Text of the determination
Case No: 241946 Determination Page 1 of 14
Case number: 241946
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Flood vs Flash Flood and Storm water Runoff - Clearly Inform
- Insurance Contracts Act (1984), Section 35
31 August 2012
Background
1. The Applicant held a home building and contents insurance policy with the
Financial Services Provider (FSP) at the time of the loss the subject of this
dispute. The insured property is located in Jindalee, Queensland.
2. Following extreme weather i n Queensland in January 2011 the Applicant‟s
property was inundated by water and the Applicant lodged a claim with the
FSP for building and contents damage.
3. The FSP denied the Applicant‟s claim on the ground that the damage to the
insured property was caus ed by a “flood” and the Applicant‟s policy does not
include cover for “flood”.
4. The Applicant received $12,500 from the FSP‟s compassionate fund.
5. The Applicant is not satisfied with the FSP‟s decision, hence this dispute.
Summary of Applicant’s position
6. The Applicant is represented, and for convenience throughout the remainder
of this Determination, the Applicant and his representative will be referred to
collectively as “the Applicant”.
7. He says the definition for „flood‟ contained in the Product Disclosure
Statement is broad and confusing and the distinction between „flood‟ and
„flash flood‟ is very difficult to understand. As a result, the FSP has not met
its obligations under section 35 of the Insurance Contracts Act 1984 (the Act)
to clearly inform him of the flood exclusion and therefore is not entitled to rely
on this exclusion to deny his claim.
8. The Applicant says that on 11 January 2011, rainwater was running into his
backyard from the higher surrounding properties. At the same time,
stormwater collected in Y Street at the front of his home, blocking the exit to
pipes which would otherwise carry stormwater away from his property. This
resulted in stormwater building up to a height of 1.5 feet on the plateau of his
Determination
Case No: 241946 Determination Page 2 of 14
block of land. By 1.00pm, this water was lapping at the front and side doors
of his home and seeping through the walls of the bedrooms at the back of
the house.
9. By 10.00pm that evening, water had built up in Y Street and he decided to
evacuate his family shortly afterwards. He returned at about 11.30pm to
collect some personal belongings and when he left, around midnight, water
from the street was halfway up the driveway.
10. He says that the stormwater which flowed from the higher properties behind
his, built up on his block late morning and early afternoon of 11 January
2011; this water entered his home and caused some damage to his home
and his contents, as well as his shed and various other items outside the
house. This damage should be covered under the policy as stormwater
damage.
11. In a separate event, water from the stormwater drains in the street inundated
his home in the early hours of 12 January 2011 and the damage caused by
this inundation should be covered as „flash flood‟.
Summary of FSP’s position
12. With regard to the PDS, the FSP says that it clearly informed the Applicant
regarding the scope of the flood cover through the PDS and the Certificate of
Insurance it provided the Applicant.
13. The FSP relies on the following policy provision contained in the Certificate
of Insurance:
“Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
14. The FSP also relies on the following policy provisions contained in the PDS.
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and A sudden flood caused by heavy rain that fell no more
Case No: 241946 Determination Page 3 of 14
stormwater run - off than 24 hours prior to the flash flood or stormwater
run - off .
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightening,
heavy rain, hail or snow, but not continuous bad
weather by itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your contents
...
Case No: 241946 Determination Page 4 of 14
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...”
Page 48 of the PDS
“ Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you
have asked for them and we agree to cover you. Additional premiums apply
for each cover. Your certificate of insurance will show which covers operate.
All optional covers are subject to the terms and conditions of this policy.”
Page 53 of the PDS
“ Optional covers for extra peace of mind
What is covered What is not covered
Flood and storm surge
This policy does not cover flood unless
we have agreed and it is shown on your
certificate of insurance.
Home and/or contents cover
We cover you for loss of or damage to
your home or contents caused by flood
or storm surge which happens during the
period of insurance at the property
address.
We will pay up to the:
home sum insured, if your home is
insured;
contents sum insured, if your
contents are insured for damage
caused by flood or storm surge,
We will pay for loss or damage in the
same way and in the same amounts as
we do under insured events cover.
We will not pay for loss or
damage to:
paths, driveways, paving,
retaining walls (whether or
not part of the home), tennis
courts or other playing
surfaces;
shade or sail cloth;
fabric awnings, swimming
pool or spa covers or liners
and the like;
glasshouse whether or not
constructed principally of
glass;
water in swimming pools or
spas;
...
...”
15. With regard to the cause of the loss, the FSP says:
The Applicant‟s recent assertion that stormwater entered his home in
the afternoon of 11 January 2011 and caused damage is inconsistent
with his earlier statements, in which he advised that when he left the
premises (sic) in that evening water had not ente red the home.
the proximate cause of the Applicant‟s loss was “flood” as defined
under the policy;
Case No: 241946 Determination Page 5 of 14
alternatively, the Applicant has not discharged the onus of proving that
the cause of the loss was by “flash flood and storm water runoff” as
defined under the policy; and
if flash flood was a proximate cause (which is denied), then “flood” was
also a proximate cause of the loss. In such case, the principle in the
Wayne Tank case would apply and the FSP is entitled to deny the
claim.
16. The FSP maintains the Applicant must prove on the balance of probabilities
the inundation was due to an event covered under the policy. Insofar as the
Applicant‟s property may have been inundated by flash flood and storm
water runoff, the Applicant must establish that this was the proximate cause
of the loss.
17. The FSP relies upon a reference document and hydrology reports from SC
to argue that the inundation of the properties by the Brisbane River was
caused by rain which fell more than 24 hours earlier, and particularly the rain
on 9 and 10 January 2011. In a separate part of the reference document
which is not addressed directly to the Applicant‟s property, the FSP argues
that on any reasonable view the damage sustained was the combined effect
of all the rainfall that had fallen and, not just the rain that had fallen from
4.00am on 11 January 2011.
18. In the alternative the FSP argues that the switch of strategy to the W4
release was not a natural or ordinary consequence of the rain that fell on the
morning on 11 January 2011 and that the cause was not the rain, but the
dam operator‟s departure from the manual.
Issues
19. Whether the FSP clearly informed the Applicant of the flood exclusion of the
policy.
20. Whether the inundation of the Applicant‟s home was caused by „flood‟ or by
„flash flo od and stormwater run- off‟.
Reasons for decision
21. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
Case No: 241946 Determination Page 6 of 14
22. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
23. The Applicant maintains he is unsure whether the FSP had provided the
PDS document to him and in any event maintains that the PDS fails to
clearly inform as to the policy exclusion for flood and limitations on the policy
with the definition of flood being too broad and too difficult to comprehend.
The FSP have provided documentation in support of the dispatch of its
documents to show that the relevant PDS and Supplementary PDS was sent
together with Renewal Certificates on 23 October 2008 and 23 October
2009. Evidence has also been provided to show that a Renewal Certificate
dated 23 October 2010 was sent to the Applicant.
24. Based on the information provided by the FSP, the Panel is satisfied that the
FSP had provided the PDS and relevant policy documentation to the
Applicant as required by the Act.
25. The FSP is able to fulfil its obligation to clearly inform the Applicant of the
relevant terms of the policy if in accordance with Section 35(2) of the Act, the
relevant exclusion is presented in clear and unambiguous language and in a
manner in which a person of average intelligence or education is likely to
have little difficulty in finding and understanding if that person reads the
policy in question. In this dispute the Panel notes the policy and PDS has an
index on the inside cover which highlights the areas of the policy to which
the policyholder might find information. “Flood” is clearly defined under page
9 together with the qualification that:
“This policy do es not cover flood unless we have agreed and it is shown on
your certificate of insurance.”
Flood and storm surge are referred to a page 55 of the policy under the
optional covers for extra peace of mind and again, reference to the flood
exclusion is provided.
26. The policy describes the limitations on cover for “flash flood and stormwater
runoff”. Having carefully read the policy, the Panel is satisfied that a person
of average intelligence and education, on reading the policy would have
been able to find and understand the nature of the policy exclusion and
limitations. The Panel is satisfied the FSP has met its obligations to clearly
inform the Applicant as to the terms and conditions of the policy and any
relevant exclusions.
Cause of damage
27. It is accepted principle of general insurance law that an insured bears the
onus to establish that, on the face of the facts, they have suffered a loss
caused by an event to which the policy responds. This is known as a prima
facie claim. Once so established, the onus shifts to the insurer to prove that
an exclusion applies if it wishes to limit or deny the claim.
Case No: 241946 Determination Page 7 of 14
28. The Applicant has alleged that damage to his home and contents occurred
through two separate inundation events, both of which are covered under the
policy.
Stormwater inundation
29. The block on which the Applicant‟s home is located is elevated from the
street, but is relatively flat. It slopes slightly down at the front, and slightly up
at the back of the property.
30. Runoff from the higher rear neighbouring properties and from the roof gutters
is normally drained away from the property through two stormwater drains at
the rear corners of the home. This stormwater exits the property through an
outlet located on the kerb 2 metres from a double drain on Y Street.
31. The Applicant says that there is a history of drainage problems in the area
and in times of heavy rain, the stormwater drains in Y Street cannot cope
with the volume of runoff and the excess water collects in the street. When
this happens, the stormwater outlet fr om the kerb of the Applicant‟s property
becomes obstructed, and the stormwater is unable to empty onto the street.
32. According to the Applicant, this occurred at about 11.00am on 11 January
2011 and by 1.00pm the runoff accumulated around the home was
approximately 1.5 feet (0.45 metres) deep. This water caused damage to an
air conditioning unit, the shed and the pool pump and fridge it contained, as
well as the pump for the water tank. In addition, the stormwater also entered
his home by lapping at the doors and seeping through the bedroom walls at
the back of the house, and inundating most of the flooring in the home.
33. The Applicant says that the damage caused by the rainwater runoff
stormwater inundation that occurred on 11 January 2011 should be covered
by his policy.
34. The FSP says that during the first site inspection performed by its hydrologist
(DC) on 14 June 2011, the Applicant advised that no water had entered his
house before he evacuated, and specifically denied that stormwater had
entered the premises. However when DC performed the second site
inspection on 15 January 2012, the Applicant altered his version of events,
saying that stormwater entered his home prior to the arrival of floodwater
from the Brisbane River. To support its position, the FSP has provided
handwritten notes recorded from both site inspections by DC.
35. It says that the Applicant‟s earlier version of events should be preferred,
primarily as it is closer in time to the events occurring.
36. The Panel recognises that the events of January 2011 and subsequent
months were extremely traumatic for the Applicant.
37. According to the Applicant (as evidenced by the notes from DC), when he
evacuated the premises just after midnight on 11 January 2011 (the early
hours of 12 January) , the water was „not in the house – lapping at the door‟.
Case No: 241946 Determination Page 8 of 14
The Panel accepts that the Applicant‟s answer to this question was given
after consideration of whether or not water had entered his home, and was
an accurate reflection of the situation at the time he evacuated.
38. In th e view of the Panel, it is not unusual for someone‟s memory of a
particular event to unfold over a period of time. In this regard, the Panel is
prepared to accept the validity of the Applicant‟s recollection in January 2012
that prior to his evacuation of the property, stormwater had inundated parts
of his property which were outside the house, including his shed and the
fridge and pool pump it contained, an external air-conditioning unit, and a
water tank pump.
39. The FSP‟s hydrologist SC provided a report da ted 6 September 2011,
drawing in part from the observations made by DC during his inspection of
the Applicant‟s property on 14 June 2011.
40. In the report SC examines the rainfall in the area over the morning and
afternoon of 11 January 2011, and the possibility of stormwater runoff
inundation of the property.
41. SC dismisses the possibility of damage resulting from stormwater runoff,
saying that the peak rainfall in the area at around 11.00am on 11 January
2011, and any stormwater runoff would have occurred shortly after.
42. The Panel notes that the timing of the stormwater inundation, as alleged by
the Applicant in his later submission, is consistent with the timing of any
possible stormwater inundation for the areas outside the house as included
in the 6 September 2011 hydrology report by SC.
43. The Panel further notes that the argument put forward by SC does not
address the Applicant‟s later allegations of inundation of the outside namely,
of the shed and its contents, the air-conditioning unit and water tank pump.
44. Although the FSP arranged for its hydrologist to conduct another site
inspection subsequent to the Applicant‟s later claims, it then took the position
that the Applicant‟s allegations were inconsistent with his earlier advice (and
therefore not accepted), rather than obtaining an opinion from its hydrologist
as to the likelihood of stormwater inundation of the items claimed.
45. Based on the information exchanged, the Panel is satisfied that the Applicant
has established a prima facie claim for loss due to stormwater runoff of those
items that were outside of the Applicant‟s property and inundated in the early
hours of 11 January 2011 in particular the items in the shed, fridge and pool
pump and the external air conditioning and the water tank pump. The Panel
finds that whilst the FSP had the opportunity of obtaining relevant hydrology
to address these issues, it has not done so and has therefore failed to
discharge the onus upon it to prove that the exclusion applies.
Case No: 241946 Determination Page 9 of 14
Flash flooding
46. The remaining issue now for Determination in this dispute is whether the
subsequent inundation of the interior of the Applicant‟s home on 11 January
2011 was due to flash flood as defined within the terms of the policy, that is
whether rain that fell no more than 24 hours prior to the inundation of the
Applicant‟s property was the proximate cause of the inundation.
47. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
48. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
49. In view of this, the FSP provided detailed further submissions to FOS on 19
June 2012 in relation to this dispute. Included with the submissions were the
following documents:
A Reference document for disputes relating to Queensland Floods (this
is a general reference document) relating to the various submissions
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute;
Letter from the FSP‟s hydrologist attaching a key information sheet for
the Applicant‟s property;
Hydrologist report “Investigations of January 2011 inundation event –
Brisbane” dated March 2011;
Statement from hydrologist dated 7 June 2012.
Statement of DC – 23 April 2012 (this statement has been referred to
earlier in this Determination).
50. In summary the FSP argues that the proximate cause of the inundation of
the properties, that is the real or effective cause of the damage caused to the
properties downstream of the dam, is not simply the rain that occurred from
4.00am on 11 January 2011. The FSP maintains that on any reasonable
view, the damage sustained to the downstream properties was the combined
effect of all of the rainfall and not just the rain that had fallen from 4.00am on
11 January 2011 leading to the implementation of the W4 strategy from
8.00am that day.
51. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011 . It is not disputed that in addition to this there was heavy
Case No: 241946 Determination Page 10 of 14
rain over the Bremer River which influenced the level of the Brisbane River
and that rain commenced at approximately 6.00am on 11 January 2011.
52. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March
2011 which confirms the rapid increase in releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
53. The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011
the dam releases were being managed at the W3 strategy. Whilst it is
accepted that the W3 strategy had led to an increase in the levels of the
Brisbane River, the W3 strategy was designed to avoid where possible
inundation of the properties below the Wivenhoe Dam by flooding from the
Brisbane River.
54. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
55. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy to W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel‟s view, the Queensland Flood Commission of Inquiry final report
does not find the adoption of W4 strategy at 8.00am on 11 January 2011
was inconsistent with the manual. Although there may be issues as to how
the Wivenhoe Dam had been managed prior to this time, there is nothing in
the material that has been provided to the Panel to suggest that the earlier
management of the Wivenhoe Dam influenced to any significant degree, the
adoption of the W4 release strategy at 8.00am on 11 January 2011.
56. The ICA hydrology and the information provided by the FSP‟s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
57. The Panel agrees with the FSP‟s general submission that the proximate
cause is a cause determined by common sense evaluation of the relevant
facts. In the event that there are two or more proximate causes, one within
the policy and the other excluded, the policy does not respond. The
proximate cause is not determined by identifying the last event or final trigger
but by determining what is the dominant, effective, direct or efficient cause of
the loss.
Case No: 241946 Determination Page 11 of 14
58. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation and such an approach produces an entirely artificial outcome.
59. The inflows into the Wivenhoe Dam had been reducing from approximately
3.00pm on 10 January 2011 after the “first spike”. This continued until the
early hours of 11 January 2011. The FSP‟s information, and information
generally supports a view that heavy rainfall commenced at around 4.00am
on 11 January 2011 and that that rainfall most likely fell more heavily over
the dam itself and the upper catchment area.
60. The evidence supports a finding that prior to the heavy rainfall, the dam
release was being maintained at the W3 level with releases controlled to this
level to avoid extensive flooding downstream at the Wivenhoe Dam.
61. The SEQWater report confirms a rapid increase in the inflows into the Dam
from approximately 4.00am on 11 January 2011, consistent with the heavy
rainfall, and that as a result of the rapid increase, the W4 strategy had to be
implemented. There is no evidence to say this strategy would have been
implemented had the rainfall not occurred.
62. Having regard to the relevant legal principles in terms of the policy, the Panel
is satisfied that whilst there is no doubt that the Wivenhoe Dam and Brisbane
River had been impacted by the heavy rainfall in the days if not months prior
to the adoption of the W4 strategy, it was the heavy rain that fell over the
Wivenhoe Dam and Brisbane River from 4.00am on 11 January 2011 that
caused the adoption of the W4 strategy and that in the absence of such
rainfall, there is no evidence to establish the W4 strategy would have been
invoked.
63. In the circumstances, the Panel is satisfied having considered all of the
material exchanged and the relevant legal principles that the heavy rain that
commenced falling from 4.00am on 11 January 2011 over the Wivenhoe
Dam leading to the adoption of the W4 release strategy combined with the
heavy rain that commenced falling at the same time over the Brisbane River
and the heavy rain that commenced falling over the Bremer River from
approximately 6.00am on that same day was the proximate cause of the
inundation of the Applicant‟s property.
64. SC‟s stateme nt, particularly his updated key conclusions attachment,
indicates the effect of the W4 releases first reached the vicinity of the
Applicant‟s property at 1.42pm, 11 January 2011. The approximate peak
contribution of the W4 releases prior to 4.00am on Wednesday 12 January
2011 was 0.3 metres above the relevant benchmark level (house slab level)
before ultimately reaching 1.6 metres at 8.50pm on 12 January 2011.
Case No: 241946 Determination Page 12 of 14
65. In the circumstances, the Panel is satisfied that the Applicant‟s property was
inundated within 24 hours of the heavy rainfall and that such an inundation
falls within the terms of the policy.
66. The evidence supported by the key conclusions in the FSP‟s hydrology
suggests however that the peak height above benchmark was reached at
1.6 metres at 8.50pm on Wednesday 12 January 2011 well outside the
relevant 24 hour period. The Panel accepts in these circumstances not all of
the damage sustained to the Applicant‟s property can be properly attributed
to “flash flood or storm water runoff”.
67. The FSP has argued that if flash flood is found to be a proximate cause then
flood was also a proximate cause of the loss, consequently the FSP argues
it is entitled to deny the claim under the Wayne Tank principle which states
that where there are two or more proximate ca uses one within the policy and
the other specifically excluded, the policy does not respond. The Panel is not
so persuaded. The policy definition of “flood” is broadly stated that it is the
rising water which enters your home as a result of it running off or
overflowing from any origin or cause. Flash flood is described as a type of
flood. It is the “sudden” flood that occurs within 24 hours of heavy rainfall.
The policy clearly states that when this type of flood occurs, the FSP will pay
the resultant damage or loss. Otherwise stated, although the policy does not
cover flood in general, where the circumstances of the actual inundation
meets the definition of flash flood, the FSP must indemnify the insured.
Calculation of Loss
Storm water inundation
68. With respect to the earlier stormwater inundation of the Applicant‟s property,
the Panel finds that the FSP is liable for the cost of repair or replacement of
the Applicant‟s shed, the fridge and pool pump it contained, the outside air -
conditioning unit, and the pump for the water tank.
Flash flood inundation
69. In addition to the liability for the damage due to stormwater inundation
outlined in the paragraph above, the FSP is also liable for the damage to the
Applicant‟s home and contents caused by the subse quent inundation event,
and the Panel determines that the proximate cause of this subsequent
damage to the insured property was the insured event of flash flood and
storm water runoff.
70. The FSP‟s loss adjustor reported damage the entire structure of the ins ured
building and the total loss of the insured contents.
71. The 24 November 2010 Certificate of Insurance shows a home building sum
insured of $491,000 and a contents sum insured of $103,000.
72. Under the policy, the Applicant is entitled to:
Case No: 241946 Determination Page 13 of 14
up to 50% of the home building sum insured or $25,000 whichever is
higher; and
up to 50% of the contents sum insured or $25,000 whichever is higher
but not exceeding the contents sum insured.
73. The FSP‟s hydrologist suggests that the property would have been
inundated due to the W4 release to approximately 300mm above benchmark
level by 4.00am on 12 January 2011. Whilst the Panel accepts that this
calculation may not be a precise calculation, the Panel accepts in the
circumstances of this dispute that the hydrologist findings are consistent with
the comments of the Applicant and in the circumstances; the Panel accepts
that the evidence of a hydrologist contained in the key conclusion statement
can be relied upon. The Panel accepts that inundation to a level of 300mm
throughout a property will cause a majority of damage to the contents and
substantial damage to the building.
74. The Panel accepts that part of the damage may well have been due to the
effects of the inundation that occurred after the relevant 24 hour period. The
Panel has no evidence as to the extent of that damage and given the time
that has elapsed; it is difficult to see how the damage could be assessed. In
the Panel‟s view, it is fair in the circumstances subject to the Applicant
providing proof of actual repair costs for the building incurred that the FSP
indemnify the Applicant 50% of the repair cost to the building subject to the
policy limitation of 50% of the $491,000 sum insured.
75. Insofar as the contents are concerned, the Panel notes the contents were
assessed as a total loss with a contents insured sum of $103,000. The Panel
again accepts it is reasonable to indemnify the Applicant 50% of the loss.
76. The FSP has already paid the Applicant $12,500 from a compassionate fund
set up by the FSP. Payment from the compassionate fund is not subject to
FOS jurisdiction but the Panel accepts the FSP is entitled to take into
account this amount when determining the sum payable to the Applicant.
Determination
77. On the basis of the available information and for the above reasons, the
Panel determines that for both inundation events that damaged the property,
the proximate cause of the damage to the insured property was flash flood
and storm water runoff, an insured event under the policy.
78. Therefore, the Panel determines that with respect to the earlier stormwater
inundation event, and subject to adequate proof of any actual costs already
incurred by the Applicant, the FSP must indemnify the Applicant for the
repair or replacement of the Applicant‟s rear shed, the fridge and pool pump
contained inside the shed, the outside air-conditioning unit and the pump for
the water tank.
79. Further, with respect to the later flash flood inundation:
Case No: 241946 Determination Page 14 of 14
For the home contents damage, the FSP must indemnify the Applicant
$51,500 being 50% of the insured sum for total loss of contents; and
For the home building damage, subject to proof of actual repair costs
already incurred by the Applicant, the FSP must indemnify the Applicant
50% of the actual repair costs subject to the policy limitation of 50% of
the $491,000 sum insured.
80. For any amounts for which the FSP cash-settles the Applicant, or reimburses
the Applicant for cost or expenses already incurred, the FSP must pay the
Applicant interest on the amount payable from 10 March 2011 (the date of
the denial of the claim) to the date of the settlement of this Determination in
accordance with Section 57 of the Act .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.