Text of the determination
Case No: 240708 Determination Page 1 of 13
Case number: 240708
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
14 September 2012
Background
1. The Applicant held a home and contents insurance policy with the Financial
Services Provider (FSP).
2. On 11 January 2011, the Applicant‘s home was inundated with water, and on
16 January 2011, she lodged a claim with the FSP for the resultant damage.
3. The FSP denied the Applicant‘s claim on the basis that the damage was
caused by flood, which is excluded under her policy.
4. After reviewing its decision at the request of the Applicant, the FSP
maintained its decision to deny the claim.
Summary of Applicant’s position
5. The Applicant first obtained home and contents insurance with the FSP in
1973, but is not sure whether she was provided with a copy of the policy
wording prior to her making the initial payment to the FSP. The flood
exclusion upon which the FSP relies to deny her claim is contained in a PDS
which was not received until after the policy was in place.
6. After the 1974 floods, she made enquiries with the FSP about whether she
was covered for flood damage, and was assured that she would be covered
if her property was flooded in future. She is unaware of any documentation
provided by the FSP that specified that it no longer provided flood cover to
her, and as at January 2011, she believed that her property was covered for
flood.
7. The FSP‘s policy definitions of flood and flash -flood overlap and are
confusing, and as such, the FSP has not fulfilled its obligation to clearly
inform her that flood is excluded from coverage.
8. It rained heavily on 10 and 11 January 2011, and this combined with weather
data from the time provides strong evidence that the cause of the inundation
was rain that fell within 24 hours. This is flash flooding, an insured event
which is not excluded under the policy.
Determination
Case No: 240708 Determination Page 2 of 13
9. In addition, her property is close to two large stormwater drains which are
connected to one another, and both have had a number on ongoing draining
and runoff issues.
10. It is therefore also possible that the cause of the damage, if not flash flooding
under the policy, was due to stormwater runoff.
11. The FSP‘s management of her claim has not been fair and transparent. It
provided her with minimal information about the evidence upon which it
relied to deny her claim.
12. The one- page report provided by the FSP titled ‗Report by [FSP] on its
Investigations into the Brisbane floods‘ relies on assumptions, assertions
and generalities to support its conclusions. The Applicant says that any such
document cannot be used to determine events in specific area of the city, let
alone on a specific property. She says that the FSP therefore did not have
sufficient evidence to deny her claim.
13. The assessor‘s report provided to her by the FSP rec ommended that a
hydrologist was required to determine the cause of the damage to her
property. However it appears that the FSP did not appoint a hydrologist at
that time, and she does not believe that the FSP had any valid hydrologist
report at the time it denied her claim.
14. The FSP refused to provide her with a copy of the hydrology report upon
which it relied to deny her claim, saying that it contained information relating
to other customers and was also subject to legal privilege, reasons that she
does not accept.
15. A copy of the hydrologist‘s report dated 5 September 2011 was eventually
provided to her, but it would appear that the FSP only obtained this report
after it had already denied her claim, and after it had reviewed and upheld
the claim decision.
16. She doubts that any hydrologist inspected her specific property; but if they
did, such an inspection would not have occurred within a reasonably short
period from event. Given the time lapse involved, a hydrologist would not be
able to correctly and fairly analyse the relevant issues, and this compromises
the validity of any report they might produce.
17. She says that the FSP should therefore honour her claim for the damage to
her home and contents.
Summary of FSP’s position
18. The Applicant has alleged that she contacted the FSP after the 1974 floods,
to enquire whether her policy covered her for flood, and was allegedly
advised that she would be covered if her property was flooded in future.
Case No: 240708 Determination Page 3 of 13
19. However the details provided by the Applicant in support of this allegation
are vague, with no specifics regarding when the contact was made, or with
whom she spoke.
20. As such, it is impossible for the FSP to provide records which contradict the
allegation. Further, given the vagueness of the Applicant‘s allegations in this
regard, the FSP considers it likely that the alleged statement was not made
and no reliance was placed on it by the Applicant.
21. The FSP‘s records indicate that the Applicant‘s policy over the property
which is the subject of this dispute has been in force since 2004. The FSP
says that it would have provided a copy of the relevant Product Disclosure
Statement (PDS), and certificate of insurance, to the Applicant within 14
days of the date when the contract was entered into.
22. In addition, each year the Applicant would have received policy renewal
documents, including certificates of insurance (which themselves clearly
states that cover for Flood and Storm Surge is not included), as well as any
updated PDSs or Supplementary PDSs relevant to her policy.
23. In light of such documents, the FSP says that the Applicant was aware (or
should have been aware) that she did not have flood coverage.
24. Further, the FSP says that the Applicant does not appear to dispute
receiving the PDS or certificate of insurance.
25. The Applicant ha s said that her home was inundated by ‗flash - flood‘ (as
defined under the policy), or — in the alternative — by stormwater runoff.
However, the Applicant has not provided any hydrological or other evidence
to support her statements in this regard, save to say that it rained or there
was a storm on 10 and 11 January 2011.
26. The FSP has conducted its own detailed investigations, through hydrologist
‗W‘, into the cause of flooding in Brisbane on a regional basis. Information
from ‗W‘ was used by the FSP as the b asis for its decision that the
Applicant‘s claim was not one for acceptance.
27. In a statement to the FSP (prepared in response to the Applicant‘s
submission to the Financial Ombudsman Service), ‗W‘ concluded that the
cause of the inundation of the Applicant‘ s property was the rising level of the
Brisbane River, which itself was caused by rain that fell more than 24 hours
earlier.
28. The statement by ‗W‘ also explains that the Applicant‘s property would not
have experienced stormwater runoff.
29. The FSP is entitled to rely on evidence it has obtained from ‗W‘, and is
entitled to deny liability for the damage to the Applicant‘s home and contents,
on the basis that it was caused by flood which is excluded under her policy.
30. The FSP relies on the following provisions:
Case No: 240708 Determination Page 4 of 13
― Certificate of Insurance
What optional covers are included and not included
Home Contents
Flood and storm surge not included not included ”
[FSP] Product Disclosure Statement (PDS)
Words with special meanings (page 10, 11 and 12 respectively)
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause. This
policy does not cover flood unless we have agreed and it is
shown on your certificate of insurance.
Flash flood and
stormwater runoff
A s udden flood caused by heavy rain that fell no more than
24 hours prior to the flash flood or stormwater runoff .
Storm A violent disturbance of the atmosphere associated with
strong winds including a cyclone, lightning, heavy rain, hail
or snow, but not continuous bad weather by itself.
Insured events you are covered for (pages 17 and 18 respectively)
Damage caused by weather
What is covered What is not covered
Storm Loss or damage:
X caused by rain, hail or snow after it
has reached the ground
X caused by rain or wind
X caused by rain or wind entering the
home unless it enters through a
opening in the windows, walls or roof
made by a storm;
...
X caused by storm surge
…
Case No: 240708 Determination Page 5 of 13
What is covered What is not covered
Flash flood and stormwater runoff
A sudden flood caused by heavy rain that
fell no more than 24 hours prior to the
flash flood or stormwater runoff
Loss or damage caused:
X by flood
…
X caused by storm surge or any
action of the sea
...
The most we will pay for home claims (page 27)
What is covered What is not covered
Flash flood and stormwater runoff
We will pay up to 50% of your home sum insured or
$25,000 whichever is higher
The most we will pay for contents claims (page 32)
What is covered What is not covered
Flash flood and stormwater runoff
We will pay up to 50% of your contents sum insured or
$25,000 whichever is higher , but not exceeding your
contents sum insured.
”
31. The FSP relies on several legal principles including the following:
“An insured bears the onus of proving that the loss was caused by an
event covered under the policy. If a loss is proven to fall, prima facie,
within the policy, then the insurer bears the onus of proving that any
exclusion applies” Wallaby Grip Ltd v QBE Insurance (Australia) Ltd
(2010) 240 CLR 444
“Where there are two or more proximate or effective causes, one within
the policy and that other excluded, the policy does not respond” Wayne
Tank and Pump Co Ltd v Employers Liability Assurance Corporation Ltd
[1974] QB 57
32. The FSP has submitted that the Applicant must prove that ―Flash -flood and
storm water runoff‖ or ―Storm‖ was the cause of the loss.
Case No: 240708 Determination Page 6 of 13
Issues
33. Whether the FSP has met its obligation to clearly inform the Applicant of the
flood exclusion.
34. Whether the FSP made verbal assurances to the Applicant to the effect that
her policy covered her for flood, and whether the Applicant is entitled to rely
on any such assurances.
35. Whether the damage to the Applicant‘s home and contents was caused by
flash flood and stormwater runoff, or flood.
Reasons for decision
36. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‘s Terms of Reference.
37. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
38. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
39. There has been a detailed exchange of information in this matter. Initially the
Applicant‘s material has been supplied through her legal representatives and
they have provided detailed submissions on her behalf as to the
circumstances of the loss and issues as to whether the FSP has either
misrepresented the level of cover and/or clearly informed the Applicant of the
limitations from cover. The FSP has also been assisted by its legal
representatives and has provided detailed submissions in relation to t he
cause of loss and whether the policy acts to clearly inform.
40. Whilst the Applicant has indicated she cannot recall receiving the initial
policy, the Applicant does not dispute that she has since received a PDS.
41. The Applicant maintains there is an overla p in the definition of ―flood‖ when
read with the definition of ―flash flood‖ and as such, this is likely to cause
confusion for a consumer as to what is covered and what is not covered. The
Panel has previously looked at the FSP‘s PDS and policy documenta tion
and the issue as to whether or not the documentation acts sufficiently to
clearly inform.
42. It is well established legal principle that a fair reading of the obligation to
clearly inform under Section 35(2) of the Insurance Contracts Act 1984
requires a relevant exclusion (and limitations) to be in clear and
unambiguous language and in a manner which a person of average
Case No: 240708 Determination Page 7 of 13
intelligence and education is likely to have little difficulty in finding and
understanding if that person reads the policy in question.
43. When looking at the certificate of insurance (COI), it is clear that the COI
identifies that flood and storm surge is not covered. When looking at the
PDS, the definition of flood again states that flood is not covered unless
agreed upon. At pages 17 and 18 of the policy under ―what is covered‖ ―flash
flood and stormwater‖ is clearly defined as being a sudden flood caused by
heavy rain that fell no more than 24 hours prior to the flash flood or
stormwater runoff. The limitations of cover are clearly spelt out at page 27
and 32 and the optional covers spelt out at page 48 and 53. There is no
suggestion that the Applicant applied for optional flood cover
44. On reading the policy documentation, the Panel is satisfied that a person of
average intelligence and education upon reading the policy documentation
would understand that the exclusions and limitations. The Panel is satisfied
that the FSP in providing the Applicant with a copy of the PDS has met its
obligation to clearly inform in accordance with Section 35 of the Act.
45. The Applicant has suggested that she was misinformed as to the extent of
flood cover and had been verbally assured that the policy was sufficient to
cover flood. There is nothing however in the material exchanged to support
the Applicant‘s alleg ation with respect to this. Whilst the Applicant may have
understood that there was flood to cover, there is nothing to indicate that the
FSP has actually provided that assurance to her and in the circumstances,
the Panel is satisfied that it would be unfair to rely on a verbal assurance
given at any time up to 36 years ago when the Applicant has during that time
had access to the relevant PDS and Certificate of Insurance and in particular
the Certificate of Insurance is clearly spelt out that the policy does not cover
flood.
Circumstances of the Loss
46. The Applicant says that it rained heavily on 10 and 11 January 2011, and on
the evening of Tuesday 11 January 2011, she saw water entering the
property. Out of concern of the risk of staying in the house, she packed
some items in her car and left at approximately 8.40pm.
47. The Applicant argues that the water which inundated her property sometime
after she left was the result of storm activity and rainwater or alternatively the
water that caused the damage was flash flooding, as defined under the
policy, as it was the result of rain that fell within 24 hours of the inundation.
48. The FSP says that it engaged hydrologist ‗W‘ to investigate the cause of the
flooding in Brisbane on a regional basis.
49. A statement provided b y ‗W‘ indicates that:
A substantial amount of rain fell in the Brisbane River catchment above
Wivenhoe Dam both before, but particularly over the period 9, 10 and 11
January 2011, commencing at approximately 9am on 9 January 2011.
This rain caused significant inflows into the Wivenhoe Dam, the level of
Case No: 240708 Determination Page 8 of 13
which peaked late in the evening on 11 January 2011. There were
significant discharges of this water from the Wivenhoe Dam which
flowed into the Brisbane River. This water worked its way down the
Brisbane River towards Brisbane.
A substantial amount of rain also fell in the Bremer River catchment from
around 6.00am on 11 January 2011. This rain travelled down the Bremer
River towards the junction of the Bremer River and the Brisbane River.
The Bremer River contributed in the order of 15% to 25% of the Brisbane
River‘s peak flow. Due to the high Brisbane River tailwater levels, there
was some attenuation of the peak flow rate in the lower reaches of the
Bremer River. This means that the overall contribution of the Bremer
River to the Brisbane River is likely to be less than 15% to 25% but it is
not possible at this stage to precisely say by how much less.
A small proportion of the overall depth of the Brisbane River prior to
6.00am on 12 January 2011 may be partially attributable to the rain that
fell in the Bremer River catchment on 11 January 2011. However, the
overwhelming influence on the flooding of the Brisbane River was the
rain which fell some days earlier over the Wivenhoe Dam catchment and
its subsequent release from Wivenhoe Dam.
After 6.00am on 12 January 2011, the Brisbane River continued to rise
to its peak level of 4.45m (recorded at the Brisbane City Gauge at
approximately 4.00am on 13 January 2011).
50. The ‗W‘ statement concludes that:
― On the basis of the above matters, I conclude that the cause of the inundation of
the Subject Property was the rising level of the Brisbane River, which was itself
caused by rain which fell more than 24 hours earlier.”
51. In view of the complexities in this dispute, the Panel Chair Ombudsman
conducted a site inspection with the Applicant and the FSP‘s representative
on 8 February 2012.
52. The property is built on a slab and internally has a number of levels that
maintain the height throughout the house as the property slopes to the rear.
According to the Applicant, water came through the stormwater drain (creek)
that is towards the back of the property. The drain is prone to flooding and
the area is prone to flooding. There is a second stormwater drain that runs
on to the road at Pratton Street w hich is at the end of the Applicant‘s street.
The Applicant believes the water backs up the stormwater drains from this
area. She believed it was a totally different pattern to any of the floods or
waters that she has seen coming from the area since first purchasing the
land in about 1975.
53. The property is in a low section of Deniven Street. It is easy to imagine water
flowing down the road to the property and the possibility of stormwater
runoff. However, the Applicant maintained that the water entered the home
from the rear of the property and not from across the road. According to the
Applicant, she first left the property around 1.00pm on Tuesday 11 January
Case No: 240708 Determination Page 9 of 13
2011. At that time, it was raining heavily. Whilst she went outside she
decided to return inside until the rain eased. At approximately 5.00pm she
went up to the supermarket to purchase some food in the event of flooding.
At about 8.45pm, she left the property. At that stage water was at the back
step, but there was no water in the front of the house. She was not able to
get anything out of the house and left with what was in her car.
54. Since the property was damaged, she has been working on the house with
the help of two builders.
55. The Panel has reviewed all the evidence provided and accepts that the
Appli cant‘s property most likely was inundated by rising water from the
Brisbane River. The Panel accepts in particular given the direction that the
Applicant has described the water flowing from that it is unlikely the initial
inundation of the Applicant‘s pro perty was due to stormwater runoff.
Inundation caused by heavy rainfall
56. The central issue however is whether the Applicant‘s property was inundated
by flood or by flash flood caused by heavy rain that fell no more than 24
hours prior to the inundation of the property.
57. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
58. At that time, the Panel noted that in relation to the approach that each
individual dispute would depend upon the individual and unique factors
relevant to the dispute and in that regard the parties were invited to make
further submissions in relation to disputes before FOS.
59. In view of this, the FSP provided detailed further submissions to FOS on 13
June 2012 in relation to this dispute. Included with the submissions were the
following documents:
A Reference document for disputes relating to Queensland Floods (this
is a general reference document) relating to the various submissions
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute;
Letter from the FSP‘s hydrologist attaching a key information sheet for
the Applicants‘ property;
Hydrologist report ―Investigations of January 2011 inundation event –
Brisbane‖ dated March 2011;
Statement from hydrologist dated 7 June 2012.
Case No: 240708 Determination Page 10 of 13
60. In summary the FSP argues that the proximate cause of the inundation of
the properties, that is the real or effective cause of the damage caused to the
properties downstream of the dam, is not simply the rain that occurred from
4.00am on 11 January 2011. The FSP maintains that on any reasonable
view, the damage sustai ned to the downstream properties was the combined
effect of all of the rainfall and not just the rain that had fallen from 4.00am on
11 January 2011 leading to the implementation of the W4 strategy from
8.00am that day.
61. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011. It is not disputed that in addition to this there was heavy
rain over the Bremer River which influenced the level of the Brisbane River
and that rain commenced at approximately 6.00am on 11 January 2011.
62. The FSP‘s hydrologist has referred to data from SEQWater dated 2 March
2011 which confirms the rapid increase in inflows to the Wivenhoe Dam from
4.00am on 11 January 2011. Examination of the SEQWater report identifies
the rapid increase in the inflows to the Wivenhoe Dam commencing from
about 4.00am, 11 January 2011. The report confirms the inflows into the
dam had been decreasing from as early as 8.00am from 10 January 2011
with steady decreases from approximately 3.00pm on 10 January 2011 to
2.00am on 11 January 2011.
63. The available information indicates the W3 strategy that was in place prior to
8.00am on 11 January 2011 had been successful in limiting the outflows and
flooding below the Wivenhoe Dam. Whether the outflows would have
continued at the same rate had the inflows continued to reduce is not known.
64. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
65. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy to W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel‘s view, the Queensland Flood Commission of Inquiry final report
does not find the adoption of W4 strategy at 8.00am on 11 January 2011
was inconsistent with the manual. Although there may be issues as to how
the Wivenhoe Dam had been managed prior to this time, there is nothing in
the material that has been provided to the Panel to suggest that the earlier
management of the Wivenhoe Dam influenced to any significant degree, the
adoption of the W4 release strategy at 8.00am on 11 January 2011.
66. The ICA hydrology and the information provided by the FSP‘s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
Case No: 240708 Determination Page 11 of 13
67. The Panel agrees with the FSP‘s general submission that the proximate
cause is a cause determined by commonsense evaluation of the relevant
facts. In the event that there are two or more proximate causes, one within
the policy and the other excluded, the policy does not respond. The
proximate cause is not determined by or identified in the last event or final
trigger, but determining what is the dominant, effective, direct or efficient
cause of the loss.
68. There is no doubt there had been a significant impact on the levels of the
Wivenhoe Dam by rainfall that commenced falling on or about 9 January
2011 or earlier, however having regard to the information exchanged and the
relevant legal principles the Panel is satisfied that the heavy rain that
commenced falling at or about 4.00am on 11 January 2011 was a pro ximate
or effective cause of the adoption of the W4 Strategy. Prior to the
commencement of the heavy rain, the W3 strategy was in place. The heavy
rain caused the rapid increase in the inflows to the dam between 4.00am
and 8.00am that led to the adoption o f the W4 strategy.
69. The Panel is satisfied having considered the information exchanged that the
heavy rain that fell over the Wivenhoe Dam commencing from 4.00am on 11
January 2011 leading to the adoption of the W4 release strategy, combined
with the heavy rain that fell over the Brisbane River from approximately
4.00am on 11 January 2011 and over the Bremer River from approximately
6.00am on that same day was the proximate cause of the inundation of the
Applicant‘s property.
70. The FSP‘s policy provides for ― flash flood ‖ cover where the inundation was
caused by heavy rain that fell no more than 24 hours prior to the inundation.
71. The Panel notes there has been some dispute as to the timing of the
inundation but accepts that most likely the Applicant‘s property was first
inundated in the late evening of 11 January 2011.
72. Although the FSP‘s hydrologist assessments as to time and height may not
be entirely accurate, the Panel has considered these assessments against
the comments attributed to the Applicant and made during these site
inspections. The Panel is satisfied that it is fair in the circumstances that the
FSP‘s hydrologist findings be relied upon as a reasonable assessment as to
the initial inundation of the Applicant‘s property due to heavy rainfall within
the 24 hour period.
73. According to the FSP‘s key conclusion statement, the effect of the W4
releases first reached the vicinity of the Applicant‘s property at 2.39pm on
Tuesday 11 January 2011 and reached the benchmark level of the
Applicant‘s property at 10. 45pm on that same day. The benchmark level is
the level of the slab on the ground at the Applicant‘s property. According to
the hydrologist, by 4.00am on 12 January 2011, the Brisbane River would
have been approximately 6.4m AHD and the Applicant‘s propert y would
have been inundated to a level of 0.8m above the benchmark level.
Case No: 240708 Determination Page 12 of 13
74. The Panel notes that the Applicant‘s property was ultimately inundated to a
level of 3.8m which is roughly roof height. Although the majority of damage
to the Applicant‘s contents an d a significant proportion of damage to the
Applicant‘s building would have occurred by the initial inundation to the level
of 0.8m, the Panel accepts not all of the damage would have been due to the
initial inundation and insofar as there was damage to the property that
occurred after 4.00am on 12 January 2011, that damage is not covered
under the terms of the policy and is properly excluded under the policy
exclusion of flood. The exclusion operates as the further inundation after
4.00am on 12 January 2011 would be after the relevant 24 hour period
under the policy.
75. Under the terms of the policy for flash flood, the policy will respond to pay up
to 50% of the home building sum insured or $25,000 whichever is the higher.
In this case, the home building is insured for $351,000, and the maximum
liability for ―flash flood‖ is therefore $175,500. The Panel has not been
provided any assessment of the actual cost of repairs to the Applicant‘s
property or any breakdown of the loss attributed to flash flood as against
flood. Whilst the Panel considers the majority of the loss will be caused by
inundation to a level of 0.8m, the parties are asked to work cooperatively
together to settle this aspect of the dispute. If the parties are unable to agree
within 30 days of the acceptance of this Determination, the Panel will
determine the amount based on further submissions.
76. Insofar as the Applicant‘s claim for loss of contents is concerned, the Panel
notes the policy provides cover for loss of contents up to $81,000 and
therefore under the flash flood provision would provide cover for 50% of the
loss being $40,500. The Panel considers it is reasonable in the
circumstances that the Applicant would have suffered a total loss of contents
and therefore reasonable in the circumstances that the FSP meet the loss of
contents claim in the sum of $40,500 in accordance with the flash flood
policy provision.
77. The Panel has also considered whether interest should be payable in this
dispute.
78. The FSP has argued that interest is only payable from the date from which it
was unreasonable to withhold payment. The FSP maintains that it is entitled
to a reasonable period to investigate and determine its position, and given
the complex nature of the flood disputes, the delays are not unreasonable.
Further complex situations require substantial periods of time for
independent bodies such as the Queensland Flood Commission of Inquiry
and FOS, to make conclusions on the issues in dispute.
79. The FSP maintains that it did not act unreasonably in this dispute and
therefore interest is not payable. Alternatively if some period of interest is to
be awarded it should be reduced to account for the substantial delays
through the course of the process which were not the FSP‘s fault.
80. Section 57 of the Insurance Contracts Act requires interest be paid when it
becomes ―unreasonable for the insurer to have withheld payment‖. An
Case No: 240708 Determination Page 13 of 13
examination of relevant case law indicates that most probably, interest will
be awarded from either when an insurer first emphatically denied liability or
disputed a matter, or from when in the normal course of events the claim
should have been paid if liability had not been disputed.
81. In this dispute the Panel accepts that the FSP was entitled to withhold
payment of the settlement monies until such time as it had properly
investigated the dispute and made its decision as to liability.
82. The FSP made its original decision to deny the claim after receiving relevant
assessment reports, hydrology reports and other information. The FSP was
aware of the terms of its policy and aware of the relevant provisions under
which liability might arise and chose to deny the claim having reviewed those
relevant provisions and the evidence available to it.
83. In the Panel‘s view, at that point the FSP has made its decis ion on the claim
and it is appropriate that from that time interest be paid unless it can be
established that the Applicant had withheld information from the FSP that
would have led to an alteration of its decision.
84. Accordingly, the Panel determines that it is appropriate that the FSP in this
dispute pay interest from the day the FSP determined following its internal
review of the matter to deny liability of the Applicant‘s claim, until payment of
the claim.
Determination
85. Accordingly the Panel determines th e FSP is to meet the Applicant‘s claim
with respect to the damage sustained as a result of ‗Flash flood and
stormwater runoff‘ in accordance with the terms and limitations contained
within the policy, and subject to the findings in paragraphs 75 and 76 above.
86. Insofar as the FSP determines to cash settle the claim, the Panel determines
it reasonable that interest be paid in accordance with Section 57 of the Act
from 12 July 2011 being the date of the FSP‘s IDR decision to date of
payment of the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.