Home / Financial Firm (Unknown - Insurer) / Determination 241994
Determination 241994
Inundation claim declined as flood; flash flood and stormwater cover disputed
Summary
The applicants' home and stumps were inundated around late December 2010, and the FSP declined the claim as flood, which the policy excludes. AFCA found the inundation was caused by heavy rain resulting in covered flash flood or stormwater run-off, and ordered the FSP to pay the property claim plus interest, while refusing lost wages and extra compensation.
Inundation caused by heavy rain within 24 hours fell within the flash flood and stormwater run-off cover, so the flood exclusion did not apply, and consequential loss such as lost wages is excluded.
Issues
- Claim denial primary · upheld
“the FSP is liable to pay the Applicants' claim for property damage/loss as a result of inundation plus interest from the date of denial.”
- Delay secondary · not upheld
“Given the high volume of claims and difficulty in obtaining expert opinions, the Panel does not believe the delay unreasonable.”
- Misleading conduct secondary · not upheld
“The Panel does not consider there is any evidence on file to support an allegation that the Applicants were misled.”
Subjects and remedies
mental healthnatural disasterpay claimpay interest
Text of the determination
Case No: 241994 Determination Page 1 of 12
Case number: 241994
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
31 August 2011
Background
1. The Applicants hold a Home Building and Contents insurance policy with the
Financial Services Provider (FSP). The policy insures the home building up to
$307,000 and contents up to $97,000.
2. On or about 30 December 2010, the Applicants‟ property was inundated. The
water caused damage to the contents and the property‟s stump footings.
3. After obtaining an assessment and hydrological reports, the FSP declined the
claim on the basis the loss was caused by flood which is an event excluded
from cover under the policy.
4. The Applicants dispute the FSP‟s declinature on the basis the inundation was
caused by flash flood and storm surge.
Summary of Applicants ’ Position
5. The male Applicant contacted the FSP on 28 December 2010 to confirm the
coverage for the property and to extend the cover for flooding. He was informed
that he was covered for flash flood and storm surge but not flood. The
Applicants believe they were misled by the telephone advice and Product
Disclosure Statement (“PDS”).
6. The Applicants contend that storm surge is when the water in the stormwater
system backs up causing flooding to the area, whereas flood is when a river
breaks its banks and changes its course of flow.
7. The Applicants submit that the storm surge inundated the property 5 -6 days
(although originally the Applicants stated 4-5 days) prior to any Fitzroy River
water crossing a Road (“G Road”), entering the Applicants‟ street (“T street”)
and reaching the property. The Applicants define storm surge as the
stormwater and sewerage that backed up out of the drains.
8. The Applicants do not deny that their property received Fitzroy River inundation
but note this was after the storm surge water had backed up and inundated the
property. Further, the road closure was placed at T Street because this was the
Determination
Case No: 241994 Determination Page 2 of 12
best diversion place for traffic as the roadway was inundated further down G
Road.
9. The Applicants contend that the water drainage systems in the area were
unable to cope due to the natural tidal flow slowing the Fitzroy River‟s flow to
the ocean causing storm and sewerage systems to backup and overflow. Once
the low tide came the storm water could no t escape due to the increased river
height which was the result of the high tide and a natural river level rise.
10. The Applicants submit that the height of the ground water table has not been
taken into account. The Applicants note the ground was saturated to the point
that even more minor rains turned the ground “to soup”.
11. The Applicants state that the document the assessor had the female Applicant
sign off has altered from what she actually signed off. In particular, the type of
loss was defined as storm su rge but the report indicated „flood‟.
12. The Applicants have claimed the costs of restumping the dwelling, loss of
wages, mental stress from the incident, rejection of the claim and time off work.
The Applicants have provided quotations for the re-stumping, payment advice
dated 10 March 2011 and a medical certificate dated 21 April 2011confirming
the male Applicant was unable to work due to exacerbation of a pre-existing
condition.
Summary of FSP’s Position
13. The FSP relies on the following policy terms and conditions:
“ [FSP] Product Disclosure Statement (PDS)
Words with special meanings (page 10)
Flood Rising water which enters your home as a result of it running off or
overflowing from any origin or cause. This policy does not cover
flood unless we have agreed and it is shown on your certificate of
insurance.
Flash flood and
stormwater run -
off
A sudden flood caused by heavy rain that fell no more than 24
hours prior to the flash flood or stormwater run - off.
Storm A violent disturbance of the atmosphere associ ated with strong
winds including a cyclone, lightning, heavy rain, hail or snow, but
not continuous bad weather by itself.
Storm surge An increase in the level of the sea associated with a tropical
cyclone or other intense storm.
Insured events you are covered for (page 17)
Damage caused by weather
Case No: 241994 Determination Page 3 of 12
What is covered What is not covered
Storm X caused by rain, hail or snow
after it has reached the
ground
…
X caused by storm surge
...
Flash flood and stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off
Loss or damage caused :
X by flood
…
X by storm surge or any other
action of the sea.
...
What is covered What is not covered
Bursting, leaking discharging or
overflowing of liquids from:
∙ dish and clothes washing machines;
∙ water catchment trays of refrigerators,
freezers and evaporative air conditioners;
∙ waterbeds;
∙ pipes, gutters, drains designed for
carrying liquid which are fixed or
connected to the home;
∙ fixed domestic apparatus such as but not
limited to water tanks, lavatory cisterns
and pans, baths, basins sinks but not a
shower recess or cubicle;
∙ water mains located at or adjacent to the
property address
Loss of damage caused by:
...
X by the escape of liquid occurring as a
result of a gradual process of bursting,
leaking, discharging or overflowing unless
you can show:
∙ if your home is damaged – that this
policy covered your home and it was
current for the whole of the time that the
damage was occurring
∙ if your contents are damaged – that this
policy covered your contents and it was
current for the whole of the time that the
damage was occurring; and
...
Flash flood and stormwater run - off
A sudden flood caused by heavy rain that
fell no more than 24 hours prior to the
flash flood or stormwater run-off
Loss or damage caused:
X by flood
…
X by storm surge or any other action of
the sea.
...
The most we will pay for home claims (page 27)
What is covered What is not
covered
Case No: 241994 Determination Page 4 of 12
Flash flood and stormwater run - off
We will pay up to 5 0% of your home sum insured or $ 25,000
whichever is higher.
Optional covers for extra peace of mind (page 53)
What is covered What is not
covered
Flood and storm surge
This policy does not cover flood unless we have agreed and it is
shown on your certificate of insurance
Home and/or contents cover
We cover you for loss of or damage to your home or contents caused
by flood or storm surge which happens during the period of insurance
at the property address.
We will pay up to the:
Home sum insured, if your home is insured;
Contents sum insured if your contents are insured for damage
caused by flood or storm surge.
We will pay for loss or damage in the same way and in the s ame
amounts as we do under Insured events cover.
”
14. The FSP relies on the following legal principles including the following:
“If a loss has two or more proximate or effective causes and at least one cause is
excluded from cover the insurer is not liable” Wayne Tank and Pump Co Ltd v
Employers Liability Assurance Corporation Ltd [1974] QB 57 ;
15. The FSP denies that the Applicants have been misled in relation to the cover
provided by the policy. The FSP submits that the Applicants were told they
were covered for flash flood and stormwater run-off and accordingly there was
no misleading and deceptive conduct. The FSP has enclosed a recording of the
telephone conversation between the male Applicant and FSP employee. The
male Applicant was informed that the flood option cannot be added mid-term.
The FSP employee informs the male Applicant he is covered for flash flood and
stormwater run-off and further provides the policy definition of flash flood.
16. The policy defines storm surge as an increase in the level of the sea associated
with a tropical cyclone or other intense storm. The FSP considers the
Applic ants‟ submissions on storm surge should be interpreted as reference to
stormwater run-off.
17. The FSP has relied on a statement from SC, a specialist flooding engineer as
to the cause of the inundation. The Panel notes the following from the
Statement:
Case No: 241994 Determination Page 5 of 12
“The Fitzroy River at Rockhampton was elevated during December 2010. It
reached a moderate flood level on 14 December 2010 which peaked at 7.65m on
16 December 2010. This was attributable primarily to the cumulative rainfall that
fell between 1 to 4 December 2010 with some further contribution from rainfall on
11 and 12 December 2010.
...
The Fitzroy River then fell to 5.5m on 23 December 2010 and from there began
to rise due to widespread rainfall occurring from 23 to 28 December 2010. This
rainfall was associated with a moist easterly flow brought into the region by
Cyclone Tasha, which was first declared a tropical low on 24 December 2010.
...
The Fitzroy River at Rockhampton then flooded with a peak at 9.2m at 4.30am
on 5 January 2011. The period of time that the river was in flood was substantial.
It maintained levels of over 9m till 11 January 2011 and was over the major flood
level of 8.5m for the period from 1 to 14 January 2011.
...
There was local rainfall in the City of Rockhampton around the times that the
Fitzroy River level was peaking (eg on 6 January 2011). However, this rainfall
was of a relatively low intensity and occurred after the flood had peaked.
...
During my discussion with [female Applicant’s name], she emphasised that the
Subject Property was inundated by water that had backed up from the
stormwater system not break out flow from the Fitzroy River. She mentioned
specifically the storm water pit in the backyard of the Subject Property, and two
storm water pits in [G Street] – one adjacent to the Subject Property and one
adjacent to the neighbouring property. She said that she saw the water coming
from the stormwater pits, and that that is where the water that inundated the
Subject Property came from. She was not able to remember specifically whether
it was raining when the inundation occurred other than to say that it was
generally raining during the December/January period.....her and [male
Applicant’s name] were away from the Subject Property in December 2010 and
that by the time they had returned there was water pooling in the backyard.
...
In relation to the definition, I note that the capacity of the local stormwater
drainage system to drain runoff can be lessened by backwater effects of a
downstream receiving water system or by obstructions. Inundation caused by
backwater surcharging out of a stormwater drainage system from a flood would
not be classed as stormwater flooding if the source of water or the flood level
reached was not caused by local runoff....The situation described by the
Applicants is consistent with the inundation of the Subject Property being caused
by the rising level of the Fitzroy River causing water to backflow into the
stormwater drainage system.
...
...In the Rockhampton region [removal of region name], the stormwater system
would generally drain into the Fitzroy River. As river levels rise, they eventually
rise above the level of the pipes which drain the stormwater into the river. As the
river levels continues to rise, the levels within the stormwater system are
dominated by the level at the outlet to the river. Therefore, as the river level
rises, water will travel back up the stormwater pipes. If there is an area of higher
ground between the watercourse and a given property, it is possible for the
Case No: 241994 Determination Page 6 of 12
property to be inundated by the rising level of the river, even though the water
has not travelled directly from the banks of the river to the site of the property
because of the obstruction posed by the higher ground....If the Subject Property
was inundated four to five days before water from the Fitzroy River crossed
Gladstone Road, this backflow effect would explain the inundation....[female
Applicant’s name] comments were all consistent with the backflow inundation
mechanism described above. In particular, if there were local run-off issues, I
would have expected [female Applicant’s name] to state there was particularly
heavy local rainfall at the time of the backflow. [Female Applicant’s name] did not
say that to me, and instead her comments indicated that the rainfall was not
particularly intense (or at least no more intense than at other times around late
December 2010/early January 2011)...This seems consistent with the relevant
rainfall data.
...
...The Applicants were not able to provide the date that the Subject Property was
inundated, other than to say that it was four to five days before the Fitzroy River
crossed G Road. According to Rockhampton Regional Council...T Street
between “D Street” and G Road was closed at 10.30am on 4 January 2011. This
would suggest that it was on 4 January 2011 that the Fitzroy River crossed G
Road. This would make the date of the alleged inundation approximately 30 or
31 December 2010.
...
The gauge records show that the highest recorded daily totals at Rockhampton
were in 24 hours to 9.00am on 26 December 2010 (140mm) and in the 24 hours
to 9.00am on 28 December 2010 (99mm). There was low rainfall in the 24 hours
leading to 9.00am on 29 December 2010 (17mm) and 30 December 2010
(6mm). From then until 9.00am on 2 January 2011 only 1mm of rain was
recorded.
...
Therefore, if the Subject Property was inundated on 30 December 2010, there
was very little rainfall in the previous 24 hours. Only 6mm of rain fell between
9.00am on 29 December 2010 and 9.00am on 30 December 2010 (after which
there was no rain until 24 hour period leading to 9.00am on 2 January 2011).
Even assuming, in favour of the Applicants, that the 17mm recorded up to 9.00
am on 29 December 2010 fell between midnight and 9.00am on 29 December
2010, the total rainfall in the 24 hours leading to the inundate would only have
been 23mm. Even on this higher figure, this rainfall is insignificant compared to
the rain that had fallen in the previous days.
...
On the basis of the above matters, I conclude that the cause of the inundation of
the Subject Property was the rising level of the Fitzroy River, which was itself
caused by rain which fell more than 24 hours earlier.”
18. SC considered the Applicants‟ property did not appear to have been inundated
by stormwater or local run-off and that the proximate cause (or at least a
proximate cause) of the loss was rain which fell in the Fitzroy River catchment
from 23 December 2010 which had the effect of raising the level of the Fitzroy
River. The rain fell more than 24 hours prior to the inundation of the Applicants‟
property and therefore the inundation was caused by flood rather than flash
flood or stormwater run-off.
Case No: 241994 Determination Page 7 of 12
19. The Panel notes reference in the statement to conversations between the male
Applicant and WT staff. No particulars of those conversations have been
exchanged. Presumably that information is not different to the information
provided by the Applicants to FOS.
20. The policy does not cover the loss of wages as claimed by the Applicants and
the Applicants have not appropriately set out a further basis for compensation.
21. The Panel note that an assessor report has been provided which includes the
following:
“At what time did water start to enter the property
Prior to 5.00pm on 27 December 2010”
Issue
22. Whether the FSP is liable to make payment of the Applicants‟ claim for property
damage/loss as a result of inundation.
Reasons for Decision
23. There has been an exchange of material between each party, and the Panel is
satisfied each party has had an opportunity to reply to the issues raised.
24. The Panel has read each party‟s submissions and materials and will only refer
to the relevant submissions and materials raised.
25. Essentially the question before the Panel is whether the inundation of the
property was covered by the policy in place between the FSP and Applicants.
26. The Panel notes that the assessor and SC have provided different dates for the
inundation of the property. The assessor has indicated several times that the
property was inundated on 27 December 2010 and even suggested it was prior
to 5.00pm on this date. SC has suggested the date of inundation was likely 30
or 31 December 2010 based on a road closure in the area which he believed
was related to the river crossing G Road.
27. The Applicants have advised that the road closure was due to it being a more
appropriate point at which to divert traffic and was not due to the river crossing
the road. The inundation of the property was 5-6 days prior to the river crossing
G Road – which would potentially make the date of inundation 29 December
2010 although it is clear the Applicants have difficulty recalling the exact date.
28. The Panel has no claim form or recording of the claim lodgement to provide
more contemporaneous evidence of when the inundation occurred.
29. Clearly, the Applicants had difficulty recalling the exact date in later discussions
with FSP. The more contemporaneous information is provided to the assessor
who stated the inundation occurred prior to 5.00pm 27 December 2010. This
does raise a concern given the Applicants have then rung the FSP on 28
Case No: 241994 Determination Page 8 of 12
December 2010 asking whether they could increase the flood cover portion.
The FSP has not addressed this issue. There is a potential that the inundation
occurred on 29 December 2010. SC has suggested inundation occurred on 30
December or 31 December 2010.
Case No: 241994 Determination Page 9 of 12
30. The Panel has reviewed the rainfall data which states that 140mm of rain fell in
24 hours on 26 December 2010 and 99mm on 28 December 2010. The rain fall
gauge data suggests that on 27 December 2010 19mm fell.
31. The Fitzroy River had a level of 5.5m on 23 December 2010 but then began to
rise due to widespread rainfall occurring from 23 to 28 December 2010. The
rainfall was associated with Cyclone Tasha which was first declared a tropical
low on 24 December 2010. The Fitzroy River did not peak until 9.2m on 5
January and further was over the major flood levels of 8.5 for the period 1 to 14
January 2011. The Panel understands this to mean that at the level of 8.5m the
river was deemed to have reached a major flood level. It is unclear if once the
Fitzroy river level reached 8.5m that it broke its banks or whether it broke its
banks earlier.
32. The information before the Panel indicates the inundation to the property
occurred prior to the Fitzroy River either breaking its banks or crossing G Road
and entering the Applicants‟ property. Further the source of inundation to the
Applicants‟ property which caused the d amage was from stormwater drains
overflowing.
33. The information before the Panel indicates significant rainfall events occurred
on 26 December 2010 and 28 December 2010. The Panel considers these
rainfall events as separate events given the volume and separation of the days
on which these rainfall volumes occurred.
34. The Panel agrees with the FSP‟s interpretation of the Applicants‟ submissions
and considers that what the Applicants‟ describe as the cause of damage is not
storm surge but rather flash flood or stormwater run-off.
35. The direct evidence of the Applicants is that the stormwater and sewerage
systems backed up and overflowed. Further, it appears the systems have done
so as the result of the water being unable to escape and drain away due to the
high volume of rain which had fallen.
36. In order to clarify aspects of the dispute, the Panel Chair spoke with the male
Applicant on 7 October 2011. Particulars of this discussion have been
exchanged.
37. The Applicant confirmed that the water inundated the foundations of his home
but did not enter the residence as it is a high set property. The inundation
remained for over a week.
38. He could not recall exactly when the initial inundation occurred.
39. He described his property as a corner lot with two storm water drains in Grant
Street. The drains connect to his property and he observed the water coming
from both drains.
40. Other than the assessor attending the property, he was unaware of any other
representative or hydrologist attending the site.
Case No: 241994 Determination Page 10 of 12
41. The Panel notes in a submission from the FSP following discussions held with
the Applicant, the FSP maintains as the Fitzroy River had reached 7.5-8m on
28 December 2010 and remained at 7m to 17 January 2011, that it is likely
inundation occurred later as the inundation lasted according to the Applicants
for almost a week and this would be consistent with the inundation occurring
when the river had risen higher.
42. The Panel notes from the hydrology information that the Fitzroy River in fact
peaked at 9.2m at 4.30 a.m. on 5 January 2011 and maintained levels of over
9m until 11 January and 8.5m until 14 January.
43. The Panel, whilst not disputing the information, provided notes the hydrology
also points to the heavy rainfall to 9.00 a.m. on 28 December 2011. The
information indicates the inundation occurred when the Applicants arrived home
which would be consistent with initial inundation on 28 December 2010.
44. Whilst he could recall talking to a WT representative, he believed this was
significantly after the event and at the time he could not reca ll the inundation
dates.
45. A high volume of rain fell in the 24 hour period preceding both 27 and 29
December 2010. The Applicants have described the rain hitting the ground and
turning it „to soup‟ which suggests the water simply was not draining away and
the drain systems backed up and overflowed.
46. The Panel notes that this occurrence would fall under flash flood or stormwater
run-off. Further, the policy also covers the overflow of drains connected to the
property – although the Applicants have not confirmed whether these drains are
connected to the home. It appears however that the sewerage infrastructure
would most probably be connected to the home.
47. The damage was allegedly caused many days prior to the Fitzroy River
crossing G Road and inundating the Applicants‟ property. The FSP has not
asked the hydrologist to comment on the alternate time frame provided by the
assessor and Applicants in relation to the inundation of the property.
Accordingly, there is no evidence to support a Wayne Tank type sce nario as
there are two distinct events several days apart. Further the prior damage
would appear to negate any suggestion that the proximate cause of the loss
was the river rather than flash flood or stormwater run-off.
48. The Panel concludes the inundation of the property was, on the balance of
probabilities, caused by heavy rain resulting in a flash flood or stormwater run-
off being unable to drain away rather than flood as defined by the policy.
49. The Panel does not consider there is any evidence on file to support an
allegation that the Applicants were misled. The FSP employee provided a
repetition of what the PDS document contained.
Case No: 241994 Determination Page 11 of 12
50. In relation to the claim for compensation for loss of wages, the Panel note the
Services Terms of Reference 9.3:
“9.3 Other compensation
Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial
Services Provider compensate the Applicant for consequential financial loss or
damage up to a maximum amount of $3,000 per claim made in the Dispute
...
Subject to paragraph 9.3c) and paragraph 9.7, FOS may decide that the Financial
Services Provider Compensate the Applicant for non-financial loss but only where:
An unusual degree or extent of physical inconvenience, time taken to resolve the
situation or interfere nce with the Applicant’s expectation of enjoyment or peace of
mind has occurred; or
In the case of a Dispute pertaining to an individual’s privacy rights – injury has
occurred to the Applicant’s feelings or humiliation has been suffered by the
Applicant.
The maximum amount of compensation for non-financial loss will be $3,000 per
claim made in the Dispute.
Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation for:
Consequential financial loss; or
Non-financial loss,
In a Dispute arising as a result of a claim on a General Insurance Policy that
expressly excludes such liability
...
9.6 Other types of damages
Punitive, exemplary or aggravated damages may not be awarded.”
51. The Panel also note the following policy terms and conditions:
“General Exclusions
...
Consequential loss
X any loss or additional expense arising indirectly from an event that is covered by this
policy.”
52. The Applicant has sought lost wages due to the onset of mental stress.
However, the policy clearly excludes consequential loss which would include a
loss of wages.
53. The Panel has reviewed the mental stress allegation under Terms of Reference
9.2 Non-financial loss. The Panel notes the male Applicant was diagnosed with
having bipolar depression. It is likely the events following the inundation of the
property contributed to the considerable stress faced by the male Applicant.
54. The Medical Certificate dated 21 April 2011 states the male Applicant has been
diagnosed with bipolar depression which was an exacerbation of an e xisting
condition. The listed date of onset is 10 February 2011 which is less than 4
weeks after lodging the claim with the FSP and prior to the claim denial.
Case No: 241994 Determination Page 12 of 12
55. It is reasonable for a FSP to obtain an opinion from an assessor and
hydrologist prior to making claims decision. The initial claims decision was
made on 8 March 2011 which is after the male Applicant has been diagnosed
as having bipolar depression. Given the high volume of claims and difficulty in
obtaining expert opinions, the Panel does not believe the delay unreasonable.
Further, the evidence as provided does not link the condition of the male
Applicant to the claims handling of the FSP and it appears to be rather due to
the events suffered by the male Applicant. The inundation eve nt suffered by the
Applicants cannot be attributed to any actions of the FSP.
56. The Panel does not consider that the Applicants are entitled to additional
compensatory amounts in excess of payment of the claim and interest on
same.
Determination
57. On the basis of the available information, the Panel determines that the FSP is
liable to pay the Applicants‟ claim for property damage/loss as a result of
inundation plus interest from the date of denial to the date of payment.
58. The FSP to make payment of the claim and interest within 14 days of
notification of the Applicants‟ acceptance of this Determination.
59. The Panel determines the Applicants are not entitled to further compensatory
amounts from the FSP.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.