Denial of Queensland flood damage claim under flood exclusion and flash flood 24-hour limit
Text of the determination
Case No: 241943 Determination Page 1 of 14
Case number: 241943
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Exclusion/Condition - Flood/Stormwater Damage
20 July 2012
Background
1. The Applicant held a home and contents policy with the Financial Services
Provider (FSP) with the relevant period of cover being from 1 November 2010.
The policy provided building cover of $350,000 and contents cover of
$120,000.
2. On 12 January 2011, the Applicant alleges his home was damaged as a result
of water inundation at the time of the flood events that affected significant parts
of Queensland.
3. The FSP arranged for an assessor to inspect the property and later for a
hydrologist to provide a desktop report. It declined the claim on the basis that
the cause of the loss was flood.
4. The Applicant disagrees with the decision and seeks reimbursement for his
losses, which are yet to be established.
Summary of Applicant’s Position
5. The Applicant says that the definition of „flood‟ is too broad in the policy and
that he has no recollection of receiving this document prior to making the claim.
6. He attributes the cause of his loss to flash flooding, which is covered under the
policy, when it occurs within 24 hours of heavy rainfall.
Summary of FSP’s Position
7. The FSP relies upon the opinion of its hydrologist that considered the cause of
the loss to be flood. Insofar as the Applicant alleges the loss was due to flash
flooding, the FSP maintains that the inundation was not due to rain that fell in
the 24 hours of the heavy rainfall, but due to the cumulative effect of the rainfall
on the Brisbane River and Wivenhoe Dam over the period from 6 January 2011
to 11 January 2011. In the alternative, the FSP maintained that if it is
considered the rainfall within 24 hours contributed to the inundation of the
Determination
Case No: 241943 Determination Page 2 of 14
properties, then the Wayne Tank principle applies and that the inundation is
due to a combination of flash flood and flooding within the terms of the policy
and is therefore excluded in accordance with the Wayne Tank principle.
8. It maintains that the Applicant was supplied with a copy of the PDS and other
documents at the relevant times and the FSP is entitled to rely upon the policy
provisions outlined in the PDS, which exclude the Applicant‟s loss from cover.
9. The FSP relies on the following policy provisions:
Page 2 of the Product Disclosure Statement (PDS)
“ How this policy works
...
Options that you can add to your policy by paying more:
...
Flood and storm surge
This policy does not cover flood unless we have agreed and it is shown
on your certificate of insurance...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it running off or
overflowing from any origin or cause. This policy does not cover
flood unless we have agreed and it is shown on your certificate of
insurance.
Flash flood and
stormwater
runoff
A sudden flood caused by heavy rain that fell no more than 24
hours prior to the flash flood or stormwater runoff.
...
Storm A violent disturbance of the atmosphere associated with strong
winds including a cyclone, lightening, heavy rain, hail or snow, but
not continuous bad weather by itself.
...”
Page 17 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
...
Case No: 241943 Determination Page 3 of 14
Flash flood and stormwater runoff
A sudden flood caused by heavy rain
that fell no more than 24 hours prior
to the flash flood or stormwater runoff
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Accidents that cause damage to your home and/or contents
What is covered What is not covered
Flash flood and stormwater runoff
We will pay up to 50% of your home
sum insured or $25,000, whichever is
higher.
...
Page 48 of the PDS
“ Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you have
asked for them and we agree to cover you. Additional premiums apply for each cover.
Your certificate of insurance will show which covers operate. All optional covers are
subject to the terms and conditions of this policy.”
Page 53 of the PDS
“ Optional covers for extra peace of mind
What is covered What is not covered
Flood and storm surge
This policy does not cover flood unless we
have agreed and it is shown on your
certificate of insurance.
Home and/or contents cover
We cover you for loss of or damage to your
home or contents caused by flood or storm
surge which happens during the period of
insurance at the property address.
We will pay up to the:
home sum insured, if your home is
insured;
contents sum insured, if your contents
are insured for damage caused by
flood or storm surge,
We will pay for loss or damage in the same
way and in the same amounts as we do
under insured events cover.
We will not pay for loss or damage to:
paths, driveways, paving,
retaining walls (whether or not
part of the home), tennis courts or
other playing surfaces;
shade or sail cloth;
fabric awnings, swimming pool or
spa covers or liners and the like;
glasshouse whether or not
constructed principally of glass;
water in swimming pools or
spas...
Case No: 241943 Determination Page 4 of 14
...”
10. The FSP further relies upon section 35 of the Insurance Contracts Act 1984
(the Act), which it says it has complied with in setting the conditions under
which the policy contract was offered and flood cover defined. Section 35
provides:
“ Notification of certain provisions
(1) Where:
a. a claim is made under a prescribed contract ; and
b. the event the happening of which gave rise to the claim is a prescribed
event in relation to the contract;
the insurer may not refuse to pay an amount equal to the minimum amount in relation
to the claim by reason only that the effect of the contract, but for this subsection, would
be that the event the happening of which gave rise to the claim was an event in
respect of which:
c. the amount of the insurance cover provided by the contract was less than
the minimum amount ; or
d. insurance cover was not provided by the contract.
(2) Subsection (1) does not have effect where the insurer proves that, before the
contract was entered into, the insurer clearly informed the insured in writing
(whether by providing the insured with a document containing the provisions, or
the relevant provisions, of the proposed contract or otherwise) or the insured
knew, or a reasonable person in the circumstances could be expected to have
known:
a. where the effect of the contract, but for subsection (1), would be that the
liability of the insurer in respect of a claim arising upon the happening of
the event would be less than the minimum amount --what the extent of the
insurer's liability under the contract in respect of such a claim would be; or
b. where the effect of the contract, but for subsection (1), would be that the
insurer would be under no liability in respect of such a claim--that the
contract would not provide insurance cover in respect of the happening of
that event.
(3) Regulations made for the purposes of this section take effect at the expiration of
60 days after the day on which they are notified in the Gazette.
(4) Where regulations made for the purposes of this section are amended after the
day on which a particular contract of insurance is entered into, the amendments
shall be disregarded in relation to the application of subsection (1) to that
contract.”
Issues
11. Whether the Applicant was „clearly informed‟ a bout the policy provisions
regarding „flood‟ and the relevant cover and exclusions stipulated in the policy.
12. Whether the cause of the Applicant‟s loss was flash flood or stormwater runoff
or flood and whether the Applicant should be covered for this event.
Case No: 241943 Determination Page 5 of 14
Reasons for Decision
13. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the amount of the claim and the issues to be
considered. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
14. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative and a consumer representative.
15. The Applic ant‟s home was inundated with water as a result of a significant
weather event that affected much of Queensland in early January 2011. The
Applicant attributes the damage to stormwater runoff and the FSP to flood. The
FSP argues that the loss is not covered as flood is excluded under its policy.
16. Due to the issues involved, a site inspection was conducted by the
Ombudsman on 15 December 2011. The Applicant and PF representing the
FSP were present.
17. The property is a two storey Queenslander. The ground level, whilst lined was
essentially a storage area including a hot water washing machine, tools, golf
clubs, pool equipment, lawn mower, fridge and workbench. The Applicant also
lost garden furniture and a pool table. The second level was inundated to about
800mm . The ground level of the Applicant‟s property was completely inundated
whilst the second level was inundated to a height of approximately 800mm
above the second level.
18. The property was vacated around 5.00pm on 11 January 2011. At that stage
the property had not been inundated. When he returned around 6.30am the
following morning, water was lapping Oxley Road and would have already
entered the lower or ground level of the Applicant‟s property. By 11.00am,
water was lapping the second level of the property.
19. The Applicant maintains he was initially told the claim would be settled as flash
flood. He is adamant that the hydrologist‟s report is inaccurate. He did not
speak with the hydrologist, and is not aware of any site inspection by the
hydrologist. He is adamant the property was not inundated at 2.00pm as
claimed by the hydrologist.
Provision of the PDS
20. The Applicant has stated that he did not recall when he last was provided with a
copy of the PDS from the FSP, or whether this had been done at all.
21. The PDS sets forth the provisions under which the FSP offers the insurance
contract. In the event that such a document cannot be provided, the FSP is not
entitled to rely upon any stipulations contained in the policy that apply outside
the terms of a normal insurance contract. In simple terms, the FSP would not
be able to exclude damage attributable to a flood.
Case No: 241943 Determination Page 6 of 14
22. It is the FSP‟s position that this document was provided to the Applicant and it
has supplied documents headed “PROOF OF DOCUMENT DELIVERY”,
together with attachments, to attest to the provision of a PDS, a supplementary
PDS and the Certificate of Insurance (COI). FOS has established, via its
„Circulars‟, a menu of compliance requirements incumbent upon FSPs,
whenever despatch of documents is an issue.
23. Without labouring the specifics of the information provided by the FSP, the
Panel is satisfied that Circular 3 of FOS has been complied with by the FSP;
insofar it has provided convincing objective evidence the PDS and COI were
supplied to the Applicant on or about 2 October 2008 (for the 2009 renewal
period), a supplementary PDS and COI supplied on or about 3 October 2009
(for the 2010 renewal period) and a COI only on or about 2 October 2010 (for
the 2011 renewal period).
24. Notwithstanding the Applicant could not recall the receipt of the PDS, the Panel
accepts based on the information supplied from the FSP, that he was provided
with the specified material and that the relevant documents for this claim are
the PDS from the 2009 renewal period, the supplementary PDS (detailing
policy amendments) from the 2010 renewal period and the COI from the 2011
renewal period.
Consideration of ‘Flood’ Definition in PDS
25. The Applicant has further suggested that the definition of „flood‟ as described in
the PDS is difficult to understand, particularly when it is considered in
conjunction with „flash flood‟, which is covered.
26. Flood is defined in the PDS as:
“Rising water which enters your home as a result of it running off or overflowing
from any origin or cause. This policy does not cover flood unless we have agreed
and it is shown on your certificate of insurance.”
27. In contrast, flash flood is defined in the PDS as:
“A sudden flood caused by heavy rain that fell no more than 24 hours prior to the
flash flood or stormwater runoff.”
28. Any cover extended to an insured person for damage attributable to flash flood
is limited to $25,000 or 50% of the total amount of the loss (whichever is the
higher amount), on the basis that the figure does not exceed the level of cover
specified under the policy. The cover extends to the home and contents
separately.
29. The Applicant is not suggesting that he invoked the option for flood cover under
the policy and this is reflected in the COI for the 2011 renewal period which
confirms that this cover was “not included”. Therefore, the FSP suggests that
any loss from the event on 12 January 2011 that is attributable to flood is
excluded.
Case No: 241943 Determination Page 7 of 14
30. The Applicant contends that the definition of flood is too broad and that the FSP
has not met its obligations under Section 3 5 of the Act to “clearly inform” him of
what is and is not covered under the policy.
31. The Panel has previously considered this issue for the FSP‟s policy. It is
satisfied that the two events („flood‟ and „flash flood and stormwater runoff‟) can
be distinguished.
32. In simple terms, the policy provides cover where damage is attributable to a
flood caused within 24 hours because of heavy rain. It does not cover any other
type of flood. This means that flooding attributable to heavy rain, outside the
relevant 24 hour window of policy exposure, is not covered.
33. Accordingly, the Panel is satisfied that the FSP has satisfactorily defined the
events in the policy as required under Section 35 of the Act and that it is
entitled to rely upon same in determining if the policy responds to the
Applicant‟s loss.
Evaluation of the Loss
34. The FSP initially rejected the claim based on general data from the region,
which it refused to supply to the Applicant. It has since obtained evidence
specific to the property upon which it seeks to rely.
35. It appointed a loss adjuster, MY, to investigate and report on the damage. The
site inspection was done on 5 February 2011. MY compiled a report dated 7
February 2011 and noted that:
the Applicant was at the property when it was inundated on the morning
of 12 January 2011;
the water originated from Oxley Creek and peaked at 3.6m; and
the property was inundated for two days.
36. The FSP later sought the opinion of a hydrologist, WT, who provided a desktop
report specific for the Applicant‟s address and a statutory declaration as to his
opinion of the cause of the loss. WT‟s statement and report revealed:
losses attributable to storm water runoff are usually very site specific and
an analysis of a site can determine whether a loss was attributable to
flood or stormwater runoff;
heavy rainfall in the Brisbane metropolitan area from 9 January 2011
caused “significant inflows” to the Wivenhoe Dam. The levels in this dam
peaked late on 11 January 2011, before water was discharged from it
and flowed into the Brisbane River. The Bremer River also was
subjected to significant rainfall from 6am on 11 January 2011 and
contributed up to 15%- 25% of the Brisbane River‟s peak flow;
a small part of the flow of water in the Brisbane River might be attributed
to the ra in falling into the Bremer River, though the “overwhelming
influence on the flooding” was the earlier rain that had been released
from the Wivenhoe Dam;
Case No: 241943 Determination Page 8 of 14
the elevation and location of the Applicant‟s property made it unlikely
that it would experience “signi ficant stormwater problems from
stormwater or other local runoff”;
stormwater runoff requires intense levels of rain and usually occurs
during the rain event or within one hour of it ceasing;
using data from a local rainfall gauge, located about 1.6km north of the
Applicant‟s property, WT stated that heavy rainfall was recorded
between 9-11 January 2011, with the most significant falls recorded
between 10-11am on 11 January 2011. No rainfall was recorded for the
area after 5.00pm on this day and he considers rainwater runoff
prospects to be unlikely;
he suggests that the subject property could have been inundated with
floodwater as early as 2.00pm on 11 January 2011.
WT concludes that the cause of the inundation was the rising flood
waters from the Brisbane River and not stormwater runoff.
37. Although there are some limitations on WT‟s initial report as SC did not visit the
site, the Panel accepts that the inundation of the property was most likely due
to floodwater from the Brisbane River.
38. The policy provides limited cover for “flash flood and stormwater runoff”. Flash
flood and stormwater runoff is defined as “a sudden flood caused by heavy rain
that fell no more than 24 hours prior to the flash flood or storm water runoff”.
39. In the circumstances, it is necessary for the Panel to consider whether the rain
that fell no more than 24 hours prior to the inundation of the Applicant‟s
property was the proximate cause of the inundation.
40. On 21 May 2012, FOS issued a memorandum to all relevant stakeholders
advising of the broad approach adopted in considering the proximate cause of
the adoption of the W4 Wivenhoe Dam strategy that led to the development of
a flood wave in the Brisbane River leading to significant inundation of properties
below the Wivenhoe Dam in the time after the W4 strategy was invoked. In that
memorandum FOS advised that after considerable deliberation, the Panel
formed the view that the heavy rain occurring from 4.00am on 11 January 2011
and in particular the heavy rain between 4.00am and 8.00am was a proximate
cause of the W4 strategy being invoked and therefore a proximate cause or
trigger that led to the flooding of many of the properties along the lower reaches
of the Brisbane River.
41. The approach was reached after consideration of all material that had been
provided to FOS by stakeholders and contrary to the comments of the FSP in
its reference documents, after the FSP was given the opportunity of addressing
the issue of the relationship between the heavy rain that fell from 4.00am on 11
January 2011, the adoption of the W4 strategy and the particular wording of its
policy.
42. The Panel noted in relation to the broad approach that each individual dispute
will depend upon the basis of the individual and unique factors relevant to the
Case No: 241943 Determination Page 9 of 14
dispute. In that regard, the parties were invited to make further submissions in
relation to the disputes before FOS.
43. In view of the issues arising, detailed further submissions were made by the
FSP on 12 June 2012. Included with the submissions were the following
documents:
1) Reference document for disputes relating to Queensland Floods (this is a
general reference document) relating to the various submissions the FSP
makes in relation to a number of topics. Not all issues raised in the
reference document appear in the current dispute.
2) Letter from SC of WT attaching a key information sheet for the Applicant‟s
property dated 7 June 2012.
3) WT Report “Investigation of the January 2011 Inundation event –
Brisbane dated March 2011”.
4) Statement from SC of WT dated 7 June 2012.
44. The FSP ‟s reference document does not address the individual factors relating
to the current dispute, but argues that the heavy rain that fell from 4.00am on
11 January 2011 should not be seen as being unrelated to the rain that had
fallen in the dams catchment of the previous days and should not be seen as
the proximate cause or affective cause that led to the adoption of the W4
strategy.
45. The FSP maintains that on any reasonable view, the damage sustained to the
downstream properties was the combined effect of a ll of the rainfall that had
fallen and not just the rain that had fallen from 4.00am on 11 January 2011.
Insofar as the proximate cause is not the first or last cause of the loss but the
dominant or effective direct or efficient cause, and by adopting a co mmon
sense of valuation of the facts, the FSP argues that the proximate cause could
not be the rain that fell from 4.00am on 11 January 2011 but on any reasonable
view, the damage sustained was the combined effect of all of the rainfall that
had fallen.
46. The Applicant‟s representatives have argued that the final report from the Flood
Commission does not call into question the evidence of the engineers about the
move from W3 to W4 strategy. Further, the Applicant‟s representatives argue
essentially that the transition from W3 to W4 by the Wivenhoe Dam engineers
on the morning of Tuesday 11 January 2011 was caused as a result of the
significant rainfall that fell commencing at approximately 4.00am on 11 January
2011 over the Wivenhoe Dam catchment area.
47. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment area
and in fact parts of the Brisbane River from 4.00am on 11 January 2011. It is
not disputed that in addition to this, there was heavy rain over the Bremer River
which influenced the level of the Brisbane River and that that rain commenced
at approximately 6.00am on 11 January 2011.
48. The information exchanged and relied upon by all parties and contained in the
SEQWater report identifies the rapid increase in the inflows to the Wivenhoe
Case No: 241943 Determination Page 10 of 14
Dam commencing from about 4.00am. The information confirms that the inflows
into the dam had been decreasing over the period from as early as 8.00am on
10 January 2011 with steady decreases from 3.00pm from 10 January 2011 to
2.00am on 11 January 2011. In t he Panel‟s view, prior to the commencement of
the heavy rainfall on or about 4.00am on 11 January 2011, the dam releases
were being managed consistent with the inflows.
49. The information exchanged confirms that prior to approximately 4.00am on 11
January 2011; the dam releases were being managed at the W3 strategy.
Whilst the W3 strategy had led to an increase in the levels of the Brisbane
River, the W3 strategy was designed to avoid where possible inundation of the
properties below the Wivenhoe Dam by flooding from the Brisbane River.
50. The rainfall data and information relied upon by the parties and not disputed
confirms that there were two significant rainfall spikes with the rain that fell from
9 to 10 January 2011 being the “first spike” and the rain that fell on 11 January
2011 being the “second spike”. This is confirmed by the FSP‟s hydrologist in his
statement of 7 June 2012.
51. There is no dispute that following the second spike, that is, the heavy rainfall
that commenced on or about 4.00am on 11 January 2011 over the Wivenhoe
Dam, that the W4 release strategy was adopted.
52. The information provided by SEQWater confirms that from about 4.00am on 11
January 2011, there was a significant increase in the inflows to the Wivenhoe
Dam and that as a result of the significant increase in the inflows, by 8.00am on
11 January 2011, the Wivenhoe Dam engineers were left with no alternative but
to adopt the W4 release strategy.
53. The information provided by the parties and in particular the information
provided by the FSP‟s hydrologist confirms that the increased releases from the
Wivenhoe Dam after the adoption of the W4 strategy led to the development of
a flood wave that ultimately caused the flooding from the Brisbane River
downstream of the Wivenhoe Dam. The FSP‟s hydrol ogist has suggested that
this flooding was also contributed to by heavy rain that fell over the Bremer
River from 6.00am on 11 January 2011 and also rainfall over the Brisbane
River itself.
54. The Panel agrees that in determining the proximate cause of the inundation of
the properties, it is necessary to look at the effective or dominant cause of the
inundation. The Panel agrees with the FSP‟s submission that the proximate
cause is the cause determined by a common sense of valuation of the relevant
facts. In the event that there are two or more proximate causes, one within the
policy and the other excluded, the policy does not respond. The proximate
cause is not determined by identifying the last event or final trigger, but by
determining what is the dominant, effective, direct or efficient cause of the loss.
55. The Panel is satisfied having considered all of the information that prior to the
rainfall commencing on or about 4.00am on 11 January 2011, there had been a
steady reduction in the inflows to the Wivenhoe Dam from about 3.00pm on 10
January 2011. At that time, the Wivenhoe Dam was being managed at the W3
Case No: 241943 Determination Page 11 of 14
release strategy. This release strategy whilst causing some increase in the
level of the Brisbane River was being maintained in the aim of avoiding flooding
of the areas below the Wivenhoe Dam wherever possible.
56. According to the information exchanged, including the information provided to
the Queensland Flood Commission of Inquiry, following the heavy rain that
commenced falling on or about 4.00am on 11 January 2011, the rapid increase
in the level of inflows into the dam, left no real alternative but to adopt the W4
release strategy from 8.00am on 11 January 2011. The hydrology, including
that from the ICA‟s hydrologist Panel and from the FSP supports the vi ew that
the adoption of the W4 strategy directly contributed to the development of a
“flood wave” and the subsequent inundation of properties below the Wivenhoe
Dam.
57. The FSP has maintained that the impact on the dam from the rainfall that fell in
the early hours of 11 January 2011 was only 29% whilst 71% of the volume
inflow came from rain that fell on 9 and 10 January 2011 or earlier. The FSP
maintains that to find that the rainfall from 4.00am on 11 January 2011 is a
proximate cause, is without foundation as such an approach produces an
entirely artificial outcome.
58. Alternatively, the FSP argues that if it is accepted that there are other proximate
causes apart from the implementation of the W4 strategy, then the Wayne Tank
principle applies, as the earlier rain was also a proximate cause of the
inundation. The FSP also argues that with respect to the inundation caused by
the W4 release that that was due to an intervening decision by the dam
operators and is not covered under the current policy.
59. With respect to the last argument, the Panel is of the view that it was not an
intervening factor that led to the adoption of the W4 strategy, but a fact that the
level the dam had reached by 8.00am on 11 January 2011 left the operators
with no alternative but to adopt the W4 strategy at that time.
60. With respect to the argument regarding the Wayne Tank principle and the
rainfall prior to the 24 hour period being a contributing factor or proximate
cause of the loss, the Panel notes the policy wording provides cover for sudden
flood caused within 24 hours of heavy rainfall. The relevant question is whether
the inundation is caused by heavy rain that fell no more than 24 hours prior to
the flood.
61. The Panel notes SC has speculated that in the event of the W3 release
strategy being maintained that the property would have been inundated under
that strategy by 2.55am on Wednesday 12 January 2011 and by 4.00am the
inundation would have been 0.1m above benchmark level. There is no
evidence to say the W3 releases would have been maintained at the same
discharge level that applied prior to 8.00am on 11 January 2011. It would be
inappropriate for the Panel to speculate on this. The Panel notes SC
acknowledges flooding of the area as a result of the W4 release strategy.
62. Whilst the Panel accepts there had been a significant impact on the levels of
the Wivenhoe Dam by the rainfall that had commenced falling on or about 6
Case No: 241943 Determination Page 12 of 14
January 2011 (and earlier), the Panel is satisfied that having regard to all of the
information exchanged and the relevant legal principles, that the heavy rain that
commenced falling at or about 4.00am on 11 January 2011 was the proximate
or effective cause of the adoption of the W4 strategy which in turn caused the
inundation of many of the properties below the Wivenhoe Dam as a result of
the flood wave created by the increased releases.
63. The statement from the FSP‟s hydrologist SC and in particular the key
conclusions attachment provided by SC indicates the effect of the W4 releases
first reached the vicinity of the Ap plicant‟s property at 2.39pm on 11 January
2011 and the approximate peak contribution of the W4 releases prior to 4.00am
on Wednesday 12 January 2011 reached 0.4m above the relevant benchmark
level with the ultimate inundation of the property reaching 3.4m above the
benchmark level at approximately 3.01am on Thursday 13 January 2011.
64. The Panel accepts that these assessments may not be entirely accurate
however they are consistent with the Applicant‟s comments as to the initial
inundation of the property, and in the circumstances, in the absence of
alternative information, the Panel accepts these as reasonable assessments to
the initial inundation of the property.
65. The FSP‟s hydrology identifies the inundation of the property to 0.4m above
benchmark level occurred within 24 hours of the commencement of heavy
rainfall over the Wivenhoe Dam and the adoption of the W4 strategy.
66. The Panel is satisfied that whilst the level of the Brisbane River may have been
increasing under the W3 strategy, it was the heavy rainfall from about 4.00am
on 11 January 2011 that caused the need to adopt the W4 strategy at 8.00am
on that same day. This led to the inundation of properties downstream of the
Wivenhoe Dam over the course of the next 24 hours and in this regard the
Panel is satisfied the initial inundation of the Applicant‟s property was caused
within 24 hours of the heavy rainfall.
67. Having regard to the relevant legal principles and terms of the policy, the Panel
is satisfied that the proximate cause of the inundation of the Applicant‟s
property to a height of 0.4m was the heavy rainfall that occurred over the
Wivenhoe Dam commencing at or about 4.00am on 11 January 2011. It is
apparent however from the FSP‟s hydrology that the inundation of the
Applicant‟s property continued after the 24 hour period with the property
ultimately inundated above the second level.
68. The Applicant‟s property is a split level property. The lower level is a significant
storage area which contained washing machines, hot water service, tools, golf
clubs, work benches, fridges, lawn mowers, pool equipment, etc. The Panel
accepts that the damage sustained to that area of the property would be
damage correctly attributed to “flash flood” within the meaning of the policy.
Insofar however as the second level of the property was inundated, the Panel
accepts that this inundation most likely occurred at some time after 4.00am on
12 January 2011. In fact the Applicant‟s own evidence is that when they
returned to the property at approximately 6.30am on 12 January 2011, water
had not entered the upper level of the property. It was not until approximately
Case No: 241943 Determination Page 13 of 14
11.00am on 12 January 2011 that the Applicant observed water lapping the
third last step leading to the second level of the property. In the circumstances,
the Panel is of the view that the policy does not respond to the damage
sustained to the second level of the property.
69. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $182,000 for the home with contents of $93,000. The Panel has not
been provided with an assessor‟s report or other quotation or estimates as to
the extent of the loss.
70. Given the time since the loss was sustained, the Panel accepts that the parties
may be unable to provide an exact estimate of the total loss sustained, or a
breakdown of that loss.
71. In the Panel‟s view, inundation of the first level of the property to 0.4m is likely
to have resulted in a majority of damage or loss in that area of the house. It is
likely that most of the structural damage would have been sustained and
damage sustained to items of an electrical or mechanical nature. The Panel is
unable to determine however the extent of that loss based on the information
that has been provided.
72. The Applicant has attended to the majority of repairs to his property and has
replaced a number of the items lost. In the Panel‟s view given the
circumstances that now exist, it is fair that the FSP meet the cost of repairs
incurred by the Applicant to the first level of the property and cost of
replacement of the items damaged as a result of the inundation of the first level
of the property, subject to the limitations contained within the policy. The Panel
accepts that the FSP is not liable for any loss sustained as a result of damage
to the second level of the property and accepts that such loss would have been
sustained as a result of inundation outside of the relevant 24 hour period.
73. The Applicant and the FSP are asked to work cooperatively together to
establish the extent of the loss sustained to the first level of the property and to
reach an agreement as to cost of repairs of the first level on replacement of the
various contents lost. Insofar as the FSP may have made payment of a
compassionate sum to the Applicant, FOS does not have jurisdiction to deal
with this payment but acknowledges that the FSP, given the terms on which the
compassionate payment was made, may be entitled to deduct this payment
from any settlement sum.
Determination
74. The FSP is to meet the cost of repairs incurred by the Applicant to the first level
of the property and the cost of the replacement of items damaged as a result of
the inundation of the first level of the property, including losses sustained to the
garage and any garden sheds.
75. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from 24
June 2011 being the date of rejection of the claim to date of payment of the
claim, in accordance with Section 57 of the Act.
Case No: 241943 Determination Page 14 of 14
76. With respect to the damage to the second level of the property, the Panel
determines the FSP is not liable for the loss as the inundation was outside the
relevant 24 hour period to attract cover under the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.