Summary

The applicant, represented by a solicitor, claimed for storm and flood damage to his home and contents. AFCA found the damage was caused by river flood, which is excluded, so the FSP was entitled to deny the claim.

Once the FSP proves on the balance of probabilities that an exclusion applies, namely river flood backflow, the claim fails despite the applicant's stormwater argument.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 242835 Determination Page 1 of 7 Case number: 242835 General Insurance - Domestic Insurance - Home Building & Home Contents – Flood - FSP Decision - Denial of claim 13 February 2012 Background 1. The Applicant is insured with the Financial Services Provider (FSP) for his home building and contents under separate policies. The Applicant rents out the ground level of the home and occupies the first level. The building is insured for the sum of $383,000 and contents for $55,000. 2. On 14 January 2011, the Applicant lodged a claim as a result of water inundation at the property. Two separate claims were recorded for the building and contents. 3. The FSP appointed a loss assessor to attend the property and report on the cause and extent of damage. The loss assessor noted the building suffered partial damage and the contents were considered a total loss. 4. On 15 March 2011 the FSP wrote to the Applicant advising the claims had been denied as the damage had been caused by flood. 5. A solicitor acting on behalf of the Applicant wrote to the FSP on 21 April 2011 disputing its decision to deny the claim and requesting review through its internal dispute resolution procedures. However, the FSP maintained its decision. Summary of Applicant’s Position 6. The Applicant is seeking indemnity under the policies for damage to the building and loss of contents. 7. The issues raised by the Applicant’s solicitor in his letter to the Service dated 21 September 2011 included:  The FSP’s failure to discharge its obligation under section 35 of the Insurance Contracts Act 1984 (the Act);  The FSP did not adequately investigate the claim and is relying on a generic hydrology report; Determination Case No: 242835 Determination Page 2 of 7  The Applicant’s home was affected by multiple events, namely stormwater and rain, before any river flooding occurred. Summary of FSP’s Position 8. The FSP states:  It relies on the hydrology report commissioned by the Insurance Council of Australia (ICA) and its loss adjuster’s report and states the findings are irrefutable and cannot be challenged;  It diligently and thoroughly investigated t he entirety of the Applicant’s claim and addressed every issue raised;  The overwhelming evidence from its investigations is that the damage occurred as a result of a river flood;  It disputes the Applicant’s contention that the damage occurred as a result of stormwater;  It provided the policy to the Applicant outlining the exclusion prior to the loss occurring;  The policy exclusion for flood is clear and unambiguous;  It has fulfilled its responsibility to inform the Applicant of the flood exclusion;  If it were considered that the inundation arose out of heavy downpour and flood it would say that both events would have occurred at the same time or so close in time to render it impossible to be able to identify which event caused the loss or losses;  If it were determined the Applicant had established he suffered a loss by an insured event, the FSP says that river flood has at least contributed to the loss and accordingly, by application of the Wayne Tank principle, the policy does not respond. 9. The FSP relies on the following policy provisions: “What you are not covered for There are certain times when this insurance may not provide cover. Some events we may not cover include:  Damage caused by the seas or river flood (see Section 1.12). … Definitions (The Meaning Of Some Words) … “flash flood” means what occurs when there are heavy, intense bursts of rainfall, usually during thunderstorms where so much water falls in a short time that it cannot get away quickly enough and collects and flows into your home. but does not include when rainwater on the site : Case No: 242835 Determination Page 3 of 7  cannot run off into a water catchment system, because it is overflowing in flood; and  mixes with the flood water coming from the water catchment system and then flows into your home. … “rain” means water that has fallen from the sky on to your building and the site but not water from flash flood . “river flood” means when water that is normally contained in a water catchment syste m increases because of rainfall or snow melt (whether in the immediate region or elsewhere) or is deliberately released by an authority, and the water overflows onto land that is not normally covered by water into your home. For example water may be deliberately released by an authority from a dam or reservoir. … 1.12 Storm, Rain Or Flash Flood … We will not pay for damage caused by:  the seas or tidal wave;  river flood ;  erosion or earth movement .” Issue 10. Whether the FSP was entitled to deny the claim on the basis the damage was caused by flood. Reasons for Decision 11. FOS has considered it is appropriate to expedite the dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is because of the issue in dispute and substantive quantum involved. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 12. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 13. There has been an exchange of material between the parties. It therefore is not intended to recite details of the various reports in this Determination except where considered relevant. 14. The Panel Chair Ombudsman attended on site where he met with the Applicant and representatives of the FSP. Case No: 242835 Determination Page 4 of 7 15. The Applicant’s solicitor has in a letter dated 21 September 2011, made reference to two previous FOS determinations in support of his client’s dispute. One determination (Determination No 40607) discussed a definition which ex cluded “Flood water combined with run - off and/or rainwater” and was determined in the Applicant’s favour. 16. However, it was noted by the Panel in Determination 40607 that there was an issue with information provided at the point of sale. Further, the Panel noted in that determination “The member has not been able to provide any information as to whether or when the Product Disclosure Statement and/or policy were forwarded to the Applicant.” There is no dispute that the Applicant in this case received the policy or PDS. 17. Determination 41709 discussed a flood definition that included rainwater mixing with water coming from a watercourse. In the current dispute the Panel notes that the limitation regarding rain water mixing with flood water coming from the water catchment sy stem is clearly referenced under the definition of “Flash flood”. Further, the FSP has denied this claim solely on the basis that river flood was the cause and contends there is no evidence to support the Applicant’s conclusion that stormwater may have entered the property in which case this limitation is not relevant. 18. In the circumstances of this dispute, it has not been argued by the Applicant’s solicitor that a copy of the policy or PDS was not provided to the Applicant but rather it is argued:  The overall framework of the policy is complex and confusing.  A person of average intelligence would have great difficulty in understanding whether damage caused by wet weather events would be covered by the policy. 19. The Panel has carefully read the policy and is satisfied the flash flood and river flood definitions are clear, the policy is appropriately indexed and the exclusion for river flood is found within the exclusions noted under the insured event of “Storm, Rain or Flash Flood”. In the Panel’s view there is nothing contained within the policy which may lead the Applicant to believe that the policy covered flood. 20. It is the Applicant’s responsibility to read the policy and relevant material to ensure he has obtained cover appropriate to his needs. There is no indication the Applicant sought clarification from the FSP regarding the aspects he found confusing and/or ambiguous. 21. As it has not been disputed the Applicant was provided with the PDS, the Panel accepts the FSP complied with section 35 of the Act and the Panel is satisfied the Applicant’s policy did not cover river flood. Case No: 242835 Determination Page 5 of 7 Storm Event 22. It is not in dispute that an extreme weather event took place in the region. The Applicant’s solicitor has argued that the damage to the Applicant’s property was the result of multiple events of storm and rainwater prior to flood water. 23. The Applicant’s solicitor has argued that the FSP has failed to discharge its onus to prove the damage was caused by an excluded event. The solicitor has advised:  the loss assessor’s report is unreliable,  the hydrology report is a generic report commissioned by the ICA, and  the FSP does not have a site specific hydrology report to prove the Applicant’s property was inundated by flood water. 24. The solicitor has referred to determination 217727 where the matter was found in the Applicant’s favour as there was no site specific report. However, in that matter the Panel noted the A pplicant’s property was situated in a different topographical region of the town to which the general hydrology report re ferred; further, having conducted its own site visit and undertaken discussions with the hydrologist, the Panel concluded that stormwater run-off could have inundated the property. 25. In this current matter, the FSP is relying upon the hydrology report commissioned by the ICA as well as information provided by its loss assessor. Although the loss assessor’s report is not extensive, the following information can be ascertained which has not been disputed:  the subject property is 200 metres from the Brisbane River  water came from storm drains  water was contaminated with sewerage  the distance from the ground level to the first floor level is 2.5 metres  the water level at the property peaked at 7 metres . 26. The Applicant’s solicitor is critical of the FSP relyin g on a statement within a hydrology report stating that it is possible for the level of the river to rise and impede the outflow of stormwater into the river and that the river may backflow through the drainage system. 27. The Applicant’s solicitor says there is nothing in the hydrology report to support that either event actually happened at the Applicant’s location. Accordingly, without the benefit of a site specific report, no reliance can be placed on the ICA report. 28. In the Panel’s view a site specific rep ort is generally helpful and instructive in determining such matters ; however, the absence of a site specific report may not necessarily be detrimental. The Panel has on a number of occasions been able to establish, on the balance of probabilities, what th e event was that caused the loss from the available information. Case No: 242835 Determination Page 6 of 7 29. The Applicant’s solicitor says that storm and rainwater caused damage to the lower level of the Applicant’s home prior to the flood waters from the Brisbane River peaking. The Applicant concedes that his claim for inundation from stormwater relates only to the ground floor of the building. 30. It has also been argued that following storm damage and prior to the river water inundating the property, stormwater that was unable to escape through the stormwater drains entered the bottom level of the property causing significant damage. 31. The Panel notes that if stormwater is unable to escape into a water catchment system because it is in flood or if it mixes with flood water coming from a water catchment system and flows into the home, then it is excluded by the flood definition. 32. For the Applicant to be successful in this matter, he needs to show the damage has been caused by an event covered by the policy. However, in this instance, the FSP has not reli ed on the Applicant’s failure to prove an insured event , simply that its exclusion operates to defeat the claim, in which case it has the onus of proof. 33. Photographs have been provided in the Applicant’s material, which are purported to have been taken at i ntervals during the day on 11 January 2011. The photographs show the water level rising into the backyard from parkland at the rear of the property. 34. Conversely, the FSP relies on its assessor’s report, in which it was reported that the water which first entered the premises was from the storm drains. It also relies on the hydrology reports which concluded that flooding along the low lying urban areas along the Brisbane River were caused by backflow up piped drainage systems. 35. According to available information the parkland forms an overland flow path. Overland flow is described as excess run-off during high rainfall events that travel overland following low-lying, natural drainage paths and that such flooding commonly occurs when underground drainage exceeds capacity. 36. The circumstances show that water in the catchment area was not able to drain into the river system as water levels rose and back flowed into the drainage system. 37. The Panel is satisfied that water escaping from the confines of the water catchme nt system, has contributed to the circumstances of flooding to the Applicant’s property. For these reasons, the Panel is of the opinion that the evidence does not support a finding that flash flood or rainwater alone entered the Applicant’s home . 38. The Applicant himself describes the inundation as a gradual/insidious increase in water from the rear of the property. The Applicant maintains that the initial inundation was from stormwater run-off as the water that initially inundated his home was clear and only later did it become a different colour. Case No: 242835 Determination Page 7 of 7 39. The Panel is not satisfied that the colour of the water alone is enough to determine its source. This is particularly so as the water inundating the home was not flowing off the road at the front of the property but rather, slowly rising from the area of the stormwater drains to the rear of the property. 40. The Panel is also satisfied that the likely source of this water is the back flow of water from the rising Brisbane River and tributaries. 41. In the Panel’s opinion, the evidence leads to the conclusion that on the balance of probabilities the FSP has discharged the onus that rests with it to show the cause for the damage was river flood which attracts the relevant policy exclusion. Determination 42. On the basis of the available information, the Panel determines that the FSP was entitled to deny liability for the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.