Home / Financial Firm (Unknown - Insurer) / Determination 241328

Determination 241328

Denial of flood damage claim - flood excluded

FirmFinancial Firm (Unknown - Insurer)
Decided2011-08-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's flood-damage claim on a home near the Brisbane River was declined under a flood exclusion, and he said he was misled about flood cover and not sent the PDS. AFCA found no evidence of misleading advice and that the PDS was sent, so the FSP was not obliged to indemnify the loss.

Under section 35 of the Insurance Contracts Act the insurer must show the flood exclusion was clearly disclosed before inception, which the Panel found was done through the PDS in the mail pack.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 241328 Determination Page 1 of 8 Case number: 241328 General Insurance - Domestic Insurance - Home Building - FSP Decision – Flood - Denial of claim 26 August 2011 Background 1. The Applicant held a Home Building Insurance policy (the policy) with the Financial Services Provider (FSP) which was incepted on 29 January 2010. 2. The insured property was damaged due to water inundation which occurred between 11 and 12 January 2011 as a result of a major weather event experienced in the south-east Queensland area. 3. The Applicant lodged a claim seeking indemnity for costs associated with the resultant water damage. The FSP declined the claim on the basis that damage arising from flood is specifically excluded from cover under the policy. 4. The Applicant remains dissatisfied with the FSP’s decision. He maintains that the FSP had informed him prior to inception that it did provide cover for all types of floods excluding tsunami. In addition, the FSP failed to provide him with the Product Disclosure Statement (PDS) at inception of the policy. Summary of Applicant’s Position 5. The Applicant maintains that he organised the finance for the insured property through “W”, which at the time offered him ins urance cover including flood cover with another FSP. However, as he had been a long time customer with the FSP he decided to obtain a quote for insurance from it. 6. When obtaining the quote from the FSP’s representative the Applicant informed her of the location of the property (proximity to the river) and asked her about flood cover. He was informed that the FSP covered all types of flood except for damage or loss arising from a tsunami. 7. The Applicant maintains he was provided with a policy premium quote in the amount of approximately $6,000 per annum over the phone and requested that the quote be mailed to him. On receipt of the quote from the FSP, the Applicant noted that it was actually for $598 per annum and had also been mailed to the Applicant’s old address. Determination Case No: 241328 Determination Page 2 of 8 8. The Applicant contacted the FSP and requested that the correct address be recorded on its system. Satisfied with the quote, which was lowe r than W’s quote, he proceeded to pay the premium via credit card. 9. The Applicant maintains that he was never provided with a PDS for the policy as alleged by the FSP. 10. When the flooding in Toowoomba occurred (which is many kilometres to the west of his location in Westlake) the garden at the rear of his property was already being inundated with water from the Brisbane River. The Applicant at this stage was however confident that water would not enter the home due to the rear bi-folding doors which he had been advised were of industrial strength. 11. At about 2.30pm on 11 January 2011 water at the rear of the property had covered his pool and garden. When he vacated the property at approximately 9.30pm on 11 January 2011, water from the river at the rear of the property had inundated the lower level (first floor) of the property up to about half a metre. 12. When he and his family returned to the property at around 5.00pm on 12 January 2011, they were shocked to find water was coming from the front of the house. Water was overflowing from the sewage drains at the front of the property over a hump in the driveway (front to rear of the property). 13. At lodgement of the claim the Applicant was advised it would take six weeks to process the claim. After the FSP’s assessor attended the property, he made no mention in his report regarding the bi-folding doors and sewage drains at the front of the home. 14. After eight weeks the Applicant contacted the FSP seeking an update regarding the claim and was advised it was still waiting on receipt of the hydrology report. 15. The Applicant believes due to the FSP’s failure to provide him with the PDS and in light of the information provided to him by the FSP’s representative whilst obtaining the quote, the FSP should be required to indemnify him for his loss. Summary of FSP’s Position 16. The Applicant contacted the FSP on 17 January 2011 to lodge a claim seeking cover for damage to the property due to water inundation damage arising from the major flood event experienced in Brisbane. 17. The FSP contacted the Applicant on 2 February 2011 and informed him that it had appointed an assessor “C” to the claim. He would attend the property and carry out an assessment of the damage and submit a report to the FSP. 18. “ C ” attended the property on 5 February 2011, after which a report was submitted to the FSP on 16 March 2011. Having obtained the necessary information the Applicant was informed of the FSP’s decision to decline the claim on 8 April 2011. Case No: 241328 Determination Page 3 of 8 19. The policy is a defined events policy, which does not provide cover for all types of risks and specifically excludes cover for flood damage. 20. The Applicant maintains that he never received the PDS from the FSP. However, he does admit to receiving the quote and that he had to contact the FSP to correct some of the details provided on the quote. 21. The FSP acknowledges sending the quote to the Applicant’s previous address, however notes the Applicant confirmed the document was received. 22. The FSP has confirmed with its mail house company “CD” (responsible for printing and dis patching the notices at the FSP’s request) that the printed quote and PDS for home building insurance were posted to the Applicant. 23. The FSP has submitted evidence explaining the process followed in sending the quote and PDS to the Applicant. On the basis o f this evidence it maintains that, on the balance of probabilities, the Applicant was sent and subsequently received the quote and PDS. 24. The FSP maintains that the electronic message records (claim notes) made of the conversations the Applicant had with its representatives make no mention of any discussion in relation to flood cover. As such, on the balance of probabilities, it is unlikely that the subject was discussed on either occasion. 25. Nevertheless, the FSP submits that even if the Applicant was told the policy did cover all types of flood except tsunami (which it denies) this does not relieve the Applicant of his responsibility to read the PDS to ensure the policy was appropriate for his requirements. 26. In the absence of any evidence to the contrary the FSP is correct in concluding that the damage to the insured property was caused by flood, which is specifically excluded under the policy. 27. The FSP relies on the following policy provisions: “Page 8 – 13 What we cover – insured events This section describes under the heading: Yes – the insured events you are covered for, No – the conditions and exclusions that specifically apply to particular insured events. Yes Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. NO Damage or loss caused by flood. Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or Case No: 241328 Determination Page 4 of 8 cannot enter, because it is full or had overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. The cost of cleaning or clearing debris from any pool or spa. … Page 14 We do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: flood, ” Issues 28. Whether the FSP provided the Applicant with the terms of the policy prior to the inception of the policy in accordance with section 35 of the Insurance Contracts Act 1984 (The Act). 29. Whether the terms of the policy provide indemnity for loss or damage arising from flood. 30. Whether the FSP was entitled to deny indemnity for the Applicant’s loss. Reasons for Decision 31. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the FOS Terms of Reference. This is due to the circumstances of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 32. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 33. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 34. Having considered the available evidence, the Case Manager noted that there was an inconsistency in respect to the date of loss. The FSP maintains it was 13 January 2011 whilst the Applicant ’s evidence indicated that it may have been 11 January 2011 or 12 January 2011. 35. The Case Manager contacted the Applicant and confirmed that it was his submission that: Case No: 241328 Determination Page 5 of 8  Water had come up from the Brisbane River at the rear of the property covering the rear garden when the floods in Toowoomba were taking place (10 January 2011).  By approximately 2.30pm on 11 January 2011 the water had further risen and had now inundated the rear garden and swimming pool area.  The property was evacuated at approximately 9.30pm on 11 January at which stage the lower level of the property was inundated up to approximately 0.5m.  When the Applicant visited the property on 12 January 2011, he was unable to access the home. He noted the two drains at the front of the property were overflowing with water travelling over the hump in his driveway and towards the front of home.  Inundation of the second level of the property occurred between the time the property was evacuated on 11 January 2011 and when the Applicant visited the property on 12 January 2011.  The Applicant’s main cause for dispute is in respect to the alleged conversation he had with the FSP’s representative in relation to flood cover and secondly not being provided with the PDS, as opposed to cause of the loss arising from flood. Discussion between the parties prior to inception of the policy 36. The Applicant maintains that prior to inception of the policy a representative of the FSP advised him that the policy provided cover for damage or loss arising from all types of flood except a tsunami. Further, the FSP failed to provide him with the terms of the policy and therefore should be required to cover him for his loss arising from the Brisbane Floods. 37. The FSP maintains that it has established through the evidence made available that, on the balance of probabilities, the Applicant was provided with the PDS and no discussion in relation to flood cover took place with its representatives prior to the loss. 38. Consideration has been given to the Applicant’s contention that he was led to believe the policy covered all types of flood except for tsunami. The Panel notes it is the Applicant’s submission that due to the proximity of the property to the Brisbane River he was conscious of the need to have flood cover. 39. The FSP maintains that it does not retain audio recordings of communication between customers and its representatives. However, the representatives are trained to enter a record via electronic messages of any conversations on the computer system. 40. The FSP has submitted records from its computer system providing the notes made by the FSP’s representatives after having served the Applicant in relation to the quote. 41. The Panel in making a determination in respect to a dispute between the parties has to do so having regard to the evidence made available by the parties and the terms of the contract of insurance. Case No: 241328 Determination Page 6 of 8 42. The Panel notes that the Applicant has been unable to provide any substantiating evidence to establish he was provided with misleading infor mation by the FSP’s representative. The FSP does not have any audio recording of the phone call in question; however it has submitted records of the notes made on the policy by its representative. 43. The Applicant is clear and consistent in his contention tha t the FSP’s representative advised him that flood was covered and the Panel is inclined to accept that he is genuine in his belief that such advice was give n. However in the absence of any substantive evidence, the Panel has no basis on which to find that the FSP’s representative provided the Applicant with misleading information at the time of issuing the quote for insurance. Provision of the PDS 44. The Applicant amongst other concerns, has advised that he was not provided with the terms of the policy and as such was not aware of the flood exclusion provision relied upon by the FSP. 45. The FSP seeks to rely on a clause (flood exclusion) in the policy to deny liability for the claim and therefore has the burden of establishing on the balance of probabilities, that not only did it provide the Applicant with the terms of the policies, but also that the clause applies to defeat the claim. 46. Where a decision in relation to a dispute depends on the Service deciding whether or not the FSP sent, and an Applicant received a specific document (e.g. a renewal, certificate of insurance, policy document, etc.), the Service has established minimum requirements in order to satisfy it about the dispatch and receipt of the document. 47. These requirements have been clearly provided in Circular Edition 3 issued in July 2010. The document states: “ FSP wishing to satisfy FOS that a document was sent Where an FSP seeks to rely on the delivery of a document to an applicant, the FSP usually needs to establish to FOS's satisfaction that, on the balance of probabilities, it sent the document to the applicant's last known address. In order to achieve this outcome, the FSP will need to provide FOS with the following:  A copy of the document it says it sent to the applicant (Document).  A copy of any record held by the FSP showing that the Document was actually sent and the date the Document was sent.  A detailed explanation of its usual process for sending documents of the same sort.  A copy of any record showing the process that was followed to send the Document, and, if the record was part of an internal report, an explanation of that record and/or report.  Where the Document is said to have been sent in a group of documents sent out by the FSP or its agent on the same day, a signed statement by an appropriately qualified individual which sets out the following relevant information: Case No: 241328 Determination Page 7 of 8 o Identification and explanation of any computer or other records/reports the FSP relies on to show that the Document was one of a group of documents that was dispatched either directly by the FSP or through its agent. o Where the FSP has used an agent to send the Document, the agent's records show that the Document was included in the group of documents it received from the FSP for dispatch that day. o Information to show the Document was actually posted that day (eg postal company collection records match with the FSP or agent's record of the group of documents to be dispatched that day).  Information to show that the address the Document was sent to was identified in the FSP's records as the last known address of the applicant.  Confirmation that the Document was not returned to the FSP, including an explanation of the FSP's usual process for identifying that documents have been returned as undelivered.” 48. The Panel notes that it is not in dispute that the Applicant received the policy quote he requested the FSP’s representative to mail to him during the telephone call in question. 49. Having considered the FSP’s evidence in this respect the Panel is satisfied that the evidence not only satisfies the requirements set out in Circular 3 but also establishes that, on the balance of probabilities, the PDS did form part of t he mail pack (quote) sent by the FSP and received by the Applicant. Flood Cover 50. In considering whether the exclusion provision is relevant to this dispute, it is pertinent to consider whether the FSP has satisfied its obligations under section 35 of the Act. 51. Section 35 of the Act provides: “where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision.” 52. Consideration has been given to the relevant terms of the policy provided in the policy documentation and the Panel is satisfied the relevant terms of the policy clearly exclude from cover loss o r damage arising from “Flood”. Proximate Cause of loss/damage 53. Having considered the submissions of the parties to this dispute, the Panel notes that it is not in dispute that the cause of the damage claimed by the Applicant arose from the significant flood event experienced in QLD. 54. The Applicant has advised that the water from the Brisbane River at the rear of the property had started to inundate parts of the property from 10 January Case No: 241328 Determination Page 8 of 8 2011, only to further rise and inundate the lower level of the property by 9.30pm on 11 January 2011 at which point the property was evacuated. 55. Although on arriving at the property on 12 January 2011, the Applicant noticed the drains at the front of the property gushing out overflowing water and travelling towards his home, it is also acknowledged that the level of water from Brisbane River has between 11 - 12 January 2011 risen to also inundate the second level of the insured property. 56. On the basis of the information available to the Panel, including the Insura nce Council of Australia (ICA) Hydrology reports, and having dealt with similar matters in the Westlake (QLD) area, the Panel is satisfied that, on the balance of probabilities, the insured property was inundated by floodwaters which had overflowed from the Brisbane River. 57. The Panel is also mindful of the Applicant’s submission that his property was damaged by water coming from the front of the house which was overflowing from the sewage drains at the front of the property. 58. However based on the expert evide nce, on the balance of probabilities this overflow was likely to have been as a result of the flood waters from the Brisbane River backing up through the stormwater and sewage systems, and on the basis of established law, this water is also properly categorised as flood water. 59. On review of the relevant terms of the policy, the Panel is satisfied that loss or damage arising from the event “Flood” is specifically excluded from cover by the FSP. Determination 60. There is no substantive evidence to support the Ap plicant’s position that the FSP’s representative advised him that his policy included cover for flood. 61. In any event, and irrespective of any such advice, on the basis of the available information the Panel determines that the FSP did fulfil its obligation to provide the Applicant with the terms of the policy prior to inception of the policy, which included notification of the flood exclusion. 62. Accordingly, under the policy the FSP is not obliged to provide indemnity to the Applicant for his loss arising from the flood.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.