Home / Financial Firm (Unknown - Insurer) / Determination 242740

Determination 242740

Flood exclusion used to refuse home water-damage claim (rainwater versus flood)

FirmFinancial Firm (Unknown - Insurer)
Decided2011-09-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home was inundated on 12 January 2011 and the FSP refused the building claim as flood, which the policy excludes. The applicant argued local rainwater contributed; the Panel accepted some merit but found the water was a mix of rainwater and river and dam-release flood water, so the exclusion applied.

Where rainwater cannot drain into a river or creek because of rising levels, or mixes with river or dam overflow, it is treated as flood, and the exclusion defeats the claim under the Wayne Tank principle.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 242740 Determination Page 1 of 6 Case number: 242740 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim – Rainwater – Flood 14 September 2011 Background 1. On 12 January 2011 water inundated the Applicant‟s home following intense rainfalls in the area. 2. A claim under the Applicant‟s home insurance policy for the resultant damage was denied by the Financial Services Provider (FSP) on the ground the inundation was flood water and excluded from cover provided by the policy. Summary of Applicant’s Position 3. The Applicant contends that local rainwater was a significant contributor to the water which entered his home on 12 January 2011. The policy covers rainwater damage. 4. The Applicant states there was significant rainfall in the area between 9.00am on 9 January and 9.00am on 12 January when a total of 166.2mm fell. This preceded the Brisbane River flood peak. 5. The Applicant asserts that the FSP‟s statement that local rainfall dissipated within 24 hours of rainfall ignores the fact that the Brisbane River was the only rainwater outlet for Wolston Creek and was continually rising due to the Wivenhoe Dam water release. 6. The Applicant notes from the SEQ water inflow report that the Wivenhoe Dam releases began on the afternoon of 7 January and steadily increased through to late on 11 January. He states that allowing for an approximately 24 hour delay for this dam water to reach Wolston Creek, the Brisbane River would have steadily risen during the significantly heavy rainfall period. In these circumstances local rainwater cannot escape with a steadily rising Brisbane River. 7. The Applicant notes that the policy covers building and contents for loss or damage as a result of storm rainwater or wind. The policy does not define „rainwater‟. Determination Case No: 242740 Determination Page 2 of 6 8. The Applicant states he does not expect rainwater to relate to rainfall which occurs many kilometres away from his property, but he does expect local rainfall to be rainwater. 9. He states 26cm of water entered his home. He contends that rainwater significantly contributed to this event. He argues that without the tremendous levels of local rainfall and resulting rainwater which could not escape as it normally would, his house would have remained dry. 10. The Applicant notes the FSP consistently refers to „storm water‟ when the policy makes no reference to „stormwater‟. His argument relies on the damage caused by rainwater which is a term referred to in his policy. 11. The Applicant also refers to a discrepancy between the 1974 flood level defined by Brisbane City Council (BCC) at his property and the actual 2011 water level which was higher at his property even though the Brisbane River peak was lower than the 1974 flood level. Summary of FSP’s Position 12. The FSP refers to the Insurance Council of Australia (ICA) hydrological reports for „flooding in the Brisbane River catchment Volume 3‟ 13. The FSP considers the Applicant‟s property was flooded by water escaping from the confines of the Brisbane River and its catc hment including Wolston Creek. The FSP refers to flood mapping provided by BCC which shows the property was inundated by flood water from Wolston Creek. 14. The FSP refers to legal precedents and considers that as a result of the application of Australian law the water was „flood‟ water as defined by the policy. 15. The FSP states that it regards water released from Wivenhoe Dam into a river and subsequently the river system floods to be floodwater. The water that inundated properties would be a mixture of stormwater and flood water or flood water alone and is excluded from cover. 16. The FSP states that it is only when „storm water‟ independent of any flood water inundates property that it accepts the damage was caused by stormwater and not floods. 17. The FSP states that rainfall records show that peak rainfall intensity in the local area was on 10 January whereas the Applicant‟s property was damaged by flood on 12 January which is in accordance with water coming from the Brisbane River and its catchment. 18. The FSP states that any rainwater which fell on the property did not enter the Applicant‟s building at the time or prior to inundation by flood water. Case No: 242740 Determination Page 3 of 6 19. The FSP argues that if the water that initially entered the premises was flood water then as a matter of law, the loss is excluded. If the water was a mixture of storm and flood water, the loss is also excluded. If it was a concurrent inundation of storm and flood water it is excluded. 20. The FSP relies on the following policy terms: “Accidental damage cover … Storm, rainwater or wind Under Accidental damage we will cover your buildings or contents for loss or damage as a result of storm, rainwater or wind. … Exclusions to your cover Any cover we provide is subject to the following exclusions We will not cover any loss or damage as a result of or caused by …  flood … Glossary of words with a special meaning … flood the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam.” Issues 21. Whether the water which inundated the Applicant‟s property was rainwater or flood water. Reasons for Decision 22. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 23. This decision has been made by a Panel consisting of an Ombudsman, an insurance industry representative and a consumer representative. 24. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. Case No: 242740 Determination Page 4 of 6 25. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 26. In addition, the Panel Ombudsman attended at the Applicant‟s premises and met with the Applicant and representatives of the FSP. The Applicant confirmed the details he had previously provided to the Service. 27. As it is not disputed between the parties that the Applicant‟s property has suffered „accidental damage‟ and the FSP seeks to rely on a clause i n the policy to deny the claim it therefore has the burden of establishing on the balance of probabilities that the terms of the relevant clause applies to defeat the claim. 28. The Applicant refers to the water as rainwater and not stormwater as referred to by the FSP. While rainwater and stormwater may be considered as the result of different weather phenomena, the end result is precipitation from the sky. The policy provided cover for loss or damage as a result of both storm and rainwater. 29. Nevertheless the hydrological reports relied on by the FSP refer to severe and intense rainfall periods, as such the Panel will consider the dispute in the context of loss or damage as a result of rainwater . 30. The severe weather events in south east Queensland in January 2011 which resulted in widespread flooding and property damage have been well documented and publicised. 31. The ICA hydrological report titled “Flooding in the Brisbane River Catchment January 2011 Volume 3 Flooding in Ipswich City LGA” contains the following information in relation to rainfall (p1)  There were four distinct rainfall periods across the Ipswich LGA during the period from 9 January to 13 January.  The first was from around 1000 hours to 1200 hours on 9 January  The second was from around 1500 hours 2100 hours on 9 January  The third was from around 0700 hours to around 1100 hours on 10 January  The fourth from around 0600 hours to 1500 hours on 11 January.  The final three rainfalls generated small floods in the Bremer River and its tributaries. 32. The report notes large releases of water were made from Wivenhoe Dam (9.3) over the period commencing 0600 hours (possibly as early as 0300 hours) on 11 January until around 0300 hours on 12 January. 33. The report concludes that the dam release flood from Wivenhoe Dam was the immediate cause of flooding along the reach of the Brisbane River downstream of the dam and along tributaries. Travel times registered in the lower Brisbane River show the river peaked at the various monitoring stations from 0900 hours Case No: 242740 Determination Page 5 of 6 on 12 January and extending out as the water travelled downstream.(8.8.1 Vol 1) 34. The ICA hydrological report Volume 1 “Flooding in the Brisbane River Catchment” reported rainfalls were heaviest and most widespread in the upper catchment in the 24 hours to 0900 on 10 and 11 January. (7.2.1) 35. The rainfall data is therefore largely consis tent with the Applicant‟s version of the rainfall and flood peak in the local area at his premises. 36. Further, the ICA report Volume 1 (9.4.4) notes that any inundation along the tributaries draining into the lower Brisbane River will have suffered water flow inundation caused principally by the dam release flood from Wivenhoe Dam over the period 11-13 January. Any inundation along tributaries draining into the lower Brisbane River downstream of Mount Crosby will also have been water flow inundation caused principally by the dam release flood. Rainfall had generally ceased in these areas some 12-30 hours before the arrival of the flood peak. 37. It is not in dispute that the Applicant‟s premises were inundated on 12 January. There is no evidence that local rainwater alone inundated the premises before 12 January. 38. The Applicant contends that localised rainwater could not drain into the continually rising Brisbane River. (letter 30/3 to FSP) As such a combination of the flood water from the Wivenhoe Dam and local rai nwater being two circumstances were responsible for the inundation to his premises. 39. In addition, the Applicant has compared the peak Brisbane River levels reached in the 1974 flood with the peak river level reached in the January 2011 flood to support his contention that rainwater was a contributing factor i n the inundation of his home. 40. Based on the evidence the Panel is of the opinion that the Applicant‟s contention has merit. 41. However, the courts have established that when rainwater cannot drain into a river or creek because of the increased water level, or rainwater mixes with river water or water overflowing from a river, creek or dam, then that rainwater is deemed to be flood water. As such, when a mixture of river water and local rainwater runoff causes damage to property, the FSP is entitled to rely on the clause which excludes loss or damage caused by flood water. 42. The policy defines „flood‟ to include water which escapes from a dam. While not specifically raised by the Applicant, the Panel has considered the fact that water was released from Wivenhoe Dam rather than escaped. The Panel considers that the terms of the policy itself draw attention to this issue under the policy‟s definition of flood. “flood the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood Case No: 242740 Determination Page 6 of 6 also includes water escaping from the confines of any reservoir, channel, canal or dam.” 43. The use of the word „escaping‟ from the sentence rel evant to the dam and not the words „escaping or released‟ suggest that the release of water from a dam will not be regarded as flood. 44. The Panel is satisfied that this is the only sensible understanding that can be made of this distinction. However, having reached this conclusion, the Panel is also satisfied that the proximate cause of the Applicant‟s loss is the combination of water from the Brisbane River and its tributary Wolston Creek and rainwater which could not drain into those watercourses. 45. According to the terms of the Applicant‟s policy, damage caused by rainwater and arguably release of dam water, is covered only in circumstances where the rainwater or released dam water alone caused the damage. The evidence does not support a finding that the water released from the dam or rainwater alone caused the damage to the Applicant‟s home. 46. For these reasons the Panel considers the FSP has discharged the onus that rests with it to show the claim does not succeed. Determination 47. After analysis of the available material the Panel determines that the FSP was entitled to deny liability for the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.