Home / Financial Firm (Unknown - Insurer) / Determination 242427

Determination 242427

Denial of home building claim for 2011 Queensland flood inundation (flood exclusion vs flash flood cover)

FirmFinancial Firm (Unknown - Insurer)
Decided2012-10-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A represented homeowner claimed for January 2011 flood inundation, which the FSP denied under its flood exclusion. AFCA found the damage was caused by flash flood within the 24-hour policy wording and ordered indemnity up to 0.2 metres above the lowest structural point, with interest from the denial date and no dollar figure stated.

The proximate cause was rain from 4am to 8am on 11 January 2011 that triggered the W4 dam release, bringing the inundation within the flash flood cover, although the Wayne Tank argument was rejected and the cover limited to the 0.2 metre level.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 242427 Determination Page 1 of 13 Case number: 242427 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 24 September 2012 The Applicant is represented. For clarity and convenience in the determination, the Applicant and his representative will hereafter be referred to as “the Applicant”. Background 1. The Applicant held a home building and contents policy with the Financial Services Provider (FSP). 2. In January 2011, the Applicant‟s property was inundated with water following severe weather events in Queensland. The Applicant lodged a claim; however, the FSP refused liability on the basis the loss was caused by flood, which is an exclusion under the policy. 3. The Applicant disputed the decision on the basis the loss was caused by rainwater and the policy wording in relation to the exclusion is not clear. 4. Upon review, the FSP maintained its refusal of the claim. Summary of Applicant’s position 5. The FSP has failed its obligations under Sections 22 and 35 of the Insurance Contracts Act 1984 to „clearly inform‟ him of the exclusion and limits under the policy. 6. The FSP‟s policy is unclear and the definition of flood is so wide that it even excludes flash flood, which is covered. The policy fails to adequately outline the limits for flash flood, with the cover for flash flood and limit for flash flood being on separate pages of the Product Disclosure Statement (PDS). 7. The Applicant provides a paper from behavioural psychologists with extensive experience in consumer disclosure. The report outlines that a person of reasonable intelligence would not be able to read and comprehend the information contained in the FSP‟s PDS. 8. The Financial Ombudsman Service has previously found that flood exclusions over several pages do not comply with the need to „clearly inform‟ under Section 35 of the Act (references 41709 and 40607). Determination Case No: 242427 Determination Page 2 of 13 9. The Applicant provides weather reports, the Queensland Flood Commission of Inquiry Interim Report and statements relating to releases from the Wivenhoe Dam around the time of the loss. The reports indicate that there was very severe rain around the time of the inundation. There is also an indication that rain on 11 January 2011 forced the Wivenhoe Dam operators to go to the „W4‟ strategy which resulted in significant flows of water into the Brisbane River. In the circumstances, the loss is a „flash flood‟ as defined by the FSP‟s policy and therefore should be covered. 10. The FSP‟s po licy wording is also such that the flash flood need only occur within 24 hours and there is no time limit on the damage occurring. 11. The rain on 9 January 2011 was not the cause of the damage to the home. It was not until after the increased releases because of rain on 11 January 2011 that the damage occurred. 12. In its later submission of 30 September 2011 the Applicant advised that the water from the „W4‟ release could not have reached the property for 21 hours, being after the inundation. This therefore proves the loss was caused by stormwater from heavy rain, rather than floodwater. 13. In a further submission of 29 November 2011 the Applicant submitted that the rain on 11 January 2011 was the true cause of the flood as it triggered the increased dam release that caused the flood. 14. The Applicant believes the FSP has an obligation to cover the claim under the policy. Summary of FSP’s position 15. The policy excludes loss caused by flood. 16. At law, the Applicant bears the onus to establish the loss was caused by an insured event under the policy. 17. It engaged a hydrology expert to report on the inundation of the Brisbane area. The evidence indicates the loss was caused by flood as defined by the policy. The conclusions are consistent with those of the Insurance Council of Australia‟s „Flood Panel Reports‟. 18. The behavioural psychologists‟ reports should not be considered, as it is based on abstract theories and there is little evidence it is a recognised body of knowledge or experience. The report also acknowledges the releva nt exclusions are easy to understand. 19. The Financial Ombudsman Service has previously issued Determinations stating the PDS is clear with respect to the flood exclusion and flash flood limit (reference 239722). Case No: 242427 Determination Page 3 of 13 20. The Certificate of Insurance also states that „Flood and storm surge‟ cover is “not included” on the policy. 21. The Applicant‟s reasoning with respect to the release of water from the Wivenhoe Dam contains errors, as the increased releases from the Wivenhoe Dam would have reached the insured property in less than the reported higher estimate of 19 hours. Based on the evidence, releases from the Wivenhoe Dam would definitely have reached the location of the Applicant‟s property by the time of the inundation. 22. Despite the Applicant‟s submissions, the evide nce in relation to the location of the property and the rainfall indicates it is unlikely stormwater runoff was the cause of the loss. 23. The „W4‟ releases cannot reasonably be considered as „flash flood‟ because of the rain on 11 January 2011. There had been significant rain from 9 January 2011 and the Wivenhoe Dam was already full before the rain on 11 January 2011. Therefore it would be unreasonable to conclude the proximate cause of the flood was only the rain on 11 January 2011 (the last link in a chain of events), when heavy inflows from 9 January 2011 contributed significantly to the decision to increase releases. 24. The Wivenhoe Dam operator‟s decision to begin the „W4‟ strategy was not done in the usual course of events in accordance with the manual. Arg uably, the departure from the manual is the proximate cause of the loss, rather than the rain on 11 January 2011. 25. The Wayne Tank principle also applies to the circumstances of the water releases, to exclude the claim. 26. The FSP relies on the following policy provisions: “ Words / terms with special meanings Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This polic y does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwat er run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow, but not continuous bad weather by itself. … Insured events you are covered for Damage caused by weather What is covered What is not covered Case No: 242427 Determination Page 4 of 13 Storm X caused by rain, hail or snow after it has reached the ground; … Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flas h flood or stormwater run-off Loss or damage caused: X by flood; … The most we will pay for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000 whichever is higher. … Optional covers for extra peace of mind What is covered What is not covered Flood and storm surge This policy does not cover flood unless we have agreed and it is shown on your certificat e of ins urance. Home and/or contents cover We cover you for loss of or damage to your home or contents caused by flood or storm surge which happens during the period of insurance at the property address. We will pay up to the:  home sum insured, if your home is insured;  contents sum insured if your contents are insured for damage caused by flood or storm surge. We will pay for loss or damage in the same way and in the s ame amounts as we do under insured events cover.” Issues 27. Whether the FSP clearly informed the Applicant of the flood exclusion in the policy. 28. Whether the loss was caused by an insured event or flood. 29. Whether the FSP is entitled to refuse liability under the terms and conditions of the policy. Case No: 242427 Determination Page 5 of 13 Reasons for decision 30. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s Terms of Reference. 31. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 32. The Panel Chair Ombudsman attended on site where he met with the Applicant and a representative of the FSP. 33. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. Was the Applicant clearly informed of the flood exclusion? 34. There is no dispute that the Applicant received the PDS. However, the Applicant argues that the PDS is not clearly written and a reasonable person could not understand the exclusions and limits contained in the wording. 35. The Applicant provides a report from behavioural psychologists that indicates a person of reasonable intelligence would not be capable of fully understanding the terms and conditions of the PDS. 36. The FSP states the PDS is clear and it has complied with its obligation to „clearly inform‟ under Section 35 of the Act . 37. The FSP has had a number of disputes with the Financial Ombudsman Service in relation to the Queensland weather events of December 2010 and January 2011. 38. The Panel has previously considered similar arguments in earlier Determinations. In particular, the Panel has considered the report from the behavioural psychologists and the argument that the policy terms, the same as those the subject of this dispute, do not comply with the FSP‟s obligation to „clearly inform‟ under Section 35 of the Act. 39. Having again considered the policy provisions, the Panel is not satisfied that the Applicant‟s arguments can be sustained. As articulated in one salient Panel determination involving this PDS: “The PDS/policy is structured in a manner which follows a sequence. The document sets out the insured events covered, then moves to what is insured as the „home‟ and the „contents‟ including the manner in which claims will be settled. A number of items are listed within the section dedicated to „contents‟ which have special terms applied including caps on the amount to be paid. “Flash flood and stormwater runoff” is found within the listed items. Case No: 242427 Determination Page 6 of 13 In the Panel‟s opinion the sequence has a n acceptable logic, is clearly identified and consistent with each section containing information relevant to that section.” 40. In reviewing this case, the Panel is satisfied the FSP‟s PDS clearly outlines the exclusions and limits under the policy. This includes the limits to coverage in respect to flash flood; that is, 50% of the home sum insured or $25,000, whichever is higher, and similarly 50% of the contents sum insured or $25,000 whichever is higher. 41. The Applicant has also made adverse references in connection with Section 22 of the Act and the PDS, however, that section relates to Duty of Disclosure matters and as such is not a consideration in this dispute. 42. Pages three and five of the Certificate of Insurance also state that the Applicant did not have the flood cover option selected on his policy (for either property or contents). In reviewing the Certificate of Insurance, the Panel is persuaded a reasonable person would be on notice that they did not have flood cover. Was the loss caused by an insured event or flood? 43. The Applicant has stated that the loss was caused by the releases from the Wivenhoe Dam after the rain on 11 January 2011 and that because this happened within 24 hours of the rain, it was caused by „flash flood‟ as defined by the policy. 44. In a separate submission, the Applicant has stated the loss could not have been caused by the releases from the Wivenhoe Dam because of the time it would have taken for the water releases to travel to the location and therefore this proves the loss was ca used by rainwater runoff. 45. The Applicant has provided rain and weather data to support his submission. 46. The FSP states to the contrary, that the loss was caused by flood as defined by the policy. It states the Wivenhoe Dam releases, due to rain experienced from 9 January 2011 through to 11 January 2011 was the proximate cause of the loss; however, this cannot reasonably be considered „flash flood‟ as these rains cumulatively occurred over a period of more than 24 hours before the loss at the risk address. 47. The Panel has reviewed the evidence to hand, including the hydrology reports provided by the FSP. The hydrologist‟s first report, dated 16 June 2011, states: “The subject property backs onto a local high point. There is little local catchment leading to the Subject Property apart from the block behind the Subject Property and the Subject Property itself. In other words, the surface area collecting rainfall that would drain into the Subject Property is not very large. Case No: 242427 Determination Page 7 of 13 The ground falls away from the Subject Property to the North East towards the Brisbane River. The house on the Subject Property appears to be several metres above the level of Strickland Terrace. Strickland Terrace itself contains stormwater infrastructure including drainage pits and curb and channelling. Overall, there is nothing in the terrain data to suggest that the Subject Property should have any particular stormwater issues. I attach as EXHIBIT SQC05 to this statement a copy of the rainfall record from the Corinda High Alert Gauge and the results of an intensity analysis for the period from 8 January 2011 to 15 January 2011. The Corinda High Alert Gauge is approximately 2.3 kilometres from the Subject Property and in my view is representative of the rain that would have fallen in the vicinity of the Subject Property. Based on the data in EXHIBIT SQ05, I would be surprised if the subject Property had in fact been inundated by stormwater or local run-off because the intensity of the local rainfall between 8 and 15 January 2011 was relatively low, and so would be unlikely to exceed stormwater drainage capacity. The most intense burst of local rainfall on 11 January 2011 occurred around midday. Further, the majority of the local rain had ceased by 6.00pm on 11 January 2011. I understand that the Applicant evacuated the property at around 6.00pm on 11 January 2011, and that at that time the Subject Property was not yet inundated. The amount of time between the intense local rainfall and the inundation of the Subject Property indicates that the Subject Property was not inundated by stormwater or local run-off. Accordingly, I conclude it does not appear that the Subject Property was inundated by stormwater run-off or other local run-off. … On the basis of the above matters, I conclude that the cause of the inundation of the Subject Property was the rising level of the Brisbane River, which was itself caused by rain which fell more than 24 hours earlier.” 48. The Panel has reviewed the graph SQC05 attached to the report, which indicates there was little or no rain recorded at the Corinda High Alert gauge between 6.00pm on 11 January 2011 and the afternoon of 12 January 2011. 49. The hydrologist provided further comments in a report dated 18 October 2011. It includes the following information:  Inundation due to intense rain usually occurs at the time of the rain or shortly after.  The rainfall at the time of the inundation of the Applicant‟s property was of low intensity.  The Applicant‟s property wo uld not be inundated with stormwater runoff six to nine hours after the rain.  The rain that fell in the area of the Applicant‟s property was minimal compared to the rain that fell over the Wivenhoe area. Case No: 242427 Determination Page 8 of 13  The Applicant‟s property was inundated with rising water from the Brisbane River. This occurred due to significant rain that fell over the Brisbane River catchment between 9 January 2011 and 11 January 2011 (and earlier rainfalls).  The Brisbane River was rising sharply at Jindalee from 9:00am on 11 January 2011, well before the higher releases from the Wivenhoe Dam had travelled that far.  The time it takes for water to travel down a river depends on a number of factors including the speed of the flow and the height of the river etc.  The water from Wivenhoe Dam would have taken 14-19 hours to reach the Applicant‟s location.  Based on the evidence, the Brisbane River would have been high enough to inundate the Applicant‟s property from about 12:30am on 12 January 2011. 50. The Panel has reviewed the FSP‟s assessor‟s report for the Applicant‟s property, dated 28 January 2011. The report indicates the Applicant evacuated the property at 6.00pm on 11 January 2011, water entered the property from 7.00pm on 11 January 2011 and the building was inundated on 12 January 2011 (no time given). 51. The Applicant‟s submission states the inundation occurred around 12.30am on 12 January 2011. 52. The Panel notes that in subsequent submissions, the FSP‟s hydrologist has estimated that the approximate time the Brisbane River reached the lowest point of the structure of the house on the land was 2.58am on 12 January 2012. 53. In reviewing the evidence, the Panel is persuaded by the FSP‟s evidence that the Applicant‟s home was in fact inundated by rising water from the Brisbane River. Des pite the Applicant‟s submissions about stormwater runoff, the rain data would indicate it was highly unlikely that stormwater runoff would have inundated the Applicant‟s property, especially considering the inundation occurred some hours after the most intense rainfall. 54. The Panel is also persuaded the increased releases from the Wivenhoe Dam would have reached the Applicant‟s location around the time of the inundation. 55. It is therefore necessary to consider the question of whether flash flood as defined wit hin the terms of the policy has application to the Applicant‟s circumstances. 56. The policy covers flash flood and stormwater runoff. In order for a claim to fall under the insured event of flash flood and stormwater runoff, the following elements must be established (in light of the Panel‟s findings in the Case No: 242427 Determination Page 9 of 13 preceding paragraphs regarding localised „stormwater runoff‟, the defined event now being analysed relates to „flash flood‟) : a) There was a sudden flood; b) There was a heavy rain that occurred within 24 hours prior to that flood; c) The sudden flood was caused by that heavy rain. 57. The Panel notes that the rainfall between 4.00am and 8.00am on 11 January 2011 was the onset of the second and highest peak of inflow to the Wivenhoe Dam according to the evidence. 58. The Service has determined in other disputes, following consideration of all material exchanged, that this heavy rainfall commencing around 4.00am on 11 January 2011 was the proximate or dominant cause of the inundation of the properties downstream from the Wi venhoe Dam. 59. Subsequent to issuing those Determinations, the evidence of the operating engineers of the Wivenhoe Dam was brought into question and the Queensland Flood Commission of Inquiry (CoI) reconvened to further consider that evidence. The Service suspended issuing further Determinations on this issue until the CoI had completed these deliberations. The parties to this dispute were then provided opportunities to address the policy‟s „flash flood‟ provision in the context of the CoI‟s final Report. 60. The FSP has since provided further submissions to the Service including a reference document (which have been updated), two additional hydrology reports and a statement from the hydrologist. Only those parts of the additional material relevant to the current dispute need be considered. 61. Within the earlier Determinations of the Service, the Panel was satisfied that the decision to change the release strategy from W3 to W4 was as a direct result of the rain which fell during the period 4.00am to 8.00am on 11 January 2011. 62. In making this finding, the Panel gave consideration to the rain which had fallen prior to 11 January 2011 and notwithstanding the extent of that rainfall, it nevertheless concluded the decision to increase the outflows from the Wivenhoe Dam to the W4 release strategy, was directly related to the rainfall in the early hours of 11 January 2011. 63. As a consequence, the Panel was satisfied that the rainfall between 4.00am and 8.00am on 11 January 2011 was the proximate or dominant cause of the inundation of the properties downstream from the Wivenhoe Dam. 64. The Panel accepts the argument that it is not necessarily the last in time that is the proximate cause but it is the dominant, or effective, or operative cause that is relevant. The Panel is satisfied that eliciting this cause requires a commonsense judgement of the facts, to determine the cause that is proximate in efficiency and the Panel has duly applied such a commonsense approach to this issue in reaching its Determination. Case No: 242427 Determination Page 10 of 13 65. Further, the Panel accepts that the proximate or dominant cause issue needs to be considered in the context of the FSP‟s policy. The policy wording is quite broad. It allows for flash flood subject to showing the sudden flood occurred within 24 hours of heavy rain. 66. There is no doubt that the significant weather events in Queensland in the periods up to 11 January 2011 impacted on the levels of water within the dams or that the ground was at saturation level leading to the likelihood of exaggerated storm or rainwater runoff. This cannot be denied. The cumulative effect of the rainfall from 9 January 2011 or earlier would have caused a significant increase in the dam levels, the rivers and ground saturation. 67. Nevertheless, based on the information that has been exchanged, the Panel is satisfied that, on the balance of probabilities it is not probable that the releases from the Wivenhoe Dam would have increased, or the W4 strategy would have been invoked, but for the extreme rainfall that fell from 4.00am on 11 January 2011. 68. The Panel notes that notwithstanding the fact that the evidence of the dam‟s operating engineers was placed under scrutiny in subsequent hearings of the CoI, the specific evidence in respect to this matter and the evidence of the decreasing inflows into the dam prior to 2.00am on 11 January 2011 and the evidence that there was heavy rain over the dam from 4.00am on 11 January 2011 leading to the decision to move to a strategy W4 release, remains uncontested. 69. The Panel also notes the evidence of the FSP‟s hydrologist to the effect that what caused the identified rises in the Brisbane River was waters that had been released from the Wivenhoe Dam and the dam release flood was the immediate cause of flooding along the reaches of the Brisbane River downstream of the dam, which is also consistent with the ICA hydrology findings. 70. In those circumstances and given the evidence presented, the Panel is satisfied, on the balance of probabilities that the proximate or dominant cause of the inundation to the Applicant‟s property was the rain which fell over the Wivenhoe Dam between 4.00am and 8.00am on 11 January 2011. 71. The Panel also notes that the FSP‟s hydrologist has estimated that the approximate time the Brisbane River reached the lowest point of the structure of the house on the land was 2.58am on 12 January 2011, which is approximately consistent with the time the Applicant says the property was inundated. This timing is within the 24 hours contemplated by the policy provision of flash flood and thus the Panel is satisfied that the FSP‟s policy and in particular the coverage for flash flood is applicable to the circumstances of the Applicant‟s loss. 72. The estimate from the FSP‟s hydrologist is that at 4.00am on 12 January 2011, the Brisbane River level was 0.2 metres above the lowest point of the structure of the house on the land. Case No: 242427 Determination Page 11 of 13 73. The Panel is therefore satisfied that the FSP is required to provide coverage for the Applicant‟s claim, under the heading flash flood, to an inundation level of 0.2 metres above the lowest point of the structure of the house on the land. 74. When the Panel Chair Ombudsman attended on site, he noted the multi level nature of the Applicant‟s home. Considering the submissions of the FSP‟s hydrologist and the observation of the Ombudsman on site and allowing for the fact that the calculations of the Ombudsman are estimates and would require some degree of flexibility, the Panel is satisfied that at 4.00am on 12 January 2012, there was approximately 200mm of water through the bottom or lower level of the house. 75. The FSP also argues in the alternative that it was the Wivenhoe Dam operating engineers‟ departure from the „operating manual‟ which was the proximate cause of the loss. 76. The Panel has reviewed the evidence presented to the CoI and in particular the subsequent hearings of the Inquiry. 77. Whilst there has been a challenge to the evidence presented by the operating engineers of the Wivenhoe Dam, the Panel is not satisfied that the challenge to the evidence relates to this particular argument. The Panel is satisfied that given the circumstances in which the engineers found themselves, on the morning of 11 January 2011, it was appropriate that they altered the release strategy to W4. It also remains undisputed by the CoI‟s final report that the shift to the W4 strateg y was as a direct reaction to the rainfall (estimated to be as much as 700mm) that had fallen over the dam between 4.00am and 8.00am on 11 January 2011. 78. The FSP also seeks to argue that the Wayne Tank principle applies to the circumstances of this dispute to exclude the claim. 79. The Panel has previously considered this argument and is not satisfied that there is anything in the material presented by the FSP which ought to alter the Panel‟s view that the Wayne Tank principle has no application to the flash flood component of the claim. 80. In essence, what the FSP is saying is that there are two proximate causes. The Panel is satisfied that in the circumstances where there are two proximate causes and one is covered under the policy and the other is not covered, then the FSP is entitled to deny the claim pursuant to the Wayne Tank principle. 81. However, in this matter the Panel is satisfied that the rain which fell over the Wivenhoe Dam from 4.00am on 11 January 2011 is the proximate cause of the inundation of the Appl icant‟s property. 82. The conclusion is that the Panel does not accept the FSP‟s argument that the claim for flash flood should be excluded on the basis that the Wayne Tank principle applies. Case No: 242427 Determination Page 12 of 13 83. The FSP maintains that the loss suffered by the Applicant would have occurred in any event, even if the release strategy had not been increased to W4, because if the release strategy had continued at W3, the rising level of the Brisbane River would have reached and inundated the Applicant‟s property in any event. 84. The reality is that the release strategy did not remain at W3 but was increased to W4 and as has been said, the Panel is satisfied that the rain which fell between 4.00am and 8.00am on 11 January 2011 was the direct cause of the increase in the release strategy fro m W3 to W4. 85. The FSP‟s argument is based upon speculation as to what may have happened if certain circumstances possibly occurred. It also requires the disregarding of the policy wording applying to „flash flood‟. 86. The Panel is not prepared to speculate as to what might or might not have happened, but relies upon the evidence of what actually happened, against the required proof standard of the balance of probabilities. 87. As such, the Panel does not accept these alternate arguments of the FSP and remains satisf ied that the Applicant‟s property was inundated as a direct result of rain which fell over the Wivenhoe Dam between 4.00am and 8.00am on 11 January 2011 leading to the change of the release strategy from W3 to W4 which created a wave of water in the Brisbane River which led to the rising of the river and the ultimate inundation of the Applicant‟s property at approximately 2.58am on 12 January 2011, as estimated by the FSP‟s hydrologist. Such an inundation falls within the parameters of the policy event of „flash flood‟. 88. The Panel accepts that the policy coverage for flash flood is to the limit of 50% of each of the home and contents sums insured or $25,000 for each, whichever is higher. 89. The FSP has argued that interest is only payable from the date from whic h it was unreasonable to withhold payment. The FSP maintains that it is entitled to a reasonable period to investigate and determine its position, and given the complex nature of the flood disputes, the delays are not unreasonable. Further complex situations require substantial periods of time for independent bodies such as the Queensland Flood Commission of Inquiry and FOS, to make conclusions on the issues in dispute. 90. The FSP maintains that it did not act unreasonably in this dispute and therefore interest is not payable. Alternatively, if some period of interest is to be awarded it should be reduced to account for the substantial delays through the course of the process which were not the FSP‟s fault. 91. Section 57 of the Insurance Contracts Act requires interest be paid when it becomes “unreasonable for the insurer to have withheld payment”. An examination of relevant case law indicates that most probably, interest will be awarded from either when an insurer first emphatically denied liability or Case No: 242427 Determination Page 13 of 13 disputed a matter, or from when in the normal course of events the claim should have been paid if liability had not been disputed. 92. In this dispute the Panel accepts that the FSP was entitled to withhold payment of the settlement monies until such time as it had properly investigated the dispute and made its decision as to liability. 93. The FSP made its original decision to deny the claim after receiving relevant assessment reports, hydrology reports and other information. The FSP was aware of the terms of its policy and aware of the relevant provisions under which liability might arise and chose to deny the claim having reviewed those relevant provisions and the evidence available to it. 94. In the Panel‟s view, at that point the FSP has made its decision on the claim and it is appropriate that from that time interest be paid unless it can be established that the Applicant had withheld information from the FSP that would have led to an alteration of its decision. 95. Accordingly, the Panel determines that it is appropriate that the FSP in this dispute pay interest from the day the FSP determined to deny liability of the Applicant‟s claim, until payment of the claim. Determination 96. The Panel determines that the FSP is required to indemnify the Applicant under the terms and conditions of the policy in respect to the loss arising from flash flood up to the level of 0.2 metres through the bottom or lower level of the house. Insofar as the FSP may have made payment of a compassionate sum to the Applicant, FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. 97. Should the FSP elect to cash settle any part of this claim then the FSP is to pay interest at the rate specified by the Insurance Contracts Act 1984 on that part of the claim which is cash settled from the date of denial of the claim, to the date of settlement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.