Home / Financial Firm (Unknown - Insurer) / Determination 242752
Determination 242752
Water inundation claim denied as river flood
Summary
The applicants' home was inundated in January 2011 and the FSP denied the claim as river flood. AFCA determined the FSP must settle 20 percent of the loss from the initial storm or flash flood inundation, with interest, but the claim was otherwise excluded as river flood.
The FSP failed to prove on the balance of probabilities that the initial inundation was caused by river flood rather than an insured storm or flash flood event, so a fair apportionment under the Terms of Reference was applied.
Issues
- Claim denial primary · upheld
“The Panel determines the FSP has failed, on the balance of probabilities, to demonstrate the absence of an initial inundation courtesy the defined event of storm, rain or flash flood.”
- Inadequate claim investigation secondary · upheld
“The loss adjuster, by failing to note the actual levels of the home, in respect to the land, has not addressed the possibility that the home was first inundated by run-off.”
- Failure to disclose secondary · not upheld
“The Panel accepts the FSP complied with section 35 the Act and is satisfied the Applicants' policy did not cover river flood.”
- Product terms interpretation secondary · not upheld
“The PDS clearly identifies that it is not intended to cover river flood.”
Subjects and remedies
natural disasterpay claimpay interest
Text of the determination
Case No: 242752 Determination Page 1 of 8
Case number: 242752
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim (Flood)
22 February 2012
Background
1. The Applicants hold a home building insurance policy with the Financial
Services Provider (FSP).
2. In January 2011, the Applicants‟ property was inundated with water following
severe weather events in and around Brisbane.
3. The FSP assessed the claim and refused liability on the basis the loss was
caused by river flood, which is an exclusion under the policy.
4. The Applicants disputed the decision on the basis the loss was caused by
storm and/or flash flood, which is covered under the policy.
Summary of Applicants ’ Position
5. The issues raised by the Applicants‟ legal representative in a letter dated 14
April 2011 to the FSP included:
The Applicants have not been clearly informed that flood was excluded by
the policy.
The difficulty placed upon the policyholder in understanding the exact
nature of cover is exacerbated by pages 29 and 30 of the Product
Disclosure Statement (PDS) that outlines the insurance cover for damage
caused by storm, rain or flash flood.
The definitions overlap with themselves and further, the flood definition
creates an exclusion so wide as to render the coverage provided by
storm, rain and flash flood meaningless.
The FSP did not adequately investigate the claim and is relying on a
generic hydrology report.
6. The policy provides cover for storm or a flash flood. The Applicants have
provided evidence which, they contend, confirms the damage to the building
was the result of either a storm or flash flood as defined by the policy. As both
occurrences are covered by the policy, the claim should be paid
Determination
Case No: 242752 Determination Page 2 of 8
Summary of FSP’s Position
7. The FSP states:
The Applicants‟ home was inundated by overflow from the Brisbane River
as a result of the dam release flood wave from the Wivenhoe Dam and
heavy rainfall in the preceding days;
Overflow from the Brisbane River comes within the policy definition of
“river flood” and there is no cover under the policy in respect of river flood;
The PDS clearly informs the Applicants that flood is excluded from cover
and therefore satisfies the statutory obligations under section 35 of the
Insurance Contracts Act 1984 (the Act).
8. The FSP relies on the following policy provisions:
“What you are not covered for
There are certain times when this insurance may not provide cover.
Some events we may not cover include:
Damage caused by the seas or river flood (see Section 1.12).
…
Definitions (The Meaning Of Some Words)
…
“flash flood” means what occurs when there are heavy, intense bursts of rainfall,
usually during thunderstorms where so much water falls in a short time that it cannot
get away quickly enough and collects and flows into your home.
but does not include when rainwater on the site :
cannot run off into a water catchment system, because it is overflowing in
flood; and
mixes with the flood water coming from the water catchment system and _then
flows into your home.
…
“rain” means water that has fallen from the sky on to your building and the site but
not water from flash flood .
“river flood” means when water that is normally contained in a water catchment
syste m increases because of rainfall or snow melt (whether in the immediate region or
elsewhere) or is deliberately released by an authority, and the water overflows onto
land that is not normally covered by water into your home.
For example water may be deliberately released by an authority from a dam or
reservoir.
…
INSURED EVENTS
…
1.12 Storm, Rain Or Flash Flood
…
Case No: 242752 Determination Page 3 of 8
We will not pay for damage caused by:
the seas or tidal wave;
river flood ;
erosion or earth movement .”
Issues
9. Whether the FSP was entitled to deny the cl aim on the basis the damage was
caused by flood.
Reasons for Decision
10. FOS has considered it is appropriate to expedite the dispute in accordance with
clause 8.6 of the FOS Terms of Reference. This is because of the issues in
dispute and substantive quantum involved. This dispute has not been the
subject of a FOS Recommendation and has proceeded directly to
Determination.
11. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
12. There has been an exchange of material between the parties. It therefore is not
intended to recite details of the various reports in this Determination except
where considered relevant.
13. The Panel Chair Ombudsman attended on site where he met with the
Applicants and representatives of the FSP.
14. The Applicants‟ solicitor, in a letter dated 26 September 2011, made reference
to two previous determinations to substantiate their clients‟ argumen t that the
FSP failed to “clearly inform” them of the exclusion. One determination
(Determination No 40607) discussed a definition which excluded “Flood water
combined with run- off and/or rainwater” and was determined in the Applicant‟s
favour.
15. However, it was noted by the Panel in Determination 40607 that there was an
issue with information provided at the point of sale. Further, the Panel noted in
that determination “ The member has not been able to provide any information
as to whether or when the Product Disclosure Statement and/or policy were
forw arded to the Applicant.” In the circumstances of this dispute, the Applicants
have not disputed receiving the policy.
16. Determination 41709 discussed a flood definition that included rainwater mixing
with water coming from a watercourse. In the current dispute though, the Panel
notes that “rain water mixing with flood water coming from the water catchment
system” is referenced as a limitation to the definition of “Flash flood”. Further,
the FSP has denied this claim on the basis that river flood was the cause.
Case No: 242752 Determination Page 4 of 8
17. In the circumstances of this dispute, it has not been argued by the Applicants‟
solicitor that a copy of the policy or PDS was not provided to the Applicants but
rather it is argued:
The policy relied upon contains language that is unclear and ambiguous;
The overall framework of the policy is complex and confusing.
A person of average intelligence would have great difficulty in
understanding whether damage caused by wet weather events would be
covered by the policy.
18. The Applicants‟ solicitor has indicated this view is supported by the Applicants‟
understanding of cover based on the following commentary:
“We found out from our neighbours that the house flooded in 1974, so we rang
[FSP] about our cover, however their policy on flood cover was still unclear to me
because of the varied definitions of flood. It seemed they didn’t cover all aspects
of flood”.
19. As there is no actual signed statement it is unclear whether the phone call
occurred prior to the loss. Altho ugh this comment may indicate the Applicants‟
confusion as to the extent of cover if the call occurred prior to the loss, then the
Applicants were alerted that the policy did not cover all aspects of flood. If the
phone call occurred after the loss there is no suggestion the Applicants were
led to believe the policy covered river flood.
20. The Panel has also looked at the PDS. Whilst the wording of the PDS is quite
broad, it is apparent from the reading of the documentation that it is indexed,
has appropriate reference to the various definitions relied upon with respect to
storm, flash flooding and flood and that it clearly identifies that it is not intended
to cover river flood.
21. Further, it is the Applicants‟ responsibility to read the policy and relevant
material to ensure they obtained the appropriate cover for their needs. There is
no indication the Applicants sought clarification from the FSP regarding the
aspects they found confusing and/or ambiguous.
22. As it has not been disputed the Applicants were provided with the PDS, the
Panel accepts the FSP complied with section 35 the Act and is satisfied the
Applicants‟ policy did not cover river flood.
Storm Event
23. It is not in dispute that an extreme weather event took place in the region. The
Applicants‟ solicitor has argued that the damage to the Applicants‟ property was
the result of multiple events as water came out of drains in the street outside
the Applicants‟ property and from the park, prior to the river breaking its bank.
24. The Applicants‟ solicitor has a rgued that the FSP has failed to discharge its
onus to prove the damage was caused by an excluded event. The solicitor has
advised:
Case No: 242752 Determination Page 5 of 8
The FSP has a poor understanding of the „dam release flood wave‟ as it
failed to consider information regarding the dam operators strategy from
W3 to W4 and the subsequent increases from Wivenhoe Dam, at 0800 on
11 January 2011 in response to rainfall at 0400 that morning;
It takes approximately 22 hours for water from Wivenhoe Dam to reach
Graceville;
Any „dam wave‟ would have hit Graceville at approximately 0600 on 12
January 2011 and any water at the Applicants‟ property prior to this time
could not have been the result of „dam release flood wave‟.
The water inundation at the Applicants‟ property commenced after 1900
on 11 January 2011 as noted by the FSP in its submission. This is almost
12 hours before the „dam wave‟ hit the Applicants‟ property;
The reports relied upon by the FSP have no evidentiary value in
establishing the hydrology of the Applicants‟ property;
The FSP has failed to prove on the balance of probabilities the damage
was caused by flood as opposed to an included event.
The event as described meets either definition of storm or flash flood.
25. In the alternative, the Applicants‟ solicitor has argued that the poli cy covers
damage caused by „water or other liquid‟ , in that the policy covers damage
caused by water or other liquid which suddenly escapes from a water pipe or
main, road gutter or curbing.
26. The Applicants‟ solicitor has noted that a reasonable person‟s un derstanding of
what would constitute a water main or pipe would include a storm water
channel. As the damage was caused by water suddenly escaping from a water
main or pipe, the claim should be paid.
27. The Applicants‟ solicitor has also argued that should th e Panel accept that
inundation of water from the drains and flood are concurrent causes, the
Wayne Tank principle does not apply due to the following:
Contra proferentem rule;
The principles that coverage provisions should be construed broadly and
exclusions narrowly;
The desirability, at least where the policy is ambiguous, of giving effect of
reasonable expectations that the FSP is not permitted to rely upon the
exclusion.
28. The Applicants‟ solicitor cited a Canadian legal case in support of its po sition.
However, the Panel is mindful that Australian courts have provided rulings on
these issues and the law here is well established. In the Panel‟s view
established Australian law on these matters takes precedence over a Canadian
case.
29. Further, the Panel has given deliberation in past matters where there is
disagreement between the parties as to whether storm or flash flood damage
Case No: 242752 Determination Page 6 of 8
occurred prior to the arrival of flood waters and whether the Wayne Tank
principle applies.
30. The Panel does not have the benefit of a site specific report but consideration
has been given to the following „flood information‟ contained in the loss
adjuster‟s report:
Habitable floor level was approximately 200mm above surrounding
ground level;
The ground level of the house was approximately 3 metres above street
level;
Water level in the house peaked at approximately 1,600mm;
The peak level occurred at 4am on 13 January 2011;
Water inundation to the property yard commenced at 11am on 12 January
2011;
Heaviest rainfall stopped on 11 January 2011;
31. However, the Panel Chair Ombudsman noted during the site visit that the rear
corner of the ground floor of the house is in fact dug into the ground to a depth
of 8 bricks, as evidence by the surrounding retaining wall. Thus, the ground
level at the rear of the house is in fact higher than the floor level of the house in
that area. The ground at that point also appears to slope upwards away from
the house and towards the properties at the rear of the house.
32. The Panel is also aware the subject property is approximately 200 metres from
the Brisbane River.
33. The Panel is aware of the Hydrological report obtained by the Insurance
Council of Australia (ICA). The report is very extensive as it relates to an
extreme weather event which caused flooding to the Brisbane region. In
Volume 3 of the report ” – “Flooding in the Brisbane River Catchment” January
2011 the following information is available which needs to be considered:
Wivenhoe Dam release (9.3)
Large releases were made from Wivenhoe Dam over the period from
06:00 hours, possibly as early as 03:00 hours on 11 January 2011,
until around 03:00 hours on 12 January 2011.
Releases from Wivenhoe Dam caused a flood wave in the Brisbane
River. Water levels in the lower reaches of the Bremer River and its
tributaries draining Ipswich City LGA were affected by backwater
flooding and backwater effects from the Brisbane River.
It was concluded that the dam release flood from Wivenhoe Dam
was the immediate cause of flooding along the reach of the Brisbane
River downstream of the dam and along tributaries through the
Ipswich City LGA.
34. According to the Applicants they evacuated the property at around 7pm on 11
January 2011. There is no indication water was in the house or yard at that
Case No: 242752 Determination Page 7 of 8
time. The male Applicant returned the next day at approximately 10am and
water was in the house and still rising.
35. This evidence from the male Applicant challenges the FSP‟s loss adjuster‟s
statement that water inundation to the property yard commenced at 11.00am
on 12 January 2011.
36. Given the male Applicant‟s statement, the Panel accepts that the inundation
commenced after 7pm or 8pm on 11 January 2011 and before 10am on 12
January 2011.
37. The Panel also notes the Applicants‟ statement at the site inspection that it was
“perhaps still drizzling as they left on Tuesday night”.
38. Had flash flood been the single factor, the Panel would have expected the
inundation to have occurred in the immediate hours after the most significant
period of rain. The BOM records little rain after 6.00pm on 11 January 2011,
with the heaviest rain on 11 January 2011 falling in the morning.
39. However, the Panel notes that the FSP has not provided a site specific
hydrology report to clarify this issue and the FSP‟s basis for its denial, the loss
adjuster‟s rep ort, omits the critical observation that the floor level at the rear of
the house is some 8 bricks below the land level. Further, that the land at the
rear of the house appears to slope upwards, away from the house.
40. In this case, the loss adjuster did not believe the policy provided liability as he
postulated the damage arose as a result of inundation of water from the
Brisbane River.
41. However, the loss adjuster, by failing to note the actual levels of the home, in
respect to the land, has not addressed the possibility that the home was first
inundated by run-off. In addition, there is no site specific hydrology report that
addresses this issue.
42. The Panel has reviewed flood mapping and it is clear that the Graceville area
was inundated by floodwater. The Pane l has also viewed aerial photographs of
the area and notes that the location of the property was within the area of
inundation from the Brisbane River.
43. The Panel notes the evidence that the home was inundated to a level of
approximately 1.6 metres. The Panel accepts that river flood was responsible
for this ultimate level of inundation.
44. However, the FSP has not denied that an insured event occurred but rather has
denied the Applicants‟ claim on the basis that the loss was caused by river
flood, which is specifically excluded under the policy.
45. In light of the above, particularly with reference to the omissions in the loss
adjuster‟s report, the Panel determines the FSP has failed, on the balance of
probabilities, to demonstrate the absence of an initial inundation courtesy the
defined event of „storm, rain or flash - flood‟ in contradistinction to its hypothesis,
that the entire inundation emanated from the excluded event of river flood.
Case No: 242752 Determination Page 8 of 8
46. As such, the Panel is satisfied that the FSP should settle the Applican ts‟ claim
insofar as the initial inundation is concerned.
47. The Panel accepts that it is an almost impossible task to determine what
portion of the loss arose from this initial inundation; in such circumstances
reliance must be placed upon clause 8.2 of the Terms of Reference to the
Service namely, „to do what is fair in all the circumstances‟. Considering all
matters, the Panel has determined that the FSP settle the Applicants‟ claim for
20% of the loss arising from water inundation.
48. For the sake of completeness the Panel notes it has also considered the
Applicants‟ argument that as the water which inundated the property was
discharged from a drain, this would give rise to a claim under „water or other
liquid‟.
49. The FSP rejects this on the basis that the eve nt does not meet the definition of
water which has „suddenly escaped‟. It also argues that the water was not drain
water but was river water which had overflowed from the Brisbane River and
therefore the proximate cause was floodwater, which is excluded from cover.
50. The Panel is inclined to the view that even though the water may have
backflowed through the drains, the water was nevertheless floodwater from the
Brisbane River. Under this scenario, it is well established Australian case law
for the resultant waters to all be characterised as river flood, which attracts the
policy exclusion.
Determination
51. The Panel determines that the FSP is to settle the Applicants‟ claim for an
amount equal to 2 0% of the Applicants‟ loss from water inundation.
52. The Panel further determines that the FSP is to pay interest on the settlement
amount from the date of denial to the date of settlement at the rate specified by
the Insurance Contracts Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.