Home / Financial Firm (Unknown - Insurer) / Determination 242400

Determination 242400

Denial of flood water damage claim: whether loss fell within flash flood cover and its cap

FirmFinancial Firm (Unknown - Insurer)
Decided2011-12-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$340,000
SourceAFCA PDF

Summary

The FSP declined the Applicants' flood-damage claim after a hydrology report attributed the inundation to river flood rather than flash flood. AFCA found the significant inundation followed a distinct storm on 11 January 2011 and fell within flash flood cover, limited by the policy caps, with interest from 1 March 2011.

Under the policy wording and s 35 of the Insurance Contracts Act 1984, provision of the policy document clearly informed the Applicants of the flood exclusion and the flash flood cap, and the inundation was within 24 hours of a distinct storm.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 242400 Determination Page 1 of 15 Case number: 242400 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim – Flood – Section 35 and 69(2) of the Insurance Contracts Act 1984 22 November 2011 Background 1. The Applicants held a home insurance policy with the Financial Services Provider (FSP) covering their home and contents. The policy was renewed in September 2010 and insured the building for the sum of $833,711 and contents for the sum of $346,321 for specified insured events. 2. During a period of several days from 9 January 2011, heavy rain and floods in the local Queensland area caused the water inundation of the Applicants‟ home. The Applicants lodged a claim for the damage under the policy. 3. The FSP declined the claim on the basis that the policy under its general exclusion excluded cover for flood unless the inundation was due to flash flooding. The FSP determined based on the hydrologist information that the property was flooded. Further, the FSP determi ned that the inundation was not due to flash flooding as the storm that produced the flooding of the area commenced at 10am on Sunday 9 January 2011 and the property was not flooded until 38 hours after the start of rainfall in the upper catchment area. The FSP maintains it was only liable in the event of flash flooding occurring within 24 consecutive hours of the storm having commenced. 4. The Applicants dispute the FSP‟s decision to decline the claim and are seeking full indemnity for their loss under the policy. Summary of Applicants ’ Position 5. The Applicants in disputing the FSP‟s decision have sought legal representation from “L”. For the purpose of this determination both the Applicants and L will be referred to as “the Applicants”. 6. The Applicants maintain that at the time of purchasing the insured property through “C” in 1994, it was their understanding that the insurance cover was a package deal combined with the mortgage. In other words, they formed the impression that if they wished to take out the mortgage through C, they were required to take out insurance with the FSP (C‟s preferred insurer). Determination Case No: 242400 Determination Page 2 of 15 7. The Applicants do not recall any particular discussion regarding the terms and conditions of the policy at the time of taking out the mortgage. It was more a ca se of when signing up for the mortgage, the instructions were “ here is the insurance, sign here ”. 8. The Applicants formed the impression that their mortgagee, who clearly has a significant stake in the protection of the policy, would not recommend or encourage taking out inadequate insurance cover. Given the location and close proximity of the property to the Brisbane River, a prudent mortgagee would ensure that appropriate cover, which would include insurance against water inundation by whatever means i.e. Flood cover. 9. The Applicants attention was never drawn to the fact that the policy restricts the FSP‟s liability to “Flash flood” only. Had this been brought to their attention, they would have immediately sought a policy which did offer adequate protection. 10. In the Applicants‟ view C acted as an agent for the FSP and as such the FSP is obliged to accept liability for its agents silence on the lack of cover for flood. 11. The Insurance Contract Act 1984 (the Act) reiterates the common law duty upon an insurer to act with respect to any matter arising under or in relation to the insurance contract with utmost good faith. 12. There is a specific obligation under the Act to clearly inform an insured in writing where the effect of a provision would be that the FSP would be under no liability in respect of a claim arising from a certain event. 13. “Flood” is a prescribed event for the purpose of Section 35 of the Act as defined in the Insurance Contract Regulations 1985 (the Regulations). If the FSP seeks to exclude this event under the policy, it has a duty to clearly inform the Applicants of such an exclusion. This obligation is also supported under the Corporations Act 2001, in that there must be “clear, concise and effective” disclosure. 14. In the Applicants‟ view, although there may be legitimate cause to exclude flood cover, the mere delivery of policy documents and the Product Disclosure Statement (PDS) does not constitute clearly informing the Applicants in writing. 15. Therefore, the Applicants remain dissatisfied with the FSP‟s position; namely that the relevant policy clearly sets out an exclusion for flood cover or that this was clearly brought to the Applicants‟ attention as required under the Act. 16. The Applicants argue, given the two very similar and overlapping definitions for “Flood” and “Flash flood” under the policy, it is likely to cause confusion for a consumer in relation to what is or is not covered. 17. Therefore, having regard for the Act and the Regulations, the Applicants maintain that the FSP cannot rely upon the policy provisions to deny or reduce liability. The policy should be read as a “Standard Cover Policy”, which includes cover for loss or damage arising from flood. Case No: 242400 Determination Page 3 of 15 18. The Applicants in referring to the site specific hydrology report submitted by “WP” and rel ied upon by the FSP note that this report concludes that water damage to the insured property was the result of flood and not flash flood. 19. The Applicants note the following policy definitions: “ Flash flooding The overflow of any lake, river, creek, storm water channel, canal or any other watercourse (whether natural, altered or man made), caused by a storm, where the flooding occurs within 24 consecutive hours of the storm having commenced. … Flood The inundation of normally dry land by water which has overflowed, escaped or been released from a lake, river, creek, storm water channel, canal or any other watercourse whether natural, altered or man made. Unless the damage is caused by flash flooding, this policy does not cover flood. … Storm  A violent wind (including cyclones) sometimes combined with thunder, heavy falls of rain, hail or snow; or  Thunderstorms or hailstorms, sometimes accompanied by heavy falls of rain or snow. It is not persistent bad weather or heavy or persistent rain by itself.” 20. The Applicants maintain that:  There is a drain located directly opposite their property, which was brought to the attention of WP.  On arriving home in the afternoon of 11 January 2011, the Applicants noticed water rising from the drain and there was water pooled outside the front of the property (it is a natural basin for surrounding areas).  The WP report concludes that “rainfall” contributed to the flooding of Brisbane River and that this rainfall started more than 24 hours prior to the inundation of their property.  However, the definition of flash flooding refers to flooding occurring within 24 consecutive hours of the storm having commenced. As such it is not a question of commencement of rainfall rather is commencement of the storm or storms within this period. 21. The Applicants argue that there is no doubt, taking into consideration information released by the Bureau of Meteorology (BoM), that there were a number of distinct weather events that occurred in the Brisbane Area during the period of 9 January 2011 to 12 January 2011. Case No: 242400 Determination Page 4 of 15 22. Additionally, it is clear from the information released by BoM and the Applicants‟ recollection of events, that the property was inundated by water within 24 hours of the storm. Therefore, the loss falls within the cover available under the insured event “flash flood”. In the alternate, the Applicants submit that the damage occurred as a result of “storm”. 23. The Applicants note a cap placed on the FSP‟s liability under the policy in respect to loss or damage arising from flash flooding. The FSP has a duty to clearly inform the consumer of the cap applied to such a loss. 24. While the definition of flash flooding is provided at page 16 of the PDS, there is absolutely no mention of the cap. It is not until page 22 that the percentage cap is mentioned. It is the only (emphasis added) insured event subject to such a cap under the policy. 25. The Applicants maintain that after reading the policy it would only be reasonable for a consumer to form the opinion that they are fully covered for loss or damage arising from flash flooding. Hiding a cap on claims many pages after the definition of an insured event does not comply with the obligation placed upon the FSP under the Act. 26. The cap is equivalent to an exclusion and as such should have at the very least been referred to with the definition on page 16 of the PDS. 27. The Applicants believe that it is misleading to refer to flash flooding as an insured event, only to also significantly cap (limit) the FSP‟s liability in respect to a claim. The FSP has not adequately brought such restriction to the Applicants‟ attention within the meaning of Section 35 of the Act. Therefore, it is not entitled to rely upon such a provision to limit its liability under the claim. 28. In the instance that the FSP accepts the Applicants‟ loss was due to flash flooding, it is then obliged to cover the Applicants for the full extent of their loss as opposed to being allowed to limit its liability under the cap. 29. The term “persistent bad weather”, included within the definition of storm is undefined and ambiguous. The Applicants believe that more than just provision of the PDS is required to satisfy the FSP‟s obligation to clearly inform under the Act. 30. The WP report does not explain its own definition of flood. It also relies upon rainfall data on its own to determine when the storm commenced. The Insurance Council of Australia (ICA) hydrology report states there were three weather events that affected Brisbane between 9 January 2011 and 12 January 2011. The third and most significant occurring on 11 January 2011. 31. It is clear that a thunderstorm commenced on 11 January 2011, when compared to the other weather events. The storm causing the overflow of Brisbane River and subsequent damage commenced on 11 January 2011, with water entering the property that evening. The inundation therefore occurred within 24 consecutive hours of the commencement of the storm. Case No: 242400 Determination Page 5 of 15 32. This event meets the definition of flash flooding under the policy and as such the Applicants are covered for their loss. Summary of FSP’s Pos ition 33. On 13 January 2011, the Applicants contacted the FSP and lodged a claim under the policy. The loss description recorded states: “Home has been flooded – Brisbane Area. Staying with family – No access to property at present – All surrounding property damaged. Unsure extent of damage as unable to gain access.” 34. The insured property was assessed on 22 January 2011 and the loss was estimated to be in the vicinity of $250,000 (building damage) and $90,000 (contents damage). 35. A hydrology report (WP) was obtai ned and this concluded that the insured property was flooded on the 11 January 2011. The claim was declined on the basis that the loss arose due to flood, which is not an event insured under the policy. 36. The Applicants received $136,000 from C‟s Compassiona te Assistance Fund on 3 March 2011. 37. The PDS in place at the time of loss has details of what is covered under the policy. Also, under the heading “General Exclusions”, it states: “We will not cover loss, damage or legal liability caused by:  Flood unless i t is flash flooding”. 38. The hydrologist (WP) attended the insured property and met with the male Applicant. WP was advised that the flooding of the property started at about 6.30pm on 11 January 2011. 39. The evidence compiled by the hydrologist contradicts the Applicants‟ opinion that the property was damaged by flash flooding due to the inundation occurring within 24 hours of the commencement of the storm. 40. Based on the rainfall gauges in close proximity of the insured property, the start of the storm was 10.00am on 9 January 2011. After that time there were two high rainfall intensity periods on 10 January 2011 and 11 January 2011. However, as the interval between these periods is less than the „response time‟ of the river, the total rainfall started with the storm that commenced on 9 January 2011. This is also the date of storm the hydrologist maintains caused the river levels to start to rise. 41. As the inundation of the property started at 6.30pm on 11 January 2011, this falls outside the 24 hour period after the commencement of the storm on 9 January 2011, and as such does not fall within cover provided for flash flooding. Case No: 242400 Determination Page 6 of 15 42. The Applicants do not dispute having received the PDS and other policy documentation from the FSP, only that the “simple delivery” of these documents does not satisfy Section 35(2) of the Act. 43. The FSP maintains by providing the Applicants with the policy documents and PDS, it has fulfilled its obligations under the Act. In support of its position in this regard the FSP refers to the New South Wales (NSW) Supreme Court decision of Hams v CGU Insurance (2002) . 44. In response to the Applicants‟ opinion regarding C‟s obligations, the FSP maintains that there is no obligation on a mortgagee to provide advice on the nature and extent of insurance for a property. It is simply not possible for a mortgagee to offer insurance by taking into account every conceivable future insurable event on a consumer‟s policy. 45. It is not the mortgagee‟s obligation to „recommend or encourage‟ insurance based upon the location of a property. There is an obligation on the Applicant to read the policy and be aware of what is or is not covered and whether this suits their needs. 46. The FSP relies on the following policy provisions: “ Page 16 of the Product Disclosure Statement (PDS) Glossary of words with special meaning flash flooding The overflow of any lake, river, creek, stormwater channel, canal or any other watercourse (whether natural, altered or man made), caused by a storm, where the flooding occurs within 24 consecutive hours of the storm having commenced. flood The inundation of normally dry land by water which has overflowed, escaped or been released from a lake, river, creek, storm water channel, canal or any other watercourse, whether natural, altered or man made. Unless the damage is caused by flash flooding, this policy does not cover flood. … Page 18 of the PDS The policy doesn’t cover everything General exclusions – apply to the overall policy Unless included in additional cover, we will not cover loss, damage or legal liability caused by:  flood unless it is flash flooding... … Page 22 of the PDS Events you are covered for Flash flooding You are covered for flash flooding as defined on page 16. Case No: 242400 Determination Page 7 of 15 ... The maximum amount we will pay is limited to:  15% of the nominated sum insured, where the building is insured by this policy; and  25% of the contents sum insured, where contents are insured by this policy.” Issues 47. Whether the inundation and subsequent loss and damage to the property falls within the cover provided under policy for the insured event “Flash flooding”. 48. Whether the policy clearly establishes the difference between the insured events of “Flood” and “Flash flooding” as well as any limits in respect the FSP‟s liability under these insured events. Relevant Law Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. Section 69 provides that section 22 will be deemed to have been complied with if it is not reasonably practicable to give the information in writing before the contract is entered into but it is reasonably practical to give the information orally. If the insurer gives the information orally, the insurer is deemed to have complied with section 22 if the information is given in writing within 14 days after the contract of insurance (including an interim contract) has been entered into. Provided the oral information is confirmed in writing within 14 days, compliance with section 22 will be established. Where a loss occurs after the contract was entered into but before written confirmation of the duty of disclosure has been provided, the insurer will only be able to avail itself of the remedies set out in Section 28, if it can prove that the information was given orally. Reasons for Decision 49. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 50. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. Case No: 242400 Determination Page 8 of 15 51. There has been a full exchange of material between the parties and each party has had the opportunity to respond to the issues raised. 52. In view of the issues raised and the material exchanged, the Panel Chair conducted a site visit of the Applicants‟ property on 21 October 2011. Whilst t he Applicants were present, the FSP declined the opportunity to attend. 53. It is relevant to report the particulars of the site visit for the purpose of this Determination as follows:  The Applicants‟ property sits at the lowest point of „O‟ street. The stree t drains down to the Applicants‟ property, with neighbouring roads and streets also draining towards the property.  There is a large development to the right of the Applicants‟ property that also drains down to the front of the property. A neighbouring property at the rear of the Applicants‟ property has a ground level that is elevated approximately 1.2 metres above the ground level of the Applicants‟ property. Surface run-off water drains from that property into the Applicants‟ property. Storm water pipes t ake some of this run-off to other storm water drains within the Applicants‟ property.  At the front of the property and across the road is a large reserve with a large storm water drain located in it. This storm water drain would be no more than 50 metres f rom the front of the Applicants‟ home. Water from the surrounding area roads and in particular an elevated road-way KA Terrace drain through to the reserve through to this drain.  On the day of the inundation, it had rained heavily. The land surrounding the property was saturated and there was considerable run-off generated.  At approximately 2pm water was pooling at the front of the property and rose rapidly by 6pm when the ground level of the property was inundated.  The male Applicant confirmed he observed water flowing from a storm water drain on his property that sits behind the home office which is located on the ground floor. The water in this drain would have been water that had built up from the storm water run-off from the property at the rear of th e Applicants‟ property. This drain would have overflowed when it could not release into the street at the front of the Applicants‟ property. The male Applicant confirmed that at 2pm water was pooling at the front of his property which would suggest that this drain would not have been able to drain down to that level by 2pm.  A number of issues have been raised by the Applicants and these will be considered separately within this Determination. Clearly inform in respect to a) Flood exclusion b) Limitations placed upon cover available under Flash flooding 54. The Applicants maintain that the FSP has failed in its obligations under Section 35 of the Act, to clearly inform them of the exclusion and limitation of its liability relied upon under the provisions of the policy. Case No: 242400 Determination Page 9 of 15 55. These provisions included within the policy limit the FSP‟s liability in respect to loss or damage arising from flood and flash flooding and therefore gave rise to the FSP‟s obligation to clearly inform the Applicants of these provisions. The Appl icants do not accept that the FSP‟s responsibility to clearly inform them of such deviations from the standard cover is fulfilled by merely providing them with the PDS and policy documentation. 56. The FSP maintains that the terms of the policy are clear and unambiguous. As such it clearly notified the Applicants of the exclusion from cover for loss or damage arising from flood and of the cap applied to loss arising from flash flooding. 57. The Panel acknowledges the Applicants‟ concerns in this respect, however notes Section 69(2) of the Act also provides that if it was not reasonably practicable for the information to be so given orally or in writing at inception of the policy, the information shall be deemed to have been given if it is provided in writing within 14 days from the day on which the contract was entered into. 58. It has been established in Max Hams & 1 Ors v CGU Insurance Limited [2002] NSWSC 273, by the Supreme Court of New South Wales, that in most circumstances, the provision of a policy document in and of itself satisfies the requirement to clearly inform under Section 35 of the Act. The decision recognised that there may be special circumstances in which the complexity of or confusions within a document mean that more than the mere provision of the policy document is required. 59. The Panel has discussed in other determinations the need to look at the whole inception process when determining whether the FSP has met the requirement to clearly inform pursuant to section 35 of the Act. In looking at this it is necessary to look at any discussions that took place during the inception of the policy and whether there was any discussion about the flood exclusion and if so what as well as any advertising that may have occurred around the policy, other discussions that may have taken place and the provision of the policy wording. 60. In terms of the inception process, the Panel notes that the Applicants had been dealing with the FSP at the time of taking up both their mortgage and insurance policy. The Applicants do not dispute that they had received policy documentation since that time and had the opportunity to read the policy. In the absence of evidence to establish the Applicants had been verbally misinformed about the level of cover, the Panel is not satisfied the Applicants were misled as to the nature of the flood exclusion or policy wording on inception or renewal of the policy. 61. It is well settled that the onus is on the insured to read and understand the policy documents in order to determine whether the policy meets his or her needs. Thus, considering the policy of insurance was established in 1994, the Applicants essentially had over 15 years to inform themselves of the content and or limitations of the policy. There is no dispute that the Applicants were provided with the relevant policy documentation and PDS over the years they remained customers of the FSP. Case No: 242400 Determination Page 10 of 15 62. The real question is whether the policy wording is clear and unambiguous. The Panel has had the opportunity of reviewing the policy closely. The PDS was issued on 8 May 2007. The first page of the document includes a detailed index and within that index reference is made as follows: 14 Glossary of words with special meaning 18 The policy doesn‟t cover everything 18 General Exclusions apply to the overall policy 20 Unless you have selected and paid for the cover 21 Events you are covered for….. 22 Flash flooding …. 22 Storm. 63. Within the glossary of words with special meaning, the words “flash flooding”, “flood” and “storm” are defined. 64. At page 18 of the policy under general exclusions, the policy clearly identifies that flood is excluded unless it is “flash flooding”. At page 22 of the policy, the policy explains that the policyholder is covered for “flash flooding” as defined at page 16. Under this provision for “flash flooding” the maximum amount or limitations on the extent of flash flooding are set out. Similar explanation is provided for storm, although there are no limitations. 65. As the Panel has indicated, it is well settled law that an insured bears the onus of reading the policy documentation that is provided to him or her. It is accepted that a fair reading of the policy requires the policy to be spelt out in clear and unambiguous language and in a manner in which a person of average intelligence and education is likely to have little difficulty in finding and understanding if that person reads the policy in q uestion. After examining the policy the Panel is satisfied that a person of average intelligence after reading the policy would understand that the policy excluded cover for flood but provided limited or capped cover for flash flooding and unlimited cover for storm. The Panel is also satisfied that a person of average intelligence in the circumstances would on reading the wording understand the distinction between flood, flash flood and storm. Loss or damage arising from “Flood or Flash flooding” WP’s Hydr ology Report 66. The FSP appointed WP to submit a hydrology report in relation to the cause and resultant water damage to the insured home. WP attended the insured address on 14 April 2011 and after completing its investigation into the loss it submitted its report to the FSP. 67. The Panel has reviewed WP‟s report and notes that it states: :  The report summarises the meteorology conditions, rainfall and river responses within the Brisbane River catchment due to the January 2011 Case No: 242400 Determination Page 11 of 15 South East Queensland weather event. It also provides an interpretation of areas inundated according to the Storm versus Flood Categorisation System and available flood data.  Flooding of the Brisbane River and Bremer River occurred over the period between 11-12 January 2011, leading to inundation of low lying areas of Ipswich and Brisbane.  Moderate intensity rainfall was experienced across the region with the greatest concentration centred around the coastal sections of Brisbane and Caboolture River catchments.  Rainfall intensity and its regional recurrence interval are most significantly linked to the generation of run-off. In other words, the run-off derived from rainfall is dependent on how “usual” or “unusual” the rainfall intensity was for a given catchment.  The peak rainfall Average Recurrence Interval (ARI) for lower Brisbane catchment was between one and two years, which is not particularly unusual. Therefore the upper catchment rainfall would have been the primary cause of overflows of large sized streams in this region such as Brisbane River.  The Applicants‟ property is located in the Brisbane suburb of Yeronga, about five kilometres southwest of the CBD. The property is a two storey residential dwelling and is located about 200 metres from the Brisbane River.  The property has a ground elevation of approximately 5 m AHD. Brisbane City Council‟s (BCC) Flood wise property report further identifies that ground levels at the property range between 4.4 and 6.7 m AHD.  A small local depression with ground levels of about 4 M AHD is located to the immediate south (front) of the property. The 1:25,000 scale topographic map for the area also identifies a watercourse running in a general westerly direction through this area.  Based on river level information obtained from the Brisbane City gauge (downstream of the property) and the gauge at the mouth of Oxley Creek (upstream of the property), WP considers it appropriate to interpolate between the river level information to determine water levels in the vicinity of the property.  The river level information indicates that levels in the Brisbane River were affected by catchment inflows as early as 9 January 2011, with a gradual but steady rise in levels until about 06.00am on 11 January 2011.  From this point on both gauges showed a steeper rise in flood levels with eventual peaks of about 9.3 meters at around 12.00am on 13 January 2011, at the mouth of Oxley Creek and about 4.4 meters at around 3.00pm on 13 January 2011 at the City gauge.  The Applicant reported that the street was affected by water at 3.00pm on 11 January 2011. Flooding of the property commenced about 6.30pm on 11 January 2011, with floodwater peaking at 1.2 meters over the first floor. Case No: 242400 Determination Page 12 of 15 This equates to a peak flood level of about 4.0 meters above ground level (estimated ground level 5.5 m AHD).  The local storm water catchment covers an area of 25 hectares. The response times for such small catchments would be expected to be less than an hour.  Taking the worst case scenario approach and supposing that all the run- off from the catchment flowed directly into the 1 hectare low lying area south of the property, the maximum depth of ponding that could have occurred is about 0.9 meters.  As the low lying area has ground levels of 4 m AHD and the floor level of the property is estimated at about 5.5 m AHD, local run-off could not have made a contribution to the inundation. As such the inundation of the property can be attributed to flows from Brisbane River.  The interval between the two high intensity rainfall periods (10/1/2011 – 11/1/2011) is less than the response time of the river at the site. As such the entirety of the rainfall commencing at 10.00am on 9 January 2011 would have contributed to the ultimate river levels.  It is WP‟s opinion that the Applicants‟ property in Yeronga was inundated by flood water escaping from the normal confines of Brisbane River. Further, the rainfall that contributed to the flooding of Brisbane River and subsequent inundation of the property started more than 24 hours prior to inundation. ICA Hydrology Report 68. The I CA hydrology report entitled “FLOODING IN THE BRISBANE RIVER CATCHMENT JANUARY 2011 VOLUME 2 FLOODING IN BRISBANE CITY LGA” contains the following information:  there were three generally distinct and significant rainfall periods between 9 – 11 January 2011 across the Brisbane City Local Government Area (Brisbane LGA). The first event occurred over the period from around 9:00am to 9:00pm on Sunday, 9 January 2011. The second event occurred from around 6:00am to 10:00am on Monday, 10 January 2011. The third event occurred from 6:00am to 4:00pm on Tuesday, 11 January 2011. (see 7.2.3)  the most significant rainfall across the Brisbane LGA occurred from approximately 6:00am to 4:00pm on 11 January 2011; (see 9.1)  after about 6:00pm on 11 January 2011, there was little or no rainfall across the Brisbane LGA; (see 9.1)  the Brisbane River water levels through the city peaked about 24-30 hours after rainfall had ceased, that is, from the late hours of Wednesday, 12 January 2011 to the early hours of Thursday, 13 January 2011; (see 9.1)  any area that was inundated after 6:00pm on 11 January 2011 will have been water flow inundation from the Brisbane River and its tributary creeks. The inundation along the tributaries was associated with Case No: 242400 Determination Page 13 of 15 backwater flooding from the Brisbane River, which in turn was principally caused by the dam release flood from the Wivenhoe Dam; (see Summary of Findings)  overland flow inundation is generally associated with intense rainfalls of short duration. In general, such rainfalls did not occur across the Brisbane City LGA in January 2011. It is expected that overland flow inundation would generally not have occurred in the Brisbane City LGA; (see 9.2)  uncertainties exist on whether properties flooded by water flows also suffered initial inundation from overland flow flooding. Investigation of local factors such as local topography and the area and characteristics of overland flow, hydrologic/hydraulic modelling of the storm event and local stormwater drainage system is required to resolve this issue. (see 9.5) 69. The Panel notes the Applicants maintain that on arriving home during the afternoon of the 11 January 2011, they noticed pooling of water to the front of the property where a storm water drain is located. Also witnessed, and the Panel notes this is not in dispute, is the fact that the property inundation began at approximately 6.00 to 6.30pm on 11 January 2011. From this it may be inferred inundation began prior to the breaking of the banks of Brisbane River. 70. The Panel notes the Applican ts‟ comments the water pooling at the front of the property around 2pm and of the water overflowing the storm water drain behind the home study at the property. The Panel accepts the Applicants were unable to say at what time water first entered the home study but accepts that an amount of water would have entered the home study area of the property prior to 6 to 6.30pm and prior to the inundation of the property from the waters entering via the front of the property. 71. The policy covers loss or damage arising from flash flooding. In order for a claim to fall under the insured event of flash flooding the following elements must be established:  The overflow of any lake, river, stormwater channel, canal or any other watercourse (whether natural, altered or manmade);  Caused by a storm;  The flooding occurs within 24 consecutive hours of the storm having commenced. 72. The ICA Hydrology Report states that there were three generally distinct and significant rainfall periods between 9 – 11 January 2011 across the Brisbane LGA:  The first event occurred over the period from around 9:00am to 9:00pm on 9 January 2011.  The second event occurred from around 6:00am to 10:00am on 10 January 2011.  The third event occurred from 6:00am to 4:00pm on 11 January 2011. (Emphasis added that the most significant event in terms of rainfall across the Brisbane LGA occurred during the third event). Case No: 242400 Determination Page 14 of 15 73. In the Panel‟s opinion, the significant rainfall that occurre d between 6:00am to 4:00pm on 11 January 2011 is a distinct and independent storm/rainfall event that is separate from the two other independent events which occurred on the 9 and 10 January 2011. 74. Since the water inundation in the insured property occurred in the early evening of 11 January 2011, the Panel is satisfied that the overflow that inundated the property followed the storm event which occurred on 11 January 2011 and as such, this falls within the consecutive 24 hour period required under the polic y. 75. Therefore, it is the Panel‟s view that the Applicant is entitled to be indemnified under the insured event of flash flood. 76. The information exchanged confirms the peak height of inundation to the property was 1-2 metres above the first floor. 77. The information does not establish the time that this level was reached. 78. Accepting that the policy provides “flash flood” cover for flooding that occurs within 24 consecutive hours of the storm and accepting the relevant storm commenced at 6.00am on 11 January 2011, then the policy would extend to cover the loss for inundation to 6.00am on 12 January 2011 under flash flooding. 79. The Panel accepts some stormwater run-off inundation occurred between 2.00pm and 6.00pm on 11 January 2011 but the significant inundation occ urred from 6.00pm on 11 January 2011 as flash flooding. 80. Although it is acknowledged that the peak flood level identified in the hydrology report is at midnight 13 January 2011, that does not identify the peak level of inundation of the Applicants‟ propert y. The Panel notes flood waters were receding in the Applicants‟ area by at least during Thursday 13 January 2011. 81. In the absence of any persuasive evidence to the contrary, the Panel is satisfied the majority of inundation and damage to the Applicants‟ pr operty should be attributed to the flash flooding that commenced at approximately 6.00pm on 11 January 2011 Determination 82. On the basis of the available information the Panel determines that the FSP is liable under the policy to provide indemnity to the Applicants for loss arising under the insured event flash flooding, in line with the provisions of the policy. 83. The FSP‟s liability under the policy is limited to 15% of the nominated building sum insured and 25% of the contents sum insured for loss or damage arising from the insured event and limited to the lower level of the insured property only. Case No: 242400 Determination Page 15 of 15 84. The FSP is to pay interest to the Applicants‟ at the statutory rate from 1 March 2011 (date of claim denial) to the date of final settlement of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.