Denial of Queensland flood inundation claim as excluded flood rather than flash flood and storm water runoff
Text of the determination
Case number: 242460
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Inundation of Home - Flood Event
27 August 2012
Background
1. The Applicants held a home and contents insurance policy with the Financial
Services Provider (FSP), which was renewed on 9 January 2011. The policy
provided building cover of $860,000 and contents cover for $108,000.
2. On 12 January 2011, the Applicants‟ property was inundated after a series of
heavy storms that led to the floods which affected the Queensland area. The
Applicants made a claim to the FSP for the damage to their home and
contents.
3. The FSP appointed a hydrologist to review the cause of the damage and
ultimately denied the claim on the basis that it considered the proximate
cause to be flooding, which is excluded under the policy. It provided a
payment under its „compassionate fund‟ to the Applicants for $12,500.
4. The Applicants dispute the FSP‟s decision and seek cover for the entirety of
their loss, estimated at $188,000.
Summary of Applicants’ position
5. The Applicants say that their home was damaged as a result of stormwater
run-off, as defined in the policy, noting that their home was inundated within
24 hours of the most recent falls to affect their area on 11 January 2011.
6. As a result of a telephone conversation with a representative of the FSP on 7
January 2011, they were left with the impression that they would be covered
for such an event and therefore had been prejudiced by the advice given.
7. The FSP‟s policy does not „clearly inform‟ them as to what is covered.
Summary of FSP’s position
8. The FSP says that the Applicants are not entitled to cover.
9. It relies upon the evidence of its hydrologist that the cause of the inundation
of the Applicants‟ property was the flooding of the Brisbane River. As the
Determination
policy does not provide flood cover, it is not required to indemnify the
Applicants for their loss.
10. The FSP relies on the following policy provisions:
Page 3 of the Certificate of Insurance
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Pages 10-12 of the Product Disclosure Statement (PDS)
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightening,
heavy rain, hail or snow, but not continuous bad
weather by itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow after it
has reached the ground...
...
Flash flood and stormwater
run-off
A sudden flood caused by heavy
rain that fell no more than 24
Loss or damage caused:
by flood...
hours prior to the flash flood or
stormwater run - off
...”
Page 27 of the PDS
“ Accidents that cause damage to your home and/or contents
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
Page 48 of the PDS
“ Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you
have asked for them and we agree to cover you... Your certificate of
insurance will show which covers operate...”
Page 53 of the PDS
“ Optional covers for extra peace of mind
What is covered What is not covered
Flood and storm surge
This policy does not cover flood
unless we have agreed and it is
shown on your certificate of
insurance.
Home and/or contents cover
We cover you for loss of or
damage to your home or contents
caused by flood or storm surge...
We will pay up to the:
home sum insured, if your
home is insured;
contents sum insured...
We wi ll pay for loss or damage in
the same way and in the same
amounts as we do under insured
events cover.
We will not pay for loss or damage to:
paths, driveways, paving,
retaining walls (whether or not
part of the home), tennis courts or
other playing surfaces;
shade or sail cloth;
fabric awnings, swimming pool or
spa covers or liners and the like;
glasshouse whether or not
constructed principally of glass;
water in swimming pools or
spas...
...”
Issues
11. Whether the FSP‟s policy „clearly informed‟ the Applicants of their level of
cover.
12. Whether the loss was attributable to stormwater run-off or flood and whether
the FSP is entitled to exclude the Applicants‟ loss from cover.
13. Whether the FSP prejudiced the Applicants through the provision of incorrect
information.
Reasons for decision
14. As advised to the parties, FOS has considered it appropriate to elevate the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the amount of the claim and the issues to be
considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
15. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
16. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
17. It is not in dispute that the Applicants‟ home was inundated with water as a
result of a significant weather event that affected much of Queensland in
early-mid January 2011. The Applicants attribute the damage to stormwater
run-off and the FSP considers it was caused by flood. The FSP argues that
the loss is not covered as flood is excluded under its policy.
Were the Applicants clearly informed
18. The Applicants do not dispute that they received a copy of the PDS. It is
further not in dispute that they received an annual Certificate of Insurance
(COI), being the documents provided by the FSP.
19. In effect, the Applicants contend that the definition of flood is too broad, too
difficult to comprehend and that the FSP has not met its obligations under
Section 35 of the Act to “clearly inform” them of what is and is not covered
under the policy.
20. The Panel has previously considered this issue for the FSP‟s policy. It is
satisfied that the two events (“flood” and “flash flood and stormwater run - off”)
can be distinguished.
21. In simple terms, the policy provides cover where damage is attributable to a
flood caused by a run-off of stormwater after a period of excessive rainfall
and occurring within 24 hours of the rain event. It does not cover any other
type of flood.
22. The Applicants have raised issue with the placing of definitions throughout
the policy and the difficulty a “reasonable person” would have in evaluating
them. The Panel is satisfied that the PDS should be read in its entirety and
that (should this be done) the interpretation of same should not be difficult for
a “reasonable person”.
23. The PDS has an index on the inside cover which highlights the areas of the
policy in which the policyholder would find information. Included in this is
“Words/terms with special meanings” on page 9, for whic h definitions of
relevant terms in the policy are provided. Flood is included in this, together
with the qualification that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
24. In addition to this, page 53 directs the reader to “Flood and storm surge”,
which is explained under the broader definition of “Optional covers for extra
peace of mind”. This section explains that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance.”
25. It is not in dispute that no cover was optioned by the Applicants for “Flood
and storm surge” and therefore they were not covered for it under the policy.
This is reflected in the COI, which confirms that flood and storm surge cover
was “not included”.
26. Accordingly, the Panel is satisfied that the FSP has satisfactorily defined the
events in the policy as required under Section 35 of the Act and that it is
entitled to rely upon same in determining if the policy responds to the
Applicants‟ loss.
Were the Applicants prejudiced by incorrect information
27. The Applicants suggest that as a result of a telephone conversation with the
FSP on the morning of 11 January 2011, they were left with the impression
that they were covered for flooding and this prejudiced their position on the
claim as they neglected to explore other potential cover options as a result.
“ Female Applicant: …so it does it not include flood, because that‟s quite difficult isn‟t
it? To get cover for flood insurance?
FSP: Ok flood insurance certificate is issued separately…
Female Applicant: Yep.
FSP: You have to either on the internet or…
Female Applicant: And generally speaking if you‟re in a low lying area that was hit
by the 74 floods you are not going to get insurance are you?
FSP: Ah so with that one, if you apply for that your premiums will be
higher for flood cover. That flash flooding though, that‟ s in your
policy for 24 hours so you are covered for that.
Female Applicant: Mmmm.
FSP: So if flooding occurs due to rainfall from 24 hours from when it
stops you are still covered for flooding after that…
Female Applicant: Hmm…
FSP: Umm…
Female Applicant: I have to say like, in the rain coming at the moment for
what…what would constitute flash and what would constitute
flooding?
FSP: There‟s a very fine line on that. Umm…but when it comes down
to the fine line between the 24 hours and not the 2 4 hours, they
take them all into consideration so they are just not a straight up
24 hours in half an hour…it comes under consideration first.
Female Applicant: Ok…
FSP: Yep. So 24 hours from when the last rain falls…
Female Applicant: Oh ok. So in t he last rain…so if it‟s been raining for a week it‟s
24 hours from when the last rain stopped?
FSP: Yep.
Female Applicant: Oh ok… in the water today…we would probably be covered for
it?
FSP: It‟s hard to tell like, for example, yesterday arvo to now we had
... of rain finishing at 12 midnight and up to 12 midnight on the
17th…ummm it‟s covered under flash flood.
Female Applicant: Oh ok.
FSP: That‟s the definition I have been told on that o ne.
Female Applicant: Ok. Ok well thanks for that.
FSP: No problems.
Female Applicant: Thanks.”
28. The above call took place at 9.10am on 11 January 2011 and the Applicants
say they were left with the impression that they were covered for any loss.
29. The FSP counters that the conversation held with the male Applicant later on
the same day (4.06pm) left no doubt as to the “flash flooding” cover provided
and that they were ultimately not prejudiced by any alleged
misrepresentation from the first call:
“M ale Applicant: ... Yep. We‟re covered for flash flooding though aren‟t we?
FSP: You are covered under what they term “flash flooding” and
that‟s defined as a heavy downpour of rain in a 24 hour period
Male Applicant: Okay
FSP: Or sudden flood caused by heavy rain that fell no more than
24 hours prior to the flash flood so that is standard under the
policy yes.
Male Applicant: So does that cover us for this flooding situation at the
moment?
FSP: At this point in time, we don‟t know. The powers that be have
not yet made a decision, and until they do we have no idea.
But basically if you have any damage caused by the flood you
will need to lodge a claim and then they will assess it and
they‟ll go fr om there.
Male Applicant: Okay, so they haven‟t determined whether this is a flash flood
or a...
Greg No, they are still working on that one; so if you do need to
make a claim, like if you have had damage caused you need
to ring [phone number].
Brian Yep – okay. Do you know when they are going to make that
decision?
Greg I honestly don‟t know I‟m sorry – they‟re still working on those
sorts of things.”
30. The second call made it known that there was no commitment to
settlement and defined the cover as outlined in the PDS.
31. In the circumstances and whilst it is conceded that the FSP‟s response
was not ideal, the Panel accepts that the Applicants were not prejudiced by
the misrepresentation of the policy cover made on the morning of 11
January 201 1 to the extent that they were materially affected. In the
Panel‟s view it is improbable that the Applicants could have secured
alternative flood cover at that time given the developing flood situation in
Queensland.
32. Further to this, the Panel accepts that inundation of the property did not
occur until 12 January 2011 and this was after the above discussions were
held. In the circumstances, the Panel considers that these conversations
did not materially affect the Applicants and their cover under the policy .
The cause of the loss
33. The Applicants report that their home was first inundated with water on 12
January 2011.
34. After the report of the incident, the FSP appointed a loss adjuster to
investigate and report on the damage caused to the Applicants‟ property.
35. The loss adjuster, MY, inspected the property on or about 20 January 2011.
The subsequent report noted that:
“ Caused by Rising water level Brisbane [R]iver.
There is water damage to toy room wall and bathroom ceiling
caused by storm.
Overflow of storm water drain may have caused flooding of the
swimming pool and ground level areas.
The risk premise is constructed on stumps and overflow of
Brisbane River would have caused the rising water level and
inundation of premise.”
36. The report noted the date of loss as 11 January 2011 and the date of
discovery of the loss as 10 January 2011. The discrepancy between these
dates and what was initially reported by the Applicants are not explained. MY
recommended the appointment of a hydrologist to more closely examine the
cause of the damage.
37. The hydrologist, SC, provided a statutory declaration dated 1 July 2011, in
considering the cause of the loss in the region surrounding the Applicants‟
home. He found that:
A significant amount of rain fell in the Greater Brisbane Area from 9
January 2011 and over the subsequent two days, which caused
significant inflows into the Wivenhoe Dam, which peaked on the
evening of 11 January 2011;
The terrain data for the Applicants‟ home “suggests that it would be
unlikely that the Subject Property (sic) would experience significant
stormwater problems from stormwater or other local run- off”;
Inundation from stormwater run- off requires “intense levels of rain”
which is sufficient to overcome the stormwater drainage system. Any
such run-off generally occurs during or very shortly after such an
intense period of rainfall;
A review of the rainwater gauge at Corinda, approximately 3.7km from
the Applicants‟ property and representative of the rainfall there (in the
expert‟s opinion), revea led that 85mm of rain fell over 9 and 10 January
2011, with a further 33mm falling on 11 January 2011. The most
intense rainfall was around 11.00am on the morning of 11 January
2011 and this gradually declined until 5.00pm that afternoon;
Examination of data shows that the Brisbane River would have
exceeded the minimum level of the Applicants‟ property at 10.00pm on
11 January 2011;
Given that the house on the Subject Property (sic) is higher than the
minimum property level, this would explain why it took some further
time for the house on the Subject Property (sic) to be inundated. For
example, the Brisbane River was 1m higher than the minimum level of
the Subject Property (sic) at approximately 3.00am on 12 January
2011. Therefore, the timing of the rise o f the Brisbane River is
consistent with the Applicants‟ version of events;
A “small proportion” of the depth of the Brisbane River may have been
attributable to the rainfall in the 24 hours preceding inundation of the
property, however, he did not consider this rainfall a major contributor
to the Applicants‟ loss;
The overwhelming cause of the rising level of the Brisbane River (and
this inundation at the property) was rain which fell more than 24 hours
earlier than the inundation.
38. Based on the report from the hydrologist, the FSP declined the Applicants‟
claim. It agreed to release $12,500 from its „compassionate fund‟, which it
reserved for insured parties that were not covered for this event.
39. The Applicants maintain that their loss should be covered.
40. Whilst it is accepted that there was a significant fall of rain in the period 24
hours prior to the flooding of the Applicants‟ property, it still needs to be
established that this event was the proximate cause of the actual loss.
41. The FSP‟s policy covers flas h flood and storm water run-off. In order for a
claim to fall under the event of flash flood and storm water run-off, the
following elements must be established:
a. There was a sudden flood.
b. There was a heavy rain that occurred within 24 hours prior to that flood.
c. The sudden flood was caused by that heavy rain.
42. The Service has made a number of Determinations to the effect that the rain
which fell over the Wivenhoe Dam between 4.00am and 8.00am on 11
January 2011 was the proximate or effective or dominant cause of the
inundation of properties down river from the Wivenhoe Dam.
43. Further, the Service has made Determinations that if the inundation occurred
within 24 hours of the rain which fell over the Wivenhoe Dam from 4.00am
on 11 January 2011 (inundation is covered up to, but not later than 4.00am
on 12 January 2011) then that inundation was properly categorised as flash
flood as covered by the terms and conditions of the FSP‟s policy.
44. When making these Determinations the Service has been mindful of a
number of things.
45. Firstly, when considering the proximate, dominant or effective cause it is
necessary to consider the facts of the situation alongside the terms of the
relevant policy. In this context the Panel accepts that the word “cause” within
the flash flood/storm water run-off definition in the policy means in the
insurance context, proximate or direct cause.
46. It is a well established principal of insurance law that the proximate cause of
the loss is not the first, or the last, or the sole cause of the loss, but the
effective or dominant or operative cause. It is a question of fact to be
considered in each case.
47. The Panel has determined the proximate cause by a common sense
evaluation of the relevant facts and a consideration of the cause which would
be attribut ed by “the man in the street” as reasonable, in respect to the
cause of the loss.
48. Secondly, the Panel has given consideration to the fact that an enormous
amount of rain had fallen in the Greater Brisbane Area, commencing from 9
January 2011 (or earlier) and the FSP has argued that it is the combined
effect of all of the rain that ultimately led to the steady increase of the
Wivenhoe Dam, causing the need to adopt the W4 release strategy.
49. The Panel is aware of the FSP‟s argument that it is not possible to i solate
the reason for the escalation of the release strategy from W3 to W4, to
simply that of the rain which fell between 4.00am and 8.00am on 11 January
2011. Also, that the rain of the preceding days was an essential precondition
for the W4 strategy shift and accordingly the 24 hour flash flood window is
rendered inoperative.
50. Thirdly, the Panel is, however, aware of the evidence that the inflows into the
dam were decreasing on the morning of 11 January 2011 prior to the rainfall
which commenced in the vicinity of the dam at around 4.00am on 11 January
2011.
51. Given those circumstances, the Panel is satisfied that it was the rain which
fell over the dam between 4.00am and 8.00am on 11 January 2011 that
directly led to the dam‟s operating engineers‟ decision to increase the
release strategy from W3 to W4.
52. Having considered those matters and reached that conclusion, the Panel is
satisfied that the proximate or dominant cause of the rising level of the
Brisbane River which led to the inundation of the Applicant s‟ property was
the increase in the release strategy from W3 to W4 which was directly
caused by the rain which fell over the Wivenhoe Dam between 4.00am and
8.00am on 11 January 2011.
53. Subsequent to the issue of the earlier Determinations referred to above, the
evidence of the operating engineers of the Wivenhoe Dam was brought into
question and the Queensland Flood Commission of Inquiry (CoI) was
reconvened. The Service suspended issuing further Determinations on this
issue until the CoI had completed its deliberations in this regard; the parties
to this dispute then made additional submissions in light of the CoI‟s final
report, as to whether the Panel‟s earlier assertions in respect of the
enlivening of the policy‟s „flash flood‟ provision were still susta inable.
54. The FSP has since provided further submissions to the Service including a
reference document, two additional hydrology reports and a statement from
the hydrologist. Only those parts of the additional material relevant to the
current dispute need to be considered.
55. The Panel has had the opportunity to review the material presented to and
the evidence given at the subsequent hearings of the CoI.
56. The Panel is satisfied that the evidence in respect to the decreasing inflows
into the dam prior to 4.00am on 11 January 2011, the rain that fell over the
dam between 4.00am and 8.00am on 11 January 2011 and the decision to
increase the release strategy from W3 to W4 at 8.00am on 11 January 2011
have not in any way been challenged by the further hearings of the CoI.
57. Having considered all of the matters detailed above and the evidence
presented in this case, the Panel is satisfied that the rain which fell over the
Wivenhoe Dam between 4.00am and 8.00am on 11 January 2011 was the
proximate or dominant cause of t he inundation of the Applicants‟ property.
58. Further, the Panel is satisfied that the inundation of the property is properly
described as flash flood as detailed within the terms and conditions of the
FSP‟s policy.
59. In this regard, the Panel notes the original evidence of the FSP‟s hydrologist
to the effect that the Brisbane River was 1m higher than the minimum level
of the subject property at approximately 3.00am on 12 January 2011.
60. The Panel also notes the additional evidence provided by the hydrologist, in
the subsequent submissions.
61. The FSP‟s hydrologist has recorded the minimum land level at 6m AHD and
the approximate bench mark level at 6.2m AHD.
62. The material describes the bench mark level as being the lowest point of the
structure of the house on the land but allowances are made for whether the
structure is a single level dwelling upon a ground slab or if there is more than
one level.
63. The hydrologist says that where the benchmark level was not reasonably
representative of the occupied areas of the property, for example if the
house was built on stumps and only the upper section of the house was
relevantly occupied, the hydrologist determined the level of that upper
section and then used that as the bench mark level for the purposes of
determining the date and time of relevant inundation of the property.
64. Within the material the hydrologist makes the comment that the bench mark
level is “elevated (possible storage areas)”. The hydrologist does not provide
a complete explanation as to the precise deta ils for the Applicants‟ property.
65. The Applicants‟ home is on stumps. The hydrologist says that the minimum
land level is 6m AHD and that the approximate bench mark level is 6.2m
AHD. The photographs of the Applicants‟ home satisfy the Panel that the
stumps are greater than 0.2m in height and thus the Panel is satisfied that
the bench mark level is the ground level of the property where the house
structure stands.
66. The hydrologist further says that the approximate time the Brisbane River
reached the approximate bench mark level was 12.50am on Wednesday 12
January 2011.
67. The earlier report from the hydrologist indicated that the Brisbane River was
1 metre higher than the minimum level of the subject property at
approximately 3.00am on 12 January 2011.
68. The subsequent material from the hydrologist estimates that at 4.00am on
12 January 2011 the level of the Brisbane River would have been 0.7 metres
above the benchmark level. The Panel is satisfied that this estimate is
consistent with the hydrologist‟s comment th at at 3.00am, the Brisbane River
was 1 metre higher than the minimum level of the subject property (6m
AHD), the bench mark level being at 6.2m AHD.
69. In the circumstances, the Panel is satisfied that inundation to a level of 0.7m
above the bench mark level at the site of the house is covered by the policy
under the heading flash flood. The parties will need to work together to
calculate the extent of loss arising from this level of inundation.
70. In this regard the Panel notes that the policy clearly provides for limits in
respect to the coverage for flash flood.
71. The Panel notes the limits are 50% of the sum insured for each of home and
contents or $25,000 for each, whichever is the higher.
72. The material presented by the FSP seeks to make alternate arguments in
respect to whether the Applicants are entitled to coverage under the terms of
the policy.
73. The FSP argues that the dam‟s operating engineers‟ decision to move to the
W4 release strategy was an intervening cause and not one that was covered
under the policy.
74. The Panel has given consideration to all of the evidence presented to the
CoI and the Panel is satisfied that there is no evidence to suggest that given
the circumstances they found themselves in on the morning of 11 January
2011, the dam‟s operating en gineers had any alternate course of action
other than to increase the release strategy from W3 to W4.
75. As a consequence the Panel is satisfied that the dam‟s operating engineers
both acted reasonably and in accordance with the manual on the morning of
11 January 2001; the decision to proceed from release strategy W3 to W4
was a reasonable and direct consequence of the rain which fell over the
Wivenhoe Dam between 4.00am and 8.00am on that morning.
76. The FSP has also sought to argue that where two proximate causes of the
loss occur and one cause is covered under the policy but the other is not
covered under the policy, then the FSP is entitled to deny the claim. This is
known as the Wayne Tank principle.
77. In effect the FSP suggests that if the Panel were to accept that flash flood
had occurred the Panel must also accept that flooding has occurred and
given that flooding is excluded under the terms of the policy then the FSP is
entitled to deny the claim.
78. The Panel has given consideration to this matter in earlier Determinations
and had concluded that flash flood is an exception created by the FSP to its
policy excluded event of flood; accordingly Wayne Tank cannot arise as
there was only one proximate or dominant cause of loss, namely the policy
event of flash flood.
79. The Panel is not satisfied that the FSP has presented any evidence to
suggest that the Panel should alter their previously held view in this regard.
80. Finally, the FSP has suggested that the Applicants‟ property would have
been inundated by the rising Brisbane River even if the W4 strategy had not
been introduced and the W3 strategy had been maintained.
81. The Panel is satisfied that this is simply speculation on the part of the FSP‟s
hydrologist. It also fails to take account of the policy definition attaching to
„flash flood‟.
82. The reality is that the strategy was altered from W3 to W4 and the inundation
occurred and as described by the FSP‟s hydrologist in the subsequent
material, the approximate time the Brisbane River reached the approximate
bench mark level was at 12.50am on Wednesday 12 January 2011; the
Panel is satisfied that this as a consequence of the W4 release.
83. The reality is that the release strategy was not maintained at W3 and the
Panel prefers to rely on the evidence of what actually occurred, rather than
speculation or estimation of what might have occurred. As such, the Panel
does not accept the FSP‟s argument in this regard.
84. In respect of the payment made by the FSP from its compassionate fund,
this is not a matter over which the Panel has any jurisdiction. However, the
Panel accepts that the FSP is entitled to take into account this amount when
determining the sum payable to the Applicants.
Determination
85. The Panel determines that the FSP is to indemnify the Applicants for their
loss under the terms of the policy, in particular the heading “flash flood” to
the level of inundation to 0.7m above the bench mark level at the site of the
Applicants‟ home.
86. Should the FSP wish to cash settle any of the Applicants‟ claim then the FSP
is to pay interest on that component of the claim which is cash settled
pursuant to the Insurance Contracts Act 1984 from the date the claim was
denied to the date of cash settlement.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.