After a May 2010 shed fire, the FSP cash settled the roof repair on a consultant's scope of works for $23,420 and refused demolition and replacement. AFCA found the FSP breached its utmost good faith duty and allowed the applicants to elect between FSP-arranged reinstatement or a cash settlement of $70,000 less the $23,220 already paid.

The insurer's election of a settlement method based on a flawed scope of works was not made in good faith under section 13 of the Insurance Contracts Act, so the applicants may choose how the claim is settled.

Issues

Subjects and remedies

home or building damagepay claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

241523 Determination Page 1 of 9 Case Number: 241523 General Insurance – Home Building – Fire damage to an outbuilding – Method of replacement/repairs to the fire damage. 28 October 2011 Background 1. The Applicants insured their home building under a Home Building Insurance Policy for $209,242 against loss or damage caused by insured events. The policy commenced on 30 September 1990 and had been renewed annually to 30 September 2010.There was a $100 policy excess. 2. On 11 May 2010, a storage shed on the property was damaged by fire. The damage was primarily to the roof frame and cladding of the building although the Applicants report that there was also some damage to the walls of the shed. It has been estimated the building was constructed in the 1960’s. 3. The Financial Services Provider (FSP) has accepted liability for the costs of repairing or replacing the roof of the shed. 4. The FSP appointed a building consultant to inspect and report on the damage to the building and to prepare a Scope of Works (SOW) for repairs or replacement of the damaged roof. 5. Due to possible problems with the weight bearing strength of the brick walls of the shed, the building consultant stated that the only way the roof could be replaced was to replace the roof with a construction that was a separate structure to the shed walls. 6. Based upon the SOW, the FSP obtained three quotes for the repair/replacement work in the amounts of:  Builder R $32,359  Builder S $26,986, and  Builder W $23,420. 7. The FSP accepted the quote of $23,420 and cash settled the Applicants for that amount. 8. The Applicants do not accept the payment as being fair and reasonable and have also disagreed with the method of repairs recommended by the FSP’s building consultant and submitted in the SOW. Determination 241523 Determination Page 2 of 9 9. The Applicants contend that the shed should be demolished and replaced with a new structure. They obtained three quotes to demolish the old shed and replace it for the amounts of:  Builder J $78,260  Builder B $80,554, and  Builder H $75,626. 10. The Applicants have also obtained two quotes to replace the shed with a pre- fabricated metal structure for the amounts of:  Builder R $60,067 plus costs to reinstate water and gas services  Builder F $55,643.20 (est) 11. The Applicant s contend the FSP’s method of settling their claim is unsafe and a substandard method of repair and their fire damaged shed should be demolished and replaced. Summary of Applicants ’ Position 12. They purchased the property in September 1990 and all relevant surveys and inspections were carried out on the property. A 317a building certificate was issued covering the whole of the property with a surveyor’ s report showing all of the property including the shed with only minor fencing irregularities and no mention was made of any unauthorised buildings requiring demolition. 13. The Applicant s contend that the FSP’s building consultant failed to include all of the necessary repairs to reinstate their building. They also raised issues of safety in the method of repairs recommended in the building consultant’s SOW which they consider to be incomplete and biased towards the FSP. The SOW has also not been reviewed by a structural engineer. 14. The building consultant stated that the concrete block walls, as they were constructed, have never been suitable as they are not co mpliant with the masonry code (AS 3700). He stated the concrete blocks do not have any supporting piers which are mandatory for lateral stiffening if they are to be used as the walling. The building consultant also stated the walls were non-compliant and unsuitable as a base for a correct roof frame. 15. The Building Code of Australia (BCA) only came into force after a change from local council ordnance to the BCA after a transition period during the period 1990 – 1993 when it became the BCA in 1993. 16. A BCA advisory officer informed them that anything built prior to 1993 would have been built to meet whatever standards were in place at the time if a 317a certificate had been issued. They obtained a 317a certificate in 1990. 17. The building consultant was of the opinion that the only way the roof can be replaced is if it is constructed as a separate structure to the shed walls. This 241523 Determination Page 3 of 9 involved the supply and fitting of eight new supporting posts, being four on each side of the building. The support posts would be used as the base supply for a new roof frame. The existing walls would be left without any supporting piers. 18. The Applicants dispute is in respect to concerns of safety being left with a building with walls unsecured. The building consultant’s report has not bee n based around an engineer’s recommendation. 19. The building consultant’s plan is unacceptable to the Applicants. The plan changes the appearance of the building in that there would be eight poles around the outside of the building and free standing roof over what will be left of the old building. It would be hideous and ill-fated. 20. In addition, the building consultant’s report and SOW was viewed by their local council who stated they had concerns over the building repair offered as it would leave the building in an unsafe condition. This is because the SOW did not state how the existing walls would be supported with the council officer stating he doubted the council would approve the repairs as being acceptable. 21. The SOW was reviewed by three independent builders who all remarked on the absence of engineer’s details or recommendations. The builders all showed concerns over the unsafe repair method offered as the building would be left in an unsafe condition. The Applicants are of the opinion that without an engi neer’s report any builder could not safely quote on the repairs as stated in the SOW. Further, any quotations based on the SOW would not be adequately priced. 22. In respect to damage to the walls of the building, the building consultant stated that the walls had many points of pre-existing cracking due in part to their unsuitability for load carrying. However, he has not reported on the horizontal cracking to the eastern wall which did not exist before the fire. 23. Based on information provided to and by the Applicants they submit that the building has sustained enough fire, heat and water damage from the fire to the roof structure and the eastern end wall to warrant that a major section of the wall would need to be demolished and rebuilt. Summary of FSP’s Positio n 24. Following the fire damage to the Applicant s’ property on 11 May 2010, the FSP appointed a building consultant to prepare a SOW in respect of the damage to the shed. 25. Upon inspection of the shed the consultant found:  the damage was primarily to the roof frame, roof cladding and electrical wiring;  the concrete walls were not compliant with the relevant building codes and were not able to carry the weight of the roof; 241523 Determination Page 4 of 9  the shed would not, at any time, have been compliant with the relevant building codes and was built without proper regard for engineering design or compliance;  the only way the roof could be replaced was by constructing it as a separate structure to the shed walls. This was because the walls were not compliant and were unsuitable as a base for a roof frame. 26. The FSP obtained three quotes in respect to the work to be carried out pursuant to the SOW. The most competitive quote was for the amount of $23,420. 27. This decision was conveyed to the Applicants who disputed the settlement method and contended the shed should be demolished and reconstructed. The FSP maintained its position to repair the roof of the shed and cash settled the claim by paying the amount of $23,420 less the $100 policy excess. 28. The FSP submits that the walls of the shed were not damaged by the fire in a way that requires them to be demolished and rebuilt. Further, pursuant to the report from the building consultant, the shed was not, at any time, compliant with the relevant building codes and was built without proper regard for engineering design or compliance. 29. Therefore, it submits that it has correctly settled the Applicants claim in accordance with the scope of works. It further submits that it is not required to bear the costs of demolishing and rebuilding the walls of the shed s uch that they are compliant with all relevant building codes and can support the new roof. 30. The FSP relies on the following policy/contract provisions: “Other cover If one of the listed events shown on pages 20 to 25 causes loss or damage, then we also cover some other things. Under the ‘other cover’ shown in this section, we tell you what additional things we cover and any specific exclusions and conditions that apply to the cover. General exclusions may also apply. ... Meeting building regulations If a listed event causes loss or damage to your home and you need to meet current building regulations to rebuild or repair the part of your home that was damaged. Covered under Buildings Insurance ► the costs to meet current building regulations to repair or r ebuild the part of your home that was damaged. Not covered ► costs to meet building regulations: 241523 Determination Page 5 of 9 - that were already in place when your home was built, renovated or altered for undamaged parts of your home – for example, installing insulation in ceilings that were not damaged. Conditions ► we must agree to pay the costs before you make any arrangements. ... What we pay for – Buildings Insurance If we agree to cover your claim under Buildings Insurance, then we will:  pay the cost to repair or rebuild the part of your home that was damaged – we pay the lower of the cost to repair or rebuild your home. ► pay for other things we cover under ‘other cover’... The most we pay The most we pay is the building sum insured. We may also pay some costs on top of the buildings sum insured – see ‘other cover’... ... How we settle your building claim We will choose to settle your claim for loss or damage to your home or ‘other cover’ in one of the following ways: 1. Arrange for repairers, builders or suppliers to repair or rebuild your home. If you agree, we can arrange for our preferred repairers, suppliers or builders to repair or rebuild your home. 2. Pay you the reasonable cost to repair or rebuild your home. We can choose to: ► pay you ► pay your nominated repairer, supplier or builder, or  provide you with store credits from one of our nominated suppliers. For example, we may pay you directly when: ► you decide not to repair or rebuild your home, or ► you don’t start repairing or rebuilding your home within 6 months from when the damage takes place, or within any longer period we agreed to in writing. 3. Pay you the building sum insured We may do this when we consider your home to be a total loss or when we choose to do so. ... Lifetime guarantee We provide a ‘lifetime guarantee’ when your home is repaired or rebuilt by one of our preferred repairers or builders. This means: ► we guarantee the workmanship of repairs that we authorised for the lifetime of your home 241523 Determination Page 6 of 9 ► we will fix any defect caused by poor workmanship. We will decide on what needs to be done to fix any defect. When you’re not covered by this guarantee This guarantee does not apply to: ► repairs you authorised your self ....” Issues 31. Whether the FSP has correctly indemnified the Applicants under the terms and conditions of the policy of insurance for the cost of the damage to their shed. Reasons for Decision 32. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence, it is not necessary to go into all of this material in any great detail. 33. The FSP contends that the walls to the shed were not, and never were, compliant with the relevant building codes. As a result, the walls would not be able to bear the weight of a roof. 34. Further, the FSP states the walls were not damaged by the fire in a way that required them to be demolished and rebuilt. 35. The Applicant s have stated that the shed was constructed in the 1960’s. Therefore, for the FSP to allege that the shed walls did not comply with relevant building codes, the onus is on the FSP to provide evidence of any breach. It appears the FSP has accepted its building consultant’s opinion without substantive evidence in support of his claim. 36. The Applicants made enquiries but because of the age of the building they could only establish that, in 1990 when they purchased the property, the local council did not find that the building did not comply with building regulations. 37. The building consultant prepared a SOW on which t hree builders’ selected by the building consultant submitted quotations to construct a standalone roof structure.  Builder R inspected the property on 29 July 2010 and submitted a quotation for the amount of $32,359.  Builder W inspected the site on 17 August 2010 and submitted a quotation for the amount of $23,420.  Builder S inspected the site on 23 August 2010 and submitted a quotation for the amount of $26,986.08. 241523 Determination Page 7 of 9 38. Each of the quotes was submitted on a standardised form and it is not known whether the builders provided any comments on the work to be carried out. 39. The Applicants also engaged three builders to inspect the fire damage and to submit quotes to repair the shed. However, each of the builders stated that repair of the roof in the manner suggested was unsuitable and submitted quotes to replace the building. 40. The quotes were as follows:  Builder J’s quote was dated 31 October 2010 and was for the amount of $78,260. The builder made the following comments: ‘ Upon site inspection of the damaged garage and subsequent review of the scope of works set by [building consultant], I have come to the conclusion that the structure is not suitable for the set out works and should be demolished for the following reasons  The structure does no longer meet building code of Australia standards  Working on the structure after the roof is taken of (sic) makes the walls unsound and becomes an OH&S hazard  The wall structure will not be stable if it repaired as set out by [building consultant] report as it at the moment requires the roof to support the stability of the walls and the walls are non load bearing.  The structure will not be reinstated as existing structure is built. I note that no structural engineering report was commissioned to do the works as is required for the works set out by the building consultant. A structural engineer must look at the structure and determine weather (sic) it is sound then set out the detail of footings etc after the structure is deemed sound.’  Builder H’s quote was dated 17 November 2010 and was for the amount of $75,626. The builder also made critical comments similar to those of builder J.  Builder B’s quotes was dated 25 November 2010 and was for the amount of $80,554. In commenting on the proposed method of repair, the builder stated: ‘Th is type of construction whilst not load bearing would no longer be acceptable by a relevant certifying body and without a supporting engineers (sic) report we are unable to determine how we would secure the structure and brace to the existing building. Our opinion would be to completely demolish the building/s to minimise risk of danger which may occur with the current suggested method of repair as per OHS requirements.’ 241523 Determination Page 8 of 9 41. The Panel notes that the FSP has not provided any evidence that the proposed SOW would be approved by the local council. 42. The Applicant s’ policy of insurance provides that: We will choose to settle your claim for loss or damage to your home or ‘other cover’ in one of the following ways: 1. Arrange for repairers, builders or suppliers to repair or rebuild your home. 2. Pay you the reasonable cost to repair or rebuild your home. We can choose to:  pay you  pay your nominated repairer, supplier or builder, or  provide you with store credits from one of our nominated suppliers. 43. The Applicants confirm that they have received a payment from the FSP of $23,220 which is insufficient to meet the full reinstatement costs of their damage. They are prepared to accept a further payment, being the difference between the amount paid and an amount which they believe will properly reinstate their property. 44. The Panel notes that the FSP engaged a building consultant to prepare a Scope of Works to repair the building. However, the Panel is disturbed by the following comments made by building consultant: ‘ I would not recommend that you are party to the reinstatement of the fire-damage structure, as I believe that once construction commences it will open up problems that could significantly affect the overall cost and you may have to pay for betterment. I would recommend that you cash settle this claim and let the owner deal with the pre- existing problems.’ 45. That the consultant made such a statement strongly suggests that he was aware that his SOW would not meet current building regulations and would leave the Applicants with a cash settlement that would not meet the eventual costs of repairs. 46. Of greater concern to the Panel is that the FSP elected to affect settlement on the basis of this advice. Presumably the FSP appointed the building consultant to prepare a SOW that would meet current building regulations. The building consultant has stepped outside his responsibility and has suggested a method of repair and settlement which in the Panel’s view is unacceptable. 47. Section 13 of the Insurance Contracts Act 1984 provides that a contract of insurance is a contract based on the utmost good faith, and there is implied in each contract, a provision requiring each party to act towards the other party, in respect of any matter arising under or in relation to it, with the utmost good faith. 48. On the evidence submitted, the Panel finds that the FSP ’s actions were in breach of section 13 of the Act. 241523 Determination Page 9 of 9 49. Given this breach, in the Panel’s view the Applicants are entitled to be placed back in the position they were in prior to the fire. The Panel is of the view that such a breach disentitles the FSP to elect its preferred method of settlement as its election was not made in good faith, rather the Panel determines that the Applicants are now entitled to elect how they choose to effect settleme nt, either by having the FSP undertake comprehensive repairs, or be cash-settled for a fair and reasonable amount which would fully reinstate the damage. 50. The Applicants have proposed that a settlement based on the average of all quotes would be a fair outcome, which they estimate at $70,000. The FSP has provided quotes which are considerably less than this amount, but clearly those quotes are likely to fall well short of the actual cost, given its building consultant’s comments. Determination 51. Therefore, the Panel determines that the Applicants may elect to accept a cash settlement for their claim for an amount of $70,000 less the amount already paid to them of $23,220, or alternatively they may elect for the FSP to undertake reinstatement of their damaged shed, which is required to include the demolishing of the fire damaged shed and construction of its replacement with equivalent materials including repairs of electrical, water and gas services, together with related building permit and associated costs. 52. The Applicants to elect their preferred method of settlement and if they elect to cash settle, the FSP to make payment within 5 working days.