Home / Financial Firm (Unknown - Insurer) / Determination 242777

Determination 242777

Landslip embankment reinstatement excluded from home cover

FirmFinancial Firm (Unknown - Insurer)
Decided2011-10-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for landslip damage to his home, and the FSP accepted the building and underground services damage but denied the cost of stabilising the embankment. AFCA held the embankment is not a building under the policy, but ordered the FSP to repair the building damage and pay temporary accommodation and related costs.

Soil and earth are not part of the policy definition of building, so embankment stabilisation falls outside cover, though resultant building damage is covered.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 242777 Determination Page 1 of 7 Case number: 242777 General Insurance - Domestic Insurance - Home Building - Service - Delay in complaint handling – extent of cover – landscape 27 October 2011 Background 1. On 14 January 2011 the Applicant lodged a claim under his home insurance policy for damage to his home caused by landslip during severe rainfall in the area. The building is located on a steep slope in a rural setting. The intense rainfall caused a landslip which in turn damaged sections of the building and underground services. 2. The Financial Services Provider (FSP) accepted liability for damage to the building including the underground services but denied that part of the claim for reinstatement, stabilising and rectification of the embankment which was subjected to landslip including all costs for compliance with recommendations by engineers to improve stability and prevent future occurrences. Summary of Applicant’s Position 3. The land at the side of the residence collapsed due to the heavy rains. The heavy continuous rain fell over the roof onto the ground and washed away the ground causing part of the house to collapse and slide. 4. The house has been rendered unliveable and dangerous. Damage includes all services to the house including plumbing, sewerage, bathroom and drinking water. 5. The collapsed bank should be repaired immediately by the FSP. He is not in a position financially to repair it. Summary of FSP’s Position 6. The FSP relies substantially on reports obtained from a geotechnical engineer and an engineer. 7. Liability was accepted for damage to the building, underground services and contents resulting from the landslip. Determination Case No: 242777 Determination Page 2 of 7 8. Liability was not accepted for the significant improvements and mitigation work required to rectify and stabilise the embankment which was subject to landslip. 9. The FSP submits that the embankment including soil and vegetation does not constitute „building‟ as defined by the policy. Consequently reinstatement of the soil does not fall within the cover provided by the policy. 10. The FSP submits tha t it is the Applicant‟s responsibility to ensure that all mitigation and construction work is undertaken for the following reasons: • there was no structure in place prior to the incident which falls within the definition of building. • earth and soil are not parts of the building. • the policy does not cover damage to landscaping caused by storm, rainwater or rainwater run-off. 11. The FSP submitted a process be undertaken to resolve the matter. The process involves 7 points. Summarised these involve: 1. FSP to authorise further inspection and testing by the engineer to confirm the structural details of the property. This in part arises as a result of the geotechnical engineer‟s comments in relation to whether the existing dwelling is supported on concrete piers taken down to bedrock. The FSP will meet the costs of this work. 2. FSP to arrange temporary accommodation for the Applicant until testing and investigation is undertaken. Should the testing result in the property being deemed unsuitable for occupation, accommodation expenses will be provided for the period for which the insured damage would take to repair or the policy limit. 3. FSP will authorise plumbers to ensure all sewage and stormwater has been adequately diverted from the landslide in accordance with the engineers ‟ recommendations. 4. FSP will ensure the landslip is adequately protected by temporary plastic and tarpaulins. 5. The Applicant should undertake all remediation and mitigation works in consultation with the engineers to ensure the stability and reinstatement of the embankment. The FSP will not meet any costs associated with this action including engineers or other expert consultants ‟ costs. 6. Once work referred to in 5 is underway, the FSP will be able to meet the cost of rectifying the sewage and storm water pipe work in the landslip. Case No: 242777 Determination Page 3 of 7 7. Subsequent to rectification and mitigation of works outlined in 5 having been under taken the FSP will assess and cost all required repairs to the building. 12. The FSP submits that it is not liable to provide cover for reinstatement and mitigation works required to be undertaken to the landslip site. 13. The FSP acknowledges the significant financial costs which would be incurred by the Applicant and is willing to reach an agreement for cash settlement. Any cash settlement at this stage of the claim would be based on the elements of the claim which are admissible. 14. The FSP relies on the following policy terms: “ What are buildings If you have selected buildings cover, the term „buildings‟ also includes: ... 5. when the buildings are not part of a strata title property, the term „buildings‟ also includes all structural domestic improvements which belong to you including: ... c. paved paths, paved driveways, terraces ... ... What are not buildings The following items are not buildings: ... d. landscaping, trees, shrubs and plants unless they are would be covered in “Landscaping” on page 28. e. unpaved paths or unpaved driveways constructed of earth or gravel; ... ... Other benefits we will provide ... 14 Landscaping ... We will pay the cost of landscaping including the replacement of fixed trees, plants and shrubs that have been lost or damaged by an insured event, up to a maximum amount of $2,000 in any one period of insurance. We will not pay for: a. Loss or damage caused by storm, rainwater or run- off, ...” ... 20 Removal of debris, professional fees and extra costs. ... Case No: 242777 Determination Page 4 of 7 When the buildings have been destroyed or damaged by an insured event and we have agreed to pay your claim, we will also pay the reasonable and necessary costs of: a. ... b. architects‟, engineer‟s, surveyors‟ and solicitors‟ fees, ... We will only pay these costs if they relate directly to the destroyed or damaged part of the buildings and we have agreed to do so before they are incurred.” Issues 15. Whether the FSP is liable for the cost of reinstating the embankment which slipped. Reasons for Decision 16. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. 18. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 19. The circumstances giving rise to the claim are not disputed. Heavy rainfall in the area of the Applica nt‟s property and other factors caused a landslip which in turn damaged the home and underground services. 20. The FSP has accepted liability for any resultant damage to the building and to the contents of the building attributable to the landslip including underground services. The Panel will therefore not consider the cause for the damage or the extent of damage to the building and contents. 21. The central issue for consideration by the Panel is whether the FSP is responsible for the cost of rectifying the embankment which slipped. 22. The engineers commissioned by the FSP have recommended the manner in which the rectification works should be carried out to stabilise the ground and prevent further similar occurrences in the future. The engineers‟ reports have been exchanged so that both parties are aware of the contents and recommendations. Therefore the contents of these reports will not be recited in this determination except where relevant. 23. Relevantly the geotechnical engineer found: Case No: 242777 Determination Page 5 of 7 They have not been able to confirm how the existing footing system of the dwelling was designed and constructed. The previous owner was convinced that the dwelling is supported on concrete piers taken down to bedrock. If this information is accurate then the dwelling is stable and continued occupation is an acceptable risk. If the dwelling is not piered to rock then occupation of the dwelling within 6 metres of the landslip is an unacceptable risk as when it rains the landslip will enlarge and the risk increases. Rectification of the problem requires the following: stop all stormwater and sewage pipes discharging into the landslide confirm the dwelling is on piers keep the landslide covered with plastic and tarpaulins use a series of post and wale walls built as terraces up the slope with the wall closest to the dwelling being built first and a series of these walls built in turn down the slope Use soil/rock anchors into the slope beneath the dwelling Install behind wall drainage as recommended. 24. Significantly the consultant engineer‟s recommendations for rectification of the landslip were consistent with the geotechnical engineer. 25. It is clear from this evidence that remedial works for reinstatement and stabilising the embankment involve earthworks and construction of a series of wale walls. It is also clear that rectification and stabilisation of the embankment should be completed before repairs to the building and underground services can start, the objective being to prevent a further similar occurrence. 26. The policy defines the term „building‟ and it therefore has that meaning in the context of this matter. The Panel is satisfied that soil/earth on which the dwelling is constructed or which surround the dwelling does not fall within that definition. 27. Although the dominant cause for the landslip was considered to be the intense rain, any damage to ground surfaces caused by the intense rain including landslip, does not fall within the cover provided by the policy. The effect of the landslip resulted in damage to the building and underground services which fall within the policy definition of „building‟. This resultant damage has been accepted by the FSP. 28. After analysis of the material the Panel is satisfied that the FSP‟s liability for the damage is limited to rectification of the damage to the building structure and underground services. The FSP is not liable for the cost of rectifying and stabilising the embankment which slipped. Case No: 242777 Determination Page 6 of 7 29. The FSP has submitted a seven point procedure to resolve the claim. The Panel considers the recommended procedure is practical in the circumstances and includes all matters for which the FSP is liable. 30. In particular, the Panel notes the FSP‟s agreement to undertake further investigation to establish the extent of damage caused by the landslip and whether the home is safe to occupy. In the event that it is unsafe to live in, the FSP will arrange for temporary accommodation for the Applicant. The period of temporary accommodation will be subject to the Applicant taking action to rectify and stabilise the landslip in a reasonable period of time. 31. Essential to the FSP‟s proposal, is the rectification and stabilisation of the embankment by the Applicant. The Panel accepts that it is not practical to commence the works to repair the house and underground services until the recommended embankment works are completed. To do otherwise places the dwelling at risk of further or future damage by landslip. 32. As the damage to the embankment is not covered by the policy the responsibility for reinstating the embankment rests with the Applicant. Determination 33. For the reasons expressed above, the Panel determines: a. The FSP is not liable for the cost of rectifying and stabilising the embankment which slipped nor is it liable for the cost of consultants‟ fees involved in the process. b. The FSP is liable for the cost of repairing the damage caused to the building and underground services. The FSP may delay commencing this work until such time as the embankment is reinstated and stabilised. In the event the Applicant chooses not to proceed with the rectification and stabilisation works, the FSP may exercise its option to cash settle the Applicant for the costs to repair the insured damage. 34. The Panel considers the process as recommended by the FSP is reasonable in the circumstances and recommends the Applicant liaise with the FSP in relation to the embankment remedial works to allow the insured damage to be repaired. 35. The Panel notes the FSP will find temporary accommodation for the Applicant while it further investigates the extent of damage and safety of the premises. The FSP will pay for the cost of temporary accommodation during the period of testing and investigation and if the property is found to be unsafe for occupation will continue to accept the costs of temporary accommodation for a period equal to the period for which the insured damage will take to repair. The FSP will also consider paying the cost of temporary accommodation expenses while the Applicant undertakes the remedial works for the embankment provided the Applicant undertakes and completes this work in a reasonable time. Case No: 242777 Determination Page 7 of 7 36. The Panel notes that the FSP will accept the cost of diverting the sewerage and stormwater pipes from the landslide site in accordance with the engineer‟s recommendations. 37. The Panel notes the FSP will accept the cost of protecting the landslip from further slippage by installation of plastic and tarpaulin covers.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.