Determination 241107

Denial of claim: re-stumping excluded from flood settlement

FirmFinancial Firm (Unknown - Insurer)
Decided2011-10-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Flood water damaged the applicant's home and the FSP settled the claim less re-stumping, relying on a builder's quote the builder would not perform. AFCA found the stump movement was caused by the insured flood event and ordered a full scope of works, then settlement based on competing quotations.

Ground collapse caused by flood water was the dominant cause of stump movement, so re-stumping is covered and the FSP's quote-based settlement was not reasonable indemnity.

Issues

Subjects and remedies

home or building damagenatural disasterreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 241107 Determination Page 1 of 7 Case number: 241107 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 15 September 2011 Background 1. The Applicant holds a Personal Insurance Policy underwritten by the Financial Services Provider (FSP). The policy covers the Applicant‟s residential building up to $349,800. 2. During late February and early March 2010 a severe monsoonal trough passed through the south-west of Queensland. In some areas up to 400mm of rain fell, resulting in wide spread flash-flooding. 3. On 2 March 2010 the insured property suffered damage due to roof leakage and flash flooding which resulted in substantial volumes of water pooling under the home. As a result, the property sustained internal damage and damage to the foundations of the home. 4. The FSP assessed the claim and determined that the home needed re- stumping due to pre-existing defects. Accordingly, the FSP offered to settle the claim less the re-stumping costs based on its preferred builder‟s quotation of $16,109. 5. The Applicant disputes the declinature on the basis the stumps were damaged by the insured event. Further, the sum of $16,109 is inadequate as the builder who provided the quotation will not perform the work and the local builders will not perform repairs for this amount. Summary of Applicant’s Position 6. The Applicant had no objection to the FSP‟s preferred builder (“D”) performing the work. However, when the Applicant requested D perform the work he received a letter dated 2 March 2011, stating the following: “As per you r request to carry out rectification works at your property, [address removed], [D’s name] regrets to advise that we are currently not undertaking any further works in this area a t the current time.” Determination Case No: 241107 Determination Page 2 of 7 7. The Applicant has been verbally quoted an amount of $25,000 to level and make the premises secure but it does not include the inside of the house. The Applicant was unable to locate a local builder to perform the works for the amount quoted by D. 8. The Appli cant considers the expert engineer “NG” has speculated given there was no excavation of the stumps, only the pushing of a pen into the ground. 9. The Applicant‟s property received 400mm of rain over three months and the ground is still soft. The Applicant denies that the stumps were of poor material. Summary of FSP’s Position 10. The FSP relies on the following policy terms and conditions: “What you are insured for We will pay for loss or damage caused by the Occurrences listed under Defined Events Cover or Accidental Damage Cover to your Building or Contents, depending on the cover type you have selected. The Schedule shows if you have insured Building(s) and/or Contents, and the cover type selected by you. ... Accidental Damage Cover We will pay for Accidental Loss of or Damage to your Building or Contents at the Address other than the Occurrences or items referred to in „What you are not insured for‟. ... What you are not insured for ... 2. Loss or damage to your property caused by: ... b. earth movement, vibration, erosion, landslide or subsidence (except when caused by earthquake); ... e. faulty materials, faulty workmanship, wrong or incorrect design, plan or specification or failure of design; f. wear, tear, rust, corrosion, depreciation, gradual deterioration, mildew, mould, dampness of atmosphere or variations in temperature; g. your failure to maintain your Building Contents in good condition” 11. The FSP relies on NG‟s report. I note the following from this report: “Our inspection was visual only, and we are unaware of any specific documentation in relation to its design or construction. We are only able to comment and draw conclusions on the basis of the visual evidence available to us, relevant advice from the insured, sound engineering principles, and our Case No: 241107 Determination Page 3 of 7 general knowledge of similar construction and generally applicable site conditions in the area. ... The site...comprises of a lowset timber framed house with timber board cladding, supported on a mixture timber, concrete and brickwork stumps. ... It is likely that the stumps have no footings present and only limited embedment into the ground. The ground itself appears to have limited cohesion and be susceptible to washout/scour. The stumps have likely been constructed by excavating a hole, placing the stump and backfilling the hole. The material around the base of the stump is likely poorly compacted and offers limited resistant to lateral movement. ...The stumps are of varying materials (concrete, timber, blockwork) and are in varying condition. The majority of the internal stumps are of timber and their bases have suffered varying degrees of deterioration. This deterioration of the timber is clearly a long term maintenance issue, however it may account for some of the movement which has occurred over the life of the building. The perimeter stumps are of concrete construction. A number had suffered significant deterioration of the surface concrete, likely due to a combination of poor quality concrete constituents used and the exposure over the life of the stump to the weather. The deterioration has resulted in a small loss of cross sectional area, however this is unlikely to have adversely affected the capacity of the stumps. The deterioration is likely to continue if maintenance is not carried out to repair spalled surface concrete. ... On the basis of the above observations and discussion our conclusions may be summarised as: ∙ the inherent deficiencies in the original construction of the building have resulted in significant differential movement of the stumps. ∙ the movement has likely been ongoing for some time, and has likely worsened each time that localised flooding due to heavy rainfall has occurred. ∙ the movement would not be expected to have occurred had the building been constructed with adequate footings and bracing of the stumps ... Given the flatness of the site and the surrounding area, during and re-stumping works it may be prudent to construct a 150mm deep layer of road-base or similar material beneath the house, at least around the perimeter, to divert rainfall run- off away from the stumps and their footings.” 12. The evidence supplied by NJ in respect of causation is unchallenged and demonstrates that the dominant and proximate cause of the building‟s subsidence was i nherent and maintenance related defects. 13. In the event that flash flood is considered an equal proximate cause of the Applicant‟s loss, the Wayne Tank principle operates to exclude liability. This is because the proximate or dominant cause of the stump‟s su bsidence is latent defect and failure of proper maintenance. Case No: 241107 Determination Page 4 of 7 14. The FSP is only liable for the internal repairs and the cost of propping, packing and re-levelling the house. 15. The offer of $16,109 in respect of these repairs is fair and reasonable and no substantive evidence has been offered to support a contrary view. Further, upon learning that D was unable to undertake repairs the FSP offered a cash settlement less the excess of $100. 16. The FSP is only liable for „indemnity value‟ of the damage parts of the bui lding – which is less than $16,109. Accordingly, the offer of settlement is greater than its liability under the policy. 17. There is no evidence that D has underquoted for repairs and as no quotation with a full scope of works has been provided the two cannot be compared. 18. The FSP has enclosed its assessor reports from “M”. I note the following from M‟s reports:  Report dated 12 April 2010, M provides a damage description as follows: “Stumps have shifted and the house will need to be jacked up and the stumps packed to level off the dwelling...we are satisfied damage has occurred due to storm and rainwater .”  Report dated 9 August 2010, M had reviewed NJ‟s report and noted that the stumps should not be replaced as they were excluded under the policy. However, the cost of propping and re-levelling of the dwelling should be covered as it may have occurred during the flood event.  Report dated 6 December 2010 notes that an additional quotation had now been received from D. M states the “total potential costs” are $16,109. 19. The FSP has enclosed a quotation dated 5 April 2010 from a builder “C”. The quotation includes the replacement of stumps in the overall costs and provides a quotation of $28,843. 20. The FSP has enclosed a copy of an email dated 22 June 2010, from C, from which I note the following: “...Why dose (sic) this company question my professional opinion for damage jobs, In relation to the above job, I feel that the ground that supports the foundation of the stumps has collapse (sic) meaning that releveling (sic) the stumps will force the stump into the ground more (so it might not be level now, but see how long it will stay level.) The other work that is part of this quote was shown to me by the owner (the paying customer of the insurance company), so I have to take his word that the damage was caused by unusual weather patten (sic) over the last few months.” Issue 21. Whether the FSP has appropriately settled the Applicant‟s claim. Case No: 241107 Determination Page 5 of 7 Reasons for Decision 22. There has been an exchange of material between each party, and I am satisfied each party has had an opportunity to reply to the issues raised. 23. I have read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 24. The parties do not dispute the following:  The property was subject to heavy rains.  Water pooled under the property.  Water damage occurred to other parts of the property causing internal damage.  The Applicant is covered for this insured event.  The FSP accepted the claim for internal damage to the property and for propping and packing the stumps. 25. In order to determine whether the FSP has properly settled the claim, I am required to review whether the stumps should form part of the scope of works and whether the FSP is entitled to rely on D‟s quotation. The Stumps 26. The evidence of NJ is that the “ ....ground itself appears to have limited cohesion and be susceptible to washout/scour.” 27. This is corroborated by C who has indicated the ground that supports the foundations of the stumps has collapsed and M who noted the stumps themselves had shifted. 28. The topography of the insured property is flat which allowed the rainfall to pool under the property. Further, the ground is susceptible to collapse. This is likely the reason NJ recommended that during re-stumping a 150mm deep layer of road-base or similar material be constructed to divert rainfall away from the stumps and their footings and for stump bracing to be added. 29. NJ has further opined that the stumps were in poor condition prior to the event. NJ has indicated a belief the stumps were not resting on footings and that the timber stumps had deteriorated over time. Further, the concrete stumps had deteriorated due to poor quality concrete and exposure to weather. Importantly though, the deterioration to the cross sectional area did not have an adverse affect on bearing capacity. 30. I must express concern with NJ forming an opinion regarding the stumps not being properly founded. NJ has acknowledged that it is “unaware of any specific documentation in relation to its design or construction” which suggests NJ has not referred to the construction/design documentation. F urther NJ has Case No: 241107 Determination Page 6 of 7 not excavated the stumps to confirm what, if any, footings the stumps are resting on. Given the lack of evidence supporting NJ ‟s opinion I consider myself unable to accept the conclusion the stumps are not resting on footings or that the stumps shifted for this reason. 31. Although NJ has noted the timber stump deterioration may account for some building movement, he does not indicate that the concrete stumps‟ bearing capacity have been affected. Further, that whilst the movement had been on- going for some time, that it likely worsened due to localised flooding as a result of heavy rainfall. 32. The comments of NJ regarding the effect of the weather on the stumps corroborates the opinion of both C and M that the stumps had shifted due to ground collapse caused by the pooling of water under the property. 33. I have considered whether the Wayne Tank principle applies to this matter. I note that the case of Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corporation Ltd [1974] QB 57 found that: “If a loss has two or more proximate or effective causes and at least one cause is excluded from cover the insurer is not liable” 34. I do not accept that the Wayne Tank principle applies in this instance. This is because the evidence before me suggests that but for the pooling of the water, the ground would not have softened to allow the stumps to shift so markedly. 35. I have further considered the exclusion for earth movement and subsidence in the policy provisions. However, the loss has not arisen due to earth movement and subsidence acting by itself but rather the saturation of the soil from the storm. I consider that but for the inundation of water the subsidence would not have occurred and accordingly the soil and stumps would not have shifted. 36. I conclude therefore that the stump movement is a result of the insured event. Further, it follows that as the stumps form part of the damage resulting from the storm and will require replacement (eg: re-stumping), they should be included as part of the claim to be covered by the FSP. Adequacy of settlement 37. Given the above findings, the quotation from D is not adequate as it excludes the costs of re-stumping. 38. I further note that D is unable to perform the work for the quoted price as requested by the Applicant. Further, that the Applicant has been unable to obtain a builder willing to perform the works at the price quoted by D. 39. Under its policy of insurance, the FSP settles building claims as follows: “Reinstatement or replacement value We will also pay the reasonable costs to rebuild or repair any damaged part of your Building to the same condition as when it was new.” Case No: 241107 Determination Page 7 of 7 40. It is therefore exceedingly difficult to accept that the FSP‟s settlement is adequate given that D will not perform the work and to date no other builder is willing to perform the work for this amount. This suggests that the settlement amount is not the reasonable cost of rebuilding/repairing the damaged portions of the insured property. 41. I consider the reliance of the FSP on the quotation by D is inappropriate in the circumstances and contrary to the indemnity provisions in the policy. 42. I consider that the Applicant‟s quotation cannot be currently relied upon given the time passed since the quote was provided. It is likely that the labour and materials costs have since increased. Determination 43. On the basis of the available information I determine that the following should occur on the Applicant‟s acceptance of this Determination: (a) Within 7 days the FSP provide to the Applicant a full scope of works for the building repairs/works including the cost of re- stumping (“the scope of works”). (b) Within 21 days of receiving the scope of works, the Applicant is to obtain and provide to the FSP written quotations for the repair cost in accordance with the scope of works. (c) The FSP review the quotations and provide settlement based on the most reasonable quotation for the works. 44. This matter is to be referred to the Code & Systemic Manager to determine whether further investigation is required in respect to my comment in paragraph 40 above.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.