Text of the determination
Case No: 242551 Determination Page 1 of 9
Case number: 242551
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Partial Denial of Claim
12 December 2011
Background
1. The Applicants held a Home Building and Contents Insurance policy (the
policy) with the Financial Services Provider (FSP).
2. A claim was lodged upon the policy for significant damage to the insured
property due to a severe hail storm on 6 March 2010. This was a very major
storm leading to extensive damage in many parts of Victoria.
3. The FSP accepted the claim, however excluded from cover damage to the
internal ceilings of the property and timber beams above the ferneries at the
property.
4. The Applicants remain dissatisfied with the approved scope of works and are
seeking cover for the full extent of the damage claimed.
Summary of Applicants ’ Position
5. The Applicants have sought legal representation by “V” in disputing the FSP’s
position in respect to their claim. In the interest of clarity, both V and the
Applicants will be referred to as the “Ap pl icant” for the purpose of this
Determination.
6. The Applicant maintains that no repairs have been undertaken at the insured
property since lodgement of the claim. This is in spite of, the builder “AG” and
“P” appointed by the FSP, having assessed the insur ed property on four
separate occasions.
7. The FSP has accepted a major portion of the claim however has excluded from
cover:
Damage to the internal ceilings of the home.
Damage to the timber beams over the fernery on the left hand side of the
property.
Determination
Case No: 242551 Determination Page 2 of 9
8. The Applicant maintains the internal ceilings at the property were in perfect
condition prior to the insured event. The FSP’s assessor visited the property in
March 2010, at which time the damage to the ceilings was not apparent.
However, sometime later the ceiling in the family area, rumpus and lounge
rooms began to sag and show signs of water damage.
9. The FSP’s appointed builders AG visited the Applicant’s home in March 2010 to
undertake an assessment of the loss/damage. The Applicant maintains that AG
did not make available a scope of works until July 2010.
10. Several telephone calls had to be made to the FSP requesting that the
damaged roof tiles be replaced as soon as possible as this issue was
contributing to further damage to the internal ceilings. On not hearing back from
the FSP in this regard, the Applicant placed his concerns in writing in a letter to
the FSP dated 20 June 2010. By this time, it is likely that further damage had
occurred.
11. The FSP sent AG’s assessment report to the Applicant in July 2010, w hich the
Applicant notes clearly included repairs to the damaged family room ceiling.
However, the report omitted other storm related damage at the insured property
and this was raised with the FSP in August 2010.
12. The FSP appointed P to the claim and instructed it to assess the insured
property. P completed its assessment of the loss and in its report completely
excluded the damage to the ceiling and this was again raised with the FSP. The
FSP arranged for P to visit the Applicant’s home again and assess th e ceilings
in question. On undertaking the assessment, P concluded that the damage to
the ceilings was not storm related, rather was due to the natural shrinkage of
the timber ceiling joists, as the damage was consistent throughout the home
(every room).
13. Due to the different opinions provided by AG and P, the FSP advised the
Applicant that it would appoint a third builder to provide further clarification in
this regard. No one attended the Applicant’s home after a considerable delay
so he contacted the FSP, who advised that it was having trouble finding
another builder, and suggested the Applicant arrange a builder ’s report for
consideration.
14. The Applicant arranged for “R” to assess the damage to the ceilings. R
confirmed that the ceilings in the lounge room, family room, rumpus area,
bedrooms 1/2/3, ensuite and bathroom were water damaged due to the
damaged condition of the roof not being weather tight. The report was provided
to the FSP as requested however the FSP chose to reject this report. The
Applican t by this time had become very frustrated with the FSP’s management
of the claim and therefore rejected an inspection by yet another party as
suggested by the FSP.
15. The Applicant maintains that it is only reasonable to accept that moisture had
entered the roof cavity as it has been accepted by all parties that there was
extensive damage to the roof (150 roof tiles broken in addition to pointing etc).
Further, the roof has remained in this state of unrepair since the said insured
Case No: 242551 Determination Page 3 of 9
event. The Applicant appoint ed a roofing consultant “RR” to inspect the
damage to the roof at the insured property. On completing his inspection, RR
confirmed that there was extensive damage to the roof and it was not in a
weather tight condition. It is also entirely plausible that the alleged shrinkage of
the timber rafters could have been due to the introduction of moisture from the
water ingress arising from the insured event, an issue not addressed by the
FSP. The claim was referred to the FSP’s dispute resolution process for revi ew.
16. The Applicant received a letter from the FSP’s dispute resolution officer in
which the FSP agreed to cover the cost to repair the family room ceiling only.
Subsequently, the Applicant was contacted by the representative from the FSP
offering to settle the dispute with an $8,000 cash settlement in respect to the
family room ceiling. The offer was refused as R had quoted the cost to repair
the damaged ceilings to be $18,400.
17. In addition to the concern regarding the internal ceilings, AG in its assessment
completely excluded damage to the pergola and surrounding areas. P
inspected the damage in September 2010 and accepted the shade cloths on
both the left and right side ferneries had been damaged during the hail storm. P
however excluded from cover damage to the timber beams upon which the
green shades were supported.
18. The Applicant contacted the FSP with concerns regarding P’s report after which
the FSP arranged a re-inspection by P. After the re-inspection, P’s report
advised that due to the area being uncovered since the storm event of 6 March
2011, when the laserlite roofing was significantly damaged, a majority of the
timber decking was splitting and had started to warp. Also, the timber beams of
the pergola were starting to rot across the top of all the beams.
19. The approved scope of works was again amended to include cover for the
damage to the timber decking and pergola. However, the claimed damage to
the timber beams over the two ferneries was excluded from cover with the FSP
citing ongoing weathering and wood rot prior to the insured event. The
Applicant disputes this position and claims that only two of the 28 timber beams
had wood rot, and as such it is an unfair decision to completely exclude from
the cover damage due to the two beams.
20. The Applicant maintains the property is continuously deteriorating on a daily
basis due to the fact that no repairs have been undertaken since the date of
loss (6 March 2010). The FSP and its appointed builders are directly
responsible for this situation due to the repeated inaccurate and incomplete
assessments of the storm damage at the insured address.
21. The Applicant is only seeking that the FSP restore the insured property back to
the condition it was before the severe hail storm.
22. The Applicant would be prepared to accept settlement of this dispute in the
form of the FSP accepting to cover the repairs in line with P’s scope of works,
while also accepting to cover costs associated with repairing the ceilings and
timber beams excluded by the FSP.
Case No: 242551 Determination Page 4 of 9
23. Alternatively, the Applicant would be prepared to accept a cash settlement of
$84,3 80.48 (P’s quote $48,600.48 - Re-paint roof tiles $1,980-Ceiling repairs
$18,400, timber beams $9,900 – Spa pump and heater $5,500).
Summary of FSP’s Position
24. The Applicant contacted the FSP on 8 March 2010 and lodged a claim for
loss/damage arising from a severe hail storm. The FSP accepted liability to
cover a majority of the loss claimed however excluded from cover the cost to
repair internal ceilings (except for the family room) and timber beams over the
two ferneries.
25. The FSP does not believe the claimed damage to the ceilings is due to an
insured event. The FSP’s appointed repairer inspected the insured property
and formed the belief that the cause of the damage to the ceiling is due to the
natural shrinkage of the truss roof rafters. This in turn has caused the
plasterboard to pop at the screw fittings. It was also noted that there was no
water staining to the ceilings indicative that the cause of the damage was not
storm damage.
26. In order for damage to be covered under the policy, it must be established that
the cause of the loss/damage was due to an insured event. It is a principle of
insurance law that the onus rests with the Applicant to establish, on the balance
of probabilities, that the loss claimed is the result of an event insured under the
policy. The FSP is of the opinion that the Applicant has not been successful in
satisfying this onus.
27. The Applicant has made available a quote to repair the damaged ceilings which
indicates that the damage is due to the storm. However, the FSP notes the
quote/report does not provide sufficient e vidence to prove the damage was in
fact caused by the storm event. There is no detail as to how the repairer formed
this opinion. The FSP’s appointed builder’s report clearly identifies that the
damage to the ceilings was not caused by storm and explains the basis for
arriving at this decision.
28. In respect to the timber beams over the ferneries, the FSP is prepared to settle
the Applicant for the timber beams that had the laserlite roofing and the
Applicant will be contacted in this respect to arrange settlement. The FSP
maintains the decision in relation to the timber beams over the other fernery.
The damage to these timber beams occurred due to weathering and is not
related to the hail storm event.
29. The onus rests with the Applicant to establish that the damage to the excluded
timber beams over the fernery is due to the insured storm event. The FSP
maintains the damage is one of wood rot which is specifically excluded by the
policy, and accordingly the FSP does not believe it is liable to accept this claim.
Case No: 242551 Determination Page 5 of 9
30. The FSP maintains the Applicant has failed in respect to the onus to establish
that disputed items of damage (excluded from cover) all associated with an
event insured under the policy. The damage to the beams has been clearly
noted to be due to ongoing issues, and as such the rectification required is
maintenance related and therefore excluded under the policy.
31. The FSP relies on the following policy provisions:
“Page 9 What we cover
We cover loss or damage caused by the insured events 1 to 12
When we insure them, your home and contents are covered for loss or damage by the
insured events 1 to 12 at the insured address. Examples include events such as fire,
theft and storm. For the full range of insured events, see page 57.
…
Page 121-127 What you are not covered for
This section details what is not covered under any part of your policy.
We do not cover loss or damage:
Failing to establish an insured incident
Loss or damage without you being able to reasonably establish an insured incident
took place at a certain time and date.
Wear, tear, rust or mould
Loss or damage caused by wear, tear, rust, fading, gradual deterioration, mould, rising
damp, mildew, action of light, atmospheric or climatic conditions, corrosion or rot
unless this is covered under
Insured event 1 (storm and flood)
Insured event 2 (burst pipes, leaks and overflows). ”
Issue
32. Whether the FSP is entitled to limit its liability towards the claimed loss/damage
under the claim.
Reasons for Decision
33. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the FOS Terms of Reference. This is due to the
circumstances of the dispute. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
34. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
Case No: 242551 Determination Page 6 of 9
I have reviewed the submissions of the parties in relation to the terms and conditions
of the policy and will only refer to the relevant submissions and materials
raised.
35. At lodgement of this dispute with the Service, I note it was in relation to
damaged internal ceilings throughout the insured property (including the family
room). Also, in dispute was the FSP’s decision to exclude from cover the timber
beams over the ferneries to the right and left of the property. During the course
of the dispute, the FSP has accepted liability to provide indemnity under the
claim for the damage to the family room ceiling and timber beams over the
fernery where the laserlite roofing was damaged.
36. Therefore, I am satisfied that the remaining issues in dispute before me are in
respect to the ceilings of the home (except for the family room) and the timber
beams over the remaining fernery which have been excluded from cover by the
FSP.
37. It is not in dispute between the parties that:
The insured property sustained significant damage due to a severe hail
storm which occurred on 6 March 2010.
The roof of the insured property was significantly damaged including but
not limited to approximately 110-150 roof tiles, mortar, ridge and hip
capping.
Due to the significant damage, the roof was no longer in a weather tight
condition giving rise to the possibility that the ceilings and insulation
would continue to deteriorate until the roof was repaired.
Impact from the severe hail damaged a majority of the timber based
structures outside the home, including decking, gates, fences, pergola
etc.
The FSP’ s appointed builders were required to revisit the insured
property on more than one occasion due to concerns with previous
reports regarding an assessment of the loss. On each occasion, the
issues raised by the Applicant were found to be legitimate and the
approved scope of works were amended accordingly.
The Applicant arranged for reports from R and RR in respect to the
claimed damage to both the roof and internal ceilings of the home.
These reports support the contention that that there is moisture damage
to the ceilings throughout the home.
No repairs have been undertaken at the insured property since the date
of loss and subsequent lodgement of the claim which to the knowledge
of the Service still remains to be the case.
Case No: 242551 Determination Page 7 of 9
The FSP through the course of the claim has increased cover to include
a larger portion of the damage claimed. The only outstanding issues
remaining between the parties are in respect to the internal ceilings and
timber beams over one of the ferneries at the property.
38. Prior to addressing the outstanding issues noted between the parties, I
consider it essential to note my concern in respect to the fact that the FSP has
failed to undertake any repair work at the insured address since lodgement of
the claim (8 March 2010). Especially, having established there was significant
damage to the roof and which has always been accepted to be damage
covered under the claim, it is reasonable to conclude that, on the balance of
probabilities, the neglect of such damage which is obviously covered, will have
contributed to further deterioration of the property. My concern is heightened by
the fact that the Applicant and his lawyer pointed this out on many occasions.
Internal Ceilings
39. The Applicant maintains the damage to the ceilings throughout the home is due
to the severe hail storm experienced on 6 March 2010. The FSP however
completely refutes this position and maintains that the current condition of the
ceilings is solely due to the natural shrinkage of the truss roof rafters. I note
although both parties acknowledge there is damage across the ceilings of the
home, neither party has made available substantiating evidence (photographic
and or documentary) to assist in establishing the nature and extent of the
damage.
40. I have considered the limited evidence made available and relied upon by the
parties in respect to the ceiling damage. I am satisfied that it is not in dispute
that the ceilings are damaged, it is the cause of this damage which remains in
dispute. Taking into account the significant damage to the roof and the severity
of the storm, I am satisfied, on the balance of probabilities, that rainwater would
have entered the roof cavity on the date of loss. Therefore, the Applicant has
satisfied the onus to establish, on the balance of probabilities, damage has
arisen due to an insured event. The onus rests with the FSP to establish that
the damage has not occurred as claimed or the cause for the damage falls
outside cover provided by the policy.
41. I ha ve considered P’s report and opinion as to how the damage occurred and
alleging that the cause for the loss falls within exclusion provisions of the policy.
Although the reasons provided by P are not essentially unique as to require an
extensive submission and supporting body of evidence, I am of the opinion that
the FSP’s submission falls short of reasonably establishing its position. As
noted above there are minimal (one or two) photographs made available to
cover damage to ceiling throughout the home. Especially, taking into
consideration the fact that this is a matter which has been subject of dispute
from very early on in the claim and multiple assessments have been
undertaken by its appointed consultants. I am not satisfied the FSP has
established the claimed damage to the ceilings is the result of shrinkage and or
other defects and or issues with construction of the ceilings.
Case No: 242551 Determination Page 8 of 9
42. Therefore, in the absence of substantiating evidence to the contrary and taking
into consideration the below noted issues, I am satisfied that, on the balance of
probabilities, it is only reasonable to conclude that the damage to the ceilings is
due to or at very least significantly contributed to by rainwater which entered
through the significantly damaged roof:
There is no evidence of the claimed damage prior to the date of loss,
evidenced by the fact it was not mentioned in initial assessment
reports.
There is no evidence to suggest that the claimed damage occurred
over an extended period of time. On the contrary it would seem the
damage occurred within a short period of time after the date of loss
and first assessment.
Having had the opportunity the FSP has been unsuccessful in
establishing the claimed damage occurred due to any other cause
other than rainwater entering the roof cavity through the damaged
roof.
The roof remains in an unrepaired non weather-tight condition with no
effort to take any temporary (emergency precautions e.g. tarpaulin)
measures to mitigate the loss.
Taking into consideration the significant damage to the roof, it is
reasonable if not apparent, to conclude that on the balance of
probabilities, rainwater would have entered through the roof.
Timber beams over fernery
43. The Applicant is claiming for damage to the timber beams over a fernery at the
insured property. I note the FSP had declined to cover the damage to timber
beams over both ferneries at the insured property. However, through the
course of the claim the FSP accepted that the timber beams over one of the
two ferneries was due to the significant hail storm.
44. In respect to the still disputed timber beams in question, the FSP maintains that
these beams are subject to wood rot and this is a position taken consistently
throughout the management of the claim. The Applicant maintains there are
only two timber beams subject to wood rot and to decline indemnity for all the
timber beams on this basis is unfair.
45. I have reviewed the photographic evidence in this respect and note the timber
beams over the fernery near the pergola and laserlite roofing do look to be in a
much better condition than the timber beams subject to this dispute. I note the
timber beams subject to this dispute do seem to be in a weathered condition
and there is no convincing evidence of extensive hail impact damage. However,
I am satisfied the hail impact has resulted in the splitting/cracking/removal of
the paint work.
Case No: 242551 Determination Page 9 of 9
46. Therefore, I am satisfied the FSP’s liability in this respect is limited to the cost
of having to repaint and not replace these timber beams.
Determination
47. On the basis of the available information, I determine that:
The FSP is to make arrangements to undertake the replacement of the
internal ceilings at the insured address in addition to the already
approved scope of works submitted by P.
The FSP is to make arrangements to include within the approved scope
of works the repainting of the timber beams subject to this dispute.
48. I determine that the work referred to above should be commenced within 30
days.
49. If the FSP elects to cash settle the Applicants for the cost to undertake the
repairs, this settlement is to be based on a fresh quote for the approved scope
of works taking into consideration the time elapsed since the date of loss.
50. Further, in the case of a cash settlement, the FSP is to pay interest at the
statutory rate upon the final settlement amount from 30 June 2011 until final
settlement of the claim.