Text of the determination
Case No: 240707 Determination Page 1 of 14
Case number: 240707
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Inundation of Home - Flood vs Stormwater Run-off
24 September 2012
Background
1. The Applicant held a home and contents policy with the Financial Services
Provider (FSP) from 4 February 2002. The policy provided building cover of
$250,000 and contents cover of $100,000.
2. On or about 11 January 2011, the Applicant ‟s home in Goodna was almost
fully inundated with water during the extreme weather events that affected
significant parts of Queensland.
3. The FSP arranged for an assessor to inspect the property and later for a
hydrologist to provide a report. It attributed the cause of the loss to flooding,
which was excluded under the policy and declined the claim.
4. The Applicant disputes the decision and seeks reimbursement for her loss.
Summary of Applicant’s p osition
5. The Applicant has legal representation: for ease of reference, both the
App licant and her representative will be referred to as the „Applicant‟ in this
determination.
6. The Applicant says that the Product Disclosure Statement (PDS) relied upon
by the FSP is unclear as to what is covered and what is not under the policy.
7. She attributes the cause of her loss to flash flooding from the Bremer River
and its subsequent affect on the Brisbane River in the hours prior to the
inundation of her home.
8. Alternatively, her home was inundated as a result of the release of water
from the Wivenhoe Dam on 11 January 2011 following heavy rainfall. This
was an insured event (flash flood) as the damage was caused within 24
hours of the rainfall having occurred.
Determination
Case No: 240707 Determination Page 2 of 14
Summary of FSP’ s position
9. The FSP relies upon the opinion of its hydrologist that considered the cause
of the loss to be flooding from the Brisbane River.
10. It further relies on the following policy provisions:
Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightening,
heavy rain, hail or snow, but not continuous bad
weather by itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off Loss or damage caused:
Case No: 240707 Determination Page 3 of 14
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 48 of the PDS
“ Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you
have asked for them and we agree to cover you. Additional premiums apply
for each cover. Your certificate of insurance will show which covers operate.
All optional covers are subject to the terms and conditions of this policy.”
Page 53 of the PDS
“ Optional covers for extra peace of mind
What is covered What is not covered
Flood and storm surge
This policy does not cover flood unless
we have agreed and it is shown on your
certificate of insurance.
Home and/or contents cover
We cover you for loss of or damage to
your home or contents caused by flood
or storm surge which happens during the
period of insurance at the property
address.
We will pay up to the:
home sum insured, if your home is
insured;
contents sum insured, if your
contents are insured for damage
caused by flood or storm surge,
We will pay for loss or damage in the
same way and in the same amounts as
we do under insured events cover.
We will not pay for loss or
damage to:
paths, driveways, paving,
retaining walls (whether or
not part of the home), tennis
courts or other playing
surfaces;
shade or sail cloth;
fabric awnings, swimming
pool or spa covers or liners
and the like;
glasshouse whether or not
constructed principally of
glass;
water in swimming pools or
spas...
Case No: 240707 Determination Page 4 of 14
...”
Issues
11. Whether the Applicant was “clearly informed” about what the policy did and
did not cover.
12. Whether the cause of the Applicant‟s loss was covered under the policy.
Reasons for Decision
13. As advised to the parties, FOS has considered it appropriate to elevate the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complexity of the issues to be considered.
This dispute has not been the subject of a FOS Recommendation and has
proceeded directly to Determination.
14. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative appointed by the Financial Ombudsman
Service Board, and a consumer representative appointed by the Financial
Ombudsman Service Board.
15. The Panel Chair Ombudsman attended on site where he met with the
Applicant, her husband and a representative of the FSP.
16. The Applicant‟s home was severely affected by the inundation and although
the Applicant has not detailed the extent of her loss, the total amount of
cover under the policy is potentially enlivened, being $350,000. The FSP has
not suggested that the claim should fall outside of the Terms of Reference,
being an award up to $280,000 and the consideration of a dispute not
exceeding $500,000. The Panel will therefore determine the matter as it
sees fit, bearing in mind these limits.
17. It is not in dispute that the Applicant‟s home was inundated with water as a
result of a significant weather event that affected much of Queensland in
early January 2011. The Applicant argues that the PDS does not clearly
define what is covered under the policy, it is too broad and it is difficult to
interpret.
18. Insofar as this is not accepted, the Applicant attributes the damage to her
home to flash flooding (as defined in the policy) and the FSP considers it
was caused by flood. The FSP further argues that the loss is not covered as
flood is excluded under its policy.
Policy coverage
19. The Applicant has suggested that the definition of “flood” as described in the
PDS is difficult to understand, particularly when it is considered in
Case No: 240707 Determination Page 5 of 14
conjunction with „flash flood‟, which is a separate and covered event under
the policy.
20. Flood is defined in the PDS as:
“Rising water which enters your home as a result of it running off or
overflowing from any origin or cause. This policy does not cover flood unless
we have agreed and it is shown on your certificate of insurance. ”
21. In contrast, “flash flood” is defined in the PDS as:
“A sudden flood caused by heavy rain that fell no more than 24 hours prior to
the flash flood or stormwater run- off.”
22. The Applicant has not suggested that she opted to choose flood cover under
the policy and this is reflected in the Certificate of Insurance (COI) for the
2010-2011 renewal periods which confirms that “flood and storm surge”
cover was “not included”. Therefore, the FSP suggests that any loss from the
event on 11 January 2011 that is attributable to flood is excluded.
23. Further, the Panel notes that any cover extended to an insured person for
damage attributable to flash flood is limited to $25,000 or 50% of the insured
sum whichever is the higher (applies similarly and separately to both home
and contents cover). For the Applicant in this instance, this would limit her
potential cover under the policy to no more than $125,000 for her home and
$50,000 for her contents.
24. The Applicant has also received payment for $12,500 from the FSP‟s
“compassionate fund” (CF) . This issue falls outside the Panel‟s remit; insofar
as any Panel determination in the Applicant‟s favour ensues, then t he
opportunity for the FSP to off- set the CF will be subject to the „Terms of
Release‟ governing same, as executed between the parties to the CF.
Consideration of ‘Flood’ Definition in PDS
25. The Applicant does not recall receipt of the PDS at initial policy inception,
although she states it was not received prior to inception. This would only be
relevant in the event a claim had occurred in the period of alleged non-
provision of the PDS - this claim falls well outside that potentially disputed
time and is therefore of no consequence. It is not in dispute that the
Applicant subsequently received a PDS, and an annual COI from the FSP,
being the documents provided by the FSP.
26. The Applicant contends that the definition of flood is too broad, too difficult to
comprehend and that the FSP has not met its obligations under Section 35
of the Act to “clearly inform” her of what is and is not covered under the
policy.
27. The Panel has previously considered this issue for the FSP‟s policy. It is
satisfied that the two event s (“flood” and “flash flood and stormwater run - off”)
can be distinguished.
Case No: 240707 Determination Page 6 of 14
28. In simple terms, the policy provides cover where damage is attributable to a
flood caused by a run-off of stormwater after a period of excessive rainfall
and occurring within 24 hours of the rain event. It does not cover any other
type of flood. This means that flooding attributable to the overflow of water
bodies (such as a lake, river or dam) is not covered.
29. The Applicant has raised issue with the placing of definitions throughout the
policy and the difficulty a „reasonable person‟ would have in evaluating it.
The Panel is satisfied that the PDS should be read in its entirety and that
(should this be done) the interpretation of same should not be difficult for a
“reasonable person”.
30. The PDS has an index on the inside cover which highlights the areas of the
policy to which the policyholder might find information. Included in this is
“Words/terms with special meanings” on page 9, for which definitions of
relevant terms in the policy are provided. Flood is included in this, together
with the qualification that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
31. In addition to this, page 53 directs the reader to “Flood and storm surge”,
which is explained under the broader definition of “Optional covers for extra
peace of mind”. This section explains that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
32. As previously highlighted, it is not in dispute that no cover was elected by the
Applicant for “Flood and storm surge” cover and therefore she was not
covered for it under the policy.
33. Accordingly, the Panel is satisfied that the FSP has satisfactorily defined the
events in the policy as required under Section 35 of the Act and that it is
entitled to rely upon same in determining if the policy responds to the
Applicant‟s loss.
34. Having thoroughly considered these matters the Panel is of the view that the
FSP has, by the provision of its various documents, discharged its
obligations to clearly inform the Applicant of the terms of its policy, and
particularly its flood exclusion and the sub - limits which apply to its „flash
flood‟ cover.
Evaluation of the Loss
35. The Panel accepts that the FSP‟s policy does not extend cover to
circumstances where a loss is caused by a flood. The policy also
distinguishes between flood, flash flood and stormwater run-off (the latter
two of which are covered). It extends cover to damage from sudden flood
events “caused by heavy rain that fell no more than 24 hours prior” to the
flash flood.
Case No: 240707 Determination Page 7 of 14
36. The Applicant left her home at about 3.00pm on 11 January 2011. The
Applicant initially reports that water had entered the property and believes
that it inundated the home sometime soon after she left. Her home was
situated about 150m from a pumping station and a witness (AC) reports that
“water rose from the south east direction” near this station at about 3.30pm.
This is verified by a second witness, JG. The Applicant considers that any
inundation prior to 6.00pm must have been from stormwater run-off from the
vicinity of the pumping station.
37. The Applicant confirmed with the Panel Chair Ombudsman that she did not
see water enter her home and any time of inundation she has detailed is an
estimation on her part.
38. The FSP accepts that heavy rainfalls earlier in the day caused a flash flood
in areas surrounding the Bremer River. This river runs into the Brisbane
River and the Applicant‟s property is situated about three or four kilometres
east of where the Bremer River runs into the Brisbane River. The waterway
most closely located to the Applicant‟s property is Woogaroo Creek, which is
situated about 100m north of the property (it also winds around it to the
east).
39. After the report of the incident, the FSP appointed a loss adjuster (MY) to
investigate and report on the damage caused to the Applicant ‟ s property.
The report considered that the cause of the loss was a flood and
recommended the appointment of a hydrologist.
40. The Panel notes that MY confirmed the distance from floor level to ground
was 1500mm. During the site visit, the Applicant confirmed that the lower
level of the home included a storage area, together with pumps for the tanks,
air conditioning units, a solar hot water unit and that there is a separate
laundry in a separate building on the ground behind the home building.
41. The FSP engaged a hydrologist, SC, to provide a report as to the damage.
42. SC provided a statutory declaration dated 26 August 2011 to evaluate the
cause of the loss in the region surrounding and specifically affecting the
Applicant ‟ s home. He found that:
a substantial amount of rain fell in the greater Brisbane area from 9
January 2011 and over the subsequent two days, which caused
significant inflows into the Wivenhoe Dam, which peaked on the evening
of 11 January 2011;
rain also fell in the area of the Bremer River from 6.00am on 11 January
2011. This rain travelled along the Bremer River to the junction of the
Brisbane River and ultimately contributed about 15-25% of its peak flow;
a “small proportion” of the overall depth of the Brisbane River “may be
partially attributable to the rain that fell in the Bremer River catchment on
11 January 2011”, although the “overwhelming influence” was the r ain
that had fallen in the previous days.
Case No: 240707 Determination Page 8 of 14
the terrain data for the Applicant‟s home suggested that it was unlikely
that the Applicant would have experienced significant stormwater or run-
off problems during the period;
inundation from stormwater run-off re quires “intense levels of rain” which
is sufficient to overcome the stormwater drainage system. Any such run-
off generally occurs during or very shortly after such an intense period of
rainfall;
a review of the rainwater gauge at Wacol, approximately 3km from the
Applicant‟s property and representative of its rainfall in the expert‟s
opinion, revealed that 87mm of rain fell over 9 and 10 January 2011, with
a further 56mm falling on 11 January 2011. The majority of the rainfall on
11 January 2011 fell in two bursts, concluding at 11.00am and 4.00pm;
any pooling of water from the second rain event ceasing at 4.00pm would
have dissipated quickly. This would not have caused the inundation of
the property;
the eyewitness accounts of the water coming from the southeast are
consistent with the rising water levels of the Brisbane River. A low point
in the local terrain is situated by the pumping station and flood water from
the Brisbane River would have backed up the Woogaroo Creek and
inundated this area first, befo re moving towards the Applicant‟s property;
the overflow of Woogaroo Creek into the low point near the pumping
station would have occurred at about 3.00pm but the water levels of the
Brisbane River was not sufficient to subsequently affect or inundate the
Applicant‟s property at that time;
the pumping station was situated at a lower level than the Applicant‟s
property and any stormwater run-off from this area at the time would not
have flowed towards the Applicant‟s property;
the water seen on the Applican t‟s property in the mid afternoon of 11
January 2011 was likely rainwater run-off but this was not to a level that
allowed inundation of the home. It likely would have drained off quickly;
the Applicant‟s property was inundated by backflow from the Brisban e
River into Woogaroo Creek between approximately 12.00-3.00am on 12
January 2011.
43. As a result of the report from SC, the FSP denied the claim on the basis that
it considered the cause of the loss to be flooding from the Brisbane River.
44. Since the matter has been referred to the Service, the Applicant has
suggested that the releases of water from the Wivenhoe Dam on 11 January
2011 were a significant factor in the increased water levels in the Brisbane
River and that this was a major facto r in the inundation of the Applicant‟s
home. This is largely now agreed by the parties, although a key element of
this dispute centres on whether such an event is covered under the policy by
Case No: 240707 Determination Page 9 of 14
reference primarily to proximate cause and whether the 24 hour time window
was exceeded.Having considered whether the home may have been
inundated by stormwater run-off in the mid afternoon of 11 January 2011 or
whether it was affected by run-off attributable to the water from the Bremer
River, the Panel accepts that the home could not have been (almost) wholly
inundated by alleged run-off from either of those two sources. In determining
what was the likely cause of inundation the Panel has been assisted by
consideration of the Interim Report of the Queensland Flood Commission of
Inquiry (the Interim Report). Evidence from this report considers the flow of
water into and out of the Wivenhoe Dam and the strategy employed.
47. The Panel notes at 2.7.7 of the Interim Report, the Commission found the
inflows into the dam were decreasing until approximately 2am on 11 January
2011. In the early hours of that morning intense rainfall again began to fall
over the dam catchments. The intensity of the rainfall was not captured by
the rain gauges, but the duty water engineers at Wivenhoe Dam realised
heavy rain must have been falling because of the increase in the Wivenhoe‟s
lake level. The hydrologic model was not matching well with the lake level
rises. A reverse process was carried out which estimated the rainfall which
must have occurred to cause the observed rise in the lake level. The
estimate was over 700mm, which was considered “an enormous amount”.
48. This period of intense rainfall identified in the area of the Wivenhoe Dam
occurred between 4am and 8am on 11 January 2011.
49. As a result of that rain, the inflow estimates for the Wivenhoe increased
sharply. At 7.00am two other engineers received advice that the heavy rain
being experienced over the dam‟s catchment areas would continue.
50. The Wivenhoe Dam employed four stages of strategy to ensure the safety of
water storage at the site. These strategies are identified as W1, W2, W3 and
W4. As of early morning on 11 January 2011 and pursuant to the rainfall
over previous days, the dam was operating under strategy W3.
51. When it is considered by the engineers that the dam level is to peak at or
above 74m, the operating manual for the dam recommends that the strategy
is upgraded to W4.
52. The rate of rise in the lake level and inflows on 11 January 2011, together
with the confirmation of continuing heavy rain meant that the dam‟s water
level could not be contained by strategy W3. Strategy W4 was invoked at
Wivenhoe at 8.00am on 11 January 2011.
53. Strategy W4 allows for a release of water from the dam to ensure that the
integrity of the structure is no t compromised. The report notes that the “only
consideration when operating... (under strategy) W4 is the safety of the
dam”.
54. The Interim Report confirms that the flood gates were open to 6 metres by
12.00pm, then all five gates opened to 7 metres by 1.00pm, 7.5 metres by
Case No: 240707 Determination Page 10 of 14
2.00pm and 8.5 metres by 3.00pm. This increase continued with the gates
being opened by 12 metres from 7.00pm to 9.00pm.
55. The Panel notes the rainfall between 4 .00am and 8.00am on 11 January
2011 was the onset of the second and highest peak of inflow to the
Wivenhoe Dam.
56. The peak release of water from the Wivenhoe Dam was at 7 .00pm on 11
January 2011. The report suggests that water released from therein reaches
Moggill, located south of the dam, in about 16 hours. Goodna (where the
Applicant lives) is located just south of Moggill, with each being either side of
the Brisbane River. Both places would likely have been inundated at a
similar time and the Panel considers that consideration of the Moggill data is
relevant to Goodna in this instance.
57. SC has since conducted his own calculation of the length of time it would
take for the water to travel from the Wivenhoe Dam to Moggill. He suggested
that this would be about 14-18 hours depending on certain factors. This (in
the Panel‟s opinion) comp ares favourably with the findings of the Interim
Report and 16 hours represents a fair “average” over the time period
estimated by SC.
58. Given that releases from the dam occurred from 8 .00am on 11 January 2011
and that the approximate rate of movement to Moggill takes about 16 hours,
it is not unreasonable to speculate that the full affect of the release would
have reached Goodna around midnight on 11 January 2011. This compares
favourably with the final estimated time of 11.52pm on 11 January 2011 by
SC.
59. The Panel is of the opinion that the escalation of the dam‟s protective
strategy was a direct result of the intense rainfall period from 4.00am on 11
January 2011. Prior to the heavy falls starting, the water inflow into the dam
area had been decreasing. The Panel therefore considers that the proximate
cause for the subsequent flooding events was the further heavy downpour
as there is no evidence that strategy W4 would need to have been invoked,
but for this further period of rain activity.
60. The Panel accepts that in examining the proximate cause, it is necessary to
determine as a matter of fact the cause that was the dominant or effective
cause of the loss and not necessarily the “last in time”.
61. The Panel accepts that the cumulative effects of the rainfall from 9 January
2011 (and earlier) directly impacted on the level of the dams. The dams had
reached near capacity and releases held at the W3 level. The Interim Report
confirms that prior to 2.00am on 11 January 2011 the inflow into the dam
was reducing. The inflows increased dramatically with the heavy rain that fell
from 4.00am that same morning. The heavy rain and increased inflow
necessitated the change in strategy.
62. But for the effect of this additional heavy fall of rain, the operating
procedures for the Wivenhoe Dam indicate that it would not have been
Case No: 240707 Determination Page 11 of 14
necessary to upgrade its strategy to W4. Therefore, a release of water into
the greater Brisbane area would not have been necessary.
63. The Panel is satisfied on the balance of probabilities that notwithstanding the
rain which had fallen prior to 11 January 2011, it was the rain which fell over
the Wivenhoe Dam between 4.00am and 8.00am on 11 January 2011 which
led to the decision to change the release strategy from W3 to W4 and as
such, it was this rain which fell over the dam between 4.00am and 8.00am
on 11 January 2011 which led to the flooding downstream of the Wivenhoe
Dam.
64. That the subsequent inundation of the Applic ant‟s property occurred within
24 hours of this event (the rain which was the proximate cause of this event
started at 4am on 11 January 2011 and the inundation was at 11.52pm the
same day based on SC‟s calculations) brings it within the “flash flood”
definition, as written.
65. The line of reasoning referred to above is consistent with a number of
Determinations made by the Service in respect to similar circumstances to
that which affected the Applicant. In each of the earlier matters, the Service
determined following consideration of all material exchanged, that the heavy
rainfall commencing around 4.00am on 11 January 2011 was the proximate
or effective cause of the inundation of the properties downstream from the
Wivenhoe Dam.
66. However, subsequent to issuing those Determinations, the evidence of the
operating engineers was brought into question following the recall of the
Queensland Flood Commission of Inquiry. The Service suspended issuing
further Determinations on this issue until the Queensland Flood Commission
of Inquiry evidence had been completed and the parties given the
opportunity of addressing the issues that arise from these Determinations
and the approach previously adopted.
67. The evidence of the operating engineers that was brought into question
during the recall of the Queensland Flood Commission of Inquiry did not
include the evidence in respect to the inflow of water into the Wivenhoe Dam
during the very early morning of 11 January 2011, or the rainfall which
occurred between 4am and 8am on 11 January 2011 or the decision by the
operating engineers to change the release strategy from W3 to W4 at
8.00am on 11 January 2011.
68. Whilst the Panel is mindful of the rainfall prior to 11 January 2011 and its
contribution to the height of the Brisbane River, when considering all of the
evidence presented, the Panel remains satisfied that the proximate cause of
the inundation of the Applicant‟s property was the rain which fell over the
Wivenhoe Dam between 4.00am and 8.00am on 11 January 2011.
69. The Panel is satisf ied that that rainfall led to the decision by the dam‟s
operating engineers to change the release policy from W3 to W4 which led
to a wave of water down the Brisbane River and the ultimate inundation of
property below the Wivenhoe Dam.
Case No: 240707 Determination Page 12 of 14
70. In this regard the P anel confirms that it prefers the estimation of the FSP‟s
hydrologist to the effect that the inundation at the Applicant‟s property
occurred later in the day on 11 January 2011 as distinct from the Applicant‟s
initial estimation of 3.00pm. In this regard, the Panel notes that the
hydrologist for the FSP originally estimated that the releases from the
Wivenhoe Dam would have reached the area of the Applicant‟s property
around 12.00am-3.00am on 12 January 2011.
71. Within the subsequent submissions and material, the FSP‟s hydrologist has
indicated that the approximate time the Brisbane River reached the
approximate benchmark level being the lowest point of the structure of the
house was 11.52pm on Tuesday 11 January 2011.
72. SC estimates that the Brisbane River level at 4.00am on 12 January 2011
would have been at approximately 1.6m above the benchmark level set by
the hydrologist.
73. Noting the statement of MY that the distance of floor level to ground is
1500mm; the Panel accepts that at 4.00am on 12 January 2011, the
Applicant‟s home was inundated above level to the extent of approximately
100mm.
74. On site the Applicant also advised that the home was subject to the affects
of sewerage as the sewerage pumping stations near Woogaroo Creek were
not turned off and the sewerage rose with the river water.
75. The Panel accepts that at 4.00am on 12 January 2011 the home, in addition
to water inundation was also impacted by sewerage.
76. The FSP has raised a number of other matters in respect to their denial of
the Applicant‟s claim .
77. The FSP says that the Dam engineer‟s change of the release strategy from
W3 to W4 represents a decision not in accordance with the Wivenhoe Dam
manual and as such is an intervening cause that is not covered under the
policy.
78. After having considered all of the relevant evidence presented in this matter,
the Panel remains satisfied that the decision taken by the dam‟s operating
engineers to change the release policy from W3 and W4 was reasonable
and appropriate in all of the circumstances applicable to them at 8.00am on
11 January 2011.
79. The Panel is not satisfied that there is any evidence that suggests that the
action taken by the dam‟s operating engineers was contrary to the
Operations Manual or that given the circumstances that applied at that time ;
the operating engineers should not have taken the action which they did.
80. As in earlier matters the FSP has also argued that there were two proximate
causes leading to the inundation of the Applicant‟s property and as one of
Case No: 240707 Determination Page 13 of 14
the proximate causes is excluded under the terms of the policy, then
coverage should be excluded.
81. The Panel, having determined that the rain that fell between 4.00am and
8.00am over the Wivenhoe Dam was the proximate cause of the loss, is
satisfied the Wayne Tank principle does not apply in this case.
82. Finally, the FSP maintains that the loss suffered by the Applicant would have
occurred in any event had the release strategy of the Wivenhoe Dam
remained at the W3 level.
83. The FSP maintains that the level of the Brisbane River would have risen to
the point of inundation of the Applicant‟s property had the release strategy
remained at W3.
84. The Panel is satisfied that this is mere speculation on the part of the FSP
and its hydrologist. The reality is that the release strategy did not remain at
W3 but was increased to W4 as a result of the rainfall that fell from 4.00am
on 11 January 2011. It was a direct consequence of this event that the dam
release strategy was increased to W4. As a result of the subsequent flooding
(which meets the policy definition for “flash flood”), the Applicant‟s property
was inundated.
85. The Panel is satisfied that it should rely upon the facts as they occurred
rather than speculate as to what might have happened had something else
occurred, which it did not.
86. As such the Panel is satisfied that the Applicant‟s claim should be met by the
FSP under the heading “flash flood” in the terms of the policy.
87. The FSP has argued that interest is only payable from the date from which it
was unreasonable to withhold payment. The FSP maintains that it is entitled
to a reasonable period to investigate and determine its position, and given
the complex nature of the flood disputes, the delays are not unreasonable.
Further complex situations require substantial periods of time for
independent bodies such as the Queensland Flood Commission of Inquiry
and FOS, to make conclusions on the issues in dispute.
88. The FSP maintains that it did not act unreasonably in this dispute and
therefore interest is not payable. Alternatively if some period of interest is to
be awarded it should be reduced to account for the substantial delays
through the course of the process which were not the FSP‟s fault.
89. Section 57 of the Insurance Contracts Act requires interest be paid when it
becomes “unreasonable for the insurer to have withheld payment”. An
examination of relevant case law indicates that most probably, interest will
be awarded from either when an insurer first emphatically denied liability or
disputed a matter, or from when in the normal course of events the claim
should have been paid if liability had not been disputed.
Case No: 240707 Determination Page 14 of 14
90. In this dispute the Panel accepts that the FSP was entitled to withhold
payment of the settlement monies until such time as it had properly
investigated the dispute and made its decision as to liability.
91. The FSP made its original decision to deny the claim after receiving relevant
assessment reports, hydrology reports and other information. The FSP was
aware of the terms of its policy and aware of the relevant provisions under
which liability might arise and chose to deny the claim having reviewed those
relevant provisions and the evidence available to it.
92. In the Panel‟s view, at that point the FSP has made its decision on the claim
and it is appropriate that from that time interest be paid unless it can be
established that the Applicant had withheld information from the FSP that
would have led to an alteration of its decision.
Determination
93. The Panel determines that the FSP is to indemnify the Applicant for her loss
under the terms of the policy to the level of 100mm above floor level and
including any loss in the lower level, the separate laundry and any loss
arising from sewerage inundation to 100mm above the floor level. This
includes coverage for up to $25,000 or 50% of the sum insured, whichever is
the greater, for each of building and contents.
94. The parties are encouraged to work together to achieve a satisfactory
resolution of this dispute given the terms of this Determination.
95. In the event that the FSP elects to cash settle any part of the App licant‟s
claim, then the FSP is to pay interest on that part of the claim that is cash
settled pursuant to the Insurance Contracts Act 1984 from the date of denial
of the claim to the date of the settlement.