Home / Financial Firm (Unknown - Insurer) / Determination 242424

Determination 242424

Water inundation claim denied under flood exclusion; wording and notice challenged

FirmFinancial Firm (Unknown - Insurer)
Decided2011-11-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insured's home was inundated in January 2011 and the insurer denied the claim as flood, which the policy excludes. AFCA found the flood exclusion was clear, the policy was provided, and the evidence showed the damage was caused by floodwater from the river and dam release.

Stormwater mixed with river or dam overflow is treated as floodwater, so the flood exclusion applies and the insured failed to show the damage was caused by covered run-off alone.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 242424 Determination Page 1 of 8 Case number: 242424 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 22 November 2011 Background 1. The Applicant incepted a home building and contents insurance policy with the Financial Services Provider (FSP) on 26 February 2010. The policy provided cover for loss or damage caused by insured events. The home building was insured for the sum insured of $250,000, contents for $82,000 and specified contents for $40,000. The policy was subject to a $400 excess in the event of a claim. 2. On 13 January 2011, the Applicant contacted the FSP to report water inundation to the property that occurred on 11 January 2011. The Applicant was advised at that time that if the damage to property had been caused by flood, the claim would not succeed. 3. Following investigation into the circumstance surrounding the loss, the FSP deemed that water inundation was the result of flood and denied the claim as this was excluded by the policy. 4. Solicitors acting on behalf of the Applicant wrote to the FSP on 5 April 2011 seeking a review of the FSP’s decision to deny the claim. Despite this, the FSP maintained its decision to deny the claim. Summary of Applicant’s Position 5. The policy definition of “flood” is too broad and does not meet the FSP’s obligation to clearly communicate the exclusion. 6. The definition of “flood” is that it not only excludes flood , but floodwater combined with run-off and or rainwater. 7. The problem is that a client would read under defined events cover that the policy provided cover for rainwater and run-off. However, under the same subsection, it excluded run-off of any kind and rainwater combined with floodwater. Determination Case No: 242424 Determination Page 2 of 8 8. The definition of flood, storm, rainwater and run-off are contradictory and confusing and do not meet the requirements to clearly inform under S35 of the Insurance Contracts Act 1984 (the Act) or the requirements of disclosure under the Corporations Act. 9. The damage was not caused by flood but was the result of stormwater. It was raining heavily on 11 January 2011 and water was witnessed to be pooling in the backyard before she evacuated the property. Summary of FSP’s Position 10. It says it has complied with all relevant requirements of the Act with respect to providing information and in particular, notifying the Applicant of the provision excluding flood in accordance with s35 of the Act. 11. It says the policy is clear and unambiguous in that flood is not an insured event and in order for the claim to succeed, the loss or damage needs to be the result of an insured event. 12. Based on the available information, including a site specific hydrology report and loss adjuster’s report, it is clear the inundation of the property was caused solely by floodwaters. The floodwater experienced was due to the backflow of the Brisbane River. 13. Further, the attending hydrologist noted there was insufficient localised rainfall to create sufficient run-off to inundate the property to the depth experienced during the event. 14. The FSP relies on the following policy provisions: “ Words with special meanings Some of the words in this policy have special meanings wherever they appear. These words and their meanings are defined below. … “flood” means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam. [Note: This policy does not cover loss, liability, injury or damage caused by or arising from flood to buildings and/or contents] … “rainwater” means rain falling naturally from the sky onto the buildings and/or ground. … “run - off” means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. … Insured events we will pay for Case No: 242424 Determination Page 3 of 8 … 9. Stormwater, rainwater or run-off. (Applicable whether you have buildings and/or contents cover) We will pay for loss or damage caused by storm, rainwater or run-off. “storm” means violent wind (including cyclones and tornadoes), thunderstorms and hail which may be accompanied by rain or snow. “rainwater” means rain falling naturally from the sky onto the buildings and/or ground. “run - off” means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. We will not pay for loss or damage: a. Caused by:  flood, or  flood water combined with run-off and/or rainwater; “flood” means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam. … When we will not pay a claim under your policy … 2. Unless we state differently in your policy, we will not pay for: a. flood as defined on page 6; b. any loss or damage which is not caused directly by one of the insured events; FSP’s Combined Insurance New Business Schedule (effective 26/2/2010) … Your new cover is set out in this Schedule and enclosed Policy Document (Product Disclosure Statement). Before you proceed please check the information in this Schedule set out below and the Policy Documents to ensure that the cover is appropriate for you. … Please Note: Flood is not covered by this policy.” Issue 15. Whether the FSP was entitled to deny the claim on the grounds the loss was caused by an event not covered by the policy. Case No: 242424 Determination Page 4 of 8 Reasons for Decision 16. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference because of the complex nature of the dispute. The dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 18. There has been an exchange of material between the parties. It therefore is not intended to recite details of the various reports in this Determination except where considered relevant. 19. The Applicant’s solicitor has in a letter dated 22 August 2011, made reference to two previous determina tions in support of their client’s dispute. One determination (Determination No 40607) discussed an identical definition as that contained in this dispute and the outcome was in that Applicant’s favour. 20. The solicitor’s letter and attached documentation was exchanged with the FSP and although the FSP was given the opportunity to respond, it did not do so. 21. The Panel noted the content of the Determination 40607 in which a previous Panel raised issue with the wording of the policy exclusion, particularly in reg ards to “ Flood water combined with run- off and/or rainwater”. 22. However it was noted by the Panel in Determination 40607 that there was an issue with information provided at the point of sale. Further, the Panel noted in that determination “ The member has not been able to provide any information as to whether or when the Product Disclosure Statement and/or policy were forw arded to the Applicant.” 23. In the circumstances of this dispute, it has not been argued by the Applicant’s solicitor that a copy of the policy or PDS was not provided to the Applicant but rather it is argued:  The exclusion is inherently confusing; and  The heading of storm, rainwater and run- off does not draw the Applicant’s attention to the fact that there is a flood exclusion in the policy and that it can be found on this page. 24. It is the Applicant’s responsibility to read the policy and relevant material to ensure they have obtained the appropriate cover for their needs. There is no indication the Applicant sought clarification from the FSP as to the extent of cover following receipt of the PDS. Case No: 242424 Determination Page 5 of 8 25. In any case, the FSP provided evidence to the Service that establishes the policy schedule and PDS was sent to the Applicant thus complying with s35 and s69 of the Act. The Panel is satisfied the Applic ant’s policy did not cover flood. Storm event 26. It is not in dispute that an extreme weather event took place in the region. The Applicant’s solicitor has argued that the damage to the Applicant’s property was the result of a storm event and in particular stormwater. 27. The FSP contends the damage to the Applicant’s property was the result of floodwater and has relied on a site specific hydrology report as well as its loss adjuster’s report. 28. The hydrologist conducted a site inspection on 25 May 2011. It is noted the property is 500 metres southwest of the Brisbane River and 400 metres northwest of Oxley Creek. The house is a raised single storey weatherboard dwelling on stumps with a concreted area underneath. 29. The loss adjuster noted the floor height at the front of the house from the ground was 1.6 metres. The hydrologist noted the timber floor at the rear of the house measured 2160mm from the concrete slab. The hydrologist noted an inundation mark on a light fixture at 2350mm from the timber floor. 30. During his site visit, the hydrologist noted the following information from the Applicant:  It was raining in the morning on 11 January 2011.  Water was coming out of the stormwater drains. There was no flow, it was rising.  Water first entered the property two houses do wn.  Inundation of the Applicant’s property started at approximately 3pm on 11 January 2011.  By 6.30pm on 11 January 2011, water was 300mm above the concrete slab level and at 8.30pm the water level was 500mm above the concrete slab level.  At 9.00am on 12 January 2011, the water level was just below the floor boards. The water level peaked on 13 January 2011.  The Applicant evacuated the property at 6.30pm on 11 January 2011. It was not raining at this time.  The water had receded from the property by approximately midday on 14 January 2011.  The Applicant advised during heavy rain water tended to puddle in the backyard. Case No: 242424 Determination Page 6 of 8 31. The hydrologist concluded the following: “Based upon the observations made during the inspection, discussions with witnesses at the site and in the area as well as the analysis of the data available, the source of water inundation at the site in our opinion, was caused exclusively by a flood event. We have arrived at this opinion because we believe the inundation to be caused by backwater from the Brisbane River and not from any localised rainfall event that would generate sufficient runoff to cause stormwater type inundation.” 32. The Panel notes the information relied upon by the FSP’s appointed hydrologist which included information regarding “ Brisbane River Catchment Data below Wivenhoe ”. The hydrologist also provided information relating to ground level ranges at the subject property as well as water gauge level information from the Brisbane River and Oxley Creek. 33. The hydrologist reported this information matched the witness ’s observations of the water inundation at the site. In his report, the hydrologist included an aerial photograph of the property during the event. Water is noted to be just under the eaves of the roof thereby confirming the water level at the site reached an excessive level unlikely to have resulted from stormwater. 34. The Panel is also aware of the hydrological report obtained by the Insurance Council of Australia. This report is very extensive as it relates to an extreme weather event which caused flooding to the Brisbane region. In Volume 3 of the report, “Flooding in the Brisbane River Catchment” January 2011 , the following information is available which needs to be considered: Wivenhoe Dam release (9.3)  Large releases were made from Wivenhoe Dam over the period from 06:00 hours, possibly as early as 03:00 hours on 11 January 2011, until around 03:00 hours on 12 January 2011.  Releases from Wivenhoe Dam caused a flood wave in the Brisbane River. Water levels in the lower reaches of the Bremer River and its tributaries draining into Ipswich City LGA were affected by backwater flooding and backwater effects from the Brisbane River.  It was concluded that the dam release flood from Wivenhoe Dam was the immediate cause of flooding along the reach of the Brisbane River downstream of the Dam and along tributaries through the Ipswich City LGA. 35. The Panel Chair Ombudsman conducted a site visit at which the Applicant and two representatives from WT were present. The site visit occurred on 20 October 2011. Case No: 242424 Determination Page 7 of 8 36. The Applicant provided photos showing water pooling in a depression at the low point of the street in which she lived. The Applicant’s property is on a rise 20 or 30 metres from the low point of the depression. At the depression there is a large drain. The drains out to Oxley Creek. Unless this drain was blocked any pooling in the depression would flow into this drain. 37. The Applicant confirms the property was flooded to within approximately 10-15 cm’s of the second level ceiling. 38. The Applicant confirms that she left the property on 11 January and returned on 12 January. When she returned she could not get to her home, but was able to observe the water had risen to the top of the first level of her house. 39. The Applicant does not dispute receiving the policy documentation and admits that she had read the policy. She maintains she was confused by the policy wording and did not understand the concept of water coming out of the drains being backflow water causing flooding. 40. The Applicant also provided copy of the Statutory Declaration provided by a neighbour. According to the Declaration at approximately 1430 hours water came across the neighbour’s property. The water was coming from the stormwater drain directly outside her property and continued to rise throughout the day. According to the Statutory Declaration, it is estimated the water inundated the top floor of the neighbour’s property at approximately 2300 hours on Tuesday, 11 January. 41. The Applicant’s policy covers run -off which is defined as “ rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas”. 42. Although the Applicant may not have understood that backflooding from stormwater drains is also considered flooding. It is clear from the Applicant’s own comments that she was aware that the policy itself excluded flood. Flood is defined in the policy as “the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural water course, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam. The policy further notes that it excludes flood water combined with runoff and/or rainwater. In the Pane’s view the policy is sufficiently clear to satisfy the requirements of Section 35 of the Insurance Contracts Act . 43. The Panel is satisfied that while the intense rainfall may be regarded as the initial cause for stormwater run-off combined with the river flooding and the release of water from the dam, it is accepted law that when stormwater mixes with river water or water overflowing from a river, creek or dam, then that stormwater is deemed to be flood water. 44. As such, when a mixture of river water and stormwater causes damage to property, the FSP is entitled to rely o n the clause which excludes loss or damage caused by floodwater. Case No: 242424 Determination Page 8 of 8 45. Further, for the Applicant to be successful in this matter, she needs to show the damage has been caused by an event covered by the policy. According to the terms of the Applicant’s policy, damage is covered only in circumstances where run-off alone caused the damage. The Panel has considered whether the initial inundation may have been run-off. There is no evidence to support this. 46. The Panel is satisfied that water escaping from the confines of the river system, along with that emanating from the Wivenhoe Dam, has contributed to the circumstances of flooding to the Applicant’s property. 47. For these reasons, the Panel is of the opinion that the evidence does not support a finding that surface runoff rainwater alone entered the Applicant’s home. 48. In the Panel’s opinion, the evidence leads to the conclusion that on the balance of probabilities the FSP has discharged the onus that rests with it to show the cause for the damage, namely flood does not fall within the cover provided by the policy. Determination 49. On the basis of the available information, the Panel determines that the FSP was entitled to deny liability for the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.