Home / Financial Firm (Unknown - Insurer) / Determination 241966

Determination 241966

River flood exclusion relied on to decline Jindalee home claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-09-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant's home flooded in January 2011 and the FSP declined the claim as river flood. AFCA found the flood was river flood excluded under the policy, the exclusion was clearly disclosed, and no misrepresentation occurred.

The inundation was floodwater from the Brisbane River backflowing up Jindalee Creek, which is river flood under the policy definition and is clearly excluded.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 241966 Determination Page 1 of 12 Case number: 241966 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition 24 September 2012 Background 1. The Applicant held a home building and contents insurance policy with the Financial Services Provider (FSP). 2. Her home in Jindalee Queensland was inundated by water following the severe weather events in January 2011, and she lodged a claim with the FSP for the resultant damage. 3. The FSP denied her claim on the basis that the damage was caused by river flood, which is excluded under the policy. 4. The Applicant disagrees with the decision, and wants the FSP to pay her claim. Summary of Applicant’s position 5. The Applicant is represented and for convenience throughout this Determination, the Applicant and her representative will be referred to as “the Applicant”. 6. She says she did not receive a Product Disclosure Statement (PDS) until after she made her initial payment for the policy. 7. The Applicant is critical of the drafting of the policy, saying that the definition for river flood includes rainwater which mixes with floodwater. In addition, the definition of river flood and the statement explaining that river flood is excluded from cover are in different parts of the policy without adequate cross referencing. 8. For these reasons, she says that the FSP has not fulfilled its obligations under Section 35 of the Insurance Contracts Act 1984 (the Act) to clearly inform her of the river flood exclusion, and should not be able to rely on this exclusion to deny her claim. 9. The Applicant says that she previously held cover for her home with another insurer and out of concern over the problems with nearby stormwater drains, Determination Case No: 241966 Determination Page 2 of 12 she called various insurers (including the FSP) to obtain information on a more suitable policy for her needs. 10. She says during her conversation with the FSP, she specifically asked about „damage from water‟ and was informed that „everything was covered‟. She later decided to purchase the policy from the FSP, believing that it provided cover for all potential forms of water damage including river flood. 11. The Applicant says that there is significant evidence to show that the damage to her home was result of a storm and flash flood, which is covered under the policy. 12. She also says that her home is close to a large stormwater drain which services a large area which has a history of drainage problems. While she concedes that her home was eventually flooded by water from the Brisbane River, she maintains that her home was first inundated by stormwater and she should be paid for the initial damage. Summary of FSP’s position 13. It says that it has evidence to show that it provided a copy of the PDS for the policy to the Applicant shortly after inception. 14. Further, it says that the policy wording is clear and unambiguous in explaining that river flood is excluded from cover under the policy, and that it has therefore clearly informed the Applicant of the river flood exclusion pursuant to the requirements of Section 35 of the Act. 15. The FSP denies that any of its operators misrepresented to the Applicant the level of cover afforded by the policy, and has provided transcripts of several phone conversations with the Applicant in support of this position. 16. It says that the hydrological evidence establishes that the cause of the damage to the Applicant‟s home was water which overflowed from the Brisbane River and its tributary, the Jindalee Creek, and that stormwater runoff or flash flood could not have been responsible for the inundation of her home. 17. The FSP also says that due to the topography of the land in the vicinity of the Applicant‟s home, water from the nearby stormwater drain could not have inundated the Applicant‟s home without having first entered Jindalee Creek. 18. The FSP relies on the following policy provisions: “ This document contains important information to help you understand this insurance. It is up to you to choose the cover you need. Any advice in this document is of a general nature only and has not considered your objectives, financial situation or needs. You should carefully consider the information provided having regard to your personal circumstances and decide if this insurance is right for you. Case No: 241966 Determination Page 3 of 12 ... What you are not covered for There are certain times when this insurance may not provide cover. Some events we may not cover include:  Damage cause by the seas or river flood (see Section 1.12). ... Definitions (The Meaning of Some Words) Some words and expressions in this policy have a specific meaning which is given below. Each word is printed in bold where it appears. … “flash flood” means what occurs when there are heavy, intense bursts of rainfall, usually during thunderstorms where so much water falls in a very short time that it cannot get away quickly enough and collects and flows into your home. but does not include when rainwat er on the site :  cannot runoff into a water catchment system , because it is overflowing in flood; and  mixes with flood water coming from the water catchment syste m and then flows into your home. … “rain” means water that has fallen from the sky on to your building and the site but not water from flash flood . ... “river flood” means when water that is normally contained in a water catchment system increases because of rainfall or snow melt (whether in the immediate region or elsewhere) or is deliberately released by an authority, and the water overflows onto land that is not normally covered by water into your home. For example water may be deliber ately released by an authority from a dam or reservoir. ... “storm” means violent weather and high winds, sometimes accompanied by rain, hail or snow including a cyclone, tornado or willy willy. ... “water catchment system” means:  a river, creek, or other natural watercourse or lake, whether or not they are in their original state or have been modified, are named or unnamed, or normally dry that only run during periods of rain;  a dam, reservoir, stormwater channel or canal. ... 1.12 Storm, Rain or Flash flood You are insured for damage to your building and/or your contents caused Case No: 241966 Determination Page 4 of 12 by storm, rain or flash flood. We will not pay for water damage to your building caused by storm or rain seeping or otherwise entering your building unless the water entered through an opening in the wall or roof that had been made directly by the storm or rain or as a direct result of it. ... We will not pay for damage caused by:  the seas or tidal wave;  river flood ;  erosion or earth movement . ...” Issues 19. Whether the FSP clearly informed the Applicant of the exclusion of river flood from cover. 20. Whether the FSP misrepresented the level of cover provided by the policy. 21. Whether the initial damage to the Applicant‟s home was caused by river flood, or by storm, rain or flash flood. Reasons for decision 22. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s Terms of Reference. 23. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 24. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. Clearly informed 25. Section 35(2) of the Act states that when a claim is made under a “prescribed contract” for a “prescribed event”, an insurer cannot refuse to pay the claim unless it can establish that it clearly informed its insured in writing that it would not cover this event. Section 34 of the Act has defined the terms “prescribed contract” and “prescribed event” by referring to the Insurance Contracts Regulations 1985. 26. There is no d ispute that contracts of insurance covering a person‟s home building or contents are “prescribed contracts” and damage due to flood is a “prescribed event”. Case No: 241966 Determination Page 5 of 12 27. The onus is therefore on the FSP to establish that it has clearly informed the Applicant prior to the claim that it would not cover damage caused by “river flood”. This is generally done by an insurer providing a copy of its policy to its insured which is meant to set out completely the rights and obligations of both parties under the insurance contract. Provision of PDS to Applicant 28. The Applicant says that she incepted the policy over the phone and the FSP did not provide her with a copy of the PDS for the policy prior to her making the initial payment, although in a latter submission she altered this position saying that she „does not recall‟ receiving the PDS. 29. The FSP has provided documents which map out the process followed for generating and dispatching the policy documents to its policyholders, as well as a Statutory Declaration from “HW”, the manager of the FSP‟s department administering the daily processing of notices. 30. The Panel notes that the FSP has pointed out that the Applicant previously held a home building and contents policy with the FSP covering the period 15 August 2008 to 15 August 2009; this has not been disputed by the Applicant. 31. Having reviewed the submissions from both parties, the Panel finds that on the balance of probabilities, the FSP provided a copy of the PDS for the policy to the Applicant prior to the claim. Policy drafting 32. The Applicant maintains:  The exclusion of flood is made up of a definition of a term „river flood‟ as well as the non- inclusion defined under the insured event of „flash flood‟. This seeks to convert an included event into an exclusion.  The „river flood‟ exclusion is buried deep within the policy document, and is in a different part of the policy and there is inadequate cross referencing. 33. She says that the river flood exclusion is for practical purposes an unusual term and the FSP should have drawn her attention to the river flood exclusion on page 30 and its definition on page 20 of the PDS. 34. The FSP does not agree with the Applicant‟s position, saying that the terms within the policy are not confusing and that:  Page 5 of the PDS, under the heading “What yo u are not covered for” it clearly states that „river flood‟ may not be covered and directs the reader to the relevant section of the policy dealing with „Storm, rain and flash flood‟ (section1.12). Case No: 241966 Determination Page 6 of 12  At Section 1.12 of the policy wording, it is clearly stated that loss or damage resulting from „storm‟, „rain‟ and „flash flood‟ are covered, but that loss or damage from „river flood‟ is not covered.  Each of the terms „storm‟, „rain‟, „flash flood‟ and „river flood‟ is a defined term, and the meaning of each is set out at the front of the policy.  There is a clear distinction drawn between „flash flood‟ and „river flood‟ within the policy. 35. The Panel has considered the arguments from both parties and has reviewed the relevant policy wording. The policy is indexed and is cross- referenced. The exclusion with respect to river flood is spelt out and this is also included under section 1.12 of the policy. 36. Whilst the Panel has commented critically on policy wording in some Determinations, the Panel has had the opportunit y of considering the FSP‟s policy wording in Determination 240581. In that Determination the Panel considered the policy wording clearly informed the Applicant as to the nature of the exclusions. 37. It is well established that for the purpose of Section 35 of the Act that a fair reading of Section 35(2) of the Act requires the relevant exclusions and/or limitations be in clear and unambiguous language and in a manner which a person of average intelligence and education is likely to have little difficulty in finding and understanding if that person reads the policy in question. In this dispute the Panel is satisfied that the Applicant, if she had read the policy in question, would have been clearly informed as to the limitations and exclusions contained. The Panel is satisfied in the circumstances that the FSP has met its obligation under Section 35(2) of the Act, to clearly inform the Applicant as to the terms and conditions of the policy and any relevant exclusion. Did the FSP misrepresent the level of cover provided by the policy? 38. The Applicant says in 2010, because she was concerned about the risk of water inundation and damage to her property, she called the FSP to seek information about the policy coverage. 39. She says that during her conversation with the FSP, she specifically asked if the policy covered „damage from water‟ and was advised that „everything was covered‟. The Applicant says she contacted the FSP again on 13 September 2010 and incepted the policy on the basis of the assurance given by the FSP in the earlier phone conversation and has provided a Statutory Declaration attesting to this. 40. She has also provided a Statutory Declaration from a friend “ILP”, who states that in the winter of 2010 she had a conversation with the Applicant in which the Applicant told her that the FSP has advised that its policy covered any water damage. Case No: 241966 Determination Page 7 of 12 41. The FSP has provided transcripts of phone conversations the Applicant had with its operators, including the call in which the Applicant incepted the policy. It says that the transcripts show that there is no evidence that any of its operators misrepresented the level of cover provided under the policy. 42. The FSP has also provided a Statutory Declaration dated 13 January 2012 from the operator “ML”, who spoke to the Applicant o n 20 September 2011 when she called to make a change to the policy. 43. In the declaration, ML states that while she had no specific recollection of having taken the call, she is well aware of the exclusions of the policy and denies that she would have said to the insured that she was „covered for everything‟. 44. The Panel notes that the FSP has provided transcripts of calls received from the Applicant as follows:  29 January 2010 – the call was in relation to insurance for a motor vehicle.  7 June 2010 – the call was in relation to Compulsory Third Party (CTP) insurance for a motor vehicle.  13 September 2010 – the call during which the Applicant purchased the policy. 45. The Panel notes that despite attempting to locate a call recording for the call of 20 September 2010 (after the inception of the policy), it was unable to do so, and was not able to find recordings of any other incoming calls from the Applicant. 46. A review of the transcripts of the calls of 29 January and 7 June 2010 show that neither of these calls included any reference to home building and contents insurance. 47. The Panel has considered the Applicant‟s assertion that she called the FSP at some stage prior to incepting the policy on 13 September 2010 in order to obtain information about water damage, noting that the Applicant has not provided any details of the date and time during which she called, or the name of the FSP‟s representative to whom she spoke. 48. It has also considered that the Applicant had previously held a home insurance policy with the FSP, and her statement that her property was exposed to potential stormwater damage and this made her realise that her then current insurance policy (with another insurer) was not suitable. 49. The Panel has noted the declaration by ILP, however it recognises that I LP‟s statement is hearsay and does not consider the document to have any probative value. 50. Even if the Panel accepts that at some point prior to incepting the policy the Applicant spoke to a representative of the FSP and was left with the impression that there was broad coverage for water damage, the Panel is of Case No: 241966 Determination Page 8 of 12 the view that when she called on 13 September 2010, there would be some indication of her raising this issue with respect to water damage which „covered everything‟, and there is no evidence to show that this occurred. 51. A review of the transcript of 13 September 2010 phone call reveals that there is no mention of or reference to „water damage‟ or „flood‟ throughout the call. 52. The information available does not allow the Panel to determine whether the FSP misrepresented the extent of cover to the Applicant at any stage. The information provided by the Applicant is inadequate in this regard. 53. It is well established at law that an insured has the responsibility to read and understand the policy documents which they are provided with, to ensure the policy is suitable for their needs. Given the Panel accepts that the FSP provided the Applicant with a PDS for the policy many months prior to date of the loss, it accepts that the Applicant had the opportunity to review the documents consider whether the coverage was suitable and to obtain alternative cover if needed. Had she done so this would have informed her that damage caused by river flood was excluded from the relevant cover. Policy record notation 54. The Applicant has pointed to the FSP‟s policy system screen shots for her policy which include the words „flood effective policy‟, suggesting that this indicates that her policy provided cover for flood. 55. The FSP has explained that the notation on the Applicant‟s pol icy record was manually added as part of an exercise to identify those policyholders whose properties had been affected by flood, with a view to tailoring the subsequent renewal offers to those customers. 56. The FSP says that the words recorded should have be en „flood affected policy‟ and that the word „effective‟ was mistakenly substituted by the officer adding the notations. It says that this flag on the Applicant‟s record does not indicate that flood coverage is or was in place. 57. The Panel accepts that FSP‟s explanation that the wording was mistakenly recorded as „effective‟ rather than „affected‟, that the screen where this notation is recorded are intended for internal use. 58. Importantly, the Panel finds that the appearance of the notation on the Applicant‟s policy record on the FSP‟s system does not alter the contract between the FSP and the Applicant as established by the PDS and other policy documents. Cause of damage 59. The Applicant does not dispute that flood water from the Brisbane River eventually inundated her property, but says that there is evidence that the initial damage to her home occurred after a period of heavy, intense rainfall which could not get away and collected and flowed into her home. Case No: 241966 Determination Page 9 of 12 60. The Applicant says her home is close to a large stormwater drain which is the outlet of water for a large area, including all of Y Street (in which her home is located), Capitol Drive and Centenary State High School. She says that due to it servicing such a large and highly populated area, there is a history of stormwater drainage problems in the area. 61. Further, the Applicant has pointed to heavy rain events which occurred in January 2012, during which the stormwater drains on the golf course at the rear of her property were unable to drain the stormwater away quickly enough and the water pooled on the golf course. She says that this is the same as the situation that occurred in January 2011. 62. The FSP says that the inundation of the Applicant‟s property was entirely due to river flood from the Brisbane River and its tributary. It has provided a report by hydrologist “W” who inspected the Applicant‟s property on 23 December 2011 and examined the rainfall and river water level data, as well as topographic information, available for the property. 63. The report from W s tates the following with regard to the Applicant‟s version of events:  It rained heavily on Tuesday morning, 11 January 2011 and the Applicant checked the level of the Brisbane River in the afternoon but saw that it did not seem higher than normal.  She saw water rising in the golf course at the rear of her property between 9.00pm and 10.00pm on 11 January 2011.  At midnight (between 11 and 12 January 2011) she saw water was at the fence at the rear of the property and she left shortly afterwards, although the property was not inundated at this time.  The Applicant returned to the area on 12 January 2011 and saw that large sections of her suburb had been inundated. She was able to gain access to her home on 13 January 2011. 64. With respect to the rainfall in the area, the report by W states the following:  According to records at the Jindalee Alert rainfall gauge, located 1.9km north- west of the Applicant‟s property the daily rainfall totals to 9 .00am on 10, 11 and 12 January 2012 were 73.9mm, 27.1mm and 46.8mm respectively.  The Jindalee Alert rainfall gauge also recorded that the peak rainfall intensity occurred in the hour to 11.00am on 11 January 2011.  Peak stormwater runoff from the local catchment would have occurred 30 minutes after peak rainfall intensity.  No rainfall was recorded at the Jindalee Alert rainfall station after 8.00pm on 11 January 2011.  The recorded local rainfall was not particularly severe for short durations, and higher peak rainfall intensities are regularly experienced in Brisbane. Case No: 241966 Determination Page 10 of 12 65. With resp ect to the Applicant‟s property and its surrounds, W states the following:  The Applicant‟s home is a split level house and the lower section at the rear is approximately 0.7m below the section at the front of the house.  The property is 0.9km from the Brisbane River.  Jindalee Creek, a tributary of the Brisbane River, flows through a golf course approximately 110m from the rear fence of the property.  The Brisbane City Council (BCC) Floodwise report for the Applicant‟s property indicates that the ground levels at the property range from 9.0m AHD to 12.9m AHD with the peak water level during the January 2011 event estimated at 12.1m AHD.  A comparison of debris marks identified from aerial photographs with topographic data also indicates the peak water level in the vicinity of the Applicant‟s property was 12.1m AHD. 66. The report by W states the following about the river water levels in the vicinity of the Applicant property:  The Jindalee Alert and the Oxley Creek Mouth Alert gauges are located 2.8km upstream and 11.4km downstream respectively of the Applicant‟s property.  By using information interpolated from data from the Jindalee and Oxley Creek Mouth Alert gauges, it is estimated that the time of peak inundation of the Applicant‟s home was 8 .00pm on 12 January 2011.  Based on the observed depth of inundation, the Applicant‟s property would have first been inundated above floor level at approximately 6am on 12 January 2011 from water from the Brisbane River flowing back up Jindalee Creek. 67. The author of the report b y W (“AT”) has also addressed the Applicant‟s suggestion that water flowing out of the nearby large stormwater drain may have been responsible for the initial inundation of her home. 68. According to AT, the stormwater drain is approximately 0.3km south-east ( upstream) of the Applicant‟s home, and the topographic information shows that it is not possible for stormwater runoff from this drain to inundate the Applicant‟s property without first entering Jindalee Creek. 69. The report by W concludes by stating:  Given the low intensity rainfall recorded in the vicinity of the Applicant‟s property and the fact that the property was not inundated above floor level when the Applicant left the premises at about midnight (between 11 and 12 January 2011), more than 12 hours a fter the peak rainfall had occurred, the property could not have been inundated by stormwater runoff. Case No: 241966 Determination Page 11 of 12  The initial and peak inundation of the Applicant‟s property was caused by floodwater from the Brisbane River flowing back along Jindalee Creek. 70. The FSP also says that the weather and stormwater events of January 2012 have no relevance to the matter in dispute. 71. The Panel has reviewed the submissions from both parties, including the site-specific hydrology report from W. 72. In the Panel‟s view, the ev ents of January 2012 referred to by the Applicant cannot be considered as indicative of the events of the previous January. 73. The Panel notes that the rainfall and river water level information provided in the site-specific hydrology report is broadly consistent with the information contained in the hydrology reports of the Brisbane Local Government Area, which were produced by three established hydrology firms and commissioned by the Insurance Council of Australia (ICA). 74. The Panel is satisfied that, on the balance of probabilities, the inundation of the Applicant‟s home was caused by water from Brisbane River which back- flowed up Jindalee Creek. 75. The Panel accepts that this water from Brisbane River and Jindalee Creek is considered river flood as defined under the policy and is excluded from coverage under the insured event of „storm, rain and flash flood‟. 76. The rainfall patterns and local topography of the area suggests it is highly unlikely that storm water runoff was involved in any initial inundation of the Applicant‟s property. The Applicant‟s own evidence is that the water level rose from the golf course at the rear of the property. The rear of the property is approximately 110 metres from the Jindalee Creek which runs through the golf course. The evidence would support a view that it was the water that overflowed from the Jindalee Creek onto the golf course which ultimately inundated the Applicant‟s property. 77. In addition, the Panel recognises established case law which provides that a watercourse is said to overflow its normal banks when all the water that would otherwise drain into it cannot be contained in it because it is full, and all the surplus water is then overflow (refer to K Sika Plastics limited v Cornhill Insurance Co Limited [1982] 2 NZLR 50, 53 ). 78. For this reason, the Panel finds that even had any water flowed from Jindalee Creek into the large stormwater drain near the Applicant‟s property and subsequently overflowed from the drain and inundated the Applicant‟s home (which has not been substantiated) it is considered river flood. Any damage caused by inundation from this water is also excluded from coverage. Case No: 241966 Determination Page 12 of 12 Determination 79. On the basis of the available information the Panel determines that:  The FSP clearly informed the Applicant of the exclusion of river flood from cover.  The FSP did not misrepresent to the Applicant the level of cover provided by the policy.  The initial and any subsequent damage to the Applicant‟s home was caused by river flood.  The FSP is entitled to deny liability for the damage caused to the Applicant‟s home and contents by the inundation.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.