Denial of flood water damage claim: whether loss fell within flash flood cover and its cap
Text of the determination
Case No: 242400 Determination Page 1 of 15
Case number: 242400
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim – Flood – Section 35 and 69(2) of the Insurance Contracts Act
1984
22 November 2011
Background
1. The Applicants held a home insurance policy with the Financial Services
Provider (FSP) covering their home and contents. The policy was renewed in
September 2010 and insured the building for the sum of $833,711 and contents
for the sum of $346,321 for specified insured events.
2. During a period of several days from 9 January 2011, heavy rain and floods in
the local Queensland area caused the water inundation of the Applicants‟
home. The Applicants lodged a claim for the damage under the policy.
3. The FSP declined the claim on the basis that the policy under its general
exclusion excluded cover for flood unless the inundation was due to flash
flooding. The FSP determined based on the hydrologist information that the
property was flooded. Further, the FSP determi ned that the inundation was not
due to flash flooding as the storm that produced the flooding of the area
commenced at 10am on Sunday 9 January 2011 and the property was not
flooded until 38 hours after the start of rainfall in the upper catchment area. The
FSP maintains it was only liable in the event of flash flooding occurring within
24 consecutive hours of the storm having commenced.
4. The Applicants dispute the FSP‟s decision to decline the claim and are seeking
full indemnity for their loss under the policy.
Summary of Applicants ’ Position
5. The Applicants in disputing the FSP‟s decision have sought legal
representation from “L”. For the purpose of this determination both the
Applicants and L will be referred to as “the Applicants”.
6. The Applicants maintain that at the time of purchasing the insured property
through “C” in 1994, it was their understanding that the insurance cover was a
package deal combined with the mortgage. In other words, they formed the
impression that if they wished to take out the mortgage through C, they were
required to take out insurance with the FSP (C‟s preferred insurer).
Determination
Case No: 242400 Determination Page 2 of 15
7. The Applicants do not recall any particular discussion regarding the terms and
conditions of the policy at the time of taking out the mortgage. It was more a
ca se of when signing up for the mortgage, the instructions were “ here is the
insurance, sign here ”.
8. The Applicants formed the impression that their mortgagee, who clearly has a
significant stake in the protection of the policy, would not recommend or
encourage taking out inadequate insurance cover. Given the location and close
proximity of the property to the Brisbane River, a prudent mortgagee would
ensure that appropriate cover, which would include insurance against water
inundation by whatever means i.e. Flood cover.
9. The Applicants attention was never drawn to the fact that the policy restricts
the FSP‟s liability to “Flash flood” only. Had this been brought to their attention,
they would have immediately sought a policy which did offer adequate
protection.
10. In the Applicants‟ view C acted as an agent for the FSP and as such the FSP is
obliged to accept liability for its agents silence on the lack of cover for flood.
11. The Insurance Contract Act 1984 (the Act) reiterates the common law duty
upon an insurer to act with respect to any matter arising under or in relation to
the insurance contract with utmost good faith.
12. There is a specific obligation under the Act to clearly inform an insured in
writing where the effect of a provision would be that the FSP would be under no
liability in respect of a claim arising from a certain event.
13. “Flood” is a prescribed event for the purpose of Section 35 of the Act as
defined in the Insurance Contract Regulations 1985 (the Regulations). If the
FSP seeks to exclude this event under the policy, it has a duty to clearly inform
the Applicants of such an exclusion. This obligation is also supported under the
Corporations Act 2001, in that there must be “clear, concise and effective”
disclosure.
14. In the Applicants‟ view, although there may be legitimate cause to exclude flood
cover, the mere delivery of policy documents and the Product Disclosure
Statement (PDS) does not constitute clearly informing the Applicants in writing.
15. Therefore, the Applicants remain dissatisfied with the FSP‟s position; namely
that the relevant policy clearly sets out an exclusion for flood cover or that this
was clearly brought to the Applicants‟ attention as required under the Act.
16. The Applicants argue, given the two very similar and overlapping definitions for
“Flood” and “Flash flood” under the policy, it is likely to cause confusion for a
consumer in relation to what is or is not covered.
17. Therefore, having regard for the Act and the Regulations, the Applicants
maintain that the FSP cannot rely upon the policy provisions to deny or reduce
liability. The policy should be read as a “Standard Cover Policy”, which includes
cover for loss or damage arising from flood.
Case No: 242400 Determination Page 3 of 15
18. The Applicants in referring to the site specific hydrology report submitted by
“WP” and rel ied upon by the FSP note that this report concludes that water
damage to the insured property was the result of flood and not flash flood.
19. The Applicants note the following policy definitions:
“ Flash flooding
The overflow of any lake, river, creek, storm water channel, canal or any other
watercourse (whether natural, altered or man made), caused by a storm, where
the flooding occurs within 24 consecutive hours of the storm having commenced.
…
Flood
The inundation of normally dry land by water which has overflowed, escaped or
been released from a lake, river, creek, storm water channel, canal or any other
watercourse whether natural, altered or man made.
Unless the damage is caused by flash flooding, this policy does not cover flood.
…
Storm
A violent wind (including cyclones) sometimes combined with thunder,
heavy falls of rain, hail or snow; or
Thunderstorms or hailstorms, sometimes accompanied by heavy falls of
rain or snow.
It is not persistent bad weather or heavy or persistent rain by itself.”
20. The Applicants maintain that:
There is a drain located directly opposite their property, which was
brought to the attention of WP.
On arriving home in the afternoon of 11 January 2011, the Applicants
noticed water rising from the drain and there was water pooled outside
the front of the property (it is a natural basin for surrounding areas).
The WP report concludes that “rainfall” contributed to the flooding of
Brisbane River and that this rainfall started more than 24 hours prior to
the inundation of their property.
However, the definition of flash flooding refers to flooding occurring
within 24 consecutive hours of the storm having commenced. As such it
is not a question of commencement of rainfall rather is commencement
of the storm or storms within this period.
21. The Applicants argue that there is no doubt, taking into consideration
information released by the Bureau of Meteorology (BoM), that there were a
number of distinct weather events that occurred in the Brisbane Area during the
period of 9 January 2011 to 12 January 2011.
Case No: 242400 Determination Page 4 of 15
22. Additionally, it is clear from the information released by BoM and the
Applicants‟ recollection of events, that the property was inundated by water
within 24 hours of the storm. Therefore, the loss falls within the cover available
under the insured event “flash flood”. In the alternate, the Applicants submit that
the damage occurred as a result of “storm”.
23. The Applicants note a cap placed on the FSP‟s liability under the policy in
respect to loss or damage arising from flash flooding. The FSP has a duty to
clearly inform the consumer of the cap applied to such a loss.
24. While the definition of flash flooding is provided at page 16 of the PDS, there is
absolutely no mention of the cap. It is not until page 22 that the percentage cap
is mentioned. It is the only (emphasis added) insured event subject to such a
cap under the policy.
25. The Applicants maintain that after reading the policy it would only be
reasonable for a consumer to form the opinion that they are fully covered for
loss or damage arising from flash flooding. Hiding a cap on claims many pages
after the definition of an insured event does not comply with the obligation
placed upon the FSP under the Act.
26. The cap is equivalent to an exclusion and as such should have at the very least
been referred to with the definition on page 16 of the PDS.
27. The Applicants believe that it is misleading to refer to flash flooding as an
insured event, only to also significantly cap (limit) the FSP‟s liability in respect
to a claim. The FSP has not adequately brought such restriction to the
Applicants‟ attention within the meaning of Section 35 of the Act. Therefore, it is
not entitled to rely upon such a provision to limit its liability under the claim.
28. In the instance that the FSP accepts the Applicants‟ loss was due to flash
flooding, it is then obliged to cover the Applicants for the full extent of their loss
as opposed to being allowed to limit its liability under the cap.
29. The term “persistent bad weather”, included within the definition of storm is
undefined and ambiguous. The Applicants believe that more than just provision
of the PDS is required to satisfy the FSP‟s obligation to clearly inform under the
Act.
30. The WP report does not explain its own definition of flood. It also relies upon
rainfall data on its own to determine when the storm commenced. The
Insurance Council of Australia (ICA) hydrology report states there were three
weather events that affected Brisbane between 9 January 2011 and 12 January
2011. The third and most significant occurring on 11 January 2011.
31. It is clear that a thunderstorm commenced on 11 January 2011, when
compared to the other weather events. The storm causing the overflow of
Brisbane River and subsequent damage commenced on 11 January 2011, with
water entering the property that evening. The inundation therefore occurred
within 24 consecutive hours of the commencement of the storm.
Case No: 242400 Determination Page 5 of 15
32. This event meets the definition of flash flooding under the policy and as such
the Applicants are covered for their loss.
Summary of FSP’s Pos ition
33. On 13 January 2011, the Applicants contacted the FSP and lodged a claim
under the policy. The loss description recorded states:
“Home has been flooded – Brisbane Area. Staying with family – No access to
property at present – All surrounding property damaged. Unsure extent of
damage as unable to gain access.”
34. The insured property was assessed on 22 January 2011 and the loss was
estimated to be in the vicinity of $250,000 (building damage) and $90,000
(contents damage).
35. A hydrology report (WP) was obtai ned and this concluded that the insured
property was flooded on the 11 January 2011. The claim was declined on the
basis that the loss arose due to flood, which is not an event insured under the
policy.
36. The Applicants received $136,000 from C‟s Compassiona te Assistance Fund
on 3 March 2011.
37. The PDS in place at the time of loss has details of what is covered under the
policy. Also, under the heading “General Exclusions”, it states:
“We will not cover loss, damage or legal liability caused by:
Flood unless i t is flash flooding”.
38. The hydrologist (WP) attended the insured property and met with the male
Applicant. WP was advised that the flooding of the property started at about
6.30pm on 11 January 2011.
39. The evidence compiled by the hydrologist contradicts the Applicants‟ opinion
that the property was damaged by flash flooding due to the inundation
occurring within 24 hours of the commencement of the storm.
40. Based on the rainfall gauges in close proximity of the insured property, the start
of the storm was 10.00am on 9 January 2011. After that time there were two
high rainfall intensity periods on 10 January 2011 and 11 January 2011.
However, as the interval between these periods is less than the „response time‟
of the river, the total rainfall started with the storm that commenced on 9
January 2011. This is also the date of storm the hydrologist maintains caused
the river levels to start to rise.
41. As the inundation of the property started at 6.30pm on 11 January 2011, this
falls outside the 24 hour period after the commencement of the storm on 9
January 2011, and as such does not fall within cover provided for flash flooding.
Case No: 242400 Determination Page 6 of 15
42. The Applicants do not dispute having received the PDS and other policy
documentation from the FSP, only that the “simple delivery” of these
documents does not satisfy Section 35(2) of the Act.
43. The FSP maintains by providing the Applicants with the policy documents and
PDS, it has fulfilled its obligations under the Act. In support of its position in this
regard the FSP refers to the New South Wales (NSW) Supreme Court decision
of Hams v CGU Insurance (2002) .
44. In response to the Applicants‟ opinion regarding C‟s obligations, the FSP
maintains that there is no obligation on a mortgagee to provide advice on the
nature and extent of insurance for a property. It is simply not possible for a
mortgagee to offer insurance by taking into account every conceivable future
insurable event on a consumer‟s policy.
45. It is not the mortgagee‟s obligation to „recommend or encourage‟ insurance
based upon the location of a property. There is an obligation on the Applicant to
read the policy and be aware of what is or is not covered and whether this suits
their needs.
46. The FSP relies on the following policy provisions:
“ Page 16 of the Product Disclosure Statement (PDS)
Glossary of words with special meaning
flash flooding The overflow of any lake, river, creek, stormwater channel, canal or
any other watercourse (whether natural, altered or man made),
caused by a storm, where the flooding occurs within 24 consecutive
hours of the storm having commenced.
flood The inundation of normally dry land by water which has overflowed,
escaped or been released from a lake, river, creek, storm water
channel, canal or any other watercourse, whether natural, altered or
man made.
Unless the damage is caused by flash flooding, this policy does not
cover flood.
…
Page 18 of the PDS
The policy doesn’t cover everything
General exclusions – apply to the overall policy
Unless included in additional cover, we will not cover loss, damage or legal liability
caused by:
flood unless it is flash flooding...
…
Page 22 of the PDS
Events you are covered for
Flash flooding
You are covered for flash flooding as defined on page 16.
Case No: 242400 Determination Page 7 of 15
...
The maximum amount we will pay is limited to:
15% of the nominated sum insured, where the building is insured by this policy;
and
25% of the contents sum insured, where contents are insured by this policy.”
Issues
47. Whether the inundation and subsequent loss and damage to the property falls
within the cover provided under policy for the insured event “Flash flooding”.
48. Whether the policy clearly establishes the difference between the insured
events of “Flood” and “Flash flooding” as well as any limits in respect the FSP‟s
liability under these insured events.
Relevant Law
Section 35 of the Act provides that, where a claim is made under a prescribed contract
and the event giving rise to the claim is a prescribed event in relation to the contract,
an insurer may not refuse to pay an amount equal to the minimum amount of cover set
out in the regulations made pursuant to the Act unless it can prove that before the
contract was entered into, the insurer clearly informed the insured in writing of the
relevant provisions of the contract, or that the insured knew or a reasonable person in
the circumstances could be expected to have known of such provision.
Section 69 provides that section 22 will be deemed to have been complied with if it is
not reasonably practicable to give the information in writing before the contract is
entered into but it is reasonably practical to give the information orally. If the insurer
gives the information orally, the insurer is deemed to have complied with section 22 if
the information is given in writing within 14 days after the contract of insurance
(including an interim contract) has been entered into. Provided the oral information is
confirmed in writing within 14 days, compliance with section 22 will be established.
Where a loss occurs after the contract was entered into but before written confirmation
of the duty of disclosure has been provided, the insurer will only be able to avail itself
of the remedies set out in Section 28, if it can prove that the information was given
orally.
Reasons for Decision
49. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
50. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
Case No: 242400 Determination Page 8 of 15
51. There has been a full exchange of material between the parties and each party
has had the opportunity to respond to the issues raised.
52. In view of the issues raised and the material exchanged, the Panel Chair
conducted a site visit of the Applicants‟ property on 21 October 2011. Whilst t he
Applicants were present, the FSP declined the opportunity to attend.
53. It is relevant to report the particulars of the site visit for the purpose of this
Determination as follows:
The Applicants‟ property sits at the lowest point of „O‟ street. The stree t
drains down to the Applicants‟ property, with neighbouring roads and
streets also draining towards the property.
There is a large development to the right of the Applicants‟ property that
also drains down to the front of the property. A neighbouring property at
the rear of the Applicants‟ property has a ground level that is elevated
approximately 1.2 metres above the ground level of the Applicants‟
property. Surface run-off water drains from that property into the
Applicants‟ property. Storm water pipes t ake some of this run-off to other
storm water drains within the Applicants‟ property.
At the front of the property and across the road is a large reserve with a
large storm water drain located in it. This storm water drain would be no
more than 50 metres f rom the front of the Applicants‟ home. Water from
the surrounding area roads and in particular an elevated road-way KA
Terrace drain through to the reserve through to this drain.
On the day of the inundation, it had rained heavily. The land surrounding
the property was saturated and there was considerable run-off generated.
At approximately 2pm water was pooling at the front of the property and
rose rapidly by 6pm when the ground level of the property was inundated.
The male Applicant confirmed he observed water flowing from a storm
water drain on his property that sits behind the home office which is
located on the ground floor. The water in this drain would have been water
that had built up from the storm water run-off from the property at the rear
of th e Applicants‟ property. This drain would have overflowed when it
could not release into the street at the front of the Applicants‟ property.
The male Applicant confirmed that at 2pm water was pooling at the front
of his property which would suggest that this drain would not have been
able to drain down to that level by 2pm.
A number of issues have been raised by the Applicants and these will be
considered separately within this Determination.
Clearly inform in respect to a) Flood exclusion b) Limitations placed upon
cover available under Flash flooding
54. The Applicants maintain that the FSP has failed in its obligations under Section
35 of the Act, to clearly inform them of the exclusion and limitation of its liability
relied upon under the provisions of the policy.
Case No: 242400 Determination Page 9 of 15
55. These provisions included within the policy limit the FSP‟s liability in respect to
loss or damage arising from flood and flash flooding and therefore gave rise to
the FSP‟s obligation to clearly inform the Applicants of these provisions. The
Appl icants do not accept that the FSP‟s responsibility to clearly inform them of
such deviations from the standard cover is fulfilled by merely providing them
with the PDS and policy documentation.
56. The FSP maintains that the terms of the policy are clear and unambiguous. As
such it clearly notified the Applicants of the exclusion from cover for loss or
damage arising from flood and of the cap applied to loss arising from flash
flooding.
57. The Panel acknowledges the Applicants‟ concerns in this respect, however
notes Section 69(2) of the Act also provides that if it was not reasonably
practicable for the information to be so given orally or in writing at inception of
the policy, the information shall be deemed to have been given if it is provided
in writing within 14 days from the day on which the contract was entered into.
58. It has been established in Max Hams & 1 Ors v CGU Insurance Limited [2002]
NSWSC 273, by the Supreme Court of New South Wales, that in most
circumstances, the provision of a policy document in and of itself satisfies the
requirement to clearly inform under Section 35 of the Act. The decision
recognised that there may be special circumstances in which the complexity of
or confusions within a document mean that more than the mere provision of the
policy document is required.
59. The Panel has discussed in other determinations the need to look at the whole
inception process when determining whether the FSP has met the requirement
to clearly inform pursuant to section 35 of the Act. In looking at this it is
necessary to look at any discussions that took place during the inception of the
policy and whether there was any discussion about the flood exclusion and if so
what as well as any advertising that may have occurred around the policy, other
discussions that may have taken place and the provision of the policy wording.
60. In terms of the inception process, the Panel notes that the Applicants had been
dealing with the FSP at the time of taking up both their mortgage and insurance
policy. The Applicants do not dispute that they had received policy
documentation since that time and had the opportunity to read the policy. In the
absence of evidence to establish the Applicants had been verbally misinformed
about the level of cover, the Panel is not satisfied the Applicants were misled as
to the nature of the flood exclusion or policy wording on inception or renewal of
the policy.
61. It is well settled that the onus is on the insured to read and understand the
policy documents in order to determine whether the policy meets his or her
needs. Thus, considering the policy of insurance was established in 1994, the
Applicants essentially had over 15 years to inform themselves of the content
and or limitations of the policy. There is no dispute that the Applicants were
provided with the relevant policy documentation and PDS over the years they
remained customers of the FSP.
Case No: 242400 Determination Page 10 of 15
62. The real question is whether the policy wording is clear and unambiguous. The
Panel has had the opportunity of reviewing the policy closely. The PDS was
issued on 8 May 2007. The first page of the document includes a detailed index
and within that index reference is made as follows:
14 Glossary of words with special meaning
18 The policy doesn‟t cover everything
18 General Exclusions apply to the overall policy
20 Unless you have selected and paid for the cover
21 Events you are covered for…..
22 Flash flooding ….
22 Storm.
63. Within the glossary of words with special meaning, the words “flash flooding”,
“flood” and “storm” are defined.
64. At page 18 of the policy under general exclusions, the policy clearly identifies
that flood is excluded unless it is “flash flooding”. At page 22 of the policy, the
policy explains that the policyholder is covered for “flash flooding” as defined at
page 16. Under this provision for “flash flooding” the maximum amount or
limitations on the extent of flash flooding are set out. Similar explanation is
provided for storm, although there are no limitations.
65. As the Panel has indicated, it is well settled law that an insured bears the onus
of reading the policy documentation that is provided to him or her. It is accepted
that a fair reading of the policy requires the policy to be spelt out in clear and
unambiguous language and in a manner in which a person of average
intelligence and education is likely to have little difficulty in finding and
understanding if that person reads the policy in q uestion. After examining the
policy the Panel is satisfied that a person of average intelligence after reading
the policy would understand that the policy excluded cover for flood but
provided limited or capped cover for flash flooding and unlimited cover for
storm. The Panel is also satisfied that a person of average intelligence in the
circumstances would on reading the wording understand the distinction
between flood, flash flood and storm.
Loss or damage arising from “Flood or Flash flooding”
WP’s Hydr ology Report
66. The FSP appointed WP to submit a hydrology report in relation to the cause
and resultant water damage to the insured home. WP attended the insured
address on 14 April 2011 and after completing its investigation into the loss it
submitted its report to the FSP.
67. The Panel has reviewed WP‟s report and notes that it states: :
The report summarises the meteorology conditions, rainfall and river
responses within the Brisbane River catchment due to the January 2011
Case No: 242400 Determination Page 11 of 15
South East Queensland weather event. It also provides an interpretation
of areas inundated according to the Storm versus Flood Categorisation
System and available flood data.
Flooding of the Brisbane River and Bremer River occurred over the period
between 11-12 January 2011, leading to inundation of low lying areas of
Ipswich and Brisbane.
Moderate intensity rainfall was experienced across the region with the
greatest concentration centred around the coastal sections of Brisbane
and Caboolture River catchments.
Rainfall intensity and its regional recurrence interval are most significantly
linked to the generation of run-off. In other words, the run-off derived from
rainfall is dependent on how “usual” or “unusual” the rainfall intensity was
for a given catchment.
The peak rainfall Average Recurrence Interval (ARI) for lower Brisbane
catchment was between one and two years, which is not particularly
unusual. Therefore the upper catchment rainfall would have been the
primary cause of overflows of large sized streams in this region such as
Brisbane River.
The Applicants‟ property is located in the Brisbane suburb of Yeronga,
about five kilometres southwest of the CBD. The property is a two storey
residential dwelling and is located about 200 metres from the Brisbane
River.
The property has a ground elevation of approximately 5 m AHD. Brisbane
City Council‟s (BCC) Flood wise property report further identifies that
ground levels at the property range between 4.4 and 6.7 m AHD.
A small local depression with ground levels of about 4 M AHD is located
to the immediate south (front) of the property. The 1:25,000 scale
topographic map for the area also identifies a watercourse running in a
general westerly direction through this area.
Based on river level information obtained from the Brisbane City gauge
(downstream of the property) and the gauge at the mouth of Oxley Creek
(upstream of the property), WP considers it appropriate to interpolate
between the river level information to determine water levels in the vicinity
of the property.
The river level information indicates that levels in the Brisbane River were
affected by catchment inflows as early as 9 January 2011, with a gradual
but steady rise in levels until about 06.00am on 11 January 2011.
From this point on both gauges showed a steeper rise in flood levels with
eventual peaks of about 9.3 meters at around 12.00am on 13 January
2011, at the mouth of Oxley Creek and about 4.4 meters at around
3.00pm on 13 January 2011 at the City gauge.
The Applicant reported that the street was affected by water at 3.00pm on
11 January 2011. Flooding of the property commenced about 6.30pm on
11 January 2011, with floodwater peaking at 1.2 meters over the first floor.
Case No: 242400 Determination Page 12 of 15
This equates to a peak flood level of about 4.0 meters above ground level
(estimated ground level 5.5 m AHD).
The local storm water catchment covers an area of 25 hectares. The
response times for such small catchments would be expected to be less
than an hour.
Taking the worst case scenario approach and supposing that all the run-
off from the catchment flowed directly into the 1 hectare low lying area
south of the property, the maximum depth of ponding that could have
occurred is about 0.9 meters.
As the low lying area has ground levels of 4 m AHD and the floor level of
the property is estimated at about 5.5 m AHD, local run-off could not have
made a contribution to the inundation. As such the inundation of the
property can be attributed to flows from Brisbane River.
The interval between the two high intensity rainfall periods (10/1/2011 –
11/1/2011) is less than the response time of the river at the site. As such
the entirety of the rainfall commencing at 10.00am on 9 January 2011
would have contributed to the ultimate river levels.
It is WP‟s opinion that the Applicants‟ property in Yeronga was inundated
by flood water escaping from the normal confines of Brisbane River.
Further, the rainfall that contributed to the flooding of Brisbane River and
subsequent inundation of the property started more than 24 hours prior to
inundation.
ICA Hydrology Report
68. The I CA hydrology report entitled “FLOODING IN THE BRISBANE RIVER
CATCHMENT JANUARY 2011 VOLUME 2 FLOODING IN BRISBANE CITY
LGA” contains the following information:
there were three generally distinct and significant rainfall periods between
9 – 11 January 2011 across the Brisbane City Local Government Area
(Brisbane LGA). The first event occurred over the period from around
9:00am to 9:00pm on Sunday, 9 January 2011. The second event
occurred from around 6:00am to 10:00am on Monday, 10 January 2011.
The third event occurred from 6:00am to 4:00pm on Tuesday, 11 January
2011. (see 7.2.3)
the most significant rainfall across the Brisbane LGA occurred from
approximately 6:00am to 4:00pm on 11 January 2011; (see 9.1)
after about 6:00pm on 11 January 2011, there was little or no rainfall
across the Brisbane LGA; (see 9.1)
the Brisbane River water levels through the city peaked about 24-30 hours
after rainfall had ceased, that is, from the late hours of Wednesday, 12
January 2011 to the early hours of Thursday, 13 January 2011; (see 9.1)
any area that was inundated after 6:00pm on 11 January 2011 will have
been water flow inundation from the Brisbane River and its tributary
creeks. The inundation along the tributaries was associated with
Case No: 242400 Determination Page 13 of 15
backwater flooding from the Brisbane River, which in turn was principally
caused by the dam release flood from the Wivenhoe Dam; (see Summary
of Findings)
overland flow inundation is generally associated with intense rainfalls of
short duration. In general, such rainfalls did not occur across the Brisbane
City LGA in January 2011. It is expected that overland flow inundation
would generally not have occurred in the Brisbane City LGA; (see 9.2)
uncertainties exist on whether properties flooded by water flows also
suffered initial inundation from overland flow flooding. Investigation of
local factors such as local topography and the area and characteristics of
overland flow, hydrologic/hydraulic modelling of the storm event and local
stormwater drainage system is required to resolve this issue. (see 9.5)
69. The Panel notes the Applicants maintain that on arriving home during the
afternoon of the 11 January 2011, they noticed pooling of water to the front of
the property where a storm water drain is located. Also witnessed, and the
Panel notes this is not in dispute, is the fact that the property inundation began
at approximately 6.00 to 6.30pm on 11 January 2011. From this it may be
inferred inundation began prior to the breaking of the banks of Brisbane River.
70. The Panel notes the Applican ts‟ comments the water pooling at the front of the
property around 2pm and of the water overflowing the storm water drain behind
the home study at the property. The Panel accepts the Applicants were unable
to say at what time water first entered the home study but accepts that an
amount of water would have entered the home study area of the property prior
to 6 to 6.30pm and prior to the inundation of the property from the waters
entering via the front of the property.
71. The policy covers loss or damage arising from flash flooding. In order for a
claim to fall under the insured event of flash flooding the following elements
must be established:
The overflow of any lake, river, stormwater channel, canal or any other
watercourse (whether natural, altered or manmade);
Caused by a storm;
The flooding occurs within 24 consecutive hours of the storm having
commenced.
72. The ICA Hydrology Report states that there were three generally distinct and
significant rainfall periods between 9 – 11 January 2011 across the Brisbane
LGA:
The first event occurred over the period from around 9:00am to 9:00pm on
9 January 2011.
The second event occurred from around 6:00am to 10:00am on 10
January 2011.
The third event occurred from 6:00am to 4:00pm on 11 January 2011.
(Emphasis added that the most significant event in terms of rainfall across
the Brisbane LGA occurred during the third event).
Case No: 242400 Determination Page 14 of 15
73. In the Panel‟s opinion, the significant rainfall that occurre d between 6:00am to
4:00pm on 11 January 2011 is a distinct and independent storm/rainfall event
that is separate from the two other independent events which occurred on the 9
and 10 January 2011.
74. Since the water inundation in the insured property occurred in the early evening
of 11 January 2011, the Panel is satisfied that the overflow that inundated the
property followed the storm event which occurred on 11 January 2011 and as
such, this falls within the consecutive 24 hour period required under the polic y.
75. Therefore, it is the Panel‟s view that the Applicant is entitled to be indemnified
under the insured event of flash flood.
76. The information exchanged confirms the peak height of inundation to the
property was 1-2 metres above the first floor.
77. The information does not establish the time that this level was reached.
78. Accepting that the policy provides “flash flood” cover for flooding that occurs
within 24 consecutive hours of the storm and accepting the relevant storm
commenced at 6.00am on 11 January 2011, then the policy would extend to
cover the loss for inundation to 6.00am on 12 January 2011 under flash
flooding.
79. The Panel accepts some stormwater run-off inundation occurred between
2.00pm and 6.00pm on 11 January 2011 but the significant inundation occ urred
from 6.00pm on 11 January 2011 as flash flooding.
80. Although it is acknowledged that the peak flood level identified in the hydrology
report is at midnight 13 January 2011, that does not identify the peak level of
inundation of the Applicants‟ propert y. The Panel notes flood waters were
receding in the Applicants‟ area by at least during Thursday 13 January 2011.
81. In the absence of any persuasive evidence to the contrary, the Panel is
satisfied the majority of inundation and damage to the Applicants‟ pr operty
should be attributed to the flash flooding that commenced at approximately
6.00pm on 11 January 2011
Determination
82. On the basis of the available information the Panel determines that the FSP is
liable under the policy to provide indemnity to the Applicants for loss arising
under the insured event flash flooding, in line with the provisions of the policy.
83. The FSP‟s liability under the policy is limited to 15% of the nominated building
sum insured and 25% of the contents sum insured for loss or damage arising
from the insured event and limited to the lower level of the insured property
only.
Case No: 242400 Determination Page 15 of 15
84. The FSP is to pay interest to the Applicants‟ at the statutory rate from 1 March
2011 (date of claim denial) to the date of final settlement of the claim.