Denial of restumping damage and of January 2011 inundation as flood rather than flash flood
Text of the determination
Case No: 241550 Determination Page 1 of 9
Case number: 241550
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
10 January 2012
Background
1. The Applicant holds a home and contents insurance policy with the Financial
Services Provider (FSP).
2. The Applicant‟s property was inundated with water in September 2010, and he
lodged a flash flood claim with the FSP for the damage.
3. In October 2010, the FSP established the cause of the damage to be flood
which is excluded under the Applicant‟s pol icy, but accepted the claim on the
basis of flash flood on an ex gratia basis, with the flash flood policy limits to
apply.
4. The FSP obtained a building consultant‟s report regarding the damage to the
Applicant‟s home, in order to form the basis for the cla im settlement.
5. The Applicant‟s home was inundated again in January 2011, and the Applicant
lodged a second flash flood claim with the FSP.
6. In March 2011, the FSP advised the Applicant that it denied the portion of his
first claim that related to damage to stumps, on the basis that the general
exclusions, including wear and tear, a nd lack of maintenance applied.
7. The FSP also denied the Applicant‟s second claim on the basis that the
damage was caused by flood.
8. After reviewing both claims, the FSP advised the Applicant in May 2011 that it
upheld its claim decisions; that is, denial of liability for the building stumps
under the Applicant‟s first claim, and denial of all liability with respect to his
second claim.
Summary of Applicant’s Position
9. The Applicant says that the damage to the stumps of his house was caused by
the flood in September 2010.
Determination
Case No: 241550 Determination Page 2 of 9
10. He has a report from a builder to support this position, and now that he has
completed and paid for the restumping work , he has photographs of the stumps
and base plates, showing them in good condition. As such, the FSP should
pay that portion of the claim.
11. With regard to his second claim, the Applicant says that the water which
inundated his property was clear run-off from the hills at the rear of his property,
and therefore not flood from the river as is stated in the FSP‟s hydrology report.
12. The Applicant has also disputed other aspects of the hydrology report, upon
which the FSP relies to den y his claim, and says that th e second claim should
be paid as flash flood.
Summary of FSP’s Position
13. The FSP submits that the inundation of the Applicant‟s home in September
2010 was flood, which is excluded under his policy.
14. Even though the FSP is entitled to deny liability for all the resulting damage, it
accepted the Applicant‟s flash flood claim on an ex gratia basis, and applied the
relevant limitations on cover for such a claim.
15. Consistent with the management of a normal flash flood claim, the FSP
appointed a building consultant („S‟) to inspect the p roperty and assess the
damage.
16. The report from „S‟ stated that the gap between the stumps and the bearers
was due to timber rot in the subfloor ground level and settlement of the stumps
had occurred over an extended period of time. He further stated that cracking in
the walls and cornices resulted from normal movement over an extended
period of time and he therefore considered this to be a maintenance issue .
17. Further, the report from „S‟ indicated that even though the September 2010
flood event may have contributed to further settlement of the stumps, all the
damage to the Applicant‟s home evident at the time of the inspection had been
occurring over an extended period of time.
18. The FSP therefore denied this portion of the claim due to general exclusions, in
particular gradual loss or damage, and wear and tear and lack of maintenance.
19. In relation to the Applicant‟s second claim, the FSP has obtained a report from
hydrologist „W‟ which states that the damage sustained to the Applicant‟s hom e
on 14 January 2011 was the result of the flooding of the Avoca River.
20. The report from „W‟ also indicates that the flooding of the Avoca River was the
result of a storm which commenced on 11 January 2011.
21. As flood is excluded from the policy, the FSP is entitled to deny liability for all
the damage to the Applicant‟s home sustained as a result of the inundation on
14 January 2011.
Case No: 241550 Determination Page 3 of 9
22. The FSP relies on the following policy provisions:
“ Glossary of words with special meaning
Flash flood - The overflow of any lake, river, creek, stormwater channel, canal or
any other watercourse (whether natural, altered or man made), caused
by a storm, where flooding occurs within 24 hours of the storm having
commenced.
Flood - The inundation of normally dry land by water which has overflowed,
escaped or been released from a lake, river, creek, stormwater
channel, canal or any other watercourse whether natural, altered or
man made.
Unless the damage is caused by flash flooding, this policy does not
cover flood.
This policy doesn’t cover everything
General exclusions – apply to overall policy
Unless included in additional cover, we will not cover loss, damage or legal liability
cause by:
Flood unless it is flash flooding;
...
Wear and tear and lack of maintenance including rust, corrosion, deterioration,
except in the case of escape of liquid (refer page 21), or legal liability claims;
Gradual loss or damage of any kind;
...
Erosion or earth movement including shrinkage
...”
Issues
23. Whether the FSP is entitled to deny liabili ty for damage to the Applicant‟s house
stumps.
24. Whether the FSP is entitled to deny liability for all damage to the Applicant‟s
home and contents resulting from the 14 January 2011 water inundation.
Reasons for Decision
25. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsma n Service‟s Terms of Reference.
26. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
Case No: 241550 Determination Page 4 of 9
27. There has been an exchange of information between the parties and the Panel
is satisfied that each party has had an opportunity to address the issues raised.
28. The following matters are not in dispute:
Water overflowing from the Avoca River which inundated the Applicant‟s
property occurred on 6 September 2010, and that this inundation is flood,
as defined under the policy.
The FSP had no liability for any damage to the Applicant‟s property arising
from the 6 September 2010 flood event, but chose to accept the
Applicant‟s claim on the basis of flash flooding on an ex gratia basis.
The FSP has settled the portion of the Applicant‟s first claim (for flash
flooding, as described in the bullet point above) in respect to damage to
the Applicant‟s split system air -conditioners, and various contents items.
The Applicant‟s property was inundated by water again on 14 January
2011.
The Applicant was provided with a P roduct Disclosure Statement (PDS)
for his policy by the FSP, prior to the water inundation event of September
2010.
The policy information contained in the PDS so provided included
wordings for the exclusions upon which the FSP relies to deny the
Applicant‟s claims or portions thereof.
Flash Flood Claim 1 – September 2010
29. The FSP has provided a copy of the report by building consultant „S‟, who
inspected the Applicant‟s property on 10 December 2010.
30. The Panel notes that the „S‟ report concluded th at the subsidence of the house
stumps, as pointed out by the Applicant, was the result of timber rot i n the
stumps below the ground.
31. The report includes several photographs depicting a stump that had been
removed from the ground by hand, and is clearly rotted away with only part of
its length remaining intact.
32. Another photograph included as part of the „S‟ report shows a 25cm
screwdriver inserted all the way to the base of its handle, at what appears to be
a slight angle, next to one of the stumps.
33. The Appl icant has disputed the conclusion of the „S‟ report in this regard,
saying that he has since had the house completely restumped, and it was
revealed that the stump base-plates were completely intact.
34. The Applicant has also said that he has provided a letter from a builder which
states that the stumps and plasterboard cracks had been affected solely by the
flood and not due to lack of maintenance.
Case No: 241550 Determination Page 5 of 9
35. Further, the Applicant has said that in the photograph with the screwdriver
(referred to in paragraph 32 above), the screwdriver was actually inserted about
2.5 cm parallel to the stump itself (i.e: straight down, not at an angle), so the
shaft of the screwdriver was never likely to intersect the stump itself. As a
result, according to the Applicant, this photograph cannot be used as evidence
of the integrity of the stumps.
36. The Panel examined the report from building consultant „S‟, and has found that
the photograph of the screwdriver (referred to in paragraphs 32 and 35 above)
shows the screwdriver inserted at an angle to the stump, and not straight down
into the ground as alleged by the Applicant. The Panel considers it highly likely
that the 25cm screwdriver would not have been able to be inserted at an angle
all the way to the base of the handle, unless the stump was substantially rotted.
37. In the view of the Panel, there is no reason to regard the evidence provided in
the „S‟ report as unreliable, and it is persuaded that a number of the stumps at
the Applicant‟s house have rotted, and that this has occurred o ver an extended
period of time.
38. The Panel has reviewed the letters dated 23 March and 11 April 2011, provided
by the Applicant from builder „R‟, and has examined the photographs of the
undamaged stumps and base plates, taken following the house re -stumping.
39. It is considered possible that some of the house stumps could be undamaged,
while others were affected by rot or deterioration; the presence of undamaged
stumps does not necessarily detract from the evidence depicted in the „S‟ report
that there were rotted stumps.
40. Further, the only evidence provided by builder „R‟ is of undamaged stumps and
there is no evidence to show that some stumps may have been damaged by
flood.
41. While acknowledging the opinion of the Applicant‟s builder „R‟, on balance the
Panel is not persuaded that the damage to the Applicant‟s stumps was caused
by the flooding in September 2010.
42. The Panel is satisfied that on the balance of probabilities, the damage to the
stumps and the cracking of the plasterboard in the house are the result of
timber rot, lack of maintenance and movement over time, which are excluded
under the policy; the Panel therefore finds that the FSP is not liable for this
damage.
Flash Flood Claim 2 – January 2011
43. The FSP has provided a hydrology report from „W‟, wh ich concludes that the
inundation of the Applicant‟s home on 14 January 2011 was caused by
floodwaters escaping the Avoca River, and that the rainfall that caused this
flooding commenced more than 24 hours prior to the inundation.
44. The Applicant says that the water that first inundated the property did not come
from the direction of the Avoca River; it came from a drain that runs to the
Case No: 241550 Determination Page 6 of 9
southeast of the property, which had filled with clear run-off from hills to the
south.
45. The Applicant also disputes certain points made within the „W‟ hydrology report,
in particular the timing of the start of the storm that was responsible for the
flooding and the interpretation of the flash flooding policy wording with respect
to the 24 hour period prior to the inundation.
Drain to Southeast - Run-off from Hills to South
46. The hydrology report by „W‟ states that local run -off was unlikely to have
affected the Applicant‟s property prior to inundation from rising levels of the
Avoca River. The report also states that local run-off would have contributed to
peak levels by mixing with overflow from the Avoca River.
47. The Applicant disputes the statements in the „W‟ report with respect to local
run-off, saying that the aerial photograph of the town provided in the report —
which was taken prior to the peak inundation level — clearly shows water
coming from the opposite direction than that of the Avoca River.
48. A review of this photograph (referred to in paragraph 47 above) gave the Panel
some indication of the extent of the flooding in the town, but did not provide the
Panel with any clear indication of the direction that the water was travelling, or
whether the Applicant‟s property was inundated at the time the photograph was
taken.
49. The Applicant‟s reference to a drain running to the south east of the property
(as mentioned in paragraph 44 above) is not specific and it is unclear how far
away from the Applicant‟s property this drain is located.
50. The hydrology report by „W‟ includes an extract of a topographic map of the
local area, but does not provide any information about any drains or stormwater
channels located to the south east of the property.
51. There is no evidence to refute the Applicant‟s statement that storm water run -
off came from the direction of the drain as indicated.
52. However the hydrology report from „W‟ has stated that by 8am on 14 January
2011 (the approximate time of inundation of the Applicant‟s home), the Avoca
River was approximately 7.25m and at the floor level of the dwelling. The report
also notes that onsite observations, confirmed by topographic data, indicated
that the majority of the town on the south side of the Avoca River (where the
Applicant‟s property is situated) has relatively minor elevation gradients, with
ground levels between 128 and 129 m AHD.
53. Although the Panel accepts that storm water run-off may have contributed to
the rising water levels, the evidence indicates that flooding from Avoca River
would have occurred concurrently with any stormwater run-off.
54. However, the key issue is whether the inundation can properly be described as
flash flood or flood. The primary differe nce between these events is the timing
Case No: 241550 Determination Page 7 of 9
of the inundation, relative to the commencement of the storm which led to the
flooding.
55. It is also clear that both events deal with water overflowing from a lake, river,
creek storm water channel, canal or any other watercourse whether natural,
altered or man-made, so effectively do not differ in terms of the physical origin
of the water.
56. This means that in the context of the Applicant‟s claim, coverage under the
flash flood insured event is available if the storm that caused the inundation
commenced within 24 hours of the inundation; but if the storm started earlier
than 24 hours before the inundation, the flood exclusion applies.
57. As such, in order to establish whether flood or flash flood occurred, it is
necessary to establish the time of the start of the storm relative to the time of
inundation.
Timing of the Inundation of Applicant‟s Property
58. According to the hydrology report by „W‟, the Applicant, who was interviewed on
19 April 2011 as part of the inspection of the property, stated that water entered
the rear of the property at 8am on 14 January 2011, and later inundated the
front of the property, despite sandbagging.
59. The Applicant has not disputed this report in terms of the timing, although the
Panel notes that the Applicant was not present at the property at 8am on 14
January 2011.
60. Having considered the limited evidence available, the Panel accepts that the
Applicant‟s property was inundated by water at or around 8am on 14 January
2011.
Timing of Storm Commencement
61. The FSP‟s policy provides a definition of storm. Interestingly, the FSP does not
refer to that definition within the Notice of Response of 6 September 2011.
62. The FSP‟s policy provides:
“Storm *A violent wind (including cyclones), sometimes combined w ith thunder, heavy
falls of rain, hail or snow; or
*Thunderstorms or hailstorms, sometimes accompanied by heavy falls of rain or snow.
It is not persistent bad weather or heavy or persistent rain by itself.”
63. The hydrology report by „W‟ provides an opinion about the start of the storm
that caused the flooding of the Avoca River in January 2011:
“...The hydrograph recorded at Charlton shows increasing levels from the 12 th
through to the peak on the 15 th of January but does not show any significant
response to variations in temporal rainfall recorded in the upstream catchment.
This indicates the causative rainfall can be considered a single storm event that
Case No: 241550 Determination Page 8 of 9
“started” at approximately 9:00 on 11 th of January 2011. Significant rainfall
ceased by approximately 11:00 on the 14 th of January 2011.”
64. The „W‟ report also states that:
“Inundation along the fence line of the property occurred approximately 64 hours
after the „start‟ of the storm.” (at 00.30 on 14 January 2011)
65. The Applicant has queried the opinion provided by „W‟ regarding the start of the
storm that caused the flooding, saying that it stopped raining in between.
66. The Applicant has also pointed to a statement in the „W‟ report regarding the
period of rainfall that was most intense (between 11pm 13 January 2011 and
8am 14 January 2011), and contends that this should be regarded as the
commencement of the storm that produced the flooding as it had stopped
raining during the period from 11 January 2011 and prior to the commencement
of the intense period of rain at 11pm on 13 January 2011.
67. The hydrology report by „W‟ includes a chart which compares the temporal
rainfall records in the local and upstream catchments, and the response of the
Avoca River at Charlton. However, the rainfall records provided are cumulative
rather than shown at discrete intervals.
68. Review of these charts indicates an accumulation of approx. 50-55mm between
00.00 11 January 2011 and 00.00 on 12 January, with very little additional
rainfall (if any) until the morning of 13 January. Significant rainfall then appears
to commence from that time with a further level of intensity increasing late on
13 January and then dissipates from the morning of 14 January 2011. All of this
is consistent with the hydrologist‟s evidence.
69. The hydrologist concludes that the period of rainfall commenced no later than
9.00am on 11 January, however, he makes no distinction between „rainfall‟ and
„storm‟.
70. Importantly, flash flood is defined in the policy as the commencement of a
„storm‟ no more than 24 hours prior to the flooding. In the Panel‟s view there is
a distinction between rain and storm. Rain can be heavy or light, intermittent or
continuous. Storm has an element of suddenness or violence which would be
distinguished by a distinct period of intensity.
71. The Panel is satisfied that this view is confirmed by the definition of storm
contained within the FSP‟s policy. In particular;
“ It is not persistent bad weather or persistent rain by itself.”
72. As can be seen from the pattern of rainfall over the period in question, a period
of intensity commenced on the morning of 13 January 2011 after a relatively
benign period of minimal rainfall. In the Panel‟s view, the commencement of the
period of intensity on 13 January is analogous with the commencement of a
storm.
Case No: 241550 Determination Page 9 of 9
73. The exact timing of these periods of rainfall or storm cannot be accurately
determined from the chart provided, however, it is clear that the period in
question would have commenced after 8.00am on 13 January 2011.
74. Accordingly, the Panel finds that the inundation that caused damage to the
Applicant‟s home and contents on 14 January 2011 occurred within 24 hours of
the commencement of a storm and his damage and losses therefore fall within
the cover provided by flash flood.
Determination
75. On the basis of the available information the Panel determines that:
The FSP is not liable for the damage to the Applicant‟s house stumps, or
the cracking of the plasterboard inside the house; and
The FSP is liable for the da mage caused by inundation of the Applicant‟s
home and contents that occurred on 14 January 2011 on the basis that it
resulted from a flash flood.
The FSP is required to indemnify the Applicant for this loss, subject to the
terms of the policy.
If the FSP elects to cash settle the Applicant, it is required to pay interest
at the statutory rate from 6 May 2011 (being the date of its decision) to the
date of settlement.