Home / Financial Firm (Unknown - Insurer) / Determination 241550

Determination 241550

Denial of restumping damage and of January 2011 inundation as flood rather than flash flood

FirmFinancial Firm (Unknown - Insurer)
Decided2012-01-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insured claimed for stump repairs after a September 2010 flood and for January 2011 inundation, which the FSP denied as flood. AFCA refused the stump claim as rot and lack of maintenance but found the January 2011 loss fell within flash flood cover and ordered indemnity with statutory interest.

Flash flood cover applies because the storm, distinct from persistent rain, commenced within 24 hours before the inundation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 241550 Determination Page 1 of 9 Case number: 241550 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 10 January 2012 Background 1. The Applicant holds a home and contents insurance policy with the Financial Services Provider (FSP). 2. The Applicant‟s property was inundated with water in September 2010, and he lodged a flash flood claim with the FSP for the damage. 3. In October 2010, the FSP established the cause of the damage to be flood which is excluded under the Applicant‟s pol icy, but accepted the claim on the basis of flash flood on an ex gratia basis, with the flash flood policy limits to apply. 4. The FSP obtained a building consultant‟s report regarding the damage to the Applicant‟s home, in order to form the basis for the cla im settlement. 5. The Applicant‟s home was inundated again in January 2011, and the Applicant lodged a second flash flood claim with the FSP. 6. In March 2011, the FSP advised the Applicant that it denied the portion of his first claim that related to damage to stumps, on the basis that the general exclusions, including wear and tear, a nd lack of maintenance applied. 7. The FSP also denied the Applicant‟s second claim on the basis that the damage was caused by flood. 8. After reviewing both claims, the FSP advised the Applicant in May 2011 that it upheld its claim decisions; that is, denial of liability for the building stumps under the Applicant‟s first claim, and denial of all liability with respect to his second claim. Summary of Applicant’s Position 9. The Applicant says that the damage to the stumps of his house was caused by the flood in September 2010. Determination Case No: 241550 Determination Page 2 of 9 10. He has a report from a builder to support this position, and now that he has completed and paid for the restumping work , he has photographs of the stumps and base plates, showing them in good condition. As such, the FSP should pay that portion of the claim. 11. With regard to his second claim, the Applicant says that the water which inundated his property was clear run-off from the hills at the rear of his property, and therefore not flood from the river as is stated in the FSP‟s hydrology report. 12. The Applicant has also disputed other aspects of the hydrology report, upon which the FSP relies to den y his claim, and says that th e second claim should be paid as flash flood. Summary of FSP’s Position 13. The FSP submits that the inundation of the Applicant‟s home in September 2010 was flood, which is excluded under his policy. 14. Even though the FSP is entitled to deny liability for all the resulting damage, it accepted the Applicant‟s flash flood claim on an ex gratia basis, and applied the relevant limitations on cover for such a claim. 15. Consistent with the management of a normal flash flood claim, the FSP appointed a building consultant („S‟) to inspect the p roperty and assess the damage. 16. The report from „S‟ stated that the gap between the stumps and the bearers was due to timber rot in the subfloor ground level and settlement of the stumps had occurred over an extended period of time. He further stated that cracking in the walls and cornices resulted from normal movement over an extended period of time and he therefore considered this to be a maintenance issue . 17. Further, the report from „S‟ indicated that even though the September 2010 flood event may have contributed to further settlement of the stumps, all the damage to the Applicant‟s home evident at the time of the inspection had been occurring over an extended period of time. 18. The FSP therefore denied this portion of the claim due to general exclusions, in particular gradual loss or damage, and wear and tear and lack of maintenance. 19. In relation to the Applicant‟s second claim, the FSP has obtained a report from hydrologist „W‟ which states that the damage sustained to the Applicant‟s hom e on 14 January 2011 was the result of the flooding of the Avoca River. 20. The report from „W‟ also indicates that the flooding of the Avoca River was the result of a storm which commenced on 11 January 2011. 21. As flood is excluded from the policy, the FSP is entitled to deny liability for all the damage to the Applicant‟s home sustained as a result of the inundation on 14 January 2011. Case No: 241550 Determination Page 3 of 9 22. The FSP relies on the following policy provisions: “ Glossary of words with special meaning Flash flood - The overflow of any lake, river, creek, stormwater channel, canal or any other watercourse (whether natural, altered or man made), caused by a storm, where flooding occurs within 24 hours of the storm having commenced. Flood - The inundation of normally dry land by water which has overflowed, escaped or been released from a lake, river, creek, stormwater channel, canal or any other watercourse whether natural, altered or man made. Unless the damage is caused by flash flooding, this policy does not cover flood. This policy doesn’t cover everything General exclusions – apply to overall policy Unless included in additional cover, we will not cover loss, damage or legal liability cause by:  Flood unless it is flash flooding; ...  Wear and tear and lack of maintenance including rust, corrosion, deterioration, except in the case of escape of liquid (refer page 21), or legal liability claims;  Gradual loss or damage of any kind; ...  Erosion or earth movement including shrinkage ...” Issues 23. Whether the FSP is entitled to deny liabili ty for damage to the Applicant‟s house stumps. 24. Whether the FSP is entitled to deny liability for all damage to the Applicant‟s home and contents resulting from the 14 January 2011 water inundation. Reasons for Decision 25. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsma n Service‟s Terms of Reference. 26. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. Case No: 241550 Determination Page 4 of 9 27. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. 28. The following matters are not in dispute:  Water overflowing from the Avoca River which inundated the Applicant‟s property occurred on 6 September 2010, and that this inundation is flood, as defined under the policy.  The FSP had no liability for any damage to the Applicant‟s property arising from the 6 September 2010 flood event, but chose to accept the Applicant‟s claim on the basis of flash flooding on an ex gratia basis.  The FSP has settled the portion of the Applicant‟s first claim (for flash flooding, as described in the bullet point above) in respect to damage to the Applicant‟s split system air -conditioners, and various contents items.  The Applicant‟s property was inundated by water again on 14 January 2011.  The Applicant was provided with a P roduct Disclosure Statement (PDS) for his policy by the FSP, prior to the water inundation event of September 2010.  The policy information contained in the PDS so provided included wordings for the exclusions upon which the FSP relies to deny the Applicant‟s claims or portions thereof. Flash Flood Claim 1 – September 2010 29. The FSP has provided a copy of the report by building consultant „S‟, who inspected the Applicant‟s property on 10 December 2010. 30. The Panel notes that the „S‟ report concluded th at the subsidence of the house stumps, as pointed out by the Applicant, was the result of timber rot i n the stumps below the ground. 31. The report includes several photographs depicting a stump that had been removed from the ground by hand, and is clearly rotted away with only part of its length remaining intact. 32. Another photograph included as part of the „S‟ report shows a 25cm screwdriver inserted all the way to the base of its handle, at what appears to be a slight angle, next to one of the stumps. 33. The Appl icant has disputed the conclusion of the „S‟ report in this regard, saying that he has since had the house completely restumped, and it was revealed that the stump base-plates were completely intact. 34. The Applicant has also said that he has provided a letter from a builder which states that the stumps and plasterboard cracks had been affected solely by the flood and not due to lack of maintenance. Case No: 241550 Determination Page 5 of 9 35. Further, the Applicant has said that in the photograph with the screwdriver (referred to in paragraph 32 above), the screwdriver was actually inserted about 2.5 cm parallel to the stump itself (i.e: straight down, not at an angle), so the shaft of the screwdriver was never likely to intersect the stump itself. As a result, according to the Applicant, this photograph cannot be used as evidence of the integrity of the stumps. 36. The Panel examined the report from building consultant „S‟, and has found that the photograph of the screwdriver (referred to in paragraphs 32 and 35 above) shows the screwdriver inserted at an angle to the stump, and not straight down into the ground as alleged by the Applicant. The Panel considers it highly likely that the 25cm screwdriver would not have been able to be inserted at an angle all the way to the base of the handle, unless the stump was substantially rotted. 37. In the view of the Panel, there is no reason to regard the evidence provided in the „S‟ report as unreliable, and it is persuaded that a number of the stumps at the Applicant‟s house have rotted, and that this has occurred o ver an extended period of time. 38. The Panel has reviewed the letters dated 23 March and 11 April 2011, provided by the Applicant from builder „R‟, and has examined the photographs of the undamaged stumps and base plates, taken following the house re -stumping. 39. It is considered possible that some of the house stumps could be undamaged, while others were affected by rot or deterioration; the presence of undamaged stumps does not necessarily detract from the evidence depicted in the „S‟ report that there were rotted stumps. 40. Further, the only evidence provided by builder „R‟ is of undamaged stumps and there is no evidence to show that some stumps may have been damaged by flood. 41. While acknowledging the opinion of the Applicant‟s builder „R‟, on balance the Panel is not persuaded that the damage to the Applicant‟s stumps was caused by the flooding in September 2010. 42. The Panel is satisfied that on the balance of probabilities, the damage to the stumps and the cracking of the plasterboard in the house are the result of timber rot, lack of maintenance and movement over time, which are excluded under the policy; the Panel therefore finds that the FSP is not liable for this damage. Flash Flood Claim 2 – January 2011 43. The FSP has provided a hydrology report from „W‟, wh ich concludes that the inundation of the Applicant‟s home on 14 January 2011 was caused by floodwaters escaping the Avoca River, and that the rainfall that caused this flooding commenced more than 24 hours prior to the inundation. 44. The Applicant says that the water that first inundated the property did not come from the direction of the Avoca River; it came from a drain that runs to the Case No: 241550 Determination Page 6 of 9 southeast of the property, which had filled with clear run-off from hills to the south. 45. The Applicant also disputes certain points made within the „W‟ hydrology report, in particular the timing of the start of the storm that was responsible for the flooding and the interpretation of the flash flooding policy wording with respect to the 24 hour period prior to the inundation. Drain to Southeast - Run-off from Hills to South 46. The hydrology report by „W‟ states that local run -off was unlikely to have affected the Applicant‟s property prior to inundation from rising levels of the Avoca River. The report also states that local run-off would have contributed to peak levels by mixing with overflow from the Avoca River. 47. The Applicant disputes the statements in the „W‟ report with respect to local run-off, saying that the aerial photograph of the town provided in the report — which was taken prior to the peak inundation level — clearly shows water coming from the opposite direction than that of the Avoca River. 48. A review of this photograph (referred to in paragraph 47 above) gave the Panel some indication of the extent of the flooding in the town, but did not provide the Panel with any clear indication of the direction that the water was travelling, or whether the Applicant‟s property was inundated at the time the photograph was taken. 49. The Applicant‟s reference to a drain running to the south east of the property (as mentioned in paragraph 44 above) is not specific and it is unclear how far away from the Applicant‟s property this drain is located. 50. The hydrology report by „W‟ includes an extract of a topographic map of the local area, but does not provide any information about any drains or stormwater channels located to the south east of the property. 51. There is no evidence to refute the Applicant‟s statement that storm water run - off came from the direction of the drain as indicated. 52. However the hydrology report from „W‟ has stated that by 8am on 14 January 2011 (the approximate time of inundation of the Applicant‟s home), the Avoca River was approximately 7.25m and at the floor level of the dwelling. The report also notes that onsite observations, confirmed by topographic data, indicated that the majority of the town on the south side of the Avoca River (where the Applicant‟s property is situated) has relatively minor elevation gradients, with ground levels between 128 and 129 m AHD. 53. Although the Panel accepts that storm water run-off may have contributed to the rising water levels, the evidence indicates that flooding from Avoca River would have occurred concurrently with any stormwater run-off. 54. However, the key issue is whether the inundation can properly be described as flash flood or flood. The primary differe nce between these events is the timing Case No: 241550 Determination Page 7 of 9 of the inundation, relative to the commencement of the storm which led to the flooding. 55. It is also clear that both events deal with water overflowing from a lake, river, creek storm water channel, canal or any other watercourse whether natural, altered or man-made, so effectively do not differ in terms of the physical origin of the water. 56. This means that in the context of the Applicant‟s claim, coverage under the flash flood insured event is available if the storm that caused the inundation commenced within 24 hours of the inundation; but if the storm started earlier than 24 hours before the inundation, the flood exclusion applies. 57. As such, in order to establish whether flood or flash flood occurred, it is necessary to establish the time of the start of the storm relative to the time of inundation. Timing of the Inundation of Applicant‟s Property 58. According to the hydrology report by „W‟, the Applicant, who was interviewed on 19 April 2011 as part of the inspection of the property, stated that water entered the rear of the property at 8am on 14 January 2011, and later inundated the front of the property, despite sandbagging. 59. The Applicant has not disputed this report in terms of the timing, although the Panel notes that the Applicant was not present at the property at 8am on 14 January 2011. 60. Having considered the limited evidence available, the Panel accepts that the Applicant‟s property was inundated by water at or around 8am on 14 January 2011. Timing of Storm Commencement 61. The FSP‟s policy provides a definition of storm. Interestingly, the FSP does not refer to that definition within the Notice of Response of 6 September 2011. 62. The FSP‟s policy provides: “Storm *A violent wind (including cyclones), sometimes combined w ith thunder, heavy falls of rain, hail or snow; or *Thunderstorms or hailstorms, sometimes accompanied by heavy falls of rain or snow. It is not persistent bad weather or heavy or persistent rain by itself.” 63. The hydrology report by „W‟ provides an opinion about the start of the storm that caused the flooding of the Avoca River in January 2011: “...The hydrograph recorded at Charlton shows increasing levels from the 12 th through to the peak on the 15 th of January but does not show any significant response to variations in temporal rainfall recorded in the upstream catchment. This indicates the causative rainfall can be considered a single storm event that Case No: 241550 Determination Page 8 of 9 “started” at approximately 9:00 on 11 th of January 2011. Significant rainfall ceased by approximately 11:00 on the 14 th of January 2011.” 64. The „W‟ report also states that: “Inundation along the fence line of the property occurred approximately 64 hours after the „start‟ of the storm.” (at 00.30 on 14 January 2011) 65. The Applicant has queried the opinion provided by „W‟ regarding the start of the storm that caused the flooding, saying that it stopped raining in between. 66. The Applicant has also pointed to a statement in the „W‟ report regarding the period of rainfall that was most intense (between 11pm 13 January 2011 and 8am 14 January 2011), and contends that this should be regarded as the commencement of the storm that produced the flooding as it had stopped raining during the period from 11 January 2011 and prior to the commencement of the intense period of rain at 11pm on 13 January 2011. 67. The hydrology report by „W‟ includes a chart which compares the temporal rainfall records in the local and upstream catchments, and the response of the Avoca River at Charlton. However, the rainfall records provided are cumulative rather than shown at discrete intervals. 68. Review of these charts indicates an accumulation of approx. 50-55mm between 00.00 11 January 2011 and 00.00 on 12 January, with very little additional rainfall (if any) until the morning of 13 January. Significant rainfall then appears to commence from that time with a further level of intensity increasing late on 13 January and then dissipates from the morning of 14 January 2011. All of this is consistent with the hydrologist‟s evidence. 69. The hydrologist concludes that the period of rainfall commenced no later than 9.00am on 11 January, however, he makes no distinction between „rainfall‟ and „storm‟. 70. Importantly, flash flood is defined in the policy as the commencement of a „storm‟ no more than 24 hours prior to the flooding. In the Panel‟s view there is a distinction between rain and storm. Rain can be heavy or light, intermittent or continuous. Storm has an element of suddenness or violence which would be distinguished by a distinct period of intensity. 71. The Panel is satisfied that this view is confirmed by the definition of storm contained within the FSP‟s policy. In particular; “ It is not persistent bad weather or persistent rain by itself.” 72. As can be seen from the pattern of rainfall over the period in question, a period of intensity commenced on the morning of 13 January 2011 after a relatively benign period of minimal rainfall. In the Panel‟s view, the commencement of the period of intensity on 13 January is analogous with the commencement of a storm. Case No: 241550 Determination Page 9 of 9 73. The exact timing of these periods of rainfall or storm cannot be accurately determined from the chart provided, however, it is clear that the period in question would have commenced after 8.00am on 13 January 2011. 74. Accordingly, the Panel finds that the inundation that caused damage to the Applicant‟s home and contents on 14 January 2011 occurred within 24 hours of the commencement of a storm and his damage and losses therefore fall within the cover provided by flash flood. Determination 75. On the basis of the available information the Panel determines that:  The FSP is not liable for the damage to the Applicant‟s house stumps, or the cracking of the plasterboard inside the house; and  The FSP is liable for the da mage caused by inundation of the Applicant‟s home and contents that occurred on 14 January 2011 on the basis that it resulted from a flash flood.  The FSP is required to indemnify the Applicant for this loss, subject to the terms of the policy.  If the FSP elects to cash settle the Applicant, it is required to pay interest at the statutory rate from 6 May 2011 (being the date of its decision) to the date of settlement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.