Text of the determination
Case No: 242150 Determination Page 1 of 15
Case number: 242150
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Denial of claim (Flood)
3 September 2012
Background
1. The Applicant insured her home and contents with the Financial Services
Provider (FSP). The relevant period of insurance operated for twelve months
beginning from 18 November 2010. During this period, the building was
insured up to a sum of $215,000 and the contents for $70,000.
2. On 13 January 2011, the Applicant lodged a claim under the policy due to
extensive water inundation following severe weather events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicant, through her solicitors, has disputed this.
4. For the sake of simplicity, reference to the Applicant will include her legal
representatives.
5. Both the Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available has been
exchanged with the other party.
Summary of Applicant ’s position
6. The Applicant submits the following as alternative arguments in response to
the FSP’s decision:
a. The Applicant applied for and received confirmation in mid 2010 that
she was covered for flood. Accordingly, the FSP should honour this
acceptance despite stating there was no such record on its system.
Alternatively, the FSP should be bound by this representation.
b. The FSP’s policy failed to clearly inform her that “flood” was excluded
as required under Section 35 of the Insurance Contracts Act 1984 (the
Act).
c. The damage was due to “Flash flood and stormwater run - off”, which is
an insured event. In particular, the inundation was due to heavy rain
that fell from 4.00am on 11 January 2011 which resulted in the
Wivenhoe Dam operators elevating their strategy to W4. This decision
Determination
Case No: 242150 Determination Page 2 of 15
resulted in massive discharges of water into the Brisbane River that
ultimately inundated her property.
d. The FSP is unable to discharge its onus in establishing the loss was
caused by “flood”.
e. Her roof sustained damage from this event as water leaked into her
bedroom. This has never occurred previously and is therefore also
covered under the policy.
7. The Applicant seeks to be indemnified for her claim in addition to legal costs.
Summary of FSP’s position
8. In response to the Applicant ’ s arguments, the FSP submits the following:
a. There is no record that the Applicant ever applied for flood cover and/or
was accepted. In particular, it has provided a transcript of a
conversation she had with it on 10 January 2011 which contradicts her
evidence in this regard.
b. It has provided evidence from an appropriately qualified individual to
corroborate that a PDS was sent to the Applicant prior to the claim.
Further, the policy structure and layout in conjunction with this evidence
enables it to rely on the exclusion clause of “flood” pursuant to Section
35(2) of the Act.
c. The damage was not caused by “Flash flood and stormwater run - off”.
9. The FSP relies on a number of hydrology reports authored by SC and the
following policy provisions to deny the Applicant’s claim :
“ Words / terms with special meanings
Flood Rising water which enters your home as a result of
it running off or overflowing from any origin or
cause. This policy does not cover flood unless we
have agreed and it is shown on your certificate of
insurance.
Flash flood and
stormwater run-off
A sudden flood caused by heavy rain that fell no
more than 24 hours prior to the flash flood or
stormwater run-off.
…
Storm A violent disturbance of the atmosphere
associated with strong winds including a cyclone,
lightning, heavy rain, hail or snow, but not
continuous bad weather by itself.
…
Insured events you are covered for
Damage caused by weather …
Case No: 242150 Determination Page 3 of 15
What is
covered
What is not covered
Storm Loss or damage:
caused by rain, hail or snow after it has
reached the ground;
Flash flood and
stormwater run - off
A sudden flood caused
by heavy rain that fell no
more than 24 hours prior
to the flash flood or
stormwater run - off
Loss or damage caused:
by flood;
…
Your home
The most we will pay you for home claims
What is covered What is n ot covered
Flash flood and stormwater
run - off
We will pay up to 50% of your
home sum insured or $25,000
whichever is higher.
…
Your contents
The most we will pay you for contents claims
What is covered What is not covered
Flash flood and stormwater
run - off
We will pay up to 50% of your
contents sum insured or
$25,000 whichever is higher,
but not exceeding your contents
sum insured.
…”
Issues
10. Whether the Applicant is able to establish that she had applied for and was
covered for flood in 2010.
11. Whether the FSP clearly informed the Applicant, pursuant to Section 35 of
the Act, that she was not covered for flood.
Case No: 242150 Determination Page 4 of 15
12. Whether the FSP was entitled to deny the claim pursuant to the “flood”
exclusion or the lack of an insured event.
13. Whether the Applicant is entitled to legal costs.
Reasons for decision
14. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS’s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
15. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
16. It is appropriate to consider the issues under the various headings.
Application for flood
17. The Applicant’s evidence in this regard has been summarised by her
solicitors. In particular, she has alleged that:
In early to mid 2010, she contacted the FSP to change her car
insurance. In this conversation, she also requested flood coverage for
her home and contents insurance policy.
The consultant posted to her an application form and told her that the
cost of adding this optional cover would be included in her next bill. She
received the form, completed it and sent it back.
A few weeks later she received a letter from the FSP stating that her
application had been approved.
On 10 January 2011, in light of the news abo ut the flash flooding in
Toowoomba, she consulted her renewal notice and identified she was
not covered for flood. Based on this, she telephoned the FSP to query
her lack of cover.
The FSP responded to the Applicant’s query stating she was not
covered for flood according to its records. She responded by referring
to the letter she had received confirming she was covered in this
regard. The FSP asked her to send a copy of this letter, to which she
agreed.
The letter had been contained in a folder that included other
documents. Following her conversation with the FSP, she left this folder
on the floor of her home. During the events that occurred the next day,
she evacuated the property and unintentionally left the folder at home.
As a result of the inundation, the folder became wet.
Case No: 242150 Determination Page 5 of 15
On Thursday, 13 January 2011 an individual CR assisted the Applicant
in cleaning the house. CR saw the open folder lying on the ground to
dry. The Applicant showed CR the flood approval letter in the folder and
expressed her displeasure that the FSP had told her she was not
covered for flood despite this letter. CR recalls seeing this letter.
On Friday 14 January 2011, whilst she was cleaning her house, she
retrieved the folder and placed it on the pavers by her front door to dry
out. On Sunday 16 January 2011, after realising the folder was still
outside, she went to retrieve it and found it was no longer there. She
presumed a volunteer had disposed of it in the rubbish and the council
had picked up her rubbish by that stage.
18. The Applicant stated both she and CR were prepared to provide statutory
declarations corroborating the existence of the letter but have failed to do so.
Regardless, the Panel does not accept this would assist her case for the
reasons to follow.
19. The FSP conducte d a search of its records using the Applicant’s phone
numbers and located 6 calls. The dates of these calls were 28 February
2010, 6 October 2010, 25 October 2010 (twice), 2 November 2010 and 10
January 2011. Due to technical difficulties, it was only able to retrieve the
recordings for 28 February 2010 and 10 January 2011 and has provided
transcripts for those calls.
20. The first conversation on 28 February 2010 relates to the cover for the
insured property being incepted after the previous policy the Applicant had
with the FSP lapsed due to non-payment of the premium. The Panel notes
the following was discussed with respect to flood:
“FSP: No. Now this policy automatically covers flash flood and stormwater
run-off. If you would like a more comprehensive cover against flood
damage you will need to apply for this separately. Also, our standard
policy includes cover for glass breakage. Would you like to include our
advance cover option which covers you for accidental damage to
selected items and includes the motor burn out.
App: Nah.
…
FSP: … Alright. Now this building is sum insured for $200,000; the contents
are $65,000. Specifically listed items for $1,900. You have not elected
a higher flood cover, pet cover, advance cover or motor burn out. …”
21. The Panel accepts that the application for flood cover was not discussed in
this conversation although the FSP did inform the Applicant on at least two
occasions that she was not covered for flood. This therefore implies the flood
application was discussed in one of the subsequent conversations on 6
October, 25 October or 2 November 2010. The Panel notes these dates are
proximate to the renewal date of this policy.
22. However, the Panel considers the conversation on 10 January 2011 contains
significant inconsistent evid ence to the Applicant’s position that a flood
Case No: 242150 Determination Page 6 of 15
application was ever sent. In particular, the Panel considers the following
excerpts of this transcript to be relevant:
“FSP: Welcome to [FSP] line, this is [A], how can I help you?
App: Hi, I just want to make sure my house is insured for flood please.
…
FSP: Okay, if you don’t have flood cover at the moment, it’s not something
you can add on immediately anyway um
App: Well, I requested it when I first got it done.…
…
FSP: Okay, so this insurance has the standard flash flood and stormwater
runoff, not the additional flood cover, so depending on what it is that you’re
referring to, it depends on whether they would class it as a flash flood or
whether it comes under the additional flood cover as to whether they would
allow you to lodge a claim for that. If there was damages you would definitely
need to look at lodging a claim for consideration.
…
FSP: You are required to add the cover at new business or renewal only.
App: Well, I requested it [unintelligible]
FSP: Okay, so you received a flood application pack from us and you
filled it out and sent it back to us?
App: I didn’t receive one.
…
FSP: Yea, look like I said you can apply for the if there is something
App: Well, f***ing I applied for it when I bloody rang up about it, and
it’s my fault that someone is incompetent enough they don’t send
the thing!”
(Panel emphasis)
23. Upon being presented with the significant inconsistency evident in this
recording, the Applicant’s explanation was that she was in an extrem ely
distressed state when the call was made. As a result, she confused the
consultant’s reference to a flood pack to be an emergency kit that was to be
sent out to parties in preparation of any flood event.
24. The Panel considers this explanation is highly implausible for the following
reasons:
The subject of the whole conversation was clearly centred and isolated
to the flood cover. There is no discussion or any reference to an
emergency kit or any confusion that the FSP’s question about the flood
application pack was in reference to this.
In the second highlighted extract, the Applicant was clearly upset about
not being sent information she requested. The Panel considers it is
improbable she would be upset in the context of an emergency kit
Case No: 242150 Determination Page 7 of 15
given the subject of the conversation preceding this was still about the
flood cover.
25. At no point in the whole conversation does the Applicant ever mention, or
even infer, that she had received confirmation from the FSP she was
covered for flood by reference to a letter. Further, there is no reference
whatsoever to her promising to send the letter to the FSP to confirm this
application.
26. Based on the evidence as provided the Panel is not satisfied that the
Applicant has been able to establish on the balance of probabilities that she
had completed an application for flood. The Panel is satisfied given the
evidence provided by the FSP that no such application was made on
inception or after inception of the policy and is satisfied that the Applicant is
mistaken as to her belief with respect to this.
27. The Applicant has also argued that the policy fails to clearly inform as to the
derogation from flood cover and/or the limitations on the extent of cover for
flash flood. There is no dispute that the Applicant had received the policy
documentation and Certificate of Insurance.
28. It is established law that in order to satisfy the requirement to clearly inform,
the language of section 35 (2) allows for a proposed insured to be clearly
informed by providing the relevant documentation in writing and that the
relevant exclusion and/or limitation in this case is clear and unambiguous
and in a manner which a person of average intelligence and education is
likely to have little difficulty in finding and understanding if that person reads
the policy in question.
29. The Panel has reviewed the FSP’s policy on a number of occasions. The
policy is indexed with relevant sections covering the insured events. The
policy sets out the definitions of storm and flash flood and stormwater runoff.
The policy clearly indentifies that flood and storm surge is an optional cover
but otherwise flood is excluded from cover. The Certificate of Insurance also
clearly identifies that with respect to the Applicant’s policy flood and storm
surge is not covered. Having considered the Applicant’s submissions and the
FSP’s policy documents, the Panel is satisfied that the FSP has met its
obligations to clearly inform the Applicant of the extent of the exclusions and
limitations in accordance with the requirements of the Insurance Contracts
Act.
Roof Claim
30. The Applicant’s evidence regarding this damage is based on her version and
a couple of black and white photographs she has produced. According to the
Applicant, rainwater had come through the roof in her bedroom and caused
damage during the storms preceding the inundation. Further, the roof had
never leaked prior to the storm.
Case No: 242150 Determination Page 8 of 15
31. The two photographs were allegedly taken at the time of the event and show
mould on the ceiling. The Panel considers it is unusual for mould to form so
quickly after a leak. Instead, mould is more indicative of an ongoing issue.
32. Accordingly, the Panel considers the photographs are inconsistent with the
Applicant’s evidence that the roof had never leaked previously.
33. The Applicant has not provided any o ther evidence to support her
contention, such as photographs of the roof or any expert report. Given the
absence of this and the inconsistent photographic evidence, the Panel is not
inclined to accept that the Applicant has established the roof was damaged
as a result of the storms in January 2011.
34. Instead, the evidence of mould indicates an ongoing issue rather than a one-
off event. Accordingly, the Panel is not satisfied, on the balance of
probabilities, the Applicant has established that the FSP is liable for any of
the costs associated with this event.
Water Inundation
35. The Applicant has provided some evidence regarding her recollection of the
events on 11 January 2011. In particular:
She recalls it was windy and raining heavily on the day. At 5.30 am
when she woke up, the yard was ankle deep with water.
At approximately 8am, the house lost power and there was a lull in the
rain at 1.15pm. By this stage, she had begun to panic as the rainwater
in the yard had reached the path leading to her front door. She went for
a walk and saw that houses on N Street were under water and water
was gushing down the Brisbane Valley Highway.
She returned home and started packing personal items up high. She
recalls there was more rain in the afternoon.
At approximately 6.00pm, she drove along S Road (which is the road
her house is located on) and observed water that stretched along the
road for approximately five houses down the street.
At approximately 6.45pm, she sought refuge with her children at the
school along with a number of other Fernvale residents.
36. The FSP has provided a number of hydrology reports from SC. The latest
one was dated 24 July 2012 and this contains the hydrologist’s latest
conclusion regarding the likely method of inundation.
37. In summary, SC identified that the likely cause of the inundation was due to
the releases of water from the Wivenhoe Dam. In particular, in his report
dated 24 July 2012, he provided the following updated information regarding
the likely method of inundation to the Applicant’s pr operty due to the
elevated levels in the Brisbane River caused by these releases:
The water from the Brisbane River reached properties in Fernvale by
means of what is known as “breakout flow”. This is where high levels of
Case No: 242150 Determination Page 9 of 15
flow cause elevated river levels that caused the flow path of a river to
change (because the elevated river levels enable the river to cross
areas which would normally be dry).
This occurred in a particular area in Fernvale (between Titmarsh Circuit
and Poole Road) where the inundation of properties occurred due to
breakout flow travelling along a breakout flow path (a portion of which is
referred to as “Titmarsh Gully”).
This breakout flow path travels from the breakout point in the Brisbane
River and crossed the unnamed road between Brisbane Valley
Highway and P Road. This flow, running in a south-easterly direction
adjacent to Titmarsh Circuit then enters an open drainage channel
which flows under S Road, then P Road prior to entering Ferny Gully.
Ferny Gully enters the Brisbane River in the immediate vicinity of the
Savages Crossing gauge.
38. Although the Applicant has provided some evidence to dispute this, the
Panel intends to adopt and accept SC’s conclusion in this regard for the
purposes of the following analysis.
39. On 21 May 2012, FOS issued a memorandum to all relevant stakeholders
advising of the broad approach adopted in considering the proximate cause
of the implementation of the W4 Wivenhoe Dam strategy that led to the
development of a flood wave in the Brisbane River. This in turn led to
significant inundation of properties below the Wivenhoe Dam in the time after
the W4 strategy was invoked.
40. In that memorandum FOS advised that after considerable deliberation, the
Panel formed the view that the heavy rain occurring from 4.00am on 11
January 2011 and in particular the heavy rain between 4.00am and 8.00am
was a proximate cause of the W4 strategy being invoked. This was therefore
a proximate or effective cause that led to the flooding of many of the
properties along the lower reaches of the Brisbane River.
41. The approach was reached after consideration of all material that had been
provided to FOS by stakeholders and contrary to the comments of the FSP
in its reference documents, after the FSP was given the opportunity of
addressing the issue of the relationship between the heavy rain that fell from
4.00am on 11 January 2011, the adoption of the W4 strategy and the
particular wording of its policy.
42. The Panel noted in relation to the broad approach that each individual
dispute will depend upon the basis of the individual and unique factors
relevant to the dispute. In that regard, the parties were invited to make
further submissions in relation to the disputes before FOS.
43. In view of the issues arising, detailed further submissions were made b y the
FSP on 14 June 2012. Included with the submissions were the following
documents:
Case No: 242150 Determination Page 10 of 15
a. A reference document for disputes relating to Queensland Floods (this
is a general reference document). This sets out various submissions
the FSP makes in relation to a number of topics. Not all issues raised in
the reference document appear in the current dispute.
b. Letter from SC attaching a key information sheet for the Applicant’s
property dated 7 June 2012 (This document was updated by SC in a
subsequent letter dated 24 July 2012).
c. WT Report “Investigation of the January 2011 Inundation event –
Brisbane” dated March 2011.
d. Statement from SC dated 7 June 2012.
44. The FSP’s reference document does not specifically address the individual
factors relating to the current dispute. However, it argues that the heavy rain
that fell from 4.00am on 11 January 2011 should not be seen as being
unrelated to the rain that had fallen in the dam’s catchment of the previous
days and should not be seen as the proximate cause or effective cause that
led to the adoption of the W4 strategy.
45. The FSP maintains that on any reasonable view, the damage sustained to
the downstream properties was the combined effect of all of the rainfall that
had fallen and not just the rain that had fallen from 4.00am on 11 January
2011. By adopting a commonsense valuation of the facts, the FSP argues
that the proximate cause could not be the rain that fell from 4.00am on 11
January 2011. Instead, on any reasonable view, the damage sustained was
the combined effect of all of the rainfall that had fallen.
46. The Applicant has argued that the final report from the Flood Commission
does not call into question the evidence of the engineers about the move
from W3 to W4 strategy. Further, the Applicant argues essentially that the
transition from W3 to W4 by the Wivenhoe Dam engineers on the morning of
Tuesday 11 January 2011 was caused as a result of the significant rainfall
that fell commencing at approximately 4.00am on 11 January 2011 over the
Wivenhoe Dam catchment area.
47. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from 4.00am on 11 January
2011.
48. The information exchanged and relied upon by all parties and contained in
the SEQWater report dated 2 March 2011 identifies the rapid increase in the
inflows to the Wivenhoe Dam commencing from about 4.00am. The
information confirms that the inflows into the dam had been steadily
decreasing from 3.00pm on 10 January 2011 to 2.00am on 11 January 2011.
49. The information exchanged confirms that prior to approximately 4.00am on
11 January 2011, the dam releases were being managed at the W3 strategy.
Whilst the W3 strategy had led to an increase in the levels of the Brisbane
River, the W3 strategy was designed to avoid where possible inundation of
the properties below the Wivenhoe Dam by flooding from the Brisbane River.
Case No: 242150 Determination Page 11 of 15
50. The rainfall data and information relied upon by the parties and not disputed
confirms that there were two significant rainfall spikes, with the rain that fell
from 9 to 10 January 2011 being the “first spike” and the rain that fell on 11
January 2011 being the “second spike”. This is confirmed by the FSP’s
hydrologist in his statement of 7 June 2012.
51. There is no dispute that following the second spike, that is, the heavy rainfall
which commenced on or about 4.00am on 11 January 2011 over the
Wivenhoe Dam, the W4 release strategy was adopted.
52. The information provided by SEQWater confirms that from about 4.00am on
11 January 2011, there was a significant increase in the inflows to the
Wivenhoe Dam and that as a result of the significant increase in the inflows,
by 8.00am on 11 January 2011, the Wivenhoe Dam engineers were left with
no alternative but to adopt the W4 release strategy.
53. The information provided by the parties and in particular the information
provided by the FSP’s hydrologist confirms that the increased releases from
the Wivenhoe Dam after the adoption of the W4 strategy led to the
development of a flood wave that ultimately caused the flooding from the
Brisbane River downstream of the Wivenhoe Dam.
54. The Panel agrees with the FSP’s submission that the proximate cause is the
cause determined by a commonsense evaluation of the relevant facts. In the
event that there are two or more proximate causes, one within the policy and
the other excluded, the policy does not respond. The proximate cause is not
determined by identifying the last event or final trigger, but by determining
what is the dominant, effective, direct or efficient cause of the loss.
55. The Panel is satisfied having considered all of the information that prior to
the rainfall commencing on or about 4.00am on 11 January 2011, there had
been a steady reduction in the inflows to the Wivenhoe Dam from about
3.00pm on 10 January 2011. At that time, the Wivenhoe Dam was being
managed at the W3 release strategy. This release strategy whilst causing
some increase in the level of the Brisbane River was being maintained with
the aim of avoiding flooding of the areas below the Wivenhoe Dam wherever
possible.
56. According to the information exchanged, including the information provided
to the Queensland Flood Commission of Inquiry, following the heavy rain
that commenced falling on or about 4.00am on 11 January 2011, the rapid
increase in the level of inflows into the dam, left no real alternative but to
adopt the W4 release strategy from 8.00am on 11 January 2011. The
hydrology, including that from the ICA’s Panel of Hydrologists and from the
FSP’s SC, supports the view that the adoption of the W4 strategy directly
contributed to the development of a “flood wave” and the subsequent
inundation of properties below the Wivenhoe Dam.
57. Whilst the Panel accepts there had been a significant impact on the levels of
the Wivenhoe Dam by the rainfall that had commenced falling on or about 9
January 2011 (and earlier), the Panel is satisfied that having regard to all of
Case No: 242150 Determination Page 12 of 15
the information exchanged and the relevant legal principles, that the heavy
rain that commenced falling at or about 4.00am on 11 January 2011 was a
proximate or effective cause of the adoption of the W4 strategy and this
combined with the heavy rain fall that fell over the Brisbane River from about
4:00am on 11 January 2011, caused the inundation of many of the
properties below the Wivenhoe Dam as a result of the flood wave created by
the increased releases.
58. Alternatively, the FSP argues that if it is accepted that there are other
proximate causes apart from the implementation of the W4 strategy, then the
Wayne Tank principle applies, as the earlier rain was also a proximate cause
of the inundation. The FSP also argues that with respect to the inundation
caused by the W4 release that was due to an intervening decision by the
dam operators and is not covered under the current policy.
59. With respect to the last argument, the Panel is of the view that it was not an
intervening factor that led to the adoption of the W4 strategy; the fact was
that the level the dam had reached by 8.00am on 11 January 2011 left the
operators with no alternative but to adopt the W4 strategy at that time.
60. With respect to the argument regarding the Wayne Tank principle and the
rainfall prior to the 24 hour period being a contributing factor or proximate
cause of the loss, the Panel notes the policy wording provides cover for
sudden flood caused within 24 hours of heavy rainfall. The relevant question
is whether the inundation is caused by heavy rain that fell no more than 24
hours prior to the flood.
The Applicant’s property
61. The A pplicant’s property is constructed on a concrete slab. A ccording to
these key conclusions statement the benchmark level of the property is
42.8m AHD.
62. SC’s statement, particularly his updated key conclusions attachment dated
24 July 2012, indicates the effect of the W4 releases first reached the vicinity
of the Applicant’s proper ty at 8.46am on 11 January 2011.
63. The Panel notes that the ultimate inundation of the property was 0.6m above
the benchmark level. SC identified this peak inundation occurred at
approximately 2.15am on Wednesday 12 January 2011.
64. In SC’s e arlier key conclusions statement he found the peak inundation
occurred at 2.12am on 12 January 2011 to a height above benchmark of
0.9m
65. The Panel accepts the possibility that these assessments may not be
entirely accurate and notes the arguments made by the Applicant with
respect to this. However, as explained previously, the Panel accepts and
adopts SC’s conclusions for the purposes of this dispute and considers it is
appropriate to do so for the following reasons:
Case No: 242150 Determination Page 13 of 15
The Applicant’s submissions about other possible methods of
inundation is not supported by hydrology evidence;
SC’s conclusions are relatively consistent with the rainfall and gauges’
data, the Applicant’s version of the events of the day and the loss
adj uster’s report.
66. The policy covers flash flood or stormwater runoff, that is, sudden flood
caused by heavy rain that fell no more than 24 hours before the flash flood
or stormwater runoff. The Panel accepts having considered all of the
information provided, the relevant legal principles and terms of the policy that
the proximate cause of the inundation of the Applicant’s property was the
heavy rain that commenced falling from 4.00am on 11 January 2011 and
that this caused the inundation of the Applicant’s pr operty within the relevant
24 hour period to fall within the terms of the policy.
67. Accordingly, the Panel is satisfied that the FSP is liable to meet the
Applicant’s claim in accordance with the flash flood and stormwater runoff
provisions of the policy.
Quantum
68. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $215,000 for the home with contents of $70,000. Pursuant to the
policy cap for the insured event of “Flash flood and stormwater runoff”, the
FSP is liable up to an amount of $107,500 for the damage to the building
and $35,000 for the contents.
69. There is minimal evidence available regarding the extent of the Applicant’s
loss. Although the Applicant has provided a number of quotes or estimates,
this has not been consid ered by the FSP’s loss adjuster. As a result, it is
unclear if the cost of repairs being sought is proportionate to the damage
sustained.
70. The Panel has been provided with a copy of the loss adjuster’s site report.
However, this contains no estimate or quotation regarding the extent of the
loss.
71. Therefore, the Applicant and the FSP are asked to work cooperatively
together to establish the extent of the loss and to reach an agreement as to
the cost of repairs and the various contents lost. Insofar as the FSP may
have made payment of a compassionate sum to the Applicant, FOS does
not have jurisdiction to deal with this payment but acknowledges that the
FSP, given the terms on which the compassionate payment was made, may
be entitled to deduct this payment from any settlement sum.
72. The Panel notes that as explained previously, the cost of repairs should not
include the damage caused by the leaking in the roof within the Applicant’s
bedroom. In this regard, the Panel has not been satisfied this damage was
due to an insured event.
Case No: 242150 Determination Page 14 of 15
Legal Costs
73. The Applicant has requested that FOS award the maximum amount of legal
costs. FOS’s Terms of Reference do allow for the awarding of legal costs
pursuant to clause 9.4 of the Terms of Reference.
74. The Applicant is represented by a community legal centre. It is commonly
understood that community legal centres do not charge their clients for their
legal services although there are exceptions to this.
75. The Panel is aware that legislation does allow for pro bono schemes such as
Legal Aid and Community Legal Services (if acting under a Legal Aid Grant)
to seek an award for costs. The case of Desmond Francis Lewis and Telstra
Corporation Limited [1995] AATA 94 is also authority that a Community
Legal Service may seek its costs in limited circumstances. This case
indicated that the legal service in question was able to do so because it
reserved the right to recover costs from the Applicant.
76. There is no evidence of any such agreement between the community legal
centre and the Applicant.
77. Further, although legislation may allow pro bono schemes to seek an award
for costs, the Panel’s ability to provide such an award is not founded in
statute. Instead, the sole basis it can provide such an award is pursuant to
clause 9.4 of the Terms of Reference which states:
“FOS may decide that the Financial Services Provider contribute to the legal
or other professional costs or travel costs incurred by the Applicant in the
course of the Dispute.” (Panel emphasis)
78. As evident, this provision is only enlivened if the Applicant has incurred the
legal costs. It does not entitle a third party to seek its costs for advocating a
dispute on behalf of the Applicant from the FSP.
79. There is no evidence that the solicitors have any entitlement to recover its
costs from the Applicant. Instead, it appears the solicitors are acting on a no
fee recoverable basis.
80. In such circumstances, the Panel has no jurisdiction to award legal costs.
Determination
81. The FSP is to meet the cost of repairs incurred by the Applicant and the cost
of the replacement of items damaged as a result of the inundation of the
property, subject to the limitations under the terms of the policy for cover for
“ flash flood ” and stormwater runoff.
82. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
9 May 2011 (being the date of rejection of the claim) to date of payment of
the claim, in accordance with Section 57 of the Act.
Case No: 242150 Determination Page 15 of 15
83. The FSP is not liable for the cost of repairs caused by the leaking roof.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.