Method of settling fire damage to garden shed and cash settlement amount disputed
Text of the determination
241523 Determination Page 1 of 9
Case Number: 241523
General Insurance – Home Building – Fire damage to an outbuilding – Method
of replacement/repairs to the fire damage.
28 October 2011
Background
1. The Applicants insured their home building under a Home Building Insurance
Policy for $209,242 against loss or damage caused by insured events. The
policy commenced on 30 September 1990 and had been renewed annually to
30 September 2010.There was a $100 policy excess.
2. On 11 May 2010, a storage shed on the property was damaged by fire. The
damage was primarily to the roof frame and cladding of the building although
the Applicants report that there was also some damage to the walls of the shed.
It has been estimated the building was constructed in the 1960’s.
3. The Financial Services Provider (FSP) has accepted liability for the costs of
repairing or replacing the roof of the shed.
4. The FSP appointed a building consultant to inspect and report on the damage
to the building and to prepare a Scope of Works (SOW) for repairs or
replacement of the damaged roof.
5. Due to possible problems with the weight bearing strength of the brick walls of
the shed, the building consultant stated that the only way the roof could be
replaced was to replace the roof with a construction that was a separate
structure to the shed walls.
6. Based upon the SOW, the FSP obtained three quotes for the
repair/replacement work in the amounts of:
Builder R $32,359
Builder S $26,986, and
Builder W $23,420.
7. The FSP accepted the quote of $23,420 and cash settled the Applicants for that
amount.
8. The Applicants do not accept the payment as being fair and reasonable and
have also disagreed with the method of repairs recommended by the FSP’s
building consultant and submitted in the SOW.
Determination
241523 Determination Page 2 of 9
9. The Applicants contend that the shed should be demolished and replaced with
a new structure. They obtained three quotes to demolish the old shed and
replace it for the amounts of:
Builder J $78,260
Builder B $80,554, and
Builder H $75,626.
10. The Applicants have also obtained two quotes to replace the shed with a pre-
fabricated metal structure for the amounts of:
Builder R $60,067 plus costs to reinstate water and gas services
Builder F $55,643.20 (est)
11. The Applicant s contend the FSP’s method of settling their claim is unsafe and a
substandard method of repair and their fire damaged shed should be
demolished and replaced.
Summary of Applicants ’ Position
12. They purchased the property in September 1990 and all relevant surveys and
inspections were carried out on the property. A 317a building certificate was
issued covering the whole of the property with a surveyor’ s report showing all of
the property including the shed with only minor fencing irregularities and no
mention was made of any unauthorised buildings requiring demolition.
13. The Applicant s contend that the FSP’s building consultant failed to include all of
the necessary repairs to reinstate their building. They also raised issues of
safety in the method of repairs recommended in the building consultant’s SOW
which they consider to be incomplete and biased towards the FSP. The SOW
has also not been reviewed by a structural engineer.
14. The building consultant stated that the concrete block walls, as they were
constructed, have never been suitable as they are not co mpliant with the
masonry code (AS 3700). He stated the concrete blocks do not have any
supporting piers which are mandatory for lateral stiffening if they are to be used
as the walling. The building consultant also stated the walls were non-compliant
and unsuitable as a base for a correct roof frame.
15. The Building Code of Australia (BCA) only came into force after a change from
local council ordnance to the BCA after a transition period during the period
1990 – 1993 when it became the BCA in 1993.
16. A BCA advisory officer informed them that anything built prior to 1993 would
have been built to meet whatever standards were in place at the time if a 317a
certificate had been issued. They obtained a 317a certificate in 1990.
17. The building consultant was of the opinion that the only way the roof can be
replaced is if it is constructed as a separate structure to the shed walls. This
241523 Determination Page 3 of 9
involved the supply and fitting of eight new supporting posts, being four on each
side of the building. The support posts would be used as the base supply for a
new roof frame. The existing walls would be left without any supporting piers.
18. The Applicants dispute is in respect to concerns of safety being left with a
building with walls unsecured. The building consultant’s report has not bee n
based around an engineer’s recommendation.
19. The building consultant’s plan is unacceptable to the Applicants. The plan
changes the appearance of the building in that there would be eight poles
around the outside of the building and free standing roof over what will be left of
the old building. It would be hideous and ill-fated.
20. In addition, the building consultant’s report and SOW was viewed by their local
council who stated they had concerns over the building repair offered as it
would leave the building in an unsafe condition. This is because the SOW did
not state how the existing walls would be supported with the council officer
stating he doubted the council would approve the repairs as being acceptable.
21. The SOW was reviewed by three independent builders who all remarked on the
absence of engineer’s details or recommendations. The builders all showed
concerns over the unsafe repair method offered as the building would be left in
an unsafe condition. The Applicants are of the opinion that without an
engi neer’s report any builder could not safely quote on the repairs as stated in
the SOW. Further, any quotations based on the SOW would not be adequately
priced.
22. In respect to damage to the walls of the building, the building consultant stated
that the walls had many points of pre-existing cracking due in part to their
unsuitability for load carrying. However, he has not reported on the horizontal
cracking to the eastern wall which did not exist before the fire.
23. Based on information provided to and by the Applicants they submit that the
building has sustained enough fire, heat and water damage from the fire to the
roof structure and the eastern end wall to warrant that a major section of the
wall would need to be demolished and rebuilt.
Summary of FSP’s Positio n
24. Following the fire damage to the Applicant s’ property on 11 May 2010, the FSP
appointed a building consultant to prepare a SOW in respect of the damage to
the shed.
25. Upon inspection of the shed the consultant found:
the damage was primarily to the roof frame, roof cladding and electrical
wiring;
the concrete walls were not compliant with the relevant building codes and
were not able to carry the weight of the roof;
241523 Determination Page 4 of 9
the shed would not, at any time, have been compliant with the relevant
building codes and was built without proper regard for engineering design
or compliance;
the only way the roof could be replaced was by constructing it as a
separate structure to the shed walls. This was because the walls were not
compliant and were unsuitable as a base for a roof frame.
26. The FSP obtained three quotes in respect to the work to be carried out
pursuant to the SOW. The most competitive quote was for the amount of
$23,420.
27. This decision was conveyed to the Applicants who disputed the settlement
method and contended the shed should be demolished and reconstructed. The
FSP maintained its position to repair the roof of the shed and cash settled the
claim by paying the amount of $23,420 less the $100 policy excess.
28. The FSP submits that the walls of the shed were not damaged by the fire in a
way that requires them to be demolished and rebuilt. Further, pursuant to the
report from the building consultant, the shed was not, at any time, compliant
with the relevant building codes and was built without proper regard for
engineering design or compliance.
29. Therefore, it submits that it has correctly settled the Applicants claim in
accordance with the scope of works. It further submits that it is not required to
bear the costs of demolishing and rebuilding the walls of the shed s uch that
they are compliant with all relevant building codes and can support the new
roof.
30. The FSP relies on the following policy/contract provisions:
“Other cover
If one of the listed events shown on pages 20 to 25 causes loss or damage, then we
also cover some other things.
Under the ‘other cover’ shown in this section, we tell you what additional things we
cover and any specific exclusions and conditions that apply to the cover. General
exclusions may also apply.
...
Meeting building regulations
If a listed event causes loss or damage to your home and you need to meet current
building regulations to rebuild or repair the part of your home that was damaged.
Covered under Buildings Insurance
► the costs to meet current building regulations to repair or r ebuild the part of your
home that was damaged.
Not covered
► costs to meet building regulations:
241523 Determination Page 5 of 9
- that were already in place when your home was built, renovated or altered for
undamaged parts of your home – for example, installing insulation in ceilings that
were not damaged.
Conditions
► we must agree to pay the costs before you make any arrangements.
...
What we pay for – Buildings Insurance
If we agree to cover your claim under Buildings Insurance, then we will:
pay the cost to repair or rebuild the part of your home that was damaged – we
pay the lower of the cost to repair or rebuild your home.
► pay for other things we cover under ‘other cover’...
The most we pay
The most we pay is the building sum insured. We may also pay some costs on top of
the buildings sum insured – see ‘other cover’...
...
How we settle your building claim
We will choose to settle your claim for loss or damage to your home or ‘other cover’
in one of the following ways:
1. Arrange for repairers, builders or suppliers to repair or rebuild your home.
If you agree, we can arrange for our preferred repairers, suppliers or builders to
repair or rebuild your home.
2. Pay you the reasonable cost to repair or rebuild your home.
We can choose to:
► pay you
► pay your nominated repairer, supplier or builder, or
provide you with store credits from one of our nominated suppliers.
For example, we may pay you directly when:
► you decide not to repair or rebuild your home, or
► you don’t start repairing or rebuilding your home within 6 months from when the
damage takes place, or within any longer period we agreed to in writing.
3. Pay you the building sum insured
We may do this when we consider your home to be a total loss or when we choose to
do so.
...
Lifetime guarantee
We provide a ‘lifetime guarantee’ when your home is repaired or rebuilt by one of our
preferred repairers or builders.
This means:
► we guarantee the workmanship of repairs that we authorised for the lifetime of
your home
241523 Determination Page 6 of 9
► we will fix any defect caused by poor workmanship.
We will decide on what needs to be done to fix any defect.
When you’re not covered by this guarantee
This guarantee does not apply to:
► repairs you authorised your self
....”
Issues
31. Whether the FSP has correctly indemnified the Applicants under the terms and
conditions of the policy of insurance for the cost of the damage to their shed.
Reasons for Decision
32. There has been an exchange of material which the parties rely on. Each party
has had access to the material on which the other party bases its case. As a
consequence, it is not necessary to go into all of this material in any great
detail.
33. The FSP contends that the walls to the shed were not, and never were,
compliant with the relevant building codes. As a result, the walls would not be
able to bear the weight of a roof.
34. Further, the FSP states the walls were not damaged by the fire in a way that
required them to be demolished and rebuilt.
35. The Applicant s have stated that the shed was constructed in the 1960’s.
Therefore, for the FSP to allege that the shed walls did not comply with relevant
building codes, the onus is on the FSP to provide evidence of any breach. It
appears the FSP has accepted its building consultant’s opinion without
substantive evidence in support of his claim.
36. The Applicants made enquiries but because of the age of the building they
could only establish that, in 1990 when they purchased the property, the local
council did not find that the building did not comply with building regulations.
37. The building consultant prepared a SOW on which t hree builders’ selected by
the building consultant submitted quotations to construct a standalone roof
structure.
Builder R inspected the property on 29 July 2010 and submitted a
quotation for the amount of $32,359.
Builder W inspected the site on 17 August 2010 and submitted a quotation
for the amount of $23,420.
Builder S inspected the site on 23 August 2010 and submitted a quotation
for the amount of $26,986.08.
241523 Determination Page 7 of 9
38. Each of the quotes was submitted on a standardised form and it is not known
whether the builders provided any comments on the work to be carried out.
39. The Applicants also engaged three builders to inspect the fire damage and to
submit quotes to repair the shed. However, each of the builders stated that
repair of the roof in the manner suggested was unsuitable and submitted
quotes to replace the building.
40. The quotes were as follows:
Builder J’s quote was dated 31 October 2010 and was for the amount of
$78,260.
The builder made the following comments:
‘ Upon site inspection of the damaged garage and subsequent review of the
scope of works set by [building consultant], I have come to the conclusion that
the structure is not suitable for the set out works and should be demolished for
the following reasons
The structure does no longer meet building code of Australia standards
Working on the structure after the roof is taken of (sic) makes the walls
unsound and becomes an OH&S hazard
The wall structure will not be stable if it repaired as set out by [building
consultant] report as it at the moment requires the roof to support the
stability of the walls and the walls are non load bearing.
The structure will not be reinstated as existing structure is built.
I note that no structural engineering report was commissioned to do the works
as is required for the works set out by the building consultant.
A structural engineer must look at the structure and determine weather (sic) it is
sound then set out the detail of footings etc after the structure is deemed
sound.’
Builder H’s quote was dated 17 November 2010 and was for the
amount of $75,626.
The builder also made critical comments similar to those of builder J.
Builder B’s quotes was dated 25 November 2010 and was for the
amount of $80,554.
In commenting on the proposed method of repair, the builder stated:
‘Th is type of construction whilst not load bearing would no longer be
acceptable by a relevant certifying body and without a supporting engineers
(sic) report we are unable to determine how we would secure the structure
and brace to the existing building. Our opinion would be to completely
demolish the building/s to minimise risk of danger which may occur with the
current suggested method of repair as per OHS requirements.’
241523 Determination Page 8 of 9
41. The Panel notes that the FSP has not provided any evidence that the proposed
SOW would be approved by the local council.
42. The Applicant s’ policy of insurance provides that:
We will choose to settle your claim for loss or damage to your home or ‘other cover’
in one of the following ways:
1. Arrange for repairers, builders or suppliers to repair or rebuild your home.
2. Pay you the reasonable cost to repair or rebuild your home.
We can choose to:
pay you
pay your nominated repairer, supplier or builder, or
provide you with store credits from one of our nominated suppliers.
43. The Applicants confirm that they have received a payment from the FSP of
$23,220 which is insufficient to meet the full reinstatement costs of their
damage. They are prepared to accept a further payment, being the difference
between the amount paid and an amount which they believe will properly
reinstate their property.
44. The Panel notes that the FSP engaged a building consultant to prepare a
Scope of Works to repair the building. However, the Panel is disturbed by the
following comments made by building consultant:
‘ I would not recommend that you are party to the reinstatement of the fire-damage
structure, as I believe that once construction commences it will open up problems
that could significantly affect the overall cost and you may have to pay for
betterment. I would recommend that you cash settle this claim and let the owner deal
with the pre- existing problems.’
45. That the consultant made such a statement strongly suggests that he was
aware that his SOW would not meet current building regulations and would
leave the Applicants with a cash settlement that would not meet the eventual
costs of repairs.
46. Of greater concern to the Panel is that the FSP elected to affect settlement on
the basis of this advice. Presumably the FSP appointed the building consultant
to prepare a SOW that would meet current building regulations. The building
consultant has stepped outside his responsibility and has suggested a method
of repair and settlement which in the Panel’s view is unacceptable.
47. Section 13 of the Insurance Contracts Act 1984 provides that a contract of
insurance is a contract based on the utmost good faith, and there is implied in
each contract, a provision requiring each party to act towards the other party, in
respect of any matter arising under or in relation to it, with the utmost good
faith.
48. On the evidence submitted, the Panel finds that the FSP ’s actions were in
breach of section 13 of the Act.
241523 Determination Page 9 of 9
49. Given this breach, in the Panel’s view the Applicants are entitled to be placed
back in the position they were in prior to the fire. The Panel is of the view that
such a breach disentitles the FSP to elect its preferred method of settlement as
its election was not made in good faith, rather the Panel determines that the
Applicants are now entitled to elect how they choose to effect settleme nt, either
by having the FSP undertake comprehensive repairs, or be cash-settled for a
fair and reasonable amount which would fully reinstate the damage.
50. The Applicants have proposed that a settlement based on the average of all
quotes would be a fair outcome, which they estimate at $70,000. The FSP has
provided quotes which are considerably less than this amount, but clearly those
quotes are likely to fall well short of the actual cost, given its building
consultant’s comments.
Determination
51. Therefore, the Panel determines that the Applicants may elect to accept a cash
settlement for their claim for an amount of $70,000 less the amount already
paid to them of $23,220, or alternatively they may elect for the FSP to
undertake reinstatement of their damaged shed, which is required to include
the demolishing of the fire damaged shed and construction of its replacement
with equivalent materials including repairs of electrical, water and gas services,
together with related building permit and associated costs.
52. The Applicants to elect their preferred method of settlement and if they elect to
cash settle, the FSP to make payment within 5 working days.