Determination 241224

Denial of hailstorm roof and water ingress claim and alleged claim handling delays

FirmFinancial Firm (Unknown - Insurer)
Decided2012-04-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed hail and water damage from a March 2010 storm, which the FSP declined after expert reports attributed the damage to maintenance. AFCA found the applicant had not shown an insured event and that the FSP's delays were not proven.

The applicant bore the onus of linking the damage to the storm, and the expert evidence attributed it to lack of maintenance and poorly sealed flashings.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 241224 Determination Page 1 of 6 Case number: 241224 General Insurance - Domestic Insurance - Home Building - Service - Delay in Claim Handling - Storm Damage - Denial of Claim 17 April 2011 Background 1. The Applicant held a home and contents insurance policy with the Financial Services Provider (FSP) from 24 March 2004. The policy provided building cover of $196,618 and contents cover of $72,929. It was subject to a $100 excess. 2. Severe hailstorms occurred in many parts of Victoria on 6 March 2010. On 11 May 2010 the Applicant notified the FSP of a claim for damage caused by hailstorm and ingress of rainwater, allegedly due to the 6 March 2010 storm. 3. The FSP invited the Applicant to obtain quotes. The Applicant confirmed that he would do so. However, he was not able to obtain quotes and in November 2010 he finally requested that the FSP appoint an expert to inspect the property. 4. As a result of the expert’s report, the FSP declined the claim on the basis that it did not consider that the observed damage was caused by the storm. 5. After the FSP’s IDR officer confirmed the rejection of the claim, the Applicant referred the matter to this Service. 6. On 13 October 2011 after carefully considering all of the material and the submissions of the parties, a Case Manager made a Recommendation that the FSP was not obliged to cover the Applicant for his loss. 7. The Applicant has not accepted that Recommendation. When rejecting the Recommendation, he has made various submissions on his own behalf and has also enclosed a brief letter from “BP” a plumber who inspected the property in April 2011. 8. The FSP has also provided detailed responses to the additional material supplied by the Applicant. 9. The Applicant also makes extensive complaints about the level of service provided by the FSP or its contractors. Determination Case No: 241224 Determination Page 2 of 6 Summary of Applicant’s Position 10. The Applicant says that the roof of his home suffered hail damage in the storm which allowed water to ingress into the property. 11. Damage was also sustained to a television, a window and a kitchen bench top. 12. The Applicant complained about the failure of the FSP to attend to the matter in a timely manner . He also complains about the actions of the FSP’s contractors in allegedly arranging for assessments on a particular day, but then not attending those assessments. 13. After rejecting the Recommendation, the Applicant supplied a letter from a plumber “BP” who had apparently inspected the property some 13 months after the hailstorm. That report contained recommendations as to the installation of new colour bond flashings but did not purport to express an opinion as to the cause of damage to the Applicant’s property in the March 2010 hailstorm. 14. In detailed submissions, the Applicant has rejected a number of findings made by the FSP’s contractors “BB” or “AA”. In partic ular, he disputes that a method which he had used to take preventative action after he purchased the property, was inadequate. 15. In his most recent submission, the Applicant has stated that “if needed, I can contact the other builders that looked at the damage last year and if needed will confirm the stormy weather was the cause of the damage to my ceiling, as they viewed the damage during a break in the rainy weather.” Summary of FSP’s Position 16. The FSP says that the damage caused to the Applicant’s property is not covered by the policy. 17. The FSP relies upon the opinions expressed both by “BB” and “AA”, to the effect that the problems which had developed within the property had been due, effectively to a lack of maintenance, rather than through any opening created by the storm. 18. Following the submissions by the Applicant after the rejection of the Recommendation, the FSP has referred the Applicant’s comments to its experts who have again rebutted the contentions made by the Applicant. Issues 19. Whether the Applicant ’s losses were attributable to insured events under the policy. 20. If so, whether the FSP is entitled to rely upon exclusion(s) in the policy in order to avoid cover. Case No: 241224 Determination Page 3 of 6 Reasons for Decision 21. There is an onus on an insured to establish on the balance of probabilities that a claim fits the definition of an insured event. Should this onus be discharged, it is then the responsibility of the insurer to establish the application of any exclusion on which it relies to deny the claim. 22. To be entitled to cover from the FSP, the onus therefore rests with the Applicant to establish that his loss fits within the scope of what is covered by the FSP’s policy. 23. The policy provides cover for a series of defined events as outlined in the PDS. It does not provide cover for accidental damage, except where specified for glass breakage. In my opinion the FSP is correct in pointing out that the damage to the bench top which appears to have been correctly reported by the Applicant as due to his wife dropping a leg of lamb on the bench top at the height of the storm, is not one for which cover is provided under the policy. 24. The principal complaint by the Applicant relates to the FSP’s failure to indemnify him for what he alleges to be damage caused to the roof of the home during the storm together with damage inside the home as a result of water ingress. 25. When considering these claims, I take into consideration that it is not disputed that there were violent hailstorms throughout Victoria on 6 March 2010. The Applicant has provided persuasive e vidence about his wife’s presence in the house when the storm occurred and the fact that the storm was so severe that she felt obliged to take shelter. 26. Whilst this is not fatal to the Applicant’s prospect of success, I do note that the matter was not reported to the FSP until 11 May 2010, over nine weeks after the storm. I note that at this point the Applicant was proposing to obtain quotes for the repair of the damage, and agreed to supply those quotes to the FSP and that, despite follow-ups from the FSP, it was in November 2010 (eight months after the storm) that the Applicant requested the assistance of the FSP to arrange for experts to inspect the property. 27. I note the Applicant’s explanation as to this delay, and can well envisage that plumbers and other tradesmen in the region of this property were at maximum capacity and that it would have been difficult to obtain an expert opinion during this time. 28. However, I do consider that this lapse of time has been most unfortunate from the Applicant’s viewpoint. With every month which has passed, it has become more difficult to determine just what proportion of the damage could, or could not be, related to the 6 March 2010 storm. 29. After the FSP retained “BB” to attend and inspect the Applicant’s property, there were a series of further delays. The Applicant states that at least on one occasion “BB” made an appointment to conduct the inspection but did not attend on that day. To the contrary, “BB” states that they made a number of Case No: 241224 Determination Page 4 of 6 attempts to meet with the Applicant to inspect the property but he was repeatedly unavailable. 30. In any event, it was not until 25 March 2011, over 12 months since the storm that “BB” finally reported to the FSP. In summary, the “BB” report revealed that:  the condition of the roof was “only fair... at best”;  the flashings on the roof showed signs of “long term weathering and cracking”;  the Applicant attempted to rectify some of the problems with a “ [bituminous] product and floor tiles” and there was evidence of previous similar repair attempts. 31. Technically, from the Applicant’s view point, “BB” concluded that “ If the maintenance works were carried out and the flashings replaced in the correct manner in the first place we believe none of the damaging water would have entered, even if storms with accompanying winds and rain had occurred. We believe lack of and poorly carried out maintenance along with gradually deteriorated flashings to be the ultimate cause of the displayed damage and that no single storm event can be directly attributable to the damage.” 32. On the basis of the “BB” report, the FSP rejected the claim. The Applicant then questioned bo th “BB’s” qualifications and im partiality. The FSP then retained an other firm “AA” to inspect the property. This inspection occurred on 18 May 2011 and was followed by a most comprehensive report of some 14 pages. As the Case Manager listed the conclusions from that report, and as I have no concern as to this aspect of th e Case Manager’s conclusions as to this point, I list again the Case Manager’s summary:  the home was a double storey brick home, with a low-pitched aluminium roof, which AA considered to be in a “poorly maintained condition with extensive repair and replac ement works required”;  there had reportedly been no issues with water ingress prior to the storm event;  that a bird strike was likely responsible for the upstairs window damage;  that the kitchen bench top damage likely occurred as reported by the Applicant, with the female Applicant dropping a leg of lamb on it;  the Applicant had not replaced the damaged roof flashing since the incident, but simply used spare tiles in an attempt to minimise/stop water ingress into the home;  AA considered the roof sheets to be in a good condition, however the flashings were not and the sealing attempts made had been to an unprofessional standard;  the Applicant had used an unusual method of sealing the box gutter with floor tiling fitted to the base with a bituminised sealer; Case No: 241224 Determination Page 5 of 6  “severe” rusting was observed at the point where the flashing screw had been torn from the gutter. This had been covered with the bitumen sealant by the Applicant;  AA was of the opinion that rust was widespread along the gutter, that it required replacement and had so for many years;  the sheet plaster ceiling linings inside, directly below the rusted area of the box gutter, showed signs of water damage and required replacement;  water damage in the bedroom was attributable to “minor splitting of the mastic s ealant” on the nearby window for the dining room;  numerous issues of maintenance were required to return the home to an acceptable standard. 33. Following the report from “AA”, the FSP again reviewed the matter and on 14 June 2011, it again rejected the Applic ant’s claim. At this point I note that the first rejection was some five weeks after the “BB” report, and the second rejection was less than four weeks after the “AA” report. Having regard to the volume of work being experienced by insurers following the 6 March 2010 storm events in Victoria, and other storm related events throughout Australia, I do not regard either of these periods of time as excessive. 34. Based upon the reports from “BB” (and I would agree that this report was not terribly detailed) but par ticularly also “AA”, the rejection of the claim by the FSP was inevitable. There was overwhelming evidence that the damage to the property had been caused by a failure to adequately maintain the property or inappropriate decisions by the Applicant as to methods of water proofing the property. 35. After the recommendation of the claim by the Case Manager, the Applicant supplied further material. The report which he has produced from “BP” is based upon an inspection some 13 months after the 6 March 2010 storm, and I would have thought that the Applicant would recognise that it could be of little assistance. 36. This is the only external report which the Applicant has produced. He has found fault with the earlier reports by “BB” and “AA”, and has argued various issues arising from those reports, or arising from the Recommendation. But, when I again point out that the Applicant bears the onus of establishing that the damage of which he complains has arisen as a result of an insured event, I consider that the “evidence” u pon which the Applicant now relies falls well short of satisfying that onus. 37. I find it remarkable that he says in his most recent submission to this Service that “if needed I can contact the other builders that looked at the damage last year and if needed will confirm the stormy weather was the cause of the damage to my ceiling, as they viewed the damage during a break in the rainy weather.” 38. If there are such builders who viewed the property during breaks in the rainy weather, or at any other time, and who are able to support the Applicant’s claim Case No: 241224 Determination Page 6 of 6 that the damage was due to the events on 6 March 2010, I would have expected the Applicant would have supplied reports from such builders in support of his claim. At all times, it must have been obvious to the Applicant that the problem confronting him is the absence of any external evidence linking the damage to the property with the 6 March 2010 storm, and particularly rebutting the suggestion that a lack of maintenance was the primary cause of the damage both externally and within the home. I think it is remarkable that the Applicant has not addressed these issues. 39. Throughout the file there are many emails from the Applicant setting out his inability to attend to various matters within reasonable times due to his absence whether overseas or interstate and I note also and sympathise with the Applicant’s concerns regarding his wife’s health which, at o ne time hindered the lodgement of material in a timely manner. 40. But the independent observer of this matter would surely find remarkable the Applicant’s complaint about delays on the part of the FSP. The material does not enable me to judge whether the Appl icant or ”BB” were responsible for missed appointments or whether there were misunderstandings as to appointments when “BB” was instructed by the FSP to ins pect the property and to report. Otherwise, I must say that the delays in this matter have been brought about by the Applicant. Determination 41. I determine that the FSP was entitled to refuse indemnity for the Applicant’s claim. 42. I do not consider that any delays on the part of the FSP are proven, or that they have adversely affected the Applicant’s positio n.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.