Claim for sewerage and stormwater inundation declined as river flood and gradual process
Text of the determination
Case No: 242501 Determination Page 1 of 13
Case number: 242501
General Insurance - Domestic Insurance - Home and Contents Building - FSP
Decision - Denial of claim
15 February 2012
Background
1. The Applicant had a Home Insurance Policy with the Financial Services
Provider (FSP). The policy is subject to a $500 excess per claim and
provides cover of up to $600,000 for buildings and $45,000 for contents
2. The Applicant lodged two claims on the policy. The first being for sewerage
backflow which entered the premises between 9 and 11 January 2011. The
second claim was for water inundation from stormwater drains and road
gutters on and from 12 to 13 January 2011.
3. The FSP declined the claims on the basis that the relevant damage was
caused by flood which is an excluded event under the policy.
4. The Applicant disputes the declinature of the claims on the basis that the
river near his property did not overflow its banks and there was no flood.
Summary of Applicant’s position
5. The Applicant incepted the policy with the FSP in the knowledge that flood
from rising river water would not be covered. However, he was informed that
the policy would cover inundation from storm drains and gutters running into
the property. If the Applicant had been aware this was not the case he would
have sought insurance elsewhere. The Applicant relies on a copy of the
telephone transcript, in particular the question and answers 43-51. The
Panel notes the Applicant was provided with the following information –
The policy provides cover for storm, rain or flash flood but in that
specific area the FSP excludes tidal surges or river floods.
The FSP was asked whether a flood which came down the street would
be covered. The FSP advised that if it is a normal flash flood this is
completely covered, flood is just when the actual river has burst its
banks.
The Applicant informed the FSP that he had a blocked up storm drain a
while ago. The FSP informed him this would definitely be covered.
Determination
Case No: 242501 Determination Page 2 of 13
6. The Applicant has cover under the policy for an event of overflow from
sewerage and backed up drains. In particular, the Applicant relies on the
following policy terms and conditions:
“You are insured for damage to your building and contents caused when
water or other liquid suddenly escapes from;
- You or your neighbours
- Plumbing system
- Bath, fixed basin or sink
…
- toilet system
- The
- Road, gutter, or curbing
- water mains or pipe”
7. The Applicant relies on a letter dated 1 March 2011 from Queensland Urban
Utilities (QUU) from which the Panel notes the following:
QUU investigated the sewers near the insured property on several
occasions between 5 and 20 January 2011 in response to reports of
sewerage overflow on the property.
The investigations found defects in the sewer downstream of the
property which prevented the sewerage from flowing through the sewer
in the normal manner. The defects have now been attended to.
QUU further believed that there were plumbing fixtures on the property
which may not comply with Brisbane City Council plumbing standards.
8. The Applicant relies on a report from a plumber dated 29 June 2011 from
which the Panel notes the following:
The plumber was shown the letter from QUU.
The plumber obtained a copy of the drainage plan from BCC which
dates to December 1935.
The plumber believed the plumbing complied with the approved plans.
The only variation to the plan was a pipe acting as an ORG (overflow
relief gully) which should have helped to minimise the impact of sewer
back up.
9. The Applicant has enclosed the assessor‟s report which states that it is
possible the flood waters did not directly overflow into the insured location.
10. The Applicant has provided a copy of an interactive flood map which
indicates his property has flooded but is surrounded b y dry land then flooded
areas. There appears to be no physical overland link between the two bodies
of water.
11. The Applicant submits that no flood or flash flood occurred as there was no
overflow from the river to the insured premise or heavy rainfall at the time of
the loss.
Case No: 242501 Determination Page 3 of 13
12. The Applicant contends that during the early days of January 2011 the ORG
backed up on several occasions causing minor overflow of sewerage in the
garden. A complaint was lodged to the Brisbane City Council who was
unable to act prior to the claimed incident.
13. On 11 January 2011 the sewer backed up causing the downstairs toilet to
overflow as well as the ORG.
14. On 12 January 2011 the Applicant returned to the premises to find the house
was now being flooded by additional water running out of the storm water
drains in the curbing, down the gutter and mixing with the sewerage.
15. The Applicant returned on 13 and 14 January 2011 by which time the flood
peaked and receded.
16. The Applicant submits that the hydrologist report supports his position that
there was a reported blockage in the sewer system at the time of the
damage and no riverine overflow at the time of the damage. Further, the
Applicant notes the river flood and overland flow is defined differently in the
Product Disclosure Statement (PDS) than as defined by the hydrologist.
17. The Applicant acknowledges the contents of the FSP‟s Notice of Response
to the Service and submits the following:
At the time of incepting the policy the Applicant was not informed that
water coming from stormwater drains or gutters was not covered if
some of the water was from the river. The Applicant was informed flood
was when a river had actually burst its banks and that an incident in
which water backed up through the drains would be covered.
The PDS specifically defines terms such as river flood as water that
overflows on to land. This has not occurred in the Applicant‟s
circumstances, there has been no overland flow.
The Applicant read the PDS when it arrived and noted Section 1.7
provided cover for escape of water. Further, he reviewed section 1.12
which confirmed that river flood was defined as an overflow from the
river.
The Applicant contends the use of the term „proximate cause‟
introduces a term not contained within the PDS and argues that it
should be rejected.
Alternatively, the Applicant contends proximate cause was not caused
by river flood but sewerage overflow followed by the escape of water
from road gutter or curbing. The Applicant notes that a swollen river or
storm water outlet to the river with no back flow prevented, allowed an
underground pipe carrying water from the outlet to the drain in the
street. However, this would still fall under 1.7 of the policy.
The overflow of sewerage into the insured premises occurred well
before there was any back up of the storm water drain in the street.
There is no evidence to suggest the first incident occurred as a result of
a backup of a stormwater drain. The sewer had a blockage which
allowed the backflow, this would likely have occurred without the flood.
Case No: 242501 Determination Page 4 of 13
The hydrology report states backflow inundation up the piped drainage
system led to inundation in low lying areas. The PDS does not define
this as river flood.
The colour of the water cannot be indicative of the source given the
river water itself was changed by running off of land and debris.
The Applicant considers the first inundation by sewerage as the
dominant cause of damage. Further, the second inundation carried
more sewerage to the second floor storey of the property. The
Applicant considers the sewerage would have caused more damage
than rain water.
The Applicant disputes that the information from QUU is speculative.
The Applicant was informed that QUU found a piece of timber
obstructing the sewer.
The PDS does not qualify the cover provided under section 1.7 by
reference to River Flood. The reference to River Flood only occurs at
section 1.12 and is not referenced to 1.7 in any manner.
The telephone conversation at the time of incepting the policy also
provided the following statement from the FSP to the Applicant “we do
cover for storm, rain or flash flood. However, on that specific area, we
do exclude tidal surges or river floods”
The Applicant objects to the FSP‟s use of the term „gradual‟ as it is a
subjective term to be interpreted in the context of relevant time scales.
However, it is indicative of a long period of time – over months or years
rather than hours as occurred in the current matter.
The FSP‟s actions amount to a breach of the prohibitions against
misleading conduct.
18. The Applicant seeks payment of structural damage caused to the insured
building and contents. Due to delays the Applicant has now entered into a
building contract with a registered builder to rectify damage.
Summary of FSP’s position
19. The FSP relies on the following additional policy terms and conditions:
“INSURED EVENTS CAUSING LOSS OR DAMAGE
YOUR BUILDING AND/OR YOUR CONTENTS
This policy insures you up to the amount of the sum insured for loss or
damage to your building and/or your contents caused by an insured event
listed below
…
1.7 Water or other liquid
You are insured for damage to your building and/or your contents caused
when water or another liquid suddenly escapes from:
you or your neighbours:
i. plumbing system
Case No: 242501 Determination Page 5 of 13
ii. bath, fixed basin or sink;
iii. …
iv. toilet system;
v. …,or
the
vi. road gutter or curbing,
vii. water main or pipe.
We will not pay if the damage is the result of a gradual process.
…
1.12 Storm, Rain or Flash Flood
You are insured for damage to your building and/or your contents caused by
storm, rain or flash flood.
…
We will not pay for damage caused by:
…
- river flood
…
Storm means violent weather and high winds, sometimes accompanied by
rain, hail, or snow including a cyclone or tornado or willy willy.
…
Rain means water that has fallen from the sky onto your building and site but
not water from flash flood.
…
Site means the land at the address shown on the schedule:
- on which the building is built, including
- the yard or garden used only for domestic purposes
…
Flash flood means what occurs when there are heavy, intense bursts of
rainfall, usually during thunderstorms where so much water falls in a very
short time that it cannot get away quickly enough and collects and flows into
your home but does not include when rainwater on the site:
- cannot run off into a water catchment system, because it is overflowing in
flood; and
- mixes with the flood water coming from the water catchment system and
then flows into your home.
…
River flood means when water that is normally contained in a water catchment
system increases because of rainfall or snow melt (whether in the immediate
region or elsewhere) or is deliberately released by an authority and the water
overflows onto land that is not normally covered by water into your home.
…
A water catchment system means
Case No: 242501 Determination Page 6 of 13
- a river, creek, other natural watercourse or lake whether they are in their
original state or have been modified, are named or unnamed, or normally dry
that only run during periods of rain;
- a dam, reservoir, storm water channel or canal.”
20. The FSP relies on the ICA Hydrology Repo rt from which the Panel notes the
following:
During 9-13 January 2011 significant rain fell across Brisbane. The
most significant rainfall fell on 11 January 2011 from 6.00am to 4.00pm.
The water levels of the Brisbane River peaked in the late hours of 12
January 2011 to the early hours of 13 January 2011. This being 24-30
hours after rainfall had ceased.
The rainfall over Brisbane City, before significant waterflow inundation
commenced, was generally 1year ARI. It is expected that overland flow
inundation would generally not have occurred in the Brisbane City. It is
noted however that saturated antecedent conditions in various
catchments would have resulted in larger overland flows than would
normally be the case for rainfalls of low intensity.
The piped drainage system across Brisbane City is expected to have
the capacity to handle storm events of at least 2 year ARI in most
areas. It is likely that the piped drainage system would have been able
to cope (without surcharge) with overland flow during the January 2011
storm events, unless inlets were blocked or the capacity was less than
1 year ARI.
It is possible that overland flow may have caused initial inundation in
some low lying areas subsequently inundated by waterflow. This initial
inundation would have been caused by overland flow making its way to
receiving waterways (in some instances, because it was unable to
enter the pipe drainage system due to high tailwater levels in the
receiving waterways) before the water levels in these waterways rose
sufficiently to inundate areas with waterflow.
Releases from Wivenhoe Dam caused a floodwave in the Brisbane
River (dam release flooding). Floodwaters moving down the Brisbane
River over the period Sunday to Friday 9 -14 January 2011 were made
up of dam release floodwaters from Wivenhoe and floodwaters from
Lockyer Creek and the Bremer River. The report concluded that the
dam release flood from Wivenhoe Dam was the immediate cause of
flooding along the reaches of the Brisbane River downstream of the
Dam, and along tributaries through the Brisbane River.
Areas adjacent to the Brisbane River that were inundated will have
suffered waterflow inundation caused principally by the dam release
flood from Wivenhoe Dam making its way downstream over the period
of 11-13 January 2011.
In low lying urban areas it is likely that high tailwater levels in the
receiving waterways caused backflow up the piped drainage system
leading to inundation in the low lying areas.
Case No: 242501 Determination Page 7 of 13
Any area inundated after 6.00pm on Tuesday 11 January 2011 will
have been waterflow inundation.
21. The FSP relies on a site specific hydrology report by “W” from which the
Panel notes the following:
The insured property is 2.3m above ground level.
The ground level of the property was completely submerged and the
upstairs area of the house was inundated to a depth of 0.35m above
floor level.
On 10 January 2011 the sewerage drain at the rear of the house
overflowed into the backyard. Then on 11 January 2011 the toilet in the
downstairs area of the house overflowed and inunda ted the downstairs
area with sewerage.
A further description indicates the house was inundated by the toilet
overflow on 9 January 2011. The sewerage was approximately 400mm
above floor level in the downstairs area.
The maximum depth of inundation above floor level at the subject
property was caused by floodwaters from the Brisbane River that back
flowed through the stormwater drainage system.
Some inundation of the downstairs area of the house was caused by
sewage overflow. It is likely that the blockage of the sewer system in
the vicinity of the subject property reported to W by others in the area
has caused the sewer overflow.
Given the floor level of the downstairs area of the house is below
ground level and the Applicant had stated there was stormwater
overflowing from the street, it is possible that some stormwater run-off
has entered the downstairs area of the house, adding to the inundation
already experienced by sewage overflow, prior to the inundation by the
Brisbane River floodwater backflow.
The total depth of inundation to sewage overflow and possibly
stormwater run-off is unlikely to have been significantly above ground
level indicating a maximum depth above lower floor level of
approximately 400mm prior to inundation by backwater flooding form
the Brisbane River.
22. The FSP submits the proximate cause of damage is not necessarily the most
immediate cause or the last step in the causal chain. Proximate means
proximate in efficiency, the effective or operative or dominant cause.
23. It is not possible to discern the precise causal mechanism by which the first
inundation occurred. A number of possibilities are discernible from the
available evidence ranging from a blockage or defect in the sewerage
system resulting in backflow, to non-compliance with the Brisbane City
Council standards. There is no specific evidence as to the origin or nature of
the sewerage backflow.
Case No: 242501 Determination Page 8 of 13
24. The FSP contends that QUU were unable to safely investigate and remove
the blockage due to the impending flood. The only true proximate cause of
the first inundation should be deemed flood.
25. It is clear from W‟s report that any sewerage backflow occurred only at the
lower floor of the premises, below ground level, and reached a height no
more than 400mm above the floor level before it was overwhelmed by water
from the second inundation which reached a height of 2.3m above the lower
floor level inundating both lower and upper floors of the premises.
26. The FSP relies on the case of Petersen v Union Des Assurances De Paris
IARD (1997) 9 ANZ Ins Cas 61-366 to argue that a first inundation should
not necessarily be considered the proximate cause of damage as a second
inundation was the proximate cause of damage. The FSP contends this case
can be differentiated from Eliade Pty Limited v Nonpareil Pty Ltd as the first
inundation peaked at a higher level than the second one.
27. The causal mechanism by which the second inundation occurred is by pipe
backflow inundation caused by the dam release flood which occurred in the
Brisbane River between 11 January 2011 and 13 January 2011. Further as
the low intensity rainfall had ceased on the evening of 11 January 2011 it
was insufficient to result in the overflowing of the stormwater drains in the
absence of the flood water.
28. The FSP relies on the cases of Aquilina v New South Wales Insurance
Ministerial Corp (1994) 8 ANZ Ins Cas 61-250 at 75,800 and a case by Alsop
J. in „McCarthy‟. The FSP notes these cases establish that where there is
more than one cause of loss, the cause or causes must be capable of being
characterised as the dominant and/or operative cause of loss in order to be a
proximate cause.
29. The FSP relies on the cases of Lasermax v QBE and Caine v Lumley
General Insurance. The Lasermax case established that proximate meant
proximate in efficiency not closes in space and time.
30. The FSP relies on the Hams v CGU Insurance (2002) 12 ANZ Ins Cas 61-
525 for the proposition that the second inundation caused by pipe backwater
flow was caused by river flood.
31. The FSP contends that the fact the water has not flowed o verland is not
sufficient to demonstrate that „water from stormwater drains and gutters‟ was
a proximate cause of the loss. The rising water in the river caused the
second inundation by pipe backflow.
32. The FSP relies on the gradual process exclusion under section 1.7 of its
policy which states no cover is provided for damage which is the result of a
gradual process. The FSP notes that the facts giving rise to the damage are
capable of supporting a gradual inundation exclusion as the inundation
occurred between the early hours of 12 January 2011 and some on 13
January 2011 when the river peaked.
33. The FSP relies on the general exclusion contained within the policy for
damage arising out of river flood. The FSP contends the exclusion should be
Case No: 242501 Determination Page 9 of 13
given its full effect irrespective of whether a claim is brought under section
1.7 or 1.12 as the proximate cause of the loss is river flood. The FSP
considers Wayne Tank & Pump Co Limited v Employers Liability Assurance
Corp Limited [1974] QB 57 will support this position.
Issues
34. Whether the FSP has appropriately declined to make payment for the
damage caused by the inundation of sewerage.
35. Whether the FSP has appropriately declined to make payment for the
damage caused by pipe backflow.
Reasons for decision
36. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
37. There has been an exchange of material between each party, and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
38. The Panel has read each party‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
39. The Panel considers there are two distinct and separate issues and will deal
with each separately.
Inundation of Sewerage into the Insured Premise
40. Based on the information from each party there is no dispute that the
Applicant‟s property was inundated by sewerage prior t o the storm drain
overflow. The water assessment report confirms inundation by sewerage
was approximately knee deep (400mm) above floor level.
41. The FSP has suggested that the evidence from QUU is speculative
regarding the cause of the backflow of the sewerage. The Applicant in
contrast contends that there was a defect in the sewer system which would
have caused a backflow regardless.
42. The evidence provided indicates that QUU investigated and rectified the
cause of the sewerage backflow. QUU found the backflow to arise from
defects in the sewer downstream of the property which prevented the
sewerage from flowing through the sewer in the normal manner. The
plumber has further confirmed that there were no defects in the plumbing at
the Applicant‟s property. The Panel notes that the h ydrologist, W, also
considered the sewerage overflow was due to the defect reported in the
area.
Case No: 242501 Determination Page 10 of 13
43. The Panel accepts that the sewerage backflow was caused by a defect in
the sewer system. The Panel does not accept that the evidence of QUU,
having physically inspected and rectified the defect, should be deemed
speculative. There is no evidence that the flood was the dominant cause of
the sewerage backflow. The Panel considers it would be too causally remote
to suggest the cause of inundation was flood because QUU could not attend
to the defect in time due to the flood. The Panel considers its position
supported by the case of National & General Insurance Co Limited v Chick
[1984] 2 NSWLR 860 which held proximate cause does not mean the latest,
but the direct, real or common sense, dominant, operative or efficient one.
44. In the Panel‟s view t he real or operative cause of the sewer backflow was,
on the balance of probabilities, the existing defect in the sewer system not
the ability of the QUU to attend to it.
45. The Panel notes that the policy provides cover for backflow from toilets,
which in this case was the mechanism through which the sewerage was
discharged into the premises.
46. The Panel has considered the case law relied upon by the FSP in relation to
the damage. It appears the FSP‟s position is that no damage occurred in the
first inundation that would not have occurred in the second inundation. The
FSP has relied on case law with respect of its position.
47. The Panel has considered Wayne Tank and Pump Co Ltd v Employers
Liability Assurance Corporation Ltd [1974] QB 57 which held that if a loss
has two or more proximate or effective causes and at least one cause is
excluded from cover the insurer is not liable.
48. The Panel accepts „Wayne Tank‟ principle is established law and is
applicable in cases where there are two or more concurrent causes of loss.
49. The Panel notes that in this case, there are two consecutive causes of loss,
the first being the sewerage inundation and the second the storm water
inundation. The causes of loss are separate both effectively and temporally
and should be treated as two separate causes of damage to the property.
50. The Panel further has difficulty accepting that the particularly noxious
inundation by sewerage would cause the same or less damage than the
stormwater inundation. The evidence regarding the damage caused by the
first inundation is also clear and can be separated from the later stormwater
inundation. The Panel accepts that damage up to 400mm over the ground
floor level would have been caused by sewerage, for which covered is
provided by the policy of insurance.
Stormwater inundation
51. The parties appear to agree that water backflowed up the stormwater drains
and pipes. There is no dispute that there was no direct overland flow from
the river itself.
52. The dispute arises as to whether the discharge of water from the stormwater
drains and pipes constitutes river flood which is excluded by the policy.
Case No: 242501 Determination Page 11 of 13
53. The Panel acknowledges the Applicant has not claimed for storm, rain or
flash flood but rather water or other liquid which suddenly escapes from the
Applicant‟s plumbing system, ro ad gutter or curbing, water main or pipe. In
contrast the FSP has submitted that this incident is caught by two
exclusions, being that the water inundation under escape of water was
gradual and/or the inundation was from river flood.
54. The Panel will deal with the first exclusion of gradual damage. The examples
provided in the policy of what is considered a gradual process are moisture
seeping through faulty recess grouting, condensation or rising damp,
damage which occurred over time because the fault was “n o remedied
immediately” (sic).
55. The Panel also notes the plain English meaning of gradual which is:
“adjective 1. taking place, changing, moving, etc., by degrees or little by little:
gradual improvement in health.
2. rising or descending at an even, moderate inclination: a gradual slope. ”
56. Both the examples provided within the policy and the plain English meaning
of gradual suggest that the damage has occurred by degrees and over time.
Accordingly, the Panel does not accept this exclusion could properly be
applied to an incident which occurred in several hours.
57. The exclusion of river flood appears to apply solely to the cover of storm,
rain or flash flood. The definition of river flood is water that is normally
contained in a water catchment system which overflows onto land that is not
normally covered by water onto an insured home. The water catchment
system includes a dam, reservoir, storm water channel or canal.
58. The Panel notes that it is unclear whether the storm water drain or channel
would encompass the stormwater drainage, gutter or curbing from which the
escape of water is covered under the policy.
59. The Panel further notes the transcript of the telephone call incepting the
policy of insurance. In particular the following:
“A43. Yeah yeah. Oh there was one other thing I was going to ask about was
flood damage.
Q.44 Oh yeah, we do cover for storm, rain or flash flood. However, on that
specific area, we do exclude tidal surges or river floods.
A. 44. Yeah.
Q.45. So are you in an area near any rivers or?
A.45. Oh fairly near the river, yeah – a few metres above it, but.
Q.46. Oh OK.
A.46. So storm, and if it‟s flood coming down the street, that‟s alright. That‟s
covered.
Q.47. Yeah, just a normal flash flood like that is completely covered. It‟s just
when like it‟s an actual river that has burst its banks.
A.47. Yeah.
Q.48. That‟s something [FSP name] does not cover.
Case No: 242501 Determination Page 12 of 13
A.48. Yeah, yeah. There was an occasion a while ago when the flash drain hit
the – not flash drain – the storm water drain got blocked and it backed up and
I‟ve got a photograph of water squirting up out of the drain.
Q.49. Yeah, that would definitely be covered.”
60. The Applicant has submitted to the Service that based on the telephone
conversation and his reading of the policy he believed backflow from
stormwater drains was covered under the policy.
61. The Panel is of the opinion that it would be reasonable for the Applicant, as a
result of the telephone conversation; to have understood that river flood
exclusion was specific to the storm, rain or flash flood cover provision.
Further that the intention of the „river flood‟ exclusion was intended to apply
when a river burst its banks. It would also be reasonable for the Applicant to
believe that any water coming from the storm water drain which inundated
the property would be covered.
62. The Panel has reviewed the policy and confirms that section 1.7 does not
contain an exclusion related to river flood but 1.12 does. Further the
definition contained in the policy of what is not covered states:
“Damage caused by the seas or river flood (See Section 1.12)”
63. It is not in dispute that the Applicant received a PDS a few days after the
inception of his cover, which is sufficient for the FSP to discharge its
obligations to „clearly inform‟. Under normal circumstance , such provision
would serve to correct any lack of clarity as to cover.
64. However, in this case, the construction of the policy is such that on reading
of the terms by a reasonable person of average intelligence, it would not
have necessarily overridden the representations made during the telephone
conversation at inception.
65. The Applicant has further stated that had he been aware such an event was
not covered, he would have arranged insurance elsewhere.
66. The Panel considers that the principle of estoppel is applicable in the
circumstances. The doctrine of estoppel, broadly put, is concerned to ensure
that a person who leads another to act to his or her detriment in reliance on
a statement made by that person should be held responsible to the actor.
The statement may take the form of an express promise or representation or
may be inferred from the conduct of a person (See page 159 of Business
Law of Australia [7 th Edition]).
67. The Applicant has relied upon a representation that water coming out of the
stormwater drain and inundating the property would be covered. The policy
is not constructed in a manner which would override this representation. The
Panel considers the Applicant has relied on this representation to his
detriment. This is because the Panel is aware of other policies of insurance
available in the market provide cover for water inundation from pipe backflow
through stormwater drains, even in instances where the backflow is properly
described as floodwater. Accordingly, the detriment is the loss of opportunity
to be covered for this type of event for which the Applicant had sought
insurance cover.
Case No: 242501 Determination Page 13 of 13
68. The Panel would stress however, that the circumstances of this dispute are
unique in that representations were made by the FSP at the time of inception
which, although unintended, gave the Applicant a belief that cover would be
provided in the said circumstances.
Determination
69. On the basis of the available information, the Panel determines that the FSP
was not entitled to decline the inundation by sewerage.
70. On the basis of the available information, the Panel determines that the FSP
is liable to meet the claim for loss/damage due to the inundation of the
property by sewerage and water escaping from the road gutter or curbing
and water main or pipe.
71. In so far as the FSP determines to cash settle this dispute, the FSP is to pay
interest in accordance with section 57 Insurance Contracts Act 1985 from 11
April 2011 to date of payment of the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.