. The assessor’s conclusions were flawed because he:
did not properly assess their home;
declined to view photos taken of the wall cavity at the time the leaking
shower combination was repaired;
declined to reopen the wall to examine its cavity;
misrepresented plumber BJ’s evidence; and
assumed that the wall lining is fibrous cement sheeting.
Determination
Case No: 242947 Determination Page 2 of 12
7. The only reliable evidence on the matter is from BJ (who had personally
seen the damage) but the FSP ignored his evidence.
8. The photos show:
The shower recess wall lining is a plaster board sheeting, and not
fibrous cement sheeting. This is evidenced by the fact its outer layer (a
cardboard like material) had delaminated from the rest of the sheet.
The wall to which the bathroom tiles have been attached to have
swelled and delaminated.
9. Their evidence as to the history of the claim is as follows:
The female Applicant “SN” noticed several floorboards near the
bathroom (located upstairs) had cupped in January 2010.
She noticed a large amount of water in the laundry (which was situated
below the upstairs bathroom) in February 2010.
SN contacted the FSP on 2 February 2010 but was advised to repair
the damage herself.
SN was unaware what was required to be done as she had never
lodged a claim before and had not met the male Applicant “SU” (a
member of the FSP’s internal dispute resolution team) yet.
SN contacted plumber “BJ” who found and repaired a leaking shower
combination. SN paid for the cost incurred.
SU and SN met in April 2010.
SU realised that SN had a valid claim which led them to reopen the
claim.
The FSP arranged for an assessor to attend the property but he was
“disinterested” and “preoccupied”. As the leaking combination was
already repaired, the assessor was only on the premises for 10 minutes
and only had a “cursory look” at the bathroom, hallway, adjoining
bedroom, stairway, and laundry before departing.
SN offered to show the assessor a number of photographs taken of the
wall cavity when the leaking shower combination was replaced, but the
assessor declined to view them. The FSP also did not consider it
necessary to view the photos despite being aware of their existence.
The FSP later informed them of the scope of works it believed was
sufficient to repair the home.
They wrote to the FSP on several occasions, outlining their concerns
with the accuracy of the assessment and scope of works.
The FSP failed to respond, so they sent it a repair quote. However,
there was still no response from the FSP.
The assessor’s report was only provided to them on 17 September
2010, over 2 months after it had been originally requested.
Case No: 242947 Determination Page 3 of 12
10. The FSP did not complete its IDR review within 15 business days, as
required by the Code. Instead, it unilaterally extended the deadline. It has
breached sections 3.2.2, 3.2.4, 3.2.5, 3.3, 3.4.1, 3.4.2, 3.4.3, 3.6.1, 3.6.4,
3.6.6, 6.1.1, 6.2, 6.3, 6.6.c, 6.7 and 6.8 of the Code.
11. The FSP never previously suggested exclusions applied in the
circumstances of the claim. It had also accepted the claim, so the Applicants
are unclear as to why a number of exclusions have been cited in its IDR
letter.
Summary of FSP’s position
12. The Applicants have not shown that their home sustained damage beyond
those that have already been identified.
13. Its assessor advised:
Plumber BJ reported that the shower membrane was sound.
The only visible damage was the cupping of the floorboards near the
bathroom.
The wall lining and hardwood timber framing would not be damaged by
a one off moisture inundation. It is acceptable building practice to
simply repaint the area.
Mould would not have the chance to grow to a point of concern once
the wall dries up.
The bathroom floor is sound.
14. Beyond noting that the timber flooring was wet at the time of his inspection,
plumber BJ has not suggested that the bathroom floor was damaged or
explain how it would have been so damaged.
15. It is not required to pull up the floorboards on the basis of speculation that
there may be damage.
16. Although it had agreed to include 2 cracked shower tiles (identified by BJ) as
part of the claim, and the Applicants have since claimed the occurrence of
new damage, they have refused to allow a further inspection of their home
so that a revised scope of works could be prepared and that the nature of
the wall lining could be identified. Instead, they provided a quote to replace a
number of items which it had not agreed to cover.
17. It is prepared to consider a claim for temporary accommodation if it is
allowed to reinspect the home, and on the basis of such reinspection, it
determines that it is liable for the bathroom repairs and the repairs would
render it unusable.
18. It has dealt with the Applicants’ claim appropriately.
19. It has The FSP relies on the following policy provisions:
Case No: 242947 Determination Page 4 of 12
“ What we cover – insured events
…
Yes No
You are covered for damage or
loss to your home building
occurring during the period of
cover and caused by the following
events:
You are not covered for:
…
Liquid escaping suddenly and
unexpectedly from a:
water main, drain, fixed pipe,
guttering, fixed tank or drain,
sink, basin, bath, shower,
toilet or spa bath,
…
Damage or loss resulting from:
liquid escaping slowly over a
period of time where you
could reasonably be expected
to be aware of this condition.
The cost of repairing or replacing the
item from which the water or liquid
escaped.
…
What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss,
cost or liability caused by or arising from or involving:
…
wear and tear, rust, deterioration or corrosion,
mechanical, structural, electrical, electronic or other failure or breakdown,…
mould, wet or dry rot, rising damp or dampness, ”
Issues
20. Whether the FSP’s cash settlement offer fulfils its obligation under the policy.
21. Whether the FSP is entitled to further reinspection of the Applicants’ home.
22. Whether the Applicants are entitled to temporary accommodation for the
duration of repairs.
23. Whether the Applicants are entitled to compensation under clause 9.3 of the
Terms of Reference.
Reasons for decision
24. I note that SU is a member of the FSP’s internal dispute resolution team and
the Service previously attempted to assist the parties in resolving the dispute
Case No: 242947 Determination Page 5 of 12
amicably. However, negotiations fell through. The Applicants have now
asked for the matter to be determined and the FSP has been informed that
the matter would proceed directly to Determination.
25. I am satisfied that the material has been exchanged and the parties have
had the opportunity to respond to the issues raised.
26. I have taken note of the following policy provisions in addition to those
referred to by the FSP:
“ Repairing or rebuilding your building
If your home building is damaged during the period of cover by an insured
event, we will decide if the damage:
can properly be repaired, or
is so severe that we reasonably believe your building will need to be
rebuilt.
Repairing your building
When we establish that your home building can be properly repaired, we will
decide to:
repair it, or
pay the cost of repairing it.”
27. I consider the FOS Terms of Reference relevant to this dispute are:
“ 8.2 Dispute resolution criteria
Subject to paragraph 8.1, when deciding a Dispute and whether a
remedy should be provided in accordance with paragraph 9, FOS will
do what in its opinion is fair in all the circumstances, having regard to
each of the following:
a) legal principles;
b) applicable industry codes or guidance as to practice;
c) good industry practice; and
d) previous relevant decisions of FOS or a Predecessor Scheme
(although FOS will not be bound by these).
…
9.3 Other compensation
…
b) Subject to paragraph c) and paragraph 9.7, FOS may decide that
the Financial Services Provider compensation the Applicant for
non-financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time
taken to resolve the situation or interference with the
Applicant’s expectation of enjoyment or peace of mind has
occurred ;…
…
Case No: 242947 Determination Page 6 of 12
The maximum amount of compensation for non-financial loss will
be $3,000 per claim made in the Dispute. ”
The claim
28. I have reviewed plumber BJ’s report and made the following observations:
BJ discovered a leaking shower combination in the cavity of the
Applicants’ upstairs bathroom wall.
He observed the following damage, which he attributes to the leaking
combination:
o 2 cracked tiles near the shower head.
o Water damage to all floorboards to the bathroom and
surrounding area. Some of them have cupped.
He further observed that the inside of the relevant wall was damp, but
does not specifically say that it was damaged. I note that this wall is a
significant point of contention between the parties.
Although BJ says that the leaking combination had caused the 2 tiles to
crack, I am unable to understand how it caused the crack.
In this respect, he merely says:
“The water seeped down the wall behind the waterproof membrane thus
causing damage to them…”
I understand that a waterproofing membrane is ordinarily situated
between the bathroom tiles and the wall. In light of this, BJ has not
explained (and I am unclear) how water flowing behind the wall (ie. on
the other side of the waterproofing membrane) would cause the 2 tiles
to crack.
BJ inspected the floorboards directly beneath the shower unit. Whilst
he found the area wet, he does not say whether or not they were
damaged.
29. The FSP’s position is that the available evidence shows that the home only
sustained (and it is only required to indemnify the Applicants for) the
following damage:
A water damaged plasterboard (measuring 1.8m x 1.8m) at the
stairwell wall.
Some staining in the laundry wall and ceiling.
Water damaged flooring in bedroom 3 and the hallway.
30. For this purpose, it offered the Applicants a cash settlement of $2,830
derived as follows:
Building repair
Water damaged plaster board $450
Sealing and repainting stairwell, laundry wall and $500
Case No: 242947 Determination Page 7 of 12
ceiling
Sand and polish water damaged floorboards $1,500
Cleaning $500
$2,950
Leak locating cost $680
Claim payable $3,630
Less: Excess $800
Net amount payable $2,830
31. I note that the FSP has since agreed to include the 2 cracked tiles as part of
the claim, and subject to it being allowed to conduct a further site inspection,
is prepared to consider the claim for temporary accommodation and other
damage.
32. The Applicants believe the FSP’s cash settlement offer of $2,830 is
inadequate. Based on the quote they provided, they seek complete
replacement of the wall and floor tiles in the bathroom, and shower screen at
a cost of $10,351 (as at 20 August 2010). They also seek the cost to repair
damaged floorboards
33. Insofar as the FSP’s request for a reinspection is concerned, they believe
that the FSP has had sufficient opportunity to properly inspect their property
and since it has not done so, they were well within their rights to refuse a
further inspection.
34. While they might well be entitled to refuse a further inspection, the
Applicants must nonetheless establish a prima facie claim as a minimum. A
claim is not automatically established or established by default just because
an insurer failed to conduct an inspection or for that matter, a proper one as
alleged. Pointing out deficiencies in the FSP’s ev idence also does not imply
a prima facie claim is established.
35. It is established law that the onus rests with policyholders to establish a
claim covered by their policy. This means they not only have to show that an
insured event occurred, they also have to show such event caused the
damage claimed.
36. There is no dispute that an insured event did occur and some damage
occurred. The FSP has agreed to cover the cost to rectify such damage, but
the Applicants’ maintain that the damage was actually more extensive than
what the FSP had assessed it to be. Since this is their belief, the onus falls
on them to establish this fact.
37. On this matter, they rely extensively on photographs taken of the inside of
the bathroom wall (when the leak was repaired) as well as on comments
made by SU.
Case No: 242947 Determination Page 8 of 12
38. Although I accept SU may have gained some specialised knowledge in the
area by virtue of his occupation, I do not accept that it automatically qualifies
him as an expert for the purposes of the issues under consideration. It also
does not assist that he is an Applicant and as such, has a clear conflict of
interest. For these reasons, I am not inclined to accept SU’s assertions as
expert evidence and am of the view that he must substantiate his assertions
with the appropriate evidence.
39. The Applicants seek a cash settlement to cover the cost to replace their
bathroom floor and wall tiles, but (apart from 2 cracked tiles which the FSP
has agreed to cover subject to a reinspection) have not shown that they
have been damaged, let alone damaged by the leaking pipe.
40. They also claim for a new shower screen as the current one was apparently
damaged, but there is nothing in the material to suggest that it was damaged
by the leaking shower combination.
41. The Applicants have advanced a number of other arguments to justify a
policy response to the cost to replace the bathroom tiles and shower screen.
Having considered the available material, I am not persuaded by the
arguments advanced.
Waterproofing membrane
42. They first sought to suggest that the leak had damaged the waterproofing
membrane. As the membrane must be replaced, the bathroom tiles and
shower must inevitably be replaced.
43. It is unusual that water could damage the very thing that is designed to keep
water out. If water could in fact damage the wate r proofing membrane, then
the reasonable inference must be that the membrane was either defective or
had simply deteriorated over time.
44. Leaving aside the unusual proposition, I found nothing in the available
evidence that supports a suggestion that the membrane had failed, let alone
failed as a result of water. At the very least, the evidence was inconclusive
on the matter.
45. BJ made two references to the waterproofing membrane in his report.
46. The first was when he sought to suggest that the 2 tiles near the shower
head were purportedly cracked by the leaking showing combination. Leaving
aside the lack of clarity as to how it could have caused the cracks, BJ does
not actually suggest that the membrane was damaged. His words suggest
that it had merely been bypassed:
“water had seeped down behind the waterproof membrane…”
47. The second reference was made when he sought to determine whether
there was a leak in the shower waste pipe. He found that it was not leaking
but noted that the timber floorboards beneath were wet. Based on these
observations, he then commented:
Case No: 242947 Determination Page 9 of 12
“… this is indicative of leakage due the breakdown of the waterproofing
membrane…”
48. Based on what BJ said of the membrane in the earlier part of his report, I am
unclear if BJ had used the term “breakdown” in the context of the membrane
being bypassed rather than a suggestion that the membrane is no longer
waterproof.
49. At the very least, BJ was unclear as to whether the leaking combination had
caused an actual failure of the membrane’s waterproofing capabi lity, and
even if I am inclined to accept he made such a suggestion, it does not assist
the Applicants that he has not explained how it did so.
Timber floorboards
50. The Applicants’ next suggestion was that the timber floorboards beneath the
shower were damaged. As such, they require repairs so the bathroom tiles
and shower screen must inevitably be replaced.
51. The Applicants have based this suggestion on the fact BJ found them to be
wet and there was evidence of water damage to other floorboards around
the bathroom.
52. I do not agree that the floorboards are necessarily damaged (or for that
matter, will necessarily be damaged or require replacement) by the mere fact
they were found to be wet.
53. The policy responds to damage caused by a covered event, so there must
be the fact of damage (such as cupping found on a number of other
floorboards). Where damage was not immediately apparent, then there must
be expert evidence demonstrating that the moisture had so compromised the
floorboards that it would be inevitable that they would degrade prematurely.
54. Whilst the Applicants have extensively argued these matters (eg. suggesting
that it is “commonly known” timber is weakened and damaged by exposure
to moisture, that floorboards exposed to a moist have greater likelihood of
dry rot etc.), the fact of the matter is that they have not provided any
evidence to substantiate their many assertions.
Bathroom wall
55. The Applicants’ final suggestion is that the bathroom wall was damaged and
must be replaced; thereby warranting replacement of the bathroom tiles and
shower screen.
56. There is much contention between the parties as to the nature of the
material constituting the wall and whether it had been damaged. The
assessor believes it may be fibrous cement and as such, unlikely to have
be en damaged by a “one off” moisture exposure. The Applicants argue that
it was plaster board and refers to photographs showing that some areas
have delaminated and purportedly swelled.
Case No: 242947 Determination Page 10 of 12
57. I have reviewed the material available and remain unclear as to what the
wall was made of and whether it was damaged to an extent it requires
replacement.
58. Whilst the assessor’s comments with respect to wall were speculative, this
does not imply the Applicants’ assertions on the matter were necessarily
correct. I would have been inclined to accept their assertions if they were
appropriately supported by expert evidence and/or evidence of damage to
the tiled side of the wall. However, there is no such evidence in the material
exchanged.
59. If the wall had indeed swelled, as the Applicants allege, it is reasonable to
expect some visible damage to tiled side of the wall. However, the
Applicants have not provided any evidence of damage to the tiled section of
the wall save for the 2 cracked tiles; which I am already unclear as to how
they could have been cracked by a leaking combination.
Inconclusive whether damage more extensive than identified
60. Accordingly, based on the material currently before me, I have not been
persuaded that the Applicants’ home had sustained more extensive damage
than those already identified, and which the FSP has agreed to cover.
61. My view on this matter is further supported by the fact the Applicants have
not sought to carry out any repairs to the areas they claim were damaged
between the time the leak was repaired and the claim was reopened. If the
areas claimed were already damaged, it is reasonable to anticipate that
repairs would have been carried out there and then. It does not appear
reasonable to only repair the leaking combination and patch the relevant
wall, leaving other purportedly apparent damage unattended or left to
deteriorate further.
Further inspection
62. Although the current evidence does not satisfy me that the home had
sustained more extensive damage, I note that the FSP is prepared to leave
the matter open and is seeking an opportunity to conduct a reinspection of
the Applicants’ property. I would strongly encourage the Applicants to oblige
a further inspection if they believe their home had indeed sustained more
extensive damage than those previously identified.
63. I would like to remind the parties that they are required to deal with each with
utmost good faith, and while the FSP is required to properly assess the claim
as a matter of good insurance practice, the Applicants should be mindful that
they ultimately have a primary obligation to demonstrate a prima facie claim.
Temporary accommodation
64. The material currently available does not satisfy me that the Applicants’
floorboards and bathroom requires complete replacement. Accordingly, I am
Case No: 242947 Determination Page 11 of 12
not satisfied that the Applicants have established an entitlement to
temporary accommodation under the policy.
Compensation
65. The Applicants have raised a number of issues with respect to the manner
their claim had been handled and on this basis, argue they are entitled to
$3,000 compensation pursuant to clause 9.3 of the Terms of Reference.
66. The information before me is inconclusive as to whether SN was misled
when she first called to lodge a claim. The Applicants generally assert that
she was asked to attend to the damage herself, but have not provided any
specific details as to what actually transpired.
67. According to the FSP’s contemporaneous records:
SN was informed of the policy’s leak location benefit.
She would have to fix the leak herself (which is not inconsistent with the
policy).
She was asked to obtain a plumber’s report on the damage.
She elected to withdraw the claim after cover was explained.
She was warned that if she fails to repair the leak and she
subsequently reopens the claim, the FSP’s liabili ty may be reduced.
68. I am unable to prefer one party’s version over the other in the absence of
independent evidence substantiating their respective claims. The fact SN
may be prepared to provide a statutory declaration does not mean that her
assertions should therefore be accepted.
69. Furthermore, the material shows that the delays in the claim was also
contributed by the late provision of plumber BJ’s report and concerns raised
by the Applicants with respect to the FSP’s assessment. On this matter, it
does not assist the Applicants’ cause that they have a primary obligation to
prove a prima facie claim and the concerns they raised were not supported
by appropriate expert evidence.
70. Accordingly, even if the FSP may not have dealt with the claim strictly in the
manner expected by the Code, its conduct must also been assessed in light
of delays attributable to the Applicants in determining if compensation should
ultimately be payable.
71. Having considered these matters, I am not satisfied that the FSP had
inordinately delayed the claim to an extent justifying an award of
compensation under clause 9.3 of the Terms of Reference.
72. Be that as it may, the Service does not encourage breaches of the Code so I
consider it appropriate to refer the Applicants’ complaints to the Co de
Compliance Manager for consideration.
Case No: 242947 Determination Page 12 of 12
Determination
73. On the basis of the above analysis, I determine that the FSP is not required
to revise its settlement offer in the absence of evidence that the damage to
the Applicants’ home was more extensive than cu rrently established.
74. I also determine that the FSP is not required to provide an allowance for
temporary accommodation.
75. I determine that the FSP is not required to pay the Applicants any
compensation under clause 9.3 of the Terms of Reference.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.