Text of the determination
Case No: 241328 Determination Page 1 of 8
Case number: 241328
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Flood - Denial of claim
26 August 2011
Background
1. The Applicant held a Home Building Insurance policy (the policy) with the
Financial Services Provider (FSP) which was incepted on 29 January 2010.
2. The insured property was damaged due to water inundation which occurred
between 11 and 12 January 2011 as a result of a major weather event
experienced in the south-east Queensland area.
3. The Applicant lodged a claim seeking indemnity for costs associated with the
resultant water damage. The FSP declined the claim on the basis that damage
arising from flood is specifically excluded from cover under the policy.
4. The Applicant remains dissatisfied with the FSP’s decision. He maintains that
the FSP had informed him prior to inception that it did provide cover for all
types of floods excluding tsunami. In addition, the FSP failed to provide him
with the Product Disclosure Statement (PDS) at inception of the policy.
Summary of Applicant’s Position
5. The Applicant maintains that he organised the finance for the insured property
through “W”, which at the time offered him ins urance cover including flood
cover with another FSP. However, as he had been a long time customer with
the FSP he decided to obtain a quote for insurance from it.
6. When obtaining the quote from the FSP’s representative the Applicant informed
her of the location of the property (proximity to the river) and asked her about
flood cover. He was informed that the FSP covered all types of flood except for
damage or loss arising from a tsunami.
7. The Applicant maintains he was provided with a policy premium quote in the
amount of approximately $6,000 per annum over the phone and requested that
the quote be mailed to him. On receipt of the quote from the FSP, the Applicant
noted that it was actually for $598 per annum and had also been mailed to the
Applicant’s old address.
Determination
Case No: 241328 Determination Page 2 of 8
8. The Applicant contacted the FSP and requested that the correct address be
recorded on its system. Satisfied with the quote, which was lowe r than W’s
quote, he proceeded to pay the premium via credit card.
9. The Applicant maintains that he was never provided with a PDS for the policy
as alleged by the FSP.
10. When the flooding in Toowoomba occurred (which is many kilometres to the
west of his location in Westlake) the garden at the rear of his property was
already being inundated with water from the Brisbane River. The Applicant at
this stage was however confident that water would not enter the home due to
the rear bi-folding doors which he had been advised were of industrial strength.
11. At about 2.30pm on 11 January 2011 water at the rear of the property had
covered his pool and garden. When he vacated the property at approximately
9.30pm on 11 January 2011, water from the river at the rear of the property had
inundated the lower level (first floor) of the property up to about half a metre.
12. When he and his family returned to the property at around 5.00pm on 12
January 2011, they were shocked to find water was coming from the front of the
house. Water was overflowing from the sewage drains at the front of the
property over a hump in the driveway (front to rear of the property).
13. At lodgement of the claim the Applicant was advised it would take six weeks to
process the claim. After the FSP’s assessor attended the property, he made no
mention in his report regarding the bi-folding doors and sewage drains at the
front of the home.
14. After eight weeks the Applicant contacted the FSP seeking an update regarding
the claim and was advised it was still waiting on receipt of the hydrology report.
15. The Applicant believes due to the FSP’s failure to provide him with the PDS
and in light of the information provided to him by the FSP’s representative
whilst obtaining the quote, the FSP should be required to indemnify him for his
loss.
Summary of FSP’s Position
16. The Applicant contacted the FSP on 17 January 2011 to lodge a claim seeking
cover for damage to the property due to water inundation damage arising from
the major flood event experienced in Brisbane.
17. The FSP contacted the Applicant on 2 February 2011 and informed him that it
had appointed an assessor “C” to the claim. He would attend the property and
carry out an assessment of the damage and submit a report to the FSP.
18. “ C ” attended the property on 5 February 2011, after which a report was
submitted to the FSP on 16 March 2011. Having obtained the necessary
information the Applicant was informed of the FSP’s decision to decline the
claim on 8 April 2011.
Case No: 241328 Determination Page 3 of 8
19. The policy is a defined events policy, which does not provide cover for all types
of risks and specifically excludes cover for flood damage.
20. The Applicant maintains that he never received the PDS from the FSP.
However, he does admit to receiving the quote and that he had to contact the
FSP to correct some of the details provided on the quote.
21. The FSP acknowledges sending the quote to the Applicant’s previous address,
however notes the Applicant confirmed the document was received.
22. The FSP has confirmed with its mail house company “CD” (responsible for
printing and dis patching the notices at the FSP’s request) that the printed quote
and PDS for home building insurance were posted to the Applicant.
23. The FSP has submitted evidence explaining the process followed in sending
the quote and PDS to the Applicant. On the basis o f this evidence it maintains
that, on the balance of probabilities, the Applicant was sent and subsequently
received the quote and PDS.
24. The FSP maintains that the electronic message records (claim notes) made of
the conversations the Applicant had with its representatives make no mention
of any discussion in relation to flood cover. As such, on the balance of
probabilities, it is unlikely that the subject was discussed on either occasion.
25. Nevertheless, the FSP submits that even if the Applicant was told the policy did
cover all types of flood except tsunami (which it denies) this does not relieve
the Applicant of his responsibility to read the PDS to ensure the policy was
appropriate for his requirements.
26. In the absence of any evidence to the contrary the FSP is correct in concluding
that the damage to the insured property was caused by flood, which is
specifically excluded under the policy.
27. The FSP relies on the following policy provisions:
“Page 8 – 13 What we cover – insured events
This section describes under the heading:
Yes – the insured events you are covered for,
No – the conditions and exclusions that specifically apply to particular insured events.
Yes
Storm and rainwater including stormwater runoff from areas surrounding the site, or
water escaping from any water main, drain, pipe, street gutter, guttering or surface.
Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy
fall of rain, snow or hail.
NO
Damage or loss caused by flood. Flood means the inundation or covering of normally
dry land by water which:
escapes or overflows from, or
Case No: 241328 Determination Page 4 of 8
cannot enter, because it is full or had overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have been
modified by human intervention, or reservoir, canal, dam or stormwater channel.
Flood does not mean stormwater runoff from areas surrounding the site, or water
escaping from any water main, drain, pipe, street gutter, guttering or surface.
The cost of cleaning or clearing debris from any pool or spa.
…
Page 14 We do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost or
liability caused by or arising from or involving:
flood, ”
Issues
28. Whether the FSP provided the Applicant with the terms of the policy prior to the
inception of the policy in accordance with section 35 of the Insurance Contracts
Act 1984 (The Act).
29. Whether the terms of the policy provide indemnity for loss or damage arising
from flood.
30. Whether the FSP was entitled to deny indemnity for the Applicant’s loss.
Reasons for Decision
31. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the FOS Terms of Reference. This is due to the
circumstances of the dispute. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
32. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
33. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address any
issues raised.
34. Having considered the available evidence, the Case Manager noted that there
was an inconsistency in respect to the date of loss. The FSP maintains it was
13 January 2011 whilst the Applicant ’s evidence indicated that it may have
been 11 January 2011 or 12 January 2011.
35. The Case Manager contacted the Applicant and confirmed that it was his
submission that:
Case No: 241328 Determination Page 5 of 8
Water had come up from the Brisbane River at the rear of the property
covering the rear garden when the floods in Toowoomba were taking
place (10 January 2011).
By approximately 2.30pm on 11 January 2011 the water had further
risen and had now inundated the rear garden and swimming pool area.
The property was evacuated at approximately 9.30pm on 11 January at
which stage the lower level of the property was inundated up to
approximately 0.5m.
When the Applicant visited the property on 12 January 2011, he was
unable to access the home. He noted the two drains at the front of the
property were overflowing with water travelling over the hump in his
driveway and towards the front of home.
Inundation of the second level of the property occurred between the time
the property was evacuated on 11 January 2011 and when the Applicant
visited the property on 12 January 2011.
The Applicant’s main cause for dispute is in respect to the alleged
conversation he had with the FSP’s representative in relation to flood
cover and secondly not being provided with the PDS, as opposed to
cause of the loss arising from flood.
Discussion between the parties prior to inception of the policy
36. The Applicant maintains that prior to inception of the policy a representative of
the FSP advised him that the policy provided cover for damage or loss arising
from all types of flood except a tsunami. Further, the FSP failed to provide him
with the terms of the policy and therefore should be required to cover him for
his loss arising from the Brisbane Floods.
37. The FSP maintains that it has established through the evidence made available
that, on the balance of probabilities, the Applicant was provided with the PDS
and no discussion in relation to flood cover took place with its representatives
prior to the loss.
38. Consideration has been given to the Applicant’s contention that he was led to
believe the policy covered all types of flood except for tsunami. The Panel
notes it is the Applicant’s submission that due to the proximity of the property to
the Brisbane River he was conscious of the need to have flood cover.
39. The FSP maintains that it does not retain audio recordings of communication
between customers and its representatives. However, the representatives are
trained to enter a record via electronic messages of any conversations on the
computer system.
40. The FSP has submitted records from its computer system providing the notes
made by the FSP’s representatives after having served the Applicant in relation
to the quote.
41. The Panel in making a determination in respect to a dispute between the
parties has to do so having regard to the evidence made available by the
parties and the terms of the contract of insurance.
Case No: 241328 Determination Page 6 of 8
42. The Panel notes that the Applicant has been unable to provide any
substantiating evidence to establish he was provided with misleading
infor mation by the FSP’s representative. The FSP does not have any audio
recording of the phone call in question; however it has submitted records of the
notes made on the policy by its representative.
43. The Applicant is clear and consistent in his contention tha t the FSP’s
representative advised him that flood was covered and the Panel is inclined to
accept that he is genuine in his belief that such advice was give n. However in
the absence of any substantive evidence, the Panel has no basis on which to
find that the FSP’s representative provided the Applicant with misleading
information at the time of issuing the quote for insurance.
Provision of the PDS
44. The Applicant amongst other concerns, has advised that he was not provided
with the terms of the policy and as such was not aware of the flood exclusion
provision relied upon by the FSP.
45. The FSP seeks to rely on a clause (flood exclusion) in the policy to deny liability
for the claim and therefore has the burden of establishing on the balance of
probabilities, that not only did it provide the Applicant with the terms of the
policies, but also that the clause applies to defeat the claim.
46. Where a decision in relation to a dispute depends on the Service deciding
whether or not the FSP sent, and an Applicant received a specific document
(e.g. a renewal, certificate of insurance, policy document, etc.), the Service has
established minimum requirements in order to satisfy it about the dispatch and
receipt of the document.
47. These requirements have been clearly provided in Circular Edition 3 issued in
July 2010. The document states:
“ FSP wishing to satisfy FOS that a document was sent
Where an FSP seeks to rely on the delivery of a document to an applicant, the FSP
usually needs to establish to FOS's satisfaction that, on the balance of probabilities, it
sent the document to the applicant's last known address. In order to achieve this
outcome, the FSP will need to provide FOS with the following:
A copy of the document it says it sent to the applicant (Document).
A copy of any record held by the FSP showing that the Document was actually
sent and the date the Document was sent.
A detailed explanation of its usual process for sending documents of the same
sort.
A copy of any record showing the process that was followed to send the
Document, and, if the record was part of an internal report, an explanation of that
record and/or report.
Where the Document is said to have been sent in a group of documents sent out
by the FSP or its agent on the same day, a signed statement by an appropriately
qualified individual which sets out the following relevant information:
Case No: 241328 Determination Page 7 of 8
o Identification and explanation of any computer or other records/reports the
FSP relies on to show that the Document was one of a group of documents
that was dispatched either directly by the FSP or through its agent.
o Where the FSP has used an agent to send the Document, the agent's
records show that the Document was included in the group of documents it
received from the FSP for dispatch that day.
o Information to show the Document was actually posted that day (eg postal
company collection records match with the FSP or agent's record of the
group of documents to be dispatched that day).
Information to show that the address the Document was sent to was identified in
the FSP's records as the last known address of the applicant.
Confirmation that the Document was not returned to the FSP, including an
explanation of the FSP's usual process for identifying that documents have been
returned as undelivered.”
48. The Panel notes that it is not in dispute that the Applicant received the policy
quote he requested the FSP’s representative to mail to him during the
telephone call in question.
49. Having considered the FSP’s evidence in this respect the Panel is satisfied that
the evidence not only satisfies the requirements set out in Circular 3 but also
establishes that, on the balance of probabilities, the PDS did form part of t he
mail pack (quote) sent by the FSP and received by the Applicant.
Flood Cover
50. In considering whether the exclusion provision is relevant to this dispute, it is
pertinent to consider whether the FSP has satisfied its obligations under section
35 of the Act.
51. Section 35 of the Act provides:
“where a claim is made under a prescribed contract and the event giving rise to
the claim is a prescribed event in relation to the contract, an insurer may not
refuse to pay an amount equal to the minimum amount of cover set out in the
regulations made pursuant to the Act unless it can prove that before the contract
was entered into, the insurer clearly informed the insured in writing of the
relevant provisions of the contract, or that the insured knew or a reasonable
person in the circumstances could be expected to have known of such
provision.”
52. Consideration has been given to the relevant terms of the policy provided in the
policy documentation and the Panel is satisfied the relevant terms of the policy
clearly exclude from cover loss o r damage arising from “Flood”.
Proximate Cause of loss/damage
53. Having considered the submissions of the parties to this dispute, the Panel
notes that it is not in dispute that the cause of the damage claimed by the
Applicant arose from the significant flood event experienced in QLD.
54. The Applicant has advised that the water from the Brisbane River at the rear of
the property had started to inundate parts of the property from 10 January
Case No: 241328 Determination Page 8 of 8
2011, only to further rise and inundate the lower level of the property by 9.30pm
on 11 January 2011 at which point the property was evacuated.
55. Although on arriving at the property on 12 January 2011, the Applicant noticed
the drains at the front of the property gushing out overflowing water and
travelling towards his home, it is also acknowledged that the level of water from
Brisbane River has between 11 - 12 January 2011 risen to also inundate the
second level of the insured property.
56. On the basis of the information available to the Panel, including the Insura nce
Council of Australia (ICA) Hydrology reports, and having dealt with similar
matters in the Westlake (QLD) area, the Panel is satisfied that, on the balance
of probabilities, the insured property was inundated by floodwaters which had
overflowed from the Brisbane River.
57. The Panel is also mindful of the Applicant’s submission that his property was
damaged by water coming from the front of the house which was overflowing
from the sewage drains at the front of the property.
58. However based on the expert evide nce, on the balance of probabilities this
overflow was likely to have been as a result of the flood waters from the
Brisbane River backing up through the stormwater and sewage systems, and
on the basis of established law, this water is also properly categorised as flood
water.
59. On review of the relevant terms of the policy, the Panel is satisfied that loss or
damage arising from the event “Flood” is specifically excluded from cover by
the FSP.
Determination
60. There is no substantive evidence to support the Ap plicant’s position that the
FSP’s representative advised him that his policy included cover for flood.
61. In any event, and irrespective of any such advice, on the basis of the available
information the Panel determines that the FSP did fulfil its obligation to provide
the Applicant with the terms of the policy prior to inception of the policy, which
included notification of the flood exclusion.
62. Accordingly, under the policy the FSP is not obliged to provide indemnity to the
Applicant for his loss arising from the flood.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.