Home / Financial Firm (Unknown - Insurer) / Determination 242632

Determination 242632

Denial of Queensland flood inundation claim as excluded flood rather than flash flood and storm water runoff

FirmFinancial Firm (Unknown - Insurer)
Decided2012-09-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$36,779
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Floodwater entered an 81-year-old policyholder's Queensland home in January 2011, and the insurer denied it as excluded flood. The ombudsman found the damage was caused by flash flood and storm water runoff within the policy, but limited the indemnity to 50% of the contents and building repair costs per the policy limits, with interest at 7.25%. Addendum corrected the contents sum insured to $40,000 and building payment to $16,779.28.

Flash flood from heavy rain within 24 hours is an exception to the excluded flood cover, and the policy's clear-inform obligation under section 35 of the Insurance Contracts Act was satisfied by the PDS and certificate.

Issues

Subjects and remedies

home or building damagelanguage or cultural barriernatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 242632 Determination Page 1 of 18 Case number: 242632 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Flood vs Flash Flood and Storm water Runoff - Clearly Inform - Insurance Contracts Act (1984), Section 35 17 July 2012 Background 1. The Applicant held a home building and contents insurance policy with the Financial Services Provider (FSP) at the time of the loss the subject of this dispute. The insured property is located in Fairfield, Queensland. 2. Following extreme weather in Queensland in January 2011 the Applicant‟s property was inundated by water on the evening of 11 January 2011. 3. The Applicant lodged a claim with the FSP for building and contents damage. 4. The FSP denied the Applicant‟s claim on the ground that the damage to the insured property was caused by a “flood” and the Applicant‟s policy does not include cover for “flood”. 5. The Applicant received $12,500 from the FSP‟s compassionate fund. 6. The Applicant is not satisfied with the FSP‟s decision, hence this dispute. Summary of Applicant’s Position 7. The Applicant is represented by her daughter in this dispute. The Applicant‟s daughter says:  her mother, the Applicant, is 81 years old and was born in Italy. English is her second language and she does not speak, write or read English fluently;  the Applicant “did NOT receive the Product Disclosure Statement (PDS) in a format that [she] could understand”. “No PDS was supplied in Italian and at no time did she receive the opportunity to receive a PDS in Italian”; and  therefore, the Applicant was “NOT fully or properly informed” about the coverage of her insurance policy. 8. The Applicant‟s daughter asserts that the water that came up and affected the insured property “was from storm water drains on the right hand side of [the Determination Case No: 242632 Determination Page 2 of 18 insured] property”. The Applicant‟s son witnessed the flow of water surging through the storm water drain near the insured property in the early evening of 11 January 2011. 9. She also says that an inspection of the area will show that “water did not com e over the hill and down the h ill to [the insured property]”. 10. She advised that repairs have been made on the insured building. Summary of FSP’s Position 11. With regard to the PDS, the FSP says that it clearly informed the Applicant regarding the scope of the flood cover through the PDS and the Certificate of Insurance it provided the Applicant. 12. The FSP relies on the following policy provision contained in the Certificate of Insurance dated 10 April 2010: “ What optional covers are included and not included Home Contents … Flood and storm surge not included not included”. 13. The FSP also relies on the following policy provisions contained in the PDS. Pages 10, 11 and 12 of the PDS: “ Words / terms with special meanings … Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. … Flash flood and A sudden flood caused by heavy rain that fell no more than storm water runoff 24 hours prior to the flash flood or storm water runoff. … Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow, but not continuous bad weather by itself.” Pages 17 and 18 of the PDS: “ Insured events you are covered for Damage caused by weather… What is covered What is not covered Storm … … Case No: 242632 Determination Page 3 of 18 Flash flood and Loss or damage caused by: Storm water runoff x by flood A sudden flood caused by … heavy rain that fell no more than 24 hours prior to the flash flood or storm water runoff ” Page 27 of the PDS “Your home The most we will pay you for home claims What is covered What is not covered Flash flood and storm water runoff We will pay up to 50% of your home sum insured or $25,000 whichever is higher.” Pages 48 and 53 of the PDS “Optional covers for extra peace of mind The covers outlined in this section are optional and do not apply unless you have asked for them and we agree to cover you. Additional premiums apply for each cover. Your certificate of insurance will show which covers operate. All optional covers are subject to the terms and conditions of this policy. … What is covered What is not covered Flood and storm surge … This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance.” 14. With regard to the cause of the loss, the FSP contends:  the proximate cause of the Applicant‟s loss was “flood” as defined under the policy;  alternatively, the Applicant has not discharged the onus of proving that the cause of the loss was by “flash flood and storm water runoff ” as defined under the policy; and  if flash flood was a proximate cause (which is denied), then “flood” was also a proximate cause of the loss. In such case, the principle in the Wayne Tank case would apply and the FSP is entitled to deny the claim. Case No: 242632 Determination Page 4 of 18 15. The FSP maintains the Applicant must prove on the balance of probabilities the inundation was due to an event covered under the policy. Insofar as the Applicant‟s property may have been inundated by flash flood and storm water runoff, the Applicant must establish that this was the proximate cause of the loss. 16. The FSP relies upon a reference document and hydrology reports from SC to argue that the inundation of the properties by the Brisbane River was caused by rain which fell more than 24 hours earlier, and particularly the rain on 9 and 10 January 2011. In a separate part of the reference document which is not addressed dire ctly to the Applicant‟s property, the FSP argues that on any reasonable view the damage sustained was the combined effect of all the rainfall that had fallen and, not just the rain that had fallen from 4.00am on 11 January 2011. 17. In the alternative the FSP argues that the switch of strategy to the W4 release was not a natural or ordinary consequence of the rain that fell on the morning on 11 January 2011 and that the cause was not the rain, but the dam operator‟s departure from the manual. Issues 18. Whether the Applicant was clearly informed of the relevant policy provisions. 19. Whether the damage to the insured property was caused by flood or flash flood and storm water runoff. Reasons for Decision 20. Due to the nature of the dispute, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Thus, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. The parties have been previously advised that a Determination will be issued in this case. 21. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 22. To assist in determining this dispute a site inspection was conducted at the Applicant‟s property on 20 December 2011 with the Applicant, her daughter in law and the FSP present. 23. The Applicant‟s property is in a low section of the street; with a large storm water drain about 20 metres to the right of the house across the road, and a ridge beyond the crossroads near the house. Case No: 242632 Determination Page 5 of 18 24. A shed or garage at the rear of the house has a ground level about 300mm to 600mm lower than the surrounding area. 25. The Applicant could not say the exact time that the property was inundated but believe it was in the early evening of 11 January 2011. Clearly Inform 26. Section 35 of the Insurance Contracts Act (1984) (the “Act”) provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 27. In Max Hams & 1 Ors v CGU Insurance Limited [2002] NSWSC 273, the Supreme Court of New South Wales held that in most circumstances, the provision of a policy document in and of itself satisfies the requirement to clearly inform under Section 35 of the Act. 28. In its submission dated 5 August 2011, the FSP has provided documentation explaining its mailing process and showing that renewal certificates dated 9 April 2009 and 10 April 2010 together with the relevant English PDS were sent to the Applicant‟s last known mailing address. 29. The Panel is satisfied the FSP provided the Applicant the 2010 renewal certificate and the relevant PDS in the English language. Not in Italian Language 30. The Applicant maintains she did not receive the PDS in a format that she could understand. She does not speak, read or write English fluently and maintains that she was not fully or properly informed of the extent of cover. 31. The Panel appreciates the Applicant‟s position with respect to this. Section 35 of the Act requires that the insurer proves that they clearly informed an insured in writing of the proposed terms and conditions of the contract, or that the insured knew, or a reasonable person in the circumstances could be expected to have known. 32. Section 11(1) of the Act provides „ writing ‟ means writing in the English language or in another language agreed between the parties. There is no suggestion the parties agreed the documents would be supplied in another language. 33. Further, for the purpose of Section 35 of the Act, the test of a reasonable person in the circumstances, is a test which does not include looking at an individual‟s particular position such as having an imperfect understanding of English or cultural background. In CGU Insurance Ltd v Porthouse (2008) HCA , the High Court said the test (when considering Section 21 of the Act and the Case No: 242632 Determination Page 6 of 18 words “a reasonable person in the circumstances” stated that it was only appropriate to take into account factors which are extrinsic to the insured such as the circumstances in which the policy was entered into, rather than intrinsic factors such as an individual‟s idiosyncrasies. 34. Whilst the Panel understands the Applicant‟s position, it would be inappropriate to take into account the Applicant‟s limited understanding of English when considering this dispute. 35. The Panel has reviewed the relevant policy provisions dealing with storm, flood, flash flood and storm water runoff contained in the PDS and the 2010 renewable certificate. The policy is indexed with clear reference under the policy that flood is not covered. The policy identifies that optional flood cover may be taken upon agreement with the FSP and that is to be shown on the Certificate of Insurance. The Certificate of Insurance for 2010 clearly identifies that flood is not included in the policy. The Panel is satisfied having considered the wording of the policy and PDS that the FSP has complied with its obligations under Section 35 of the Act to clearly inform. Flood vs Flashflood/Storm Water Runoff 36. FOS has determined in other disputes, following co nsideration of all material exchanged that the heavy rainfall commencing around 4.00am on 11 January 2011 was the proximate or effective cause of the inundation of the properties downstream from the Wivenhoe Dam. 37. Subsequent to issuing those determinations, the evidence of the flood engineers was brought into question following the recall of the Queensland Flood Commission of Inquiry. FOS suspended issuing further determinations on this issue until the Queensland Flood Commission of Inquiry evidence had been completed and the parties given the opportunity of addressing the issues that arise from these determinations and the approach previously adopted. 38. The FSP has since provided further submissions to FOS including a reference document, two additional hydrology reports and a statement from the hydrologist. Only those parts of the additional material relevant to the current dispute need be considered. Loss Adjustor’s Report 39. The FSP‟s loss adjustor inspected the insured property on 4 February 2011 and issued a “ SITE REPORT- Property Claim” dated 15 March 2011. 40. The loss adjustor‟s report states, amongst other things:  inundation of water to dwelling to a height of 1.3m above floor;  date of loss – 11 January 2011;  date/time of discovery - 11 January 2011; Case No: 242632 Determination Page 7 of 18  building damaged – All rooms - 3 bedrooms, kitchen, dining, lounge, bathroom, laundry, garage, shed, built-in robes;  contents damaged – total loss. Insurance Council of Australia (ICA) Hydrology Report 41. The Insurance Council Australia hydrology report entitled “FLO ODING IN THE BRISBANE RIVER CATCHMENT JANUARY 2011 VOLUME 2 FLOODING IN BRISBANE CITY LGA” contains the following information:  there were three generally distinct and significant rainfall periods between 9 – 11 January 2011 across the Brisbane City Local Government Area (Brisbane LGA). The first event occurred over the period from around 9.00am to 9.00pm on Sunday, 9 January 2011. The second event occurred from around 6.00am to 10.00am on Monday, 10 January 2011. The third event occurred from 6.00am to 4.00pm on Tuesday, 11 January 2011; (see 7.2.3)  the most significant rainfall across the Brisbane LGA occurred from approximately 6.00am to 4.00pm on 11 January 2011; (see 9.1)  after about 6:00pm on 11 January 2011, there was little or no rainfall across the Brisbane LGA; (see 9.1)  the Brisbane River water levels through the city peaked about 24 -30 hours after rainfall had ceased, that is, from the late hours of Wednesday, 12 January 2011 to the early hours of Thursday, 13 January 2011; (see 9.1)  any area that was inundated after 6.00pm on 11 January 2011 will have been water flow inundation from the Brisbane River and its tributary creeks. The inundation along the tributaries was associated with backwater flooding from the Brisbane River, which in turn was pri ncipally caused by the dam release flood from the Wivenhoe Dam; (see Summary of Findings)  overland flow inundation is generally associated with intense rainfalls of short duration. In general, such rainfalls did not occur across the Brisbane City LGA in January 2011. It is expected that overland flow inundation would generally not have occurred in the Brisbane City LGA; (see 9.2)  uncertainties exist on whether properties flooded by water flows also suffered initial inundation from overland flow flooding. Investigation of local factors such as local topography and the area and characteristics of overland flow, hydrologic/hydraulic modelling of the storm event and local storm water drainage system is required to resolve this issue. (see 9.5) FSP’s Expert Repo rt 42. The FSP‟s hydrologist SC provi ded a report dated 28 June 2011 stating:  On 9 – 11 January 2011, commencing at approximately 9.00am on 9 January 2011, a substantial amount of rain fell in the Brisbane River catchment above Wivenhoe Dam. This rain caused significant inflows into Case No: 242632 Determination Page 8 of 18 the Wivenhoe Dam which peaked in late evening of 11 January 2011. Significant discharges of the water from the Wivenhoe Dam then flowed into the Brisbane River which then worked its way towards Brisbane.  From 6.00am on 11 January 2011, a substantial amount of rain fell also in the Bremer River catchment. This rain travelled down the Bremer River towards the junction of the Bremer River and the Brisbane River. The Bremer River contributed in the order of 15% to 25% of the Brisbane Ri ver‟s peak flow.  A small proportion of the overall depth of the Brisbane River prior to 6.00am on 12 January 2011 may be partially attributable to the rain that fell in the Brisbane River catchment on 11 January 2011.  However, the rain which fell some days earlier over the Wivenhoe Dam catchment and its subsequent release from that dam had the overwhelming influence on the flooding of the Brisbane River. 43. SC “undertook further steps to identify whether the cause of the inundation to the [insured property] may have been storm water ”. Accordingly:  A copy of the Brisbane City Council Floodwise data for the insured property “shows that the level of the [insured property] varies from approximately RL 5.4m AHD to RL 7.1m AHD”. The insured property is close to the lowest point on S Street which has storm water infrastructure, including curb and channelling and storm water pits.  The Applicant‟s allegation that the insured property was inundated by water which “came up” from the storm water drains on the right-hand side of the insured property and that the area near the insured property was “swelling with water” on the evening of 11 January 2011 “ is consistent with the inundation of the [insured property] being caused by the rising level of the Brisbane River causing water to backflow into the storm water drainage system”: 44. SC concluded that “the cause of the inundation of [the insured property] was the rising level of the Brisbane River, which was itself caused by rain which fell more than 24 hours earlier”. 45. In the latest hydrology report dated 7 June 2012, SC appears to have changed his earlier view and now maintains that it was the rain that fell between 9 and 11 January 2011 (that is, including the rain that fell on 11 January 2011) which was the cause of the elevated level of the water at the Wivenhoe Dam. 46. SC has also provided a key conclusions attachment to the report to assist in identifying the time the W4 releases first reached the vicinity of the Applicant‟s property. According to the key conclusions attachment the W4 releases first reached the vicinity of the property at 2.57am on 12 January 2011with the peak height above benchmark level at 4.00am on 12 January 2011 being 0.2 metres above benchmark level before ultimately reaching 2.2 metres at 2.57am on Thursday, 13 January 2011. SC does not appear to have taken into account any eye witness statements but has relied on hydrological data in reaching his conclusion. In reaching the benchmark level presumably, he has taken this as Case No: 242632 Determination Page 9 of 18 the level of the slab in the house but has not considered the storage areas which were below this level in a sunken part of the property. 47. The Applicant alleges that she has witnesses who, in the early evening of 11 January 2011, saw that the water that came up and affected her property was from storm water drains on the right side of her property and saw that the area was swelling with water that was coming from storm water drains near G Street which runs parallel to her property. 48. It is noted that while the Applicant says she has eye-witnesses, the Applicant has not presented any statements or statutory declarations from any witness in support of her claim. 49. It is also noted that the FSP‟s loss adjuster‟s report indicates the date of loss and date of discovery of loss as 11 January 2011. 50. The Panel notes there is relative consistency between the Applicant‟s comments that the property was first inundated in the evening of 11 January 2011, t he loss adjustor‟s report and the latest hydrology indicating the waters entered the property above the benchmark level at 2.57am. We note that the ground level of the property is lower than the benchmark level which could help explain this difference. 51. The policy covers flash flood and storm water runoff. In order for a claim to fall under the insured event of flash flood and storm water runoff, the following elements must be established: a. there was a sudden flood; b. there was a heavy rain that occurred within 24 hours prior to that flood; c. the sudden flood was caused by that heavy rain. 52. The ICA Hydrology Report states that there were three generally distinct and significant rainfall periods between 9 – 11 January 2011 across the Brisbane LGA. The first event occurred over the period from around 9.00am to 9.00pm on 9 January 2011. The second event occurred from around 6.00am to 10.00am on 10 January 2011. The third event occurred from 6.00am to 4.00pm on 11 January 2011. The most significant rainfall across the Brisbane LGA occurred during the third event. 53. There is no dispute that from 8.00am on 11 January 2011 releases from the Wivenhoe Dam rapidly increased in response to the adoption of the W4 strategy. Information relied upon by the parties and referred to in the latest hydrology report, SC details the significant change in those releases. 54. There is no dispute between the parties that the adoption of the W4 strategy led to a wave of water that travelled downstream along the Brisbane River. Again, this is supported by the material exchanged and impact assessed in the latest hydrology. 55. The central issue in dispute in this matter is whether the heavy rain that fell over the Wivenhoe catchment area from 4.00am on 11 January 2011 could be Case No: 242632 Determination Page 10 of 18 said to be the proximate cause or effective cause of the subsequent inundation of the Applicant‟s property which is downstream. 56. In considering the proximate or effective causes, it is necessary to consider the facts of the situation alongside the terms of the relevant policy. In this context the Panel accepts the word „caused‟ within the flash floods/ storm water runoff definition in the policy means in the insurance context „proximate or direct cause‟. 57. It is a well established principle of insurance law that the proximate cause of the loss is not the first, or the last, or the sole cause of the loss but the effective or dominant or operative cause. It is a question of fact to be considered in each case. It has been said by the FSP and the Panel agrees that in determining „proximate cause‟ by a common sense evaluation of the relevant facts, the cause which would be attributed by „ the man in the street ‟ would reasonably be the one determined as the cause of the loss. The Panel also agrees that if there are two or more proximate causes, one within the policy and another excluded, then the policy does not respond. 58. The Panel accepts as indicated earlier in this determination that the rainfall that commenced falling on 9 January 2011 a nd earlier led to significant increases in the level of the Wivenhoe Dam and in the level of the Brisbane River. 59. The Panel notes from the FSP‟s fur ther hydrology dated 7 June 2012 and the accompanying statement that the hydrologist SC felt the relevant rainfall gauge data indicated the rain which fell on 11 January 2011 was more heavily centred over the Wivenhoe Dam itself, rather than in the upper catchment. 60. In a report headed “Investigation of the January 2011 Inundation Event Brisbane” dated March 2011 the hydrologist considered the significant rainfall event that occurred in the Upper Bremer between approximately 06:00 and 15:00 on 11 January 2011 also contributed to the peak flow in the order of 15% to 25% of the Brisbane River. In addition, a small proportion of the overall depth of the Brisbane River pre 06:00 on 12 January may be partially attributed to the rainfall which fell within the catchments downstream of the Wivenhoe Dam in the preceding 24 hours. 61. The Panel notes this has not been referred to in the statement provided by the hydrologist dated 7 June 2012, nor has the impact of the Bremer River been referred to in the hydrology report. We note this is however contained in the statement provided by SC on 28 June 2011. 62. The FSP has argued that the proximate or effective cause of the adoption of the W4 strategy was not the rainfall that commenced at 4.00am on 11 January 2011 but the combined effects of the rainfall over the several days commencing from 9 January 2011 (or earlier) and it is the combined effect that has ultimately led to the steady increase of the Wivenhoe Dam causing the need to adopt the W4 strategy. The FSP has also argued that the Brisbane River itself was already in flood prior to the W4 strategy being adopted. In arguing this, the FSP has provided information as to the rainfall that fell from 6 January 2011 and the impact that this caused on the dam level. Case No: 242632 Determination Page 11 of 18 63. The Panel accepts that the Wivenhoe Dam had been impacted on by heavy rainfall in the days, if not months prior to the adoption of the W4 strategy. 64. The inflows into the Wivenhoe Dam had been reducing from approximately 3.00pm on 10 January 2011after the “first spi k e”. This continued until the early hours of 11 January 2011. The information provided supports a view that heavy rainfall commenced around 4.00am on 11 January 2011. The rainfall most likely fell more heavily over the dam itself than the upper catchment area. This view is supported by the FSP‟s hydrologist. Prior to the heavy rainfall, the dam release was being maintained at the W3 level with the releases controlled at this level to avoid extensive flooding downstream of the Wivenhoe Dam. 65. The charts show a rapid increase in the inflows into the dam from 4 .00am on 11 January 2011 and as a result of that rapid increase, the W4 strategy leading to increased outflows into the Brisbane River from the dam had to be implemented. There is no evidence to say that this strategy would have been implemented had the rainfall not occurred. Whether it would have been necessary to maintain the outflow of the W3 level in the absence of any additional rainfall is uncertain, in particular given that the pattern inflows into the dam were decreasing. In the absence of any additional rain, the inflows may have decreased further. 66. The Panel accepts that whilst the inflow were decreasing, the dam levels itself were still increasing. There is nothing however in the material exchanged to suggest that this would have continued in the absence of the heavy rain that commenced falling at approximately 4.00am on 11 January 2011. There is nothing in the information exchanged to suggest that the W4 strategy would have been invoked if the heavy rain had not occurred. The evidence supported by the FSP‟s hydrology is that the increased release once the W4 strategy was invoked led to the development of a flood wave which was a direct cause of flooding downstream of the dam. The flood wave was also impacted by the increased outflow from the Bremer River due to the heavy rain that fell over the Bremer catchment area from 6am on 11 January 2011. 67. As indicated earlier, the FSP has provided a hydrologist report dated 7 June 2012 to which are attached key conclusions. That hydrologist report confirmed the inundation of the property as a result of the W4 “flood wave” commenced at 2.57pm on 11 January 2011. 68. There is no evidence presented that the property was inundated prior to W4 being implemented or prior to the W4 releases having impacted on the property. The evidence supports a view that the inundation of the property occurred in line with the flood wave following the W4 release. That is the inundation occurred within 24 hours of the heavy rainfall. 69. Having regard to the relevant legal principles and the terms of the policy, the Panel is satisfied that whilst there is no doubt that the Wivenhoe Dam and Brisbane River had been impacted by heavy rainfall in the days if not months prior to the adoption of the W4 strategy, it was the heavy rain that fell over the Wivenhoe Dam and Brisbane River from 4.00am on 11 January 2011 that was the direct or effective cause of the adoption of the W4 strategy and that in the Case No: 242632 Determination Page 12 of 18 absence of such rainfall, there is no evidence to establish that the W4 strategy would have been invoked. The Panel is satisfied in the circumstances that a common sense evaluation of the relevant facts in these circumstances establishes that the proximate cause of the adoption of the W4 strategy and consequently the proximate cause of the flood wave was the rain that fell from 4.00am on 11 January 2011 combined with the rainfall over the Brisbane and Bremer Rivers on 11 January 2011. 70. In the circumstances, the Panel is satisfied that the Applicant‟s property was inundated within 24 hours of the heavy rainfall and that such an inundation falls within the terms of the policy. 71. The evidence supported by the key conclusions in the FSP‟s hydrology suggests however that the peak height above benchmark was reached at 2.2 metres at 2.57am on Thursday 13 January 2011 well outside the relevant 24 hour period. The Panel accepts in these circumstances not all of the damage sustained to the Applicant‟s property can be properly attributed to “flash flood or storm water runoff”. 72. The FSP has argued that if flash flood is found to be a proximate cause then flood was also a proximate cause of the loss, consequently the FSP argues it is entitled to deny the claim under the Wayne Tank principle which states that where there are two or more proximate causes one within the policy and the other specifically excluded, the policy does not respond. The Panel is not so persuaded. The policy definition of “flood” is broadly stated that it is the rising water which enters your home as a result of it running off or overflowing from any origin or cause. Flash flood is described as a type of flood. It is the “sudden” flood that occurs within 24 hours of heavy rainfall. The policy clearly states that when this type of flood occurs, the FSP will pay the resultant damage or loss. Otherwise stated, although the policy does not cover flood in general, where the circumstances of the actual inundation meets the definition of flash flood, the FSP must indemnify the insured. Calculation of Loss 73. The FSP‟s loss adjustor reported severe damage to all the rooms in the insured building and the total loss of the insured contents. 74. The 10 April 2010 Certificate of Insurance shows a home building sum insured of $289,000 and a contents sum insured of $88,000. 75. Under the policy, the Applicant is entitled to:  up to 50% of the home building sum insured or $25,000 whichever is higher; and  up to 50% of the contents sum insured or $25,000 whichever is higher. 76. The FSP‟s hydrologist suggests that the property would have been inundated due to the W4 release to approximately 200mm above benchmark level by 4.00am on 12 January 2011. The Panel accepts that this may not be a precise Case No: 242632 Determination Page 13 of 18 calculation. At this level of inundation it is likely in the Panel‟s view that substantial damage would have been sustained. 77. The Panel accepts that part of the damage may well have been due to the effects of the inundation that occurred after the relevant 24 hour period. The Panel has no evidence as to the extent of that damage and given the time that has elapsed, it is difficult to see how the damage could be assessed. In the Panel‟s view, it is fair in the circumstances subject to the Applicant providing proof of actual repair costs for the building incurred that the FSP indemnify the Applicant 50% of the repair cost to the building subject to the policy limitation of 50% of the $289,000 sum insured or $25,000 whichever is higher. 78. Insofar as the contents are concerned, the Panel notes the contents were assessed as a total loss with a contents insured sum of $88,000. The Panel again accepts it is reasonable to indemnify the Applicant 50% of the loss. 79. The FSP has already paid the Applicant $12,500 from a compassionate fund set up by the FSP. Payment from the compassionate fund is not subject to FOS jurisdiction but the Panel accepts the FSP is entitled to take into account this amount when determining the sum payable to the Applicant. Determination 80. On the basis of the available information and the above reasons, the Panel determines that the proximate cause of the damage to the insured property was the insured event of flash flood and storm water runoff. 81. Therefore, the Panel determines that:  with regard to the contents damage, the FSP must indemnify the Applicant $44,000 being 50% of the insured sum for total loss of contents;  with regard to the building damage, subject to proof of actual repair costs already incurred by the Applicant, the FSP must indemnify the Applicant 50% of the actual repair costs subject to the policy limitation of 50% of the $289,000 sum insured or $25,000 whichever is higher; and  the FSP must pay the Applicant interest on the amount payable from 23 March 2011 (the date of the denial of the claim) to the date of the settlement of this Determination at the rate of 7.25% in accordance with section 57 of the Insurance Contracts Act 1984 . Case No: 242632 Determination Page 14 of 18 Case number: 242632 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Flood vs Flash Flood and Storm Water Runoff - Quantum 28 August 2012 Background 1. On 17 July 2012, the Financial Ombudsman Service (FOS) issued a Determination in favour of the Applicant and against the Financial Services Provider (FSP). In part the Determination states: “80. On the basis of the available information and the above reasons, the Panel determines that the proximate cause of the damage to the insured property was the insured event of flash flood and storm water runoff. 81. Therefore, the Panel determines that:  with regard to the contents damage, the FSP must indemnify the Applicant $44,000 being 50% of the insured sum for total loss of contents;  with regard to the building damage, subject to proof of actual repair costs already incurred by the Applicant, the FSP must indemnify the Applicant 50% of the actual repair costs subject to the policy limitation of 50% of the $289,000 sum insured or $25,000 whichever is higher; and  the FSP must pay the Applicant interest on the amount payable from 23 March 2011 (the date of the denial of the claim) to the date of the settlement of this Determination at the rate of 7.25% in accordance with section 57 of the Insurance Contracts Act 1984 .” 2. On 3 August 2012, the FSP contacted FOS stating: “We note that paragraph 81 of the determination states that „the FSP must indemnify the Applicant $44,000 being 50% of the insured sum for total loss of contents‟. The certificate of insurance provided to FOS in the course of the matter indicated that the contents sum insured was $88,000. However, the policy was amended on 21 April 2010 (before the loss in question) to reduce the sum insured to $40,000 (see attached amended certificate of insurance). Un fortunately this fact was not realised at the time that the [FSP‟s] submissions were provided in the matter. In light of the above, the [FSP] submits that paragraph 81 of the determination was made on the basis of an error. ... Addendum Determination Case No: 242632 Determination Page 15 of 18 The [FSP] therefore requests that FOS‟s determination be corrected so that the maximum payable by the [FSP] (with respect to the contents loss) is stated as $20,000, representing half of the sum insured”. 3. FOS sought the Applicant‟s comments. 4. On 13 August 2012, the Applicant‟s representative advised that “I have now checked my mother‟s policy and it does have a contents insured value of $40,000”. On the same day, she sought clarification on the second dot point of paragraph 81 of the Determination regarding compensation for building damage. Summary of Applicant’s position 5. With regard to the building damage, the Applicant‟s representative says: “Please note there seems to be some confusion about the second dot point in Paragraph 81 of the Determination section of the FOS report. My u nderstanding is that if the total cost of repairs to my mother‟s house is for example, $39000, half of this is $19500, which is less than $25,000, hence $25,000 would be payable to my mother as stated in Para 81 at the second dot point... as [$25,000] is a higher value, than the halved $39,000. Please confirm if this is the meaning intended in the Determination by FOS.” Summary of FSP’s position 6. With regard to the contents damage, the FSP says it is liable only for $20,000, which is 50% of the sum insured of $40,000. 7. With regard to the building damage, the FSP says that:  based on the information from the Applicant, the actual repair costs is $33,558.55;  50% of $33,558.55 is $16,779.28;  FOS correctly notes that the Product Disclosure Statement (PDS) limits any payment under the insured event of flash flood/stormwater run-off to 50% of the sum insured or $25,000, whichever is higher;  however, as the calculated indemnity to be provided to the Applicant is $16,779.28, this limit has no relevance to the Applic ant‟s settlement. 8. The FSP submits that the following calculation (plus interest) is in accordance with the FOS Determination: “Building repairs (50% of total cost) $16,779.28+ Clean up costs allowance $2,200.00+ Alternate accommodation allowance $1,500.00+ Contents (50% of sum insured) $20,000.00+ Policy deductible $300.00- Case No: 242632 Determination Page 16 of 18 Total $40,179.28 ”. Issues 9. With regard to the contents damage, whether the FSP‟s liability is $20,000. 10. With regard to the building damage, whether the FSP‟s liability is $16,779.28. Reasons for decision Certificate of Insurance dated 21 April 2010 11. The FSP has previously submitted a copy of “Renewal – Certificate of Insurance” with date of issue of 10 April 2010. This shows a sum insured of $88,000 for home contents. 12. After the issuance of the Determination dated 17 July 2012, the FSP has provided a copy of “Renewal – Certificate of Insurance” with date of issue of 21 April 2010. This shows a sum insured of $40,000 for home contents. 13. The Applicant agrees that her copy of the Certificate of Insurance “does have a contents insured value of $40,000”. Contents damage 14. The Panel is satisfied that incorrect information was previously provided to FOS. 15. It is also satisfied that the Certificate of Insurance dated 21 April 2010 is the relevant certificate. This shows a sum insured of $40,000 for home contents. 16. FOS has previously published FOS Circular No 7 which discusses the application of the “slip rule” in case of an arithmetic or clerical error, to wit: “Slip Rule Occasionally a FOS Determination or Recommendation will contain an arithmetic or clerical error which alters the meaning of the document. In those situations it is necessary to ensure the true position is conveyed to the parties to the dispute. FOS uses the “slip rule” to make the necessary corrections. The slip rule is a recognised legal principle and has been successfully used within other jurisdictions, such as courts and tribunals, over a number of years to correct an arithmetic or clerical error in judgments or orders. Paragraph 8.2 of FOS‟s Terms of Reference provides that FOS will do what in its opinion is fair in all the circumstances, having regard to, amongst other matters, legal principles. The slip rule is as follows: “FOS may correct a Determination or Recommendation if it contains –  a clerical mistake; or Case No: 242632 Determination Page 17 of 18  an error arising from an accidental slip or omission; or  a material miscalculation of figures or a material mistake in the description of any person, thing or matter; or  a defect of form. If a Determination or Recommendation relating to a Dispute requires a correction to address an issue listed above, a party to the Dispute may request the correction in writing. The request should explain the issue to be addressed through the correction. An Ombudsman will decide whether FOS should make any correction. FOS may correct a Determination or Recommendation relating to a Dispute whether or not a party to the Dispute requests a correction.” 17. Therefore, the Panel determines that paragraphs 74, 78 and 81 of the Determination dated 17 July 2012 should be amended as follows: “74. The 21 April 2010 Certificate of Insurance shows a home building sum insured of $289,000 and a contents sum insured of $40,000. ... 78. Insofar as the contents are concerned, the Panel notes the contents were assessed as a total loss with a contents sum insured of $40,000. The Panel again accepts it is reasonable to indemnify the Applicant 50% of the loss. ... 81. Therefore, the Panel determines that:  with regard to the contents damage, the FSP must indemnify the Applicant $20,000, being 50% of the insured sum for total loss of contents;” . Building damage 18. The Applicant seeks clarification on the following wording of the Determination dated 17 July 2012: “the FSP must indemnify the Applicant 50% of the actual repair costs subject to the policy limitation of 50% of the $289,000 sum insured or $25,000 whichever is higher;” 19. Page 27 of the PDS relevantly reads: “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and storm water runoff We will pay up to 50% of your home sum insured or $25,000 whichever is higher.” Case No: 242632 Determination Page 18 of 18 20. The above provision sets a policy limit, that is, the maximum liability of the FSP and the maximum amount to which an insured is entitled. This can be gleaned from the words “The most we will pay” and “We will pay up to”. 21. Notably, the above provision is not worded as “We will pay 50% of your home sum insured or $25,000 whichever is higher” and therefore, it does not set an automatic entitlement to at least $25,000 from the FSP. 22. The wording cannot be read to provide 50% of the loss or $25,000 whichever is the higher to set $25,000 as an automatic minimum entitlement. 23. It is common ground that, subsequent to the Determination dated 17 July 2012 the Applicant has provided repair receipts to the FSP totalling $33,558.55. As per the Determination dated 17 July 2012, the Applicant is entitled to 50% of the actual repair costs. Thus, 50% of $33,558.55 is $16,779.28. 24. The policy term “ We will pay up to 50% of your home sum insured or $25,000 whichever is higher ” sets the absolute limit which would otherwise apply to any payment. In this case the limit applicable would therefore be the greater of $144,500 or $25,000. Given the amount determined as payable is $16,779.28 the limit has no application in this instance. 25. Therefore, the Panel determines that the FSP‟s liabil ity with regard to the building damage is $16,779.28. Determination 26. On the basis of the available information and the above reasons, the Panel determines that:  paragraphs 74, 78 and 81 of the Determination dated 17 July 2012 be amended as described in paragraph 17 above;  with regard to the contents damage, the FSP must indemnify the Applicant $20,000 plus interest at the rate of 7.25%; and  with regard to the building damage, the FSP must indemnify the Applicant $16,779.28 plus interest at the rate of 7.25%. 27. The Panel notes from the FSP‟s further submission that it has also accepted liabilty for a number of other benefits in addition to those as determined above.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.