Home / Financial Firm (Unknown - Insurer) / Determination 241224
Determination 241224
Denial of hailstorm roof and water ingress claim and alleged claim handling delays
Summary
The applicant claimed hail and water damage from a March 2010 storm, which the FSP declined after expert reports attributed the damage to maintenance. AFCA found the applicant had not shown an insured event and that the FSP's delays were not proven.
The applicant bore the onus of linking the damage to the storm, and the expert evidence attributed it to lack of maintenance and poorly sealed flashings.
Issues
- Claim denial primary · not upheld
“I determine that the FSP was entitled to refuse indemnity for the Applicant's claim.”
- Delay secondary · not upheld
“I do not consider that any delays on the part of the FSP are proven, or that they have adversely affected the Applicant's position.”
Subjects and remedies
natural disasterno remedy
Text of the determination
Case No: 241224 Determination Page 1 of 6
Case number: 241224
General Insurance - Domestic Insurance - Home Building - Service - Delay in
Claim Handling - Storm Damage - Denial of Claim
17 April 2011
Background
1. The Applicant held a home and contents insurance policy with the Financial
Services Provider (FSP) from 24 March 2004. The policy provided building
cover of $196,618 and contents cover of $72,929. It was subject to a $100
excess.
2. Severe hailstorms occurred in many parts of Victoria on 6 March 2010. On 11
May 2010 the Applicant notified the FSP of a claim for damage caused by
hailstorm and ingress of rainwater, allegedly due to the 6 March 2010 storm.
3. The FSP invited the Applicant to obtain quotes. The Applicant confirmed that he
would do so. However, he was not able to obtain quotes and in November 2010
he finally requested that the FSP appoint an expert to inspect the property.
4. As a result of the expert’s report, the FSP declined the claim on the basis that it
did not consider that the observed damage was caused by the storm.
5. After the FSP’s IDR officer confirmed the rejection of the claim, the Applicant
referred the matter to this Service.
6. On 13 October 2011 after carefully considering all of the material and the
submissions of the parties, a Case Manager made a Recommendation that the
FSP was not obliged to cover the Applicant for his loss.
7. The Applicant has not accepted that Recommendation. When rejecting the
Recommendation, he has made various submissions on his own behalf and
has also enclosed a brief letter from “BP” a plumber who inspected the property
in April 2011.
8. The FSP has also provided detailed responses to the additional material
supplied by the Applicant.
9. The Applicant also makes extensive complaints about the level of service
provided by the FSP or its contractors.
Determination
Case No: 241224 Determination Page 2 of 6
Summary of Applicant’s Position
10. The Applicant says that the roof of his home suffered hail damage in the storm
which allowed water to ingress into the property.
11. Damage was also sustained to a television, a window and a kitchen bench top.
12. The Applicant complained about the failure of the FSP to attend to the matter in
a timely manner . He also complains about the actions of the FSP’s contractors
in allegedly arranging for assessments on a particular day, but then not
attending those assessments.
13. After rejecting the Recommendation, the Applicant supplied a letter from a
plumber “BP” who had apparently inspected the property some 13 months after
the hailstorm. That report contained recommendations as to the installation of
new colour bond flashings but did not purport to express an opinion as to the
cause of damage to the Applicant’s property in the March 2010 hailstorm.
14. In detailed submissions, the Applicant has rejected a number of findings made
by the FSP’s contractors “BB” or “AA”. In partic ular, he disputes that a method
which he had used to take preventative action after he purchased the property,
was inadequate.
15. In his most recent submission, the Applicant has stated that “if needed, I can
contact the other builders that looked at the damage last year and if needed will
confirm the stormy weather was the cause of the damage to my ceiling, as they
viewed the damage during a break in the rainy weather.”
Summary of FSP’s Position
16. The FSP says that the damage caused to the Applicant’s property is not
covered by the policy.
17. The FSP relies upon the opinions expressed both by “BB” and “AA”, to the
effect that the problems which had developed within the property had been due,
effectively to a lack of maintenance, rather than through any opening created
by the storm.
18. Following the submissions by the Applicant after the rejection of the
Recommendation, the FSP has referred the Applicant’s comments to its
experts who have again rebutted the contentions made by the Applicant.
Issues
19. Whether the Applicant ’s losses were attributable to insured events under the
policy.
20. If so, whether the FSP is entitled to rely upon exclusion(s) in the policy in order
to avoid cover.
Case No: 241224 Determination Page 3 of 6
Reasons for Decision
21. There is an onus on an insured to establish on the balance of probabilities that
a claim fits the definition of an insured event. Should this onus be discharged, it
is then the responsibility of the insurer to establish the application of any
exclusion on which it relies to deny the claim.
22. To be entitled to cover from the FSP, the onus therefore rests with the
Applicant to establish that his loss fits within the scope of what is covered by
the FSP’s policy.
23. The policy provides cover for a series of defined events as outlined in the PDS.
It does not provide cover for accidental damage, except where specified for
glass breakage. In my opinion the FSP is correct in pointing out that the
damage to the bench top which appears to have been correctly reported by the
Applicant as due to his wife dropping a leg of lamb on the bench top at the
height of the storm, is not one for which cover is provided under the policy.
24. The principal complaint by the Applicant relates to the FSP’s failure to
indemnify him for what he alleges to be damage caused to the roof of the home
during the storm together with damage inside the home as a result of water
ingress.
25. When considering these claims, I take into consideration that it is not disputed
that there were violent hailstorms throughout Victoria on 6 March 2010. The
Applicant has provided persuasive e vidence about his wife’s presence in the
house when the storm occurred and the fact that the storm was so severe that
she felt obliged to take shelter.
26. Whilst this is not fatal to the Applicant’s prospect of success, I do note that the
matter was not reported to the FSP until 11 May 2010, over nine weeks after
the storm. I note that at this point the Applicant was proposing to obtain quotes
for the repair of the damage, and agreed to supply those quotes to the FSP and
that, despite follow-ups from the FSP, it was in November 2010 (eight months
after the storm) that the Applicant requested the assistance of the FSP to
arrange for experts to inspect the property.
27. I note the Applicant’s explanation as to this delay, and can well envisage that
plumbers and other tradesmen in the region of this property were at maximum
capacity and that it would have been difficult to obtain an expert opinion during
this time.
28. However, I do consider that this lapse of time has been most unfortunate from
the Applicant’s viewpoint. With every month which has passed, it has become
more difficult to determine just what proportion of the damage could, or could
not be, related to the 6 March 2010 storm.
29. After the FSP retained “BB” to attend and inspect the Applicant’s property,
there were a series of further delays. The Applicant states that at least on one
occasion “BB” made an appointment to conduct the inspection but did not
attend on that day. To the contrary, “BB” states that they made a number of
Case No: 241224 Determination Page 4 of 6
attempts to meet with the Applicant to inspect the property but he was
repeatedly unavailable.
30. In any event, it was not until 25 March 2011, over 12 months since the storm
that “BB” finally reported to the FSP. In summary, the “BB” report revealed that:
the condition of the roof was “only fair... at best”;
the flashings on the roof showed signs of “long term weathering and
cracking”;
the Applicant attempted to rectify some of the problems with a
“ [bituminous] product and floor tiles” and there was evidence of previous
similar repair attempts.
31. Technically, from the Applicant’s view point, “BB” concluded that
“ If the maintenance works were carried out and the flashings replaced in the
correct manner in the first place we believe none of the damaging water would
have entered, even if storms with accompanying winds and rain had occurred.
We believe lack of and poorly carried out maintenance along with gradually
deteriorated flashings to be the ultimate cause of the displayed damage and that
no single storm event can be directly attributable to the damage.”
32. On the basis of the “BB” report, the FSP rejected the claim. The Applicant then
questioned bo th “BB’s” qualifications and im partiality. The FSP then retained
an other firm “AA” to inspect the property. This inspection occurred on 18 May
2011 and was followed by a most comprehensive report of some 14 pages. As
the Case Manager listed the conclusions from that report, and as I have no
concern as to this aspect of th e Case Manager’s conclusions as to this point, I
list again the Case Manager’s summary:
the home was a double storey brick home, with a low-pitched aluminium
roof, which AA considered to be in a “poorly maintained condition with
extensive repair and replac ement works required”;
there had reportedly been no issues with water ingress prior to the storm
event;
that a bird strike was likely responsible for the upstairs window damage;
that the kitchen bench top damage likely occurred as reported by the
Applicant, with the female Applicant dropping a leg of lamb on it;
the Applicant had not replaced the damaged roof flashing since the
incident, but simply used spare tiles in an attempt to minimise/stop water
ingress into the home;
AA considered the roof sheets to be in a good condition, however the
flashings were not and the sealing attempts made had been to an
unprofessional standard;
the Applicant had used an unusual method of sealing the box gutter with
floor tiling fitted to the base with a bituminised sealer;
Case No: 241224 Determination Page 5 of 6
“severe” rusting was observed at the point where the flashing screw had
been torn from the gutter. This had been covered with the bitumen sealant
by the Applicant;
AA was of the opinion that rust was widespread along the gutter, that it
required replacement and had so for many years;
the sheet plaster ceiling linings inside, directly below the rusted area of
the box gutter, showed signs of water damage and required replacement;
water damage in the bedroom was attributable to “minor splitting of the
mastic s ealant” on the nearby window for the dining room;
numerous issues of maintenance were required to return the home to an
acceptable standard.
33. Following the report from “AA”, the FSP again reviewed the matter and on 14
June 2011, it again rejected the Applic ant’s claim. At this point I note that the
first rejection was some five weeks after the “BB” report, and the second
rejection was less than four weeks after the “AA” report. Having regard to the
volume of work being experienced by insurers following the 6 March 2010
storm events in Victoria, and other storm related events throughout Australia, I
do not regard either of these periods of time as excessive.
34. Based upon the reports from “BB” (and I would agree that this report was not
terribly detailed) but par ticularly also “AA”, the rejection of the claim by the FSP
was inevitable. There was overwhelming evidence that the damage to the
property had been caused by a failure to adequately maintain the property or
inappropriate decisions by the Applicant as to methods of water proofing the
property.
35. After the recommendation of the claim by the Case Manager, the Applicant
supplied further material. The report which he has produced from “BP” is based
upon an inspection some 13 months after the 6 March 2010 storm, and I would
have thought that the Applicant would recognise that it could be of little
assistance.
36. This is the only external report which the Applicant has produced. He has found
fault with the earlier reports by “BB” and “AA”, and has argued various issues
arising from those reports, or arising from the Recommendation. But, when I
again point out that the Applicant bears the onus of establishing that the
damage of which he complains has arisen as a result of an insured event, I
consider that the “evidence” u pon which the Applicant now relies falls well short
of satisfying that onus.
37. I find it remarkable that he says in his most recent submission to this Service
that “if needed I can contact the other builders that looked at the damage last
year and if needed will confirm the stormy weather was the cause of the
damage to my ceiling, as they viewed the damage during a break in the rainy
weather.”
38. If there are such builders who viewed the property during breaks in the rainy
weather, or at any other time, and who are able to support the Applicant’s claim
Case No: 241224 Determination Page 6 of 6
that the damage was due to the events on 6 March 2010, I would have
expected the Applicant would have supplied reports from such builders in
support of his claim. At all times, it must have been obvious to the Applicant
that the problem confronting him is the absence of any external evidence
linking the damage to the property with the 6 March 2010 storm, and
particularly rebutting the suggestion that a lack of maintenance was the primary
cause of the damage both externally and within the home. I think it is
remarkable that the Applicant has not addressed these issues.
39. Throughout the file there are many emails from the Applicant setting out his
inability to attend to various matters within reasonable times due to his absence
whether overseas or interstate and I note also and sympathise with the
Applicant’s concerns regarding his wife’s health which, at o ne time hindered the
lodgement of material in a timely manner.
40. But the independent observer of this matter would surely find remarkable the
Applicant’s complaint about delays on the part of the FSP. The material does
not enable me to judge whether the Appl icant or ”BB” were responsible for
missed appointments or whether there were misunderstandings as to
appointments when “BB” was instructed by the FSP to ins pect the property and
to report. Otherwise, I must say that the delays in this matter have been
brought about by the Applicant.
Determination
41. I determine that the FSP was entitled to refuse indemnity for the Applicant’s
claim.
42. I do not consider that any delays on the part of the FSP are proven, or that they
have adversely affected the Applicant’s positio n.