Denial of Queensland flood damage claim under flood exclusion and flash flood 24-hour limit

FirmFinancial Firm (Unknown - Insurer)
Decided2012-08-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A Queensland homeowner claimed for January 2011 flood damage to his split-level home and the FSP declined under the flood exclusion. AFCA found the first-level inundation fell within the 24-hour flash flood cover and ordered the FSP to pay the first-level losses with interest, but the second-level damage was outside that window and was not covered.

The proximate cause of the first-level inundation was heavy rain from 4.00am on 11 January 2011 within the 24-hour flash flood window, but second-level inundation occurred later.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 241943 Determination Page 1 of 14 Case number: 241943 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition - Flood/Stormwater Damage 20 July 2012 Background 1. The Applicant held a home and contents policy with the Financial Services Provider (FSP) with the relevant period of cover being from 1 November 2010. The policy provided building cover of $350,000 and contents cover of $120,000. 2. On 12 January 2011, the Applicant alleges his home was damaged as a result of water inundation at the time of the flood events that affected significant parts of Queensland. 3. The FSP arranged for an assessor to inspect the property and later for a hydrologist to provide a desktop report. It declined the claim on the basis that the cause of the loss was flood. 4. The Applicant disagrees with the decision and seeks reimbursement for his losses, which are yet to be established. Summary of Applicant’s Position 5. The Applicant says that the definition of „flood‟ is too broad in the policy and that he has no recollection of receiving this document prior to making the claim. 6. He attributes the cause of his loss to flash flooding, which is covered under the policy, when it occurs within 24 hours of heavy rainfall. Summary of FSP’s Position 7. The FSP relies upon the opinion of its hydrologist that considered the cause of the loss to be flood. Insofar as the Applicant alleges the loss was due to flash flooding, the FSP maintains that the inundation was not due to rain that fell in the 24 hours of the heavy rainfall, but due to the cumulative effect of the rainfall on the Brisbane River and Wivenhoe Dam over the period from 6 January 2011 to 11 January 2011. In the alternative, the FSP maintained that if it is considered the rainfall within 24 hours contributed to the inundation of the Determination Case No: 241943 Determination Page 2 of 14 properties, then the Wayne Tank principle applies and that the inundation is due to a combination of flash flood and flooding within the terms of the policy and is therefore excluded in accordance with the Wayne Tank principle. 8. It maintains that the Applicant was supplied with a copy of the PDS and other documents at the relevant times and the FSP is entitled to rely upon the policy provisions outlined in the PDS, which exclude the Applicant‟s loss from cover. 9. The FSP relies on the following policy provisions: Page 2 of the Product Disclosure Statement (PDS) “ How this policy works ...  Options that you can add to your policy by paying more:  ...  Flood and storm surge This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance...” Pages 10-12 of the PDS “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater runoff A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater runoff. ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightening, heavy rain, hail or snow, but not continuous bad weather by itself. ...” Page 17 of the PDS “ Insured events you are covered for Damage caused by weather... What is covered What is not covered ... Case No: 241943 Determination Page 3 of 14 Flash flood and stormwater runoff A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater runoff Loss or damage caused:  by flood... ...” Page 27 of the PDS “ Accidents that cause damage to your home and/or contents What is covered What is not covered Flash flood and stormwater runoff We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... Page 48 of the PDS “ Optional covers for extra peace of mind The covers outlined in this section are optional and do not apply unless you have asked for them and we agree to cover you. Additional premiums apply for each cover. Your certificate of insurance will show which covers operate. All optional covers are subject to the terms and conditions of this policy.” Page 53 of the PDS “ Optional covers for extra peace of mind What is covered What is not covered Flood and storm surge This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Home and/or contents cover We cover you for loss of or damage to your home or contents caused by flood or storm surge which happens during the period of insurance at the property address. We will pay up to the:  home sum insured, if your home is insured;  contents sum insured, if your contents are insured for damage caused by flood or storm surge, We will pay for loss or damage in the same way and in the same amounts as we do under insured events cover. We will not pay for loss or damage to:  paths, driveways, paving, retaining walls (whether or not part of the home), tennis courts or other playing surfaces;  shade or sail cloth;  fabric awnings, swimming pool or spa covers or liners and the like;  glasshouse whether or not constructed principally of glass;  water in swimming pools or spas... Case No: 241943 Determination Page 4 of 14 ...” 10. The FSP further relies upon section 35 of the Insurance Contracts Act 1984 (the Act), which it says it has complied with in setting the conditions under which the policy contract was offered and flood cover defined. Section 35 provides: “ Notification of certain provisions (1) Where: a. a claim is made under a prescribed contract ; and b. the event the happening of which gave rise to the claim is a prescribed event in relation to the contract; the insurer may not refuse to pay an amount equal to the minimum amount in relation to the claim by reason only that the effect of the contract, but for this subsection, would be that the event the happening of which gave rise to the claim was an event in respect of which: c. the amount of the insurance cover provided by the contract was less than the minimum amount ; or d. insurance cover was not provided by the contract. (2) Subsection (1) does not have effect where the insurer proves that, before the contract was entered into, the insurer clearly informed the insured in writing (whether by providing the insured with a document containing the provisions, or the relevant provisions, of the proposed contract or otherwise) or the insured knew, or a reasonable person in the circumstances could be expected to have known: a. where the effect of the contract, but for subsection (1), would be that the liability of the insurer in respect of a claim arising upon the happening of the event would be less than the minimum amount --what the extent of the insurer's liability under the contract in respect of such a claim would be; or b. where the effect of the contract, but for subsection (1), would be that the insurer would be under no liability in respect of such a claim--that the contract would not provide insurance cover in respect of the happening of that event. (3) Regulations made for the purposes of this section take effect at the expiration of 60 days after the day on which they are notified in the Gazette. (4) Where regulations made for the purposes of this section are amended after the day on which a particular contract of insurance is entered into, the amendments shall be disregarded in relation to the application of subsection (1) to that contract.” Issues 11. Whether the Applicant was „clearly informed‟ a bout the policy provisions regarding „flood‟ and the relevant cover and exclusions stipulated in the policy. 12. Whether the cause of the Applicant‟s loss was flash flood or stormwater runoff or flood and whether the Applicant should be covered for this event. Case No: 241943 Determination Page 5 of 14 Reasons for Decision 13. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the amount of the claim and the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 14. This decision has been made by a Panel consisting of an Ombudsman, an insurance industry representative and a consumer representative. 15. The Applic ant‟s home was inundated with water as a result of a significant weather event that affected much of Queensland in early January 2011. The Applicant attributes the damage to stormwater runoff and the FSP to flood. The FSP argues that the loss is not covered as flood is excluded under its policy. 16. Due to the issues involved, a site inspection was conducted by the Ombudsman on 15 December 2011. The Applicant and PF representing the FSP were present. 17. The property is a two storey Queenslander. The ground level, whilst lined was essentially a storage area including a hot water washing machine, tools, golf clubs, pool equipment, lawn mower, fridge and workbench. The Applicant also lost garden furniture and a pool table. The second level was inundated to about 800mm . The ground level of the Applicant‟s property was completely inundated whilst the second level was inundated to a height of approximately 800mm above the second level. 18. The property was vacated around 5.00pm on 11 January 2011. At that stage the property had not been inundated. When he returned around 6.30am the following morning, water was lapping Oxley Road and would have already entered the lower or ground level of the Applicant‟s property. By 11.00am, water was lapping the second level of the property. 19. The Applicant maintains he was initially told the claim would be settled as flash flood. He is adamant that the hydrologist‟s report is inaccurate. He did not speak with the hydrologist, and is not aware of any site inspection by the hydrologist. He is adamant the property was not inundated at 2.00pm as claimed by the hydrologist. Provision of the PDS 20. The Applicant has stated that he did not recall when he last was provided with a copy of the PDS from the FSP, or whether this had been done at all. 21. The PDS sets forth the provisions under which the FSP offers the insurance contract. In the event that such a document cannot be provided, the FSP is not entitled to rely upon any stipulations contained in the policy that apply outside the terms of a normal insurance contract. In simple terms, the FSP would not be able to exclude damage attributable to a flood. Case No: 241943 Determination Page 6 of 14 22. It is the FSP‟s position that this document was provided to the Applicant and it has supplied documents headed “PROOF OF DOCUMENT DELIVERY”, together with attachments, to attest to the provision of a PDS, a supplementary PDS and the Certificate of Insurance (COI). FOS has established, via its „Circulars‟, a menu of compliance requirements incumbent upon FSPs, whenever despatch of documents is an issue. 23. Without labouring the specifics of the information provided by the FSP, the Panel is satisfied that Circular 3 of FOS has been complied with by the FSP; insofar it has provided convincing objective evidence the PDS and COI were supplied to the Applicant on or about 2 October 2008 (for the 2009 renewal period), a supplementary PDS and COI supplied on or about 3 October 2009 (for the 2010 renewal period) and a COI only on or about 2 October 2010 (for the 2011 renewal period). 24. Notwithstanding the Applicant could not recall the receipt of the PDS, the Panel accepts based on the information supplied from the FSP, that he was provided with the specified material and that the relevant documents for this claim are the PDS from the 2009 renewal period, the supplementary PDS (detailing policy amendments) from the 2010 renewal period and the COI from the 2011 renewal period. Consideration of ‘Flood’ Definition in PDS 25. The Applicant has further suggested that the definition of „flood‟ as described in the PDS is difficult to understand, particularly when it is considered in conjunction with „flash flood‟, which is covered. 26. Flood is defined in the PDS as: “Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance.” 27. In contrast, flash flood is defined in the PDS as: “A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater runoff.” 28. Any cover extended to an insured person for damage attributable to flash flood is limited to $25,000 or 50% of the total amount of the loss (whichever is the higher amount), on the basis that the figure does not exceed the level of cover specified under the policy. The cover extends to the home and contents separately. 29. The Applicant is not suggesting that he invoked the option for flood cover under the policy and this is reflected in the COI for the 2011 renewal period which confirms that this cover was “not included”. Therefore, the FSP suggests that any loss from the event on 12 January 2011 that is attributable to flood is excluded. Case No: 241943 Determination Page 7 of 14 30. The Applicant contends that the definition of flood is too broad and that the FSP has not met its obligations under Section 3 5 of the Act to “clearly inform” him of what is and is not covered under the policy. 31. The Panel has previously considered this issue for the FSP‟s policy. It is satisfied that the two events („flood‟ and „flash flood and stormwater runoff‟) can be distinguished. 32. In simple terms, the policy provides cover where damage is attributable to a flood caused within 24 hours because of heavy rain. It does not cover any other type of flood. This means that flooding attributable to heavy rain, outside the relevant 24 hour window of policy exposure, is not covered. 33. Accordingly, the Panel is satisfied that the FSP has satisfactorily defined the events in the policy as required under Section 35 of the Act and that it is entitled to rely upon same in determining if the policy responds to the Applicant‟s loss. Evaluation of the Loss 34. The FSP initially rejected the claim based on general data from the region, which it refused to supply to the Applicant. It has since obtained evidence specific to the property upon which it seeks to rely. 35. It appointed a loss adjuster, MY, to investigate and report on the damage. The site inspection was done on 5 February 2011. MY compiled a report dated 7 February 2011 and noted that:  the Applicant was at the property when it was inundated on the morning of 12 January 2011;  the water originated from Oxley Creek and peaked at 3.6m; and  the property was inundated for two days. 36. The FSP later sought the opinion of a hydrologist, WT, who provided a desktop report specific for the Applicant‟s address and a statutory declaration as to his opinion of the cause of the loss. WT‟s statement and report revealed:  losses attributable to storm water runoff are usually very site specific and an analysis of a site can determine whether a loss was attributable to flood or stormwater runoff;  heavy rainfall in the Brisbane metropolitan area from 9 January 2011 caused “significant inflows” to the Wivenhoe Dam. The levels in this dam peaked late on 11 January 2011, before water was discharged from it and flowed into the Brisbane River. The Bremer River also was subjected to significant rainfall from 6am on 11 January 2011 and contributed up to 15%- 25% of the Brisbane River‟s peak flow;  a small part of the flow of water in the Brisbane River might be attributed to the ra in falling into the Bremer River, though the “overwhelming influence on the flooding” was the earlier rain that had been released from the Wivenhoe Dam; Case No: 241943 Determination Page 8 of 14  the elevation and location of the Applicant‟s property made it unlikely that it would experience “signi ficant stormwater problems from stormwater or other local runoff”;  stormwater runoff requires intense levels of rain and usually occurs during the rain event or within one hour of it ceasing;  using data from a local rainfall gauge, located about 1.6km north of the Applicant‟s property, WT stated that heavy rainfall was recorded between 9-11 January 2011, with the most significant falls recorded between 10-11am on 11 January 2011. No rainfall was recorded for the area after 5.00pm on this day and he considers rainwater runoff prospects to be unlikely;  he suggests that the subject property could have been inundated with floodwater as early as 2.00pm on 11 January 2011.  WT concludes that the cause of the inundation was the rising flood waters from the Brisbane River and not stormwater runoff. 37. Although there are some limitations on WT‟s initial report as SC did not visit the site, the Panel accepts that the inundation of the property was most likely due to floodwater from the Brisbane River. 38. The policy provides limited cover for “flash flood and stormwater runoff”. Flash flood and stormwater runoff is defined as “a sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or storm water runoff”. 39. In the circumstances, it is necessary for the Panel to consider whether the rain that fell no more than 24 hours prior to the inundation of the Applicant‟s property was the proximate cause of the inundation. 40. On 21 May 2012, FOS issued a memorandum to all relevant stakeholders advising of the broad approach adopted in considering the proximate cause of the adoption of the W4 Wivenhoe Dam strategy that led to the development of a flood wave in the Brisbane River leading to significant inundation of properties below the Wivenhoe Dam in the time after the W4 strategy was invoked. In that memorandum FOS advised that after considerable deliberation, the Panel formed the view that the heavy rain occurring from 4.00am on 11 January 2011 and in particular the heavy rain between 4.00am and 8.00am was a proximate cause of the W4 strategy being invoked and therefore a proximate cause or trigger that led to the flooding of many of the properties along the lower reaches of the Brisbane River. 41. The approach was reached after consideration of all material that had been provided to FOS by stakeholders and contrary to the comments of the FSP in its reference documents, after the FSP was given the opportunity of addressing the issue of the relationship between the heavy rain that fell from 4.00am on 11 January 2011, the adoption of the W4 strategy and the particular wording of its policy. 42. The Panel noted in relation to the broad approach that each individual dispute will depend upon the basis of the individual and unique factors relevant to the Case No: 241943 Determination Page 9 of 14 dispute. In that regard, the parties were invited to make further submissions in relation to the disputes before FOS. 43. In view of the issues arising, detailed further submissions were made by the FSP on 12 June 2012. Included with the submissions were the following documents: 1) Reference document for disputes relating to Queensland Floods (this is a general reference document) relating to the various submissions the FSP makes in relation to a number of topics. Not all issues raised in the reference document appear in the current dispute. 2) Letter from SC of WT attaching a key information sheet for the Applicant‟s property dated 7 June 2012. 3) WT Report “Investigation of the January 2011 Inundation event – Brisbane dated March 2011”. 4) Statement from SC of WT dated 7 June 2012. 44. The FSP ‟s reference document does not address the individual factors relating to the current dispute, but argues that the heavy rain that fell from 4.00am on 11 January 2011 should not be seen as being unrelated to the rain that had fallen in the dams catchment of the previous days and should not be seen as the proximate cause or affective cause that led to the adoption of the W4 strategy. 45. The FSP maintains that on any reasonable view, the damage sustained to the downstream properties was the combined effect of a ll of the rainfall that had fallen and not just the rain that had fallen from 4.00am on 11 January 2011. Insofar as the proximate cause is not the first or last cause of the loss but the dominant or effective direct or efficient cause, and by adopting a co mmon sense of valuation of the facts, the FSP argues that the proximate cause could not be the rain that fell from 4.00am on 11 January 2011 but on any reasonable view, the damage sustained was the combined effect of all of the rainfall that had fallen. 46. The Applicant‟s representatives have argued that the final report from the Flood Commission does not call into question the evidence of the engineers about the move from W3 to W4 strategy. Further, the Applicant‟s representatives argue essentially that the transition from W3 to W4 by the Wivenhoe Dam engineers on the morning of Tuesday 11 January 2011 was caused as a result of the significant rainfall that fell commencing at approximately 4.00am on 11 January 2011 over the Wivenhoe Dam catchment area. 47. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment area and in fact parts of the Brisbane River from 4.00am on 11 January 2011. It is not disputed that in addition to this, there was heavy rain over the Bremer River which influenced the level of the Brisbane River and that that rain commenced at approximately 6.00am on 11 January 2011. 48. The information exchanged and relied upon by all parties and contained in the SEQWater report identifies the rapid increase in the inflows to the Wivenhoe Case No: 241943 Determination Page 10 of 14 Dam commencing from about 4.00am. The information confirms that the inflows into the dam had been decreasing over the period from as early as 8.00am on 10 January 2011 with steady decreases from 3.00pm from 10 January 2011 to 2.00am on 11 January 2011. In t he Panel‟s view, prior to the commencement of the heavy rainfall on or about 4.00am on 11 January 2011, the dam releases were being managed consistent with the inflows. 49. The information exchanged confirms that prior to approximately 4.00am on 11 January 2011; the dam releases were being managed at the W3 strategy. Whilst the W3 strategy had led to an increase in the levels of the Brisbane River, the W3 strategy was designed to avoid where possible inundation of the properties below the Wivenhoe Dam by flooding from the Brisbane River. 50. The rainfall data and information relied upon by the parties and not disputed confirms that there were two significant rainfall spikes with the rain that fell from 9 to 10 January 2011 being the “first spike” and the rain that fell on 11 January 2011 being the “second spike”. This is confirmed by the FSP‟s hydrologist in his statement of 7 June 2012. 51. There is no dispute that following the second spike, that is, the heavy rainfall that commenced on or about 4.00am on 11 January 2011 over the Wivenhoe Dam, that the W4 release strategy was adopted. 52. The information provided by SEQWater confirms that from about 4.00am on 11 January 2011, there was a significant increase in the inflows to the Wivenhoe Dam and that as a result of the significant increase in the inflows, by 8.00am on 11 January 2011, the Wivenhoe Dam engineers were left with no alternative but to adopt the W4 release strategy. 53. The information provided by the parties and in particular the information provided by the FSP‟s hydrologist confirms that the increased releases from the Wivenhoe Dam after the adoption of the W4 strategy led to the development of a flood wave that ultimately caused the flooding from the Brisbane River downstream of the Wivenhoe Dam. The FSP‟s hydrol ogist has suggested that this flooding was also contributed to by heavy rain that fell over the Bremer River from 6.00am on 11 January 2011 and also rainfall over the Brisbane River itself. 54. The Panel agrees that in determining the proximate cause of the inundation of the properties, it is necessary to look at the effective or dominant cause of the inundation. The Panel agrees with the FSP‟s submission that the proximate cause is the cause determined by a common sense of valuation of the relevant facts. In the event that there are two or more proximate causes, one within the policy and the other excluded, the policy does not respond. The proximate cause is not determined by identifying the last event or final trigger, but by determining what is the dominant, effective, direct or efficient cause of the loss. 55. The Panel is satisfied having considered all of the information that prior to the rainfall commencing on or about 4.00am on 11 January 2011, there had been a steady reduction in the inflows to the Wivenhoe Dam from about 3.00pm on 10 January 2011. At that time, the Wivenhoe Dam was being managed at the W3 Case No: 241943 Determination Page 11 of 14 release strategy. This release strategy whilst causing some increase in the level of the Brisbane River was being maintained in the aim of avoiding flooding of the areas below the Wivenhoe Dam wherever possible. 56. According to the information exchanged, including the information provided to the Queensland Flood Commission of Inquiry, following the heavy rain that commenced falling on or about 4.00am on 11 January 2011, the rapid increase in the level of inflows into the dam, left no real alternative but to adopt the W4 release strategy from 8.00am on 11 January 2011. The hydrology, including that from the ICA‟s hydrologist Panel and from the FSP supports the vi ew that the adoption of the W4 strategy directly contributed to the development of a “flood wave” and the subsequent inundation of properties below the Wivenhoe Dam. 57. The FSP has maintained that the impact on the dam from the rainfall that fell in the early hours of 11 January 2011 was only 29% whilst 71% of the volume inflow came from rain that fell on 9 and 10 January 2011 or earlier. The FSP maintains that to find that the rainfall from 4.00am on 11 January 2011 is a proximate cause, is without foundation as such an approach produces an entirely artificial outcome. 58. Alternatively, the FSP argues that if it is accepted that there are other proximate causes apart from the implementation of the W4 strategy, then the Wayne Tank principle applies, as the earlier rain was also a proximate cause of the inundation. The FSP also argues that with respect to the inundation caused by the W4 release that that was due to an intervening decision by the dam operators and is not covered under the current policy. 59. With respect to the last argument, the Panel is of the view that it was not an intervening factor that led to the adoption of the W4 strategy, but a fact that the level the dam had reached by 8.00am on 11 January 2011 left the operators with no alternative but to adopt the W4 strategy at that time. 60. With respect to the argument regarding the Wayne Tank principle and the rainfall prior to the 24 hour period being a contributing factor or proximate cause of the loss, the Panel notes the policy wording provides cover for sudden flood caused within 24 hours of heavy rainfall. The relevant question is whether the inundation is caused by heavy rain that fell no more than 24 hours prior to the flood. 61. The Panel notes SC has speculated that in the event of the W3 release strategy being maintained that the property would have been inundated under that strategy by 2.55am on Wednesday 12 January 2011 and by 4.00am the inundation would have been 0.1m above benchmark level. There is no evidence to say the W3 releases would have been maintained at the same discharge level that applied prior to 8.00am on 11 January 2011. It would be inappropriate for the Panel to speculate on this. The Panel notes SC acknowledges flooding of the area as a result of the W4 release strategy. 62. Whilst the Panel accepts there had been a significant impact on the levels of the Wivenhoe Dam by the rainfall that had commenced falling on or about 6 Case No: 241943 Determination Page 12 of 14 January 2011 (and earlier), the Panel is satisfied that having regard to all of the information exchanged and the relevant legal principles, that the heavy rain that commenced falling at or about 4.00am on 11 January 2011 was the proximate or effective cause of the adoption of the W4 strategy which in turn caused the inundation of many of the properties below the Wivenhoe Dam as a result of the flood wave created by the increased releases. 63. The statement from the FSP‟s hydrologist SC and in particular the key conclusions attachment provided by SC indicates the effect of the W4 releases first reached the vicinity of the Ap plicant‟s property at 2.39pm on 11 January 2011 and the approximate peak contribution of the W4 releases prior to 4.00am on Wednesday 12 January 2011 reached 0.4m above the relevant benchmark level with the ultimate inundation of the property reaching 3.4m above the benchmark level at approximately 3.01am on Thursday 13 January 2011. 64. The Panel accepts that these assessments may not be entirely accurate however they are consistent with the Applicant‟s comments as to the initial inundation of the property, and in the circumstances, in the absence of alternative information, the Panel accepts these as reasonable assessments to the initial inundation of the property. 65. The FSP‟s hydrology identifies the inundation of the property to 0.4m above benchmark level occurred within 24 hours of the commencement of heavy rainfall over the Wivenhoe Dam and the adoption of the W4 strategy. 66. The Panel is satisfied that whilst the level of the Brisbane River may have been increasing under the W3 strategy, it was the heavy rainfall from about 4.00am on 11 January 2011 that caused the need to adopt the W4 strategy at 8.00am on that same day. This led to the inundation of properties downstream of the Wivenhoe Dam over the course of the next 24 hours and in this regard the Panel is satisfied the initial inundation of the Applicant‟s property was caused within 24 hours of the heavy rainfall. 67. Having regard to the relevant legal principles and terms of the policy, the Panel is satisfied that the proximate cause of the inundation of the Applicant‟s property to a height of 0.4m was the heavy rainfall that occurred over the Wivenhoe Dam commencing at or about 4.00am on 11 January 2011. It is apparent however from the FSP‟s hydrology that the inundation of the Applicant‟s property continued after the 24 hour period with the property ultimately inundated above the second level. 68. The Applicant‟s property is a split level property. The lower level is a significant storage area which contained washing machines, hot water service, tools, golf clubs, work benches, fridges, lawn mowers, pool equipment, etc. The Panel accepts that the damage sustained to that area of the property would be damage correctly attributed to “flash flood” within the meaning of the policy. Insofar however as the second level of the property was inundated, the Panel accepts that this inundation most likely occurred at some time after 4.00am on 12 January 2011. In fact the Applicant‟s own evidence is that when they returned to the property at approximately 6.30am on 12 January 2011, water had not entered the upper level of the property. It was not until approximately Case No: 241943 Determination Page 13 of 14 11.00am on 12 January 2011 that the Applicant observed water lapping the third last step leading to the second level of the property. In the circumstances, the Panel is of the view that the policy does not respond to the damage sustained to the second level of the property. 69. The Renewal Certificate of Insurance for the relevant period provides a sum insured of $182,000 for the home with contents of $93,000. The Panel has not been provided with an assessor‟s report or other quotation or estimates as to the extent of the loss. 70. Given the time since the loss was sustained, the Panel accepts that the parties may be unable to provide an exact estimate of the total loss sustained, or a breakdown of that loss. 71. In the Panel‟s view, inundation of the first level of the property to 0.4m is likely to have resulted in a majority of damage or loss in that area of the house. It is likely that most of the structural damage would have been sustained and damage sustained to items of an electrical or mechanical nature. The Panel is unable to determine however the extent of that loss based on the information that has been provided. 72. The Applicant has attended to the majority of repairs to his property and has replaced a number of the items lost. In the Panel‟s view given the circumstances that now exist, it is fair that the FSP meet the cost of repairs incurred by the Applicant to the first level of the property and cost of replacement of the items damaged as a result of the inundation of the first level of the property, subject to the limitations contained within the policy. The Panel accepts that the FSP is not liable for any loss sustained as a result of damage to the second level of the property and accepts that such loss would have been sustained as a result of inundation outside of the relevant 24 hour period. 73. The Applicant and the FSP are asked to work cooperatively together to establish the extent of the loss sustained to the first level of the property and to reach an agreement as to cost of repairs of the first level on replacement of the various contents lost. Insofar as the FSP may have made payment of a compassionate sum to the Applicant, FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. Determination 74. The FSP is to meet the cost of repairs incurred by the Applicant to the first level of the property and the cost of the replacement of items damaged as a result of the inundation of the first level of the property, including losses sustained to the garage and any garden sheds. 75. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from 24 June 2011 being the date of rejection of the claim to date of payment of the claim, in accordance with Section 57 of the Act. Case No: 241943 Determination Page 14 of 14 76. With respect to the damage to the second level of the property, the Panel determines the FSP is not liable for the loss as the inundation was outside the relevant 24 hour period to attract cover under the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.