Home / Financial Firm (Unknown - Insurer) / Determination 241164
Determination 241164
Floorboard damage from rain denied under structural or design defect exclusion
Summary
The insured's timber floorboards buckled after heavy rain, and the insurer denied the claim as caused by design or structural defects. AFCA found the rain damage was covered, with the design exclusion applying only to part of the loss, and ordered the insurer to reimburse 75 per cent of the rectification costs.
The rain cover applies, but the defect exclusion was only partly engaged, so the insurer must meet 75 per cent of the costs once the quantum is established.
Issues
- Claim denial primary · upheld
“I determine that the FSP should reimburse the Applicant for 75% of the costs properly incurred in rectification of the flooring”
- Product terms interpretation secondary · upheld
“I accept that the policy provides cover for damage caused by rain, however, it does not cover damage by rain if the rain has entered the property due to a defect”
Subjects and remedies
home or building damagepay claim
Text of the determination
Case No: 241164 Determination Page 1 of 5
Case number: 241164
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition
15 November 2011
Background
1. The Applicant insured his home building under a home buildings insurance
policy held by the Financial Services Provider (FSP) for a sum insured of
$349,000.
2. On 23 August 2010 the Applicant lodged a claim against the policy for damage
to the internal floor boards which he stated was as a result of ongoing water
damage from rainwater.
3. The FSP arranged for the damage to be assessed and upon receipt of reports
informed the Applicant that it would not indemnify him for the damage as there
was no evidence that the damage had been caused by a listed event and the
damage is as a result of defects in the building structure and/or design which is
specifically excluded under the terms and conditions of the policy.
4. The Applicant seeks review of the FSP’s decision as he submits that the
damage has been brought about due to ongoing rain which has caused
moisture to build as it was not absorbed by the soil.
5. The Applicant states at the very least the FSP should be liable for a minimum of
70-80% of the total cost to repair the property.
Summary of Applicant’s Position
6. The Applicant states tha t the FSP’s submission that damage has been caused
by poor floor ventilation and insufficient gradient of the floor plumbing is
incorrect.
7. The Applicant states that with respect to floor ventilation there is an opening
from the light well which reaches the affected area and furthermore the
damaged area has been on the same footings for 28 years and there has never
been an issue.
8. The Applicant states that floorboards in other areas of the house have not been
damaged and they are services by one small vent at the front of the house and
therefore it cannot be as a result of poor ventilation.
Determination
Case No: 241164 Determination Page 2 of 5
9. Further, the Applicant submits that he engaged the services of a plumber and
was advised that the gradient of the sub floor plumbing is not incorrect and
therefore this cannot be the cause of the damage.
10. Therefore, the Applicant submits that the only logical explanation as to why the
damage has occurred is due to unusually high rainfall and subsequent
rainwater run-off has caused the damage as the soil from the neighbouring
property has not absorbed the excess water.
11. The Applicant states that the most fair and reasonable outcome to the dispute
is that the FSP is held liable for a significant portion of the cost to repair the
damage which is approximately 70-80%
Summary of FSP’s Position
12. The FSP states that it relies on its expert report which confirms that the
damage to the flooring has occurred as a result of a structural defect or design
which is specifically excluded under the terms and conditions of the policy.
13. Further, the FSP states that the onus is on the Applicant to establish on the
balance of probabilities that the property has suffered damage as a result of an
event contained in the policy. As the Applicant has failed to establish this, it
states it is not required to indemnify the Applicant in this instance.
14. The FSP relies on the following policy provisions:
“ PART 1 LOSS OR DAMAGE TO YOUR HOME
The events we insure you for
...
7. Rain
What we insure you for
We insure you for loss or damage to the home caused by rain. Rain includes that part
of the rainfall that is not absorbed by the soil but runs off as surface water.
What we do not insure you for
We do not insure you for loss or damage caused by rain seeping into or entering the
home because of:
defects in the structure or design of the home
defects in the building work done on the home
...
PART 7 GENERAL EXCLUSIONS
We do not insure you for loss or damage that is not directly caused by an event that
we insure you for, unless we say that we do in this policy.
...
We do not insure you for loss or damage or legal liability caused by:
failing to keep the home or site in good repair and condition
Case No: 241164 Determination Page 3 of 5
the home or site settling or shrinking or expanding
...
defects in the structure, design, work done, or materials used on the home or
at the site
...
rust, corrosion, rot, mildew, seepage, rising damp, any gradual deterioration or
process
...”
Issue
15. Whether the FSP was correct in denying liability to the Applicant for the
damage to the property under the terms and conditions of the policy.
Reasons for Decision
16. I am satisfied that a full exchange of information has occurred between the
parties and each party has had the opportunity to address all the issues raised.
17. Having carefully read the terms and conditions of the policy, I accept that the
policy provides cover for damage caused by rain, however, it does not cover
damage by rain if the rain has entered the property due to a defect in design,
structure or building works.
18. The onus is on the Applicant to establish on the balance of probabilities that the
property has suffered loss or damage as a result of an insured event. Should
the FSP wish to rely on an exclusion or limitation in the policy, the onus then
shifts to it to establish that it is entitled to rely on the exclusion or limitation.
19. The Applicant has stated that he believes the damage to the floorboards has
occurred as a result of ongoing heavy rainfall following the drought in Victoria.
20. The Applicant notes that the soil contained in the neighbouring property was
not absorbing the excessive rainwater and as a result this has led to moisture
build-up which in turn has caused the damage.
21. The Applicant states that he has received advice from a number of people who
have stated that the damage is water damage from excessive rain
22. The FSP’s expert report provided the following comment:
“The flooring and skirting boards have buckles and twisted due to excessive
moisture being absorbed into the underside of the flooring boards causing
expansion of the flooring.
Moisture in the sub floor area is entering from the surrounding ground areas
during periods of high rainfall fue to the sub floor area being lower than the
surrounding paved and exposed ground areas.
Case No: 241164 Determination Page 4 of 5
The lack of adequate ventilation is allowing the moisture to build up in the sub
floor area to excessive levels causing swelling of the timber flooring.
This has been further aggravated by the installation of the flooring without
adequate gaps to the perimeter, particularly in the wider living area, where the
expansion affect of each board multiples across the floor. This is a reasonable
explanation as to why the problem has not been seen in other rooms, as the
width of the rooms elsewhere is less and the sections of the building are not
exposed to sup soil moisture from adjacent unpaved and undrained areas. A
further explanation is that this section of the building is the only section that has
an exterior wall exposed to the ground externally as seen in the ae rial photo.”
23. Whilst, at this time, the Applicant had not obtained any written expert opinion,
he did seek review from the FSP. A further expert engaged by the FSP
confirmed the findings of the initial expert as a result of which the FSP
maintained its denial of the claim.
24. At that point, and in the absence of any evidence that contradicted or refuted
the findings of the experts engaged by the FSP, I would have had no reason to
disregard their conclusions. Whilst I had examined the material which the
Applicant had personally supplied including photographs, they were not
sufficient to contradict the findings of the FSP’s experts.
25. However, the Applicant has chosen to obtain an expert opinion. In a report
prepared by GS, whose CV reveals considerable expertise which is required in
this matter and which contradicts the opinions of the FSP’s experts. GS
expresses the opinion that:
excess rain has caused damage to the flooring
sub-floor ventilation does exist (performance proven over the years)
there is adequate drainage under normal conditions
roof is well constructed and flashed.
26. GS does then discuss two other issues which he considers have contributed to
the problem. A missing brick on the side of the building through which the
moisture appears to have entered, is responsible, in his view, for 10% of the
problem and he considers that a further 10-15% may be attributed to ventilation
not in accordance with the building code of Australia (BCA).
27. However in his report, he makes several points which I regard as being of
importance. When a suggestion is made that problems, whether on this or any
other property, are the result of poor design, and the property has been in situ
for many years (in this case 28 years) without any significant problem, I
consider it more difficult for an FSP to allege that the problems which have now
surfaced due to inadequate design.
28. It is true that this property was apparently the subject of extensive renovations
four and half years earlier, but even then, one would have expected that if the re
was a significant design problem, and particularly inadequate ventilation in the
sub-floor area, problems might have surfaced earlier.
Case No: 241164 Determination Page 5 of 5
29. For these reasons, I consider that there is certain logic underpinning the
opinion of GS.
30. I also note that the opinion of GS was exchanged with the FSP which would
obviously have had the opportunity to refer the GS opinion to the experts which
it has previously engaged. However I note that on 27 October 2011, the FSP
advised this service that “having read the client’s report, we do not wish to
make any comment.”
31. I am, therefore, left with the impression that the FSP does not seek to
contradict the GS opinion.
32. Unfortunately, the material supplied by the Applicant does not adequately list
the quantum of the damage which he has sustained, the FSP has had no
opportunity to comment upon any items of damage, and therefore no
determination can be made as to the question of quantum.
Determination
33. I determine that the FSP should reimburse the Applicant for 75% of the costs
properly incurred in rectification of the flooring following heavy rainfall in July
2010.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.