A St Lucia home contents claim for January 2011 water damage was declined as flood, and the applicant argued it was first stormwater run-off. AFCA found the inundation was Brisbane River flood, the flood exclusion was clearly informed under section 35, and the claim is not payable.

The policy excludes flood, including water escaping from a watercourse or dam, and the PDS was provided within 14 days of inception so section 35 is met.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 242104 Determination Page 1 of 11 Case number: 242104 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Denial of Claim - Storm vs Flood - Clearly Inform - Insurance Contracts Act (1984), Section 35 03 February 2012 Background 1. The Applicant held a home contents insurance policy with the Financial Services Provider (FSP) at the time of the loss the subject of this dispute. The insured property is located in St Lucia, Queensland. 2. On 9 – 13 January 2011, Queensland suffered a devastating storm and the insured property was inundated with water. 3. The Applicant lodged a claim with the FSP for contents damage. 4. The FSP denied the Applicant’s claim on the ground that the damage to the insured property was caused by a “flood” and the Applicant’s policy spec ifically excludes loss or damage caused by a “flood”. 5. The Applicant is not satisfied with the FSP’s decision, hence this dispute. Summary of Applicant’s Position 6. The Applicant, through legal counsel, says:  the insured property was damaged by a storm as defined under the policy because there was excessive stormwater run-off in the local area. Water started backing up in the storm water drain on 11 January 2011;  the storm water infrastructure in the area was not adequate. Prior to the floods, the local council was aware of the drainage problems in the area;  alternatively, the damage was caused by multiple events and the first in time was excess run-off from a storm in the local area which is covered under the policy. According to the Applicant, the water first entered the garage at approximately 2:30pm on 11 January 2011;  the Wayne Tank principle is not applicable because the storm water flooding at the Applicant’s property occurred first in time and independently of riverine flooding; Determination Case No: 242104 Determination Page 2 of 11  in Elilade Pty Ltd v Nonpareil Pty Ltd (2001) 12 ANZ Insurance Cases 61- 535 where damage caused by storm water run-off was followed shortly thereafter by flood damage, the Court found that the insured was covered for the earlier damage and its consequences;  the FSP did not clearly inform the Applicant of the policy exclusion of flood, contrary to section 35 of the Insurance Contracts Act (1984) (Act);  she received a copy of the PDS only after payment of the first insurance premium, four to five years ago at policy inception. After that, the Applicant did not receive any other PDS during policy renewals;  she “didn’t realise there were so many types of floods and water damage”. Section 1013C(3) of the Corporations Act (Cth) 2001 requires “clear, concise and effective” disclosure. She argues there “are problems in identifying what is the difference between water that has overflowed from a stormwater drain because it cannot reach the watercourse as the watercourse is full which is not covered and water that has escaped from a stormwater drain which would be covered as part of stormwater run- off”. 7. The Applicant relies on the following policy provisions contained in the Product Disclosure Statement (PDS): “ Storm If your… conten ts suffer loss or damage caused by  …  thunderstorm or hail which may be accompanied by rain or snow, or  a sudden, excessive run-off of water as a direct result of a storm in your local area”. Summary of FSP’s Position 8. The FSP says it is entitled to deny the Applicant’s claim because:  the hydrology reports by WP “confirm that the property was inundated as a result of flooding from the Brisbane River and not as a result of rainfall in the local area”;  the Insurance Council Australia (ICA) hydrology report “ reiterate[s] that that (A)pplicant’s house was inundated as a result of floo ding from the Brisbane River”;  the hydrology reports and the Bureau of Meteorology records show no significant rainfall in the local area at the time of the loss;  the inundation was a result of flooding caused by rain upstream in the upper catchments of the Brisbane River, Bremer River and Lockyer Creek which some time later overflowed the banks of the Brisbane River downstream and caused backwater flooding of its tributaries; Case No: 242104 Determination Page 3 of 11  the FSP clearly informed the Applicant of the policy exclusion of flood when it provided her the Certificate of Insurance and the PDS which clearly and unambiguously excludes loss or damage to property caused by flood. The Applicant has admitted receiving the PDS after payment of the first premium. The FSP has complied with section 35 and the provision of the PDS was in accordance with sections 69(2) and 11(10)(a) of the Act. 9. The FSP relies on the following policy provisions contained in the PDS: “ Storm … However  we will NOT cover loss or damage caused by flood … What you are not covered for - general exclusions we will NOT cover  loss, damage… that occurs as a result of  flood … Glossary … flood is the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam. Flood is not covered by this Policy .” Issues 10. Whether the Applicant was clearly informed of the relevant policy provisions. 11. Whether the damage to the insured property was caused by storm or flood. Reasons for Decision 12. Due to the nature of the dispute, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Thus, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. The parties have been previously advised that a Determination will be issued in this case. Case No: 242104 Determination Page 4 of 11 13. The Determination will be made by a Panel consisting of a Panel Chair Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 14. The Panel Chair Ombudsman attended on site to meet with the Applicant and a representative of the FSP. Clearly Inform 15. Section 35 of the Insurance Contracts Act (1984) (the “Act”) provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. Provision of PDS 16. In Max Hams & 1 Ors v CGU Insurance Limited [2002] NSWSC 273, the Supreme Court of New South Wales held that in most circumstances, the provision of a policy document in and of itself satisfies the requirement to clearly inform under section 35 of the Act. 17. The Applicant admits receiving the PDS “4 to 5 years ago when she took out the policy”. However, she says she received it only after payment of the first premium. 18. Section 35 of the Act imposes the obligation on the insurer to clearly inform the insured in writing before the contract is entered into. However, section 69(2) of the Act provides that if it was not reasonably practicable for the information to be so given orally or in writing, the information shall be deemed to have been given if it is given in writing 14 days after the day on which the contract was entered into. 19. In this case, the policy commenced on 28 October 2004. 20. The Panel is satisfied with the documentary evidence submitted by the FSP to prove dispatch of the PDS to the Applicant, pursuant to FOS Circular 3, on 29 October 2004. 21. The Applicant says she received the PDS after she paid the first premium. The Applicant does not indicate exactly when she received the PDS. However, it is reasonable to presume this occurred within 14 days after the day on which the contract was entered into in light of the FSP’s documentary evidence proving dispatch of the PDS on 29 October 2004. Case No: 242104 Determination Page 5 of 11 22. The Applicant also says she has not received any other PDS from the FSP. That is, the Applicant did not receive a ny PDS during policy renewals. The FSP does not dispute this. 23. The Panel agrees with the FSP that under section 11(10)(a) of the Act, the provision of the PDS at policy inception is sufficient and the FSP is not obliged to provide another PDS during policy renewals, unless there have been changes to the PDS which the FSP seeks to rely on. Clear and unambiguous provisions 24. The Supreme Court stated in Max Hams & 1 Ors v CGU Insurance Limited that special circumstances may exist in which the complexity of or confusions within the document containing the relevant provisions (which one would expect would usually be the Insurance Policy itself) could be such that the mere provision of the policy did not establish that the insurer had effectively informed the insured of relevant limitations. In each case, the content of the document and all of the circumstances of its provision would need to be considered in order to determine if the insurer had effectively informed the insured of the policy limitation. 25. It is well settled that the onus is on the insured to read and understand the policy documents in order to determine whether the policy meets his or her needs. Thus, the onus was on the Applicant to read and understand the policy documents, including the PDS. 26. The Panel has carefully examined the PDS provisions relating to flood and storm. 27. The Panel is of the opinion that on page 15 of the PDS, under the heading “Storm”, it is clearly and unambiguously stated that loss or damage caused by flood is not covered. 28. The Pa nel is also of the opinion that “Flood” is clearly and unambiguously defined in the “Glossary” on page 70 of the PDS as “the covering of normally dry land by”:  “water escaping or released from the normal confines of a watercourse or lake, whether or not i t is altered or modified”; or  “water escaping from the confines of any reservoir, channel, canal or dam”. 29. It is also noted that policy definition of “Flood” reiterates that “Flood is not covered by this Policy.” 30. Further, page 35 of the PDS, under the hea ding “What you are not covered for – general exclusions”, it is also clearly and unambiguously stated that the FSP will “NOT cover… loss or damage… that occurs as a result of … flood”. 31. Therefore, the Panel determines that the FSP has clearly informed the Applicant of the policy exclusion of flood. Case No: 242104 Determination Page 6 of 11 Storm vs Flood FSP’s Home Assessment Report 32. The FSP’s assessor inspected the Applicant’s home on 21 January 2011. 33. The assessment report shows the following relevant information:  entry point for the water - garage, stairs and balcony;  time of water entry – Tuesday, 11 January 2011 at 6:00pm;  water built up gradually and peaked on Thursday, 13 January 2011 at 4:00am  maximum inundation – 1130mm internal; 3530mm external  100% of the habitable floor area was affected by water;  the water came from the direction of the Brisbane River; and  brown water entered the property. Insurance Council of Australia (ICA) Hydrology Report 34. The Insurance Council of Australia hydrology report entitled “FLOODING IN THE BRISBANE RIVER CATCHMENT JANUARY 2011 VOLUME 2 FLOODING IN BRISBANE CITY LGA” contains the following information:  there were three generally distinct and significant rainfall periods between 9 – 11 January 2011 across the Brisbane City Local Government Area (Brisbane LGA). The first event occurred over the period from around 9:00am to 9:00pm on Sunday, 9 January 2011. The second event occurred from around 6:00am to 10:00am on Monday, 10 January 2011. The third event occurred from 6:00am to 4:00pm on Tuesday, 11 January 2011;  the most significant rainfall across the Brisbane LGA occurred from approximately 6:00am to 4:00pm on 11 January 2011;  after about 6:00pm on 11 January 2011, there was little or no rainfall across the Brisbane LGA;  the Brisbane River water levels through the city peaked about 24 -30 hours after rainfall had ceased, that is, from the late hours of Wednesday, 12 January 2011 to the early hours of Thursday, 13 January 2011;  any area that was inundated after 6:00pm on 11 January 2011 will have been waterflow inundation from the Brisbane River and its tributary creeks. The inundation along the tributaries was associated with backwater flooding from the Brisbane River, which in turn was principally caused by the dam release flood from the Wivenhoe Dam;  overland flow inundation is generally associated with intense rainfalls of short duration. In general, such rainfalls did not occur across the Brisbane Case No: 242104 Determination Page 7 of 11 City LGA in January 2011. It is expected that overland flow inundation would generally not have occurred in the Brisbane City LGA;  uncertainties exist on whether properties flooded by waterflows also suffered initial inundation from overland flow flooding. Investigation of local factors such as local topography and the area and characteristics of overland flow, hydrologic/hydraulic modelling of the storm event and local stormwater drainage system is required to resolve this issue. WP’s Regional Hydrology Report 35. The FSP submitted WP’s hydrology report entitled “Impact of Januar y 2011 Southeast Queensland Weather Event at Brisbane and Ipswich” dated 17 February 2011. 36. The report states, among others:  rainfall began in the lower catchment at approximately 9:00am on 9 January 2011 with minor intensities and accumulations occurring until 4:00pm on 11 January 2011a total rainfall accumulation of 170mm was recorded in Brisbane.  while some local drainage systems may have been overwhelmed by the runoff that was generated, it is unlikely that a significant number of properties at Ipswich and downstream along the Brisbane River would have been effected directly by runoff or overland flowflooding of the Brisbane and Bremer Rivers occurred over the period 11 -12 January 2011 which then led to inundation of low lying areas of Ipswich and Brisbane. WP’s Site -Specific Hydrology Report 37. The FSP organised a hydrology report by WP on the Applicant’s home. The report is entitled “HYDROLOGY REPORT RELATING TO THE JANUARY 2011 STORM” and dated 8 June 2011. 38. The report notes the discussion with the Applicant on 2 June 2011 and the Applicant’s recollection of the event:  inundation began at 2:00pm, 11 January 2011. Water began to back up a drain near the balcony located directly east of the property;  water flows were seen travelling across the oval and C Street, east of the property;  it was raining lightly as the property became inundated;  no evacuation notices were given to the Applicant at this point;  at 7:00am, 12 January 2011 evacuation occurred by boat. At this stage, the water level was lapping underneath the verandah; and  the Applicant returned in the afternoon of 14 January 2011. Case No: 242104 Determination Page 8 of 11 39. The report states, among others:  the Applicant’s suburb, St Lucia is located approximately 4 km south of the centre of Brisbane. The Brisbane River flows in the vicinity of St Lucia in a northerly direction approximately 250 metres north of the property. It discharges into the ocean approximately 32 km downstream from the site;  the Applicant’s home is a unit on the first floor of a three storey unit block. The Applicant’s street has an elevation of 3.5 m AHD. Floor level within the unit is raised at approximately 2.4 metres from ground level;  the peak level of inundation at the Applicant’s home was 1.18 metres from floor level;  the peak intensity of the rainfall event was estimated to have an Annual Recurrence Interval (ARI) of 1 year. Considering the small catchment size draining to the site, there would not have been sufficient runoff from the local area to inundate the first floor of the building. Surrounding storm water infrastructure would be adequately designed to handle such flows;  as the water level in the Brisbane River began to rise, river water would have begun to flow up the defined watercourse and enter the piped drainage system. River water would then have seen to be ponding within the open channel. With the river level continuing to rise, river water would have discharged from the open channel to inundate the low lying areas prior to SF Drive and C Street being inundated directly from the river. This is indicated in a photograph which the Applicant took on 11 January 2011 at 5:43pm. 40. The report concludes that:  the inundation of the Applicant’s unit was caused by flood water escaping the normal confines of the Brisbane River as well as backing through the storm water infrastructure located along M Street;  due to the source and timing of inundation at the site, the event would be classified as Category 4 - “medium to large river where the majority of rain occurs over the upper and possibly middle catchments. The long response time of the river system to communities within the lower catchment results in flooding commencing some time after the critical rainfall (typically more than 8 hours for medium streams and a day or more for large streams). The Applicant’s Statement 25 August 2011 41. The Applicant has issued a Statutory Declaration on 25 August 2011 stating that:  the water started backing up in the storm water drain on 11 January 2011. It backed up underneath the unit block and the garage level started filling up. The water first entered the garage at approximately 2:30pm;  the initial water from the drain came from across M Street towards the property; Case No: 242104 Determination Page 9 of 11  at no time was the water coming from the direction of the river past the property up M Street towards C Road;  water then came over the C Street from an easterly direction after the storm water had entered the garages;  at approximately 5:00am on 12 January 2011, the Applicant was standing on the veranda watching logs and bits of debris move slowly down in the direction of the river. The water appeared to be “pretty still” but when the Applicant looked long enough, the water “was moving slowly past [her] veranda toward the river, [and] not from the river”;  the Applicant left the unit at around 7:00am on 12 January 2011. Most of the people in the building/complex evacuated at the same time. The water was at the top of the stairwell at this stage and was lapping at the Applicant’s floor. The Applicant thinks that may still have been just storm water and water from the university because the water was still and not moving and the colour of the water was the same as the colour of the water in the drain the previous afternoon (11 January 2011). January 2011 Daily Weather Observations 42. The Bureau of Meteorology’s “Brisbane, Queensland January 2011 Daily Weather Observations” shows the following rainfall data:  9 January 2011 – 12.2mm  10 January 2011 – 110.8mm  11 January 2011 – 15.4mm  12 January 2011 – 40.0mm. Lightning Strike Data 43. The Applicant says that Brisbane experienced 2,455 lightning strikes from 11:00pm of 10 January 2011 to 11:00pm of 11 January 2011 compared to only 6 strikes the previous day. 44. The Applicant submitted a document entitled “LIAS Results: 10/01/2011 to 11/01/2011” showing a total “Stroke Count” of 2,455. The Applicant says that this document was requested from the website of a company called “Global Posit ioning and Tracking Systems Pty Ltd”. Drainage Information 45. The Applicant has submitted a “Water and Stormwater Network” map in the subject area. Further Submissions 46. Both the representatives of the Applicant and the FSP have provided a number of further and additional submissions in regard to this dispute. Case No: 242104 Determination Page 10 of 11 47. The additional submissions have been exchanged and each party has had the opportunity to consider and respond to those additional submissions. The Panel has also considered the additional submissions. 48. The further and additional submissions included but were not limited to the Applicant’s argument that the proximate cause of the damage to the Applicant’s property was the release of water from the Wivenhoe Dam which the Applicant says is not excluded from the policy. 49. In this regard, the Panel refers to the definition of “flood” referred to above and notes that that definition includes water escaping from the confines of a dam. The Applicant argues that the water was released and did not escape. 50. This issue has been considered by the Panel on previous occasions and whilst the Panel is satisfied that the water was released rather than escaped from the Wivenhoe Dam, the Panel is satisfied that the water which affected the Applicant’s property can be said to hav e escaped from the confines of a water course, that being the Brisbane River. In those circumstances, the Panel is not satisfied that the release of water from the Wivenhoe Dam necessarily assists the Applicant in this matter. 51. The Panel has also considered the FSP’s argument that the Wivenhoe Dam should be regarded as a lake and not a dam. The Panel does not accept the argument and indeed agrees with the assertion from the Applicant that given the control that can be exercised over the release of water from the Wivenhoe Dam, it is properly categorised as a dam rather than a lake. 52. The Panel has also given consideration to the other matters raised within the further and additional submissions from the Applicant and the FSP and the Panel confirms its conclusion that the FSP has complied with section 35 of the Insurance Contracts Act (1984) and clearly informed the Applicant of the policy exclusion of flood. Analysis/Conclusion 53. It is noted that although water started to enter the garage of the complex where the A pplicant’s unit is at around 2:30pm on 11 January 2011, the water did not enter the Applicant’s unit until after 7:00 am on 12 January 2011. The Applicant admits that at 7:00am on 12 January 2011, the water was only at the top of the stairwell of the compl ex/building and was only lapping at the Applicant’s floor (which was the first floor). Thus, it was only after 7:00am on 12 January 2011 that water entered the Applicant’s unit and damaged the Applicant’s contents. 54. According to the ICA Hydrology Report, a ny area that was inundated after 6:00pm on 11 January 2011 will have been waterflow inundation from the Brisbane River and its tributary creeks. 55. In consideration of the above, it is clear that the Brisbane River was unable to handle the volume of water from the storms and the subsequent releases out of the Wivenhoe Dam. The overflow of water from this point caused the Brisbane Case No: 242104 Determination Page 11 of 11 River to break its banks, and/or to back flow through the various drainage systems and flood the Applicant’s Unit. 56. Given the definit ions contained within the Applicant’s policy, the FSP is entitled to deny the Applicant’s claim on the basis the loss was caused by flood. Determination 57. On the basis of the available information and the above reasons the Panel determines that:  the Applicant was clearly informed of the policy exclusion of flood;  the damage to the Applicant’s contents was caused by flood;  the FSP is entitled to deny the Applicant’s claim.