Text of the determination
Case No: 240469 Determination Page 1 of 11
Case number: 240469
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
28 October 2011
Background
1. The Applicant holds a Home Building and Contents policy of insurance with the
Financial Services Provider (FSP) covering a residential premise.
2. Between 9 and 11January 2011 the Applicant‟s home was subject to intense
rainfall in the area.
3. Late on 11 January 2011 or early 12 January 2011 the locale of the Applicant‟s
premise was inundated by water causing damage to the building and to
contents.
4. After obtaining an assessment and hydrological reports, the FSP declined the
claim on the basis the loss was caused by flood which is an excluded event
under the policy.
5. The Applicant disputes the FSP‟s declinat ure on the basis she was not
informed of the policy exclusion for flood.
Summary of Applicant’s Position
6. The Applicant relies on section 35 and 37 of the Insurance Contracts Act (1984)
(“the Act”). The Panel presumes the Applicant means to rely solely on section
35 of the Act given that the insurance contract between herself and the FSP is
a prescribed contract and section 37 refers to non-prescribed contracts.
7. Section 35 of the Act provides that, where a claim is made under a prescribed
contract and the event giving rise to the claim is a prescribed event in relation
to the contract, an insurer may not refuse to pay an amount equal to the
minimum amount of cover set out in the regulations made pursuant to the Act
unless it can prove that before the contract was entered into, the insurer clearly
informed the insured in writing of the relevant provisions of the contract, or that
the insured knew or a reasonable person in the circumstances could be
expected to have known of such provision.
8. The Applicant contends that as section 35 was not complied with that she is
entitled to rely on the standard provisions contained in the Insurance Contracts
Determination
Case No: 240469 Determination Page 2 of 11
Regulations (1985) (“the Regulations”). Regulation 10 and 14 provide flood
cover for home building and contents as an insured event.
9. The Applicant has enclosed a copy of Hydrology report from which the Panel
notes the following:
Over the period 9-12 January 2011 Brisbane recorded a total rainfall
accumulation of 175mm.
The peak rainfall intensity at Brisbane (the lower Brisbane catchment) was
between 1-2 years. Altogether the upper Brisbane catchment located in
Toowoomba experienced between 50-100 year rainfall intensity and the
middle reaches of the catchment between 10-20 years rainfall intensity.
The upper catchment rainfall combined with the release from the
Wivenhoe Dam would have been the primary cause of overflows of large
sized streams in this region such as the Brisbane River.
The stream levels would have risen rapidly due to the previous saturation
of the catchment from a rain event in December 2010.
The storm produced less intense rainfall in the lower catchment compared
to that in the areas to the west and north. Some local drainage systems
may have been overwhelmed by the run-off that was generated. It is
however unlikely that a significant number of properties at Ipswich and
downstream along the Brisbane River would have been affected directly
by run-off or overland flow.
The Brisbane City River gauge recorded a „largely tidal hydrograph‟ up to
10 January 2011 which was progressively dampened on 11 January 2011
in response to the arrival of flows derived from the upper catchment. At
12pm on 11 January 2011 the gauge height indicated 1.70m, and reached
a height of 2.6m and 3.5m at 2am and 8am respectively on 12 January
2011. A peak level of 4.5m was recorded at 2am on 13 January 2011.
The metropolitan areas of Brisbane are considered to fall within
Categories 4 or 5 of the Storm versus Flood Categorisation Scheme. The
Panel notes that Categories 4 and 5 are described as follows:
“Category 4 relates to a medium to large river where the majority of rain occurs
over the upper and possibly middle catchments. The long response time of the
river system to Regions with the lower catchment results in flooding commencing
some time after the critical rainfall (typically more than 8 hours for medium
streams and a day or more for large streams.
Category 5 is the classic „sunny day‟ flood where rainfall in the upper catchment
of a large river system generates flooding in the middle and downstream reaches
several days to weeks later.”
Summary of FSP’s Position
10. The FSP relies on the following policy terms and conditions:
“Storm
If your home or contents suffer loss or damage caused by
Case No: 240469 Determination Page 3 of 11
- a violent wind, cyclone or tornado
- thunderstorm or hail which may be accompanied by rain or snow, or
- a sudden, excessive run-off of water as a direct result of a storm in your local area.
...
However
- we will NOT cover loss or damage caused by flood.
...
What you are not covered for – general exclusions
We will NOT cover
- loss, damage, injury or death that occurs as a result of
- flood
...
Flood
Is the covering of normally dry land by water escaping or released from the normal
confines of a watercourse or lake, whether or not it is altered or modified. Flood also
includes water escaping from the confines of any reservoir, channel, canal or dam.
Flood is not covered by this Policy.
...
Storm
Is a violent wind, cyclone, tornado, thunderstorm or hail which may be accompanied by
rain or snow, or a sudden, excessive run-off of water as a direct result of a storm in
your local area. It does not include persistent rain by itself.
11. The FSP relies on the following sections of the Act:
Section 11(10) Notwithstanding subsection (9):
(a) subject to paragraph (c), where, after the commencement of this Act and at
or before the original entering into, or the renewal, extension or reinstatement, of
a contract of insurance, the insurer has given information to the insured as
required by section 22, 35, 37, 40, 44, 49 or 68, the requirement by that section
to give information to the insured shall be deemed to be satisfied at or before any
subsequent renewal, extension or reinstatement of the contract;
...
(11) Where a provision of this Act requires anything to be done before a
particular contract is entered into, it is sufficient compliance with that provision if
that thing is done at the time when the contract is entered into.
Section 35 of the Act (summarised above in the Applicant‟s submissions).
Section 69 provides that section 22 will be deemed to have been complied
with if it is not reasonably practicable to give the information in writing
before the contract is entered into but it is reasonably practical to give the
information orally. If the insurer gives the information orally, the insurer is
deemed to have complied with section 22 if the information is given in
writing within 14 days after the contract of insurance (including an interim
contract) has been entered into. Provided the oral information is confirmed
in writing within 14 days, compliance with section 22 will be established.
Case No: 240469 Determination Page 4 of 11
Where a loss occurs after the contract was entered into but before written
confirmation of the duty of disclosure has been provided, the insurer will
only be able to avail itself of the remedies set out in Section 28, if it can
prove that the information was given orally.
Section 77 of the Act provides that a notice or other document that is by
the Act required or permitted to be given, may be given to a body
corporate in any way in which documents may be served on that body
corporate, and to a natural person, personally or by post to that person at
his last known address.
12. The FSP relies on its assessment report completed on 22 January 2011. The
Panel notes the following from this report:
The property has not been flooded previously.
The water came through the front of the property at an unknown time.
The Applicant has indicated that the water built up gradually and she was
uncertain how long it took for the water level to rise.
The maximum inundation level was 1800cm internally and externally.
The Applicant did not know from which direction the water came from, the
type of water which inundated the property or how long the property was
affected by water.
13. The FSP relies on the hydrology report summarised in the Applicant‟s
submissions.
14. The FSP relies on the ICA hydrology report from which the Panel notes the
following:
Floodwaters moving down the Brisbane River over the period 9 to 14
January 2011 were made up of releases from Wivenhoe Dam and
floodwaters from Lockyer Creek and the Bremer River. (page 1 para 3)
Water level response to these „normal‟ flood events in the lower Brisbane
River was dwarfed by the subsequent water level rise associated with the
releases from Wivenhoe Dam over the period 0600 hours on 11 January
and 0300 hours on 12 January 2011. (page 1 para 3)
Based on the recorded water level behaviour it was concluded that
releases from Wivenhoe Dam was the principal immediate cause for
flooding along the reach of the Brisbane River downstream of the Dam.
(page i para 4)
Rain ceased over the Brisbane City area around 1800 hours on 11
January 2011 being about 24-30 hours before flood levels in the Brisbane
River peaked. (page ii para 3)
Given the rainfall across Brisbane City LGA ceased by 1800 hours on 11
January 2011 any flooding after this time will have been caused by water
flow inundation from the Brisbane River and its tributary creeks it being
noted that inundation along the tributaries was associated with backwater
flooding from the Brisbane River which in turn was principally caused by
the dam release flood from Wivenhoe Dam. (page ii para 6)
Case No: 240469 Determination Page 5 of 11
The following factors affected and exacerbated the nature of flooding in
the Brisbane City LGA over the period 10-14 January 2011.
– Intense rainfalls that occurred over the catchment areas upstream of
Wivenhoe and Somerset Dams.
– A „wet‟ catchment that maximised the rate of delivery and volume of
surface run-off resulting in large volumes of floodwater flowing into
the Wivenhoe and Somerset Dams.
– Significant releases from the Wivenhoe Dam made over the period
11-12 January 2011 together with significant out flows from Lockyer
Creek and the Brisbane River.
– In a number of instances high tail water levels in the Brisbane River
and its creeks resulted in backflow up piped drainage systems. The
backflow led to inundation with waterway floodwaters of low-lying
areas normally drained by the piped drainage system (pipe backflow
inundation.)
There was no effective rainfall in the Brisbane CBD and surrounds after
6pm on 11 January 2011 and the maximum hourly rainfall from 9 -12
January 2011 in the Brisbane CBD was less than 6mm. These figures
show that any inundation in the Brisbane CBD and surrounding areas
after this time would have been due to backwater flooding from the
Brisbane River (page 47).
Any areas within the Brisbane City LGA adjacent to the Brisbane River
that were inundated will have suffered water flow inundation caused
principally by the dam release flood from Wivenhoe Dam making its way
downstream over the period 11-13 January 2011 (page 61).
Rainfall had generally ceased in these areas some 24-30 hours before the
arrival of the flood peak (page 61).
Section 10 of the ICA report discussed factors affecting flooding in
Brisbane City LGA flood behaviour and included the following:
“…However it is clear that the dam release flood from Wivenhoe Dam was
the immediate cause of flooding in Brisbane City LGA.” (para 4)
15. The FSP relies on the Bureau of Meteorology (BOM) data contained within the
Hydrology reports. The FSP contends that the rainfall data supports a
conclusion that the inundation was not the result of a storm event rather than a
flood event.
16. The Applicant has effectively admitted that her property was flooded.
Accordingly, the FSP contends that it was entitled to deny the Applicant‟s claim
given flood was excluded under the policy. The exclusions set out in the PDS
for flood is clear and unambiguous in its meaning.
17. The FSP submits that the Hydrology report confirms the Applicant‟s loss was
caused by flood rather than storm. The majority of rain occurred in the upper
and possibly middle catchments, resulting in flooding of the lower catchment
some time later. This ultimately led to the inundation of the Applicant‟s house.
Case No: 240469 Determination Page 6 of 11
18. The FSP con tends that the damage to the Applicant‟s property did not occur as
a result of an insured event. The Applicant has not alleged another event other
than flooding caused the damage to her property. Further, there was no
significant rainfall in the Applicant‟ s locale at the time of the loss and what
rainfall did occur was insufficient to flood the property. The expert evidence
further demonstrates the flooding was caused by flooding by the Brisbane
River.
19. The FSP submits that the evidence does not support an assertion that storm
caused the damage. However, in the event that the Panel considers there may
be some loss caused by storm inundation, the FSP relies on the principle of
Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corporation Ltd
[1974] QB 57:
“If a loss has two or more proximate or effective causes and at least one cause is
excluded from cover the insurer is not liable”
20. The FSP further states there is no cover under any other insured event such as
Accidental damage given the general exclusions for flood apply to the whole
policy.
21. The FSP submits that section 35 of the Act was complied with as the Applicant
was clearly informed in writing of the policy cover.
22. The FSP relies on a Statutory Declaration by an employee of the “Print
Development Team” (“G”) from which the Panel notes the following:
The Print Development team is responsible for providing FSP insureds
with the Certificate of Insurance and the PDS.
G monitors the daily print applications, reconciling and processing print
jobs internally and externally with a mail house.
G was requested to confirm whether the Applicant had been sent the
relevant Certificate of Insurance and PDS (“policy documents”).
G has reviewed the records for the Applicant and determined the policy
was incepted on 28 September 2010, and notes a request to send the
policy documents out were made.
The records indicate that the policy documents were sent to Australia Post
by the mail house on 29 September 2010. The Australia Post job number
assigned for the batch of mail indicates that all envelopes were sent.
23. The FSP relies on a Statutory Declaration by an employee “D” who is involved
with mail “returned to sender”, from which the Panel notes the following:
When mail is returned to sender the document is scanned by the mail
room and D reviews these scanned documents.
D will make a policy note on the file to indicate that the mail has been
returned.
D was asked to check the Applicant‟s file to determine wheth er any mail
was returned to sender.
Case No: 240469 Determination Page 7 of 11
D completed relevant searches on the Applicant‟s file to determine
whether the policy had a „return to sender‟ notation on the policy. D states
that he was unable to find any indication the policy documents had been
returned to sender.
24. The Applicant has not contested that the relevant insurance documents,
comprising the Certificate of Insurance and Product Disclosure Statement
(PDS), were provided to her in the postal mail on 29 September 2010.
25. At the time of taking out the policy on 28 September 2010 the FSP had no
opportunity to provide the PDS prior to policy inception and it was not
reasonably practicable to read the whole PDS to the Applicant. Further, the
PDS was provided in accordance with sections 69 and 77 of the Act as
demonstrated by the Statutory Declarations. In addition, the Applicant was
verbally informed the policy did not cover flood. The Panel has listened to the
telephone recording of this conversation and can confirm that the Applicant was
advised there was no flood cover at all.
26. It is irrelevant whether the Applicant was provided with the PDS when she first
moved to Queensland over a decade ago given that she has held a number of
policies with the FSP some of which have lapsed due to non-payment. The
policy for the relevant period was incepted over the telephone and a new PDS
provided.
27. The FSP further notes that the NSW policy did not cover flood until 2009 and
the NSW policy is irrelevant to the Applicant who resides in Queensland.
28. The FSP acknowledges t he Applicant has argued she looked at the FSP‟s
website which stated it had flood cover as a standard clause in the policy. The
FSP notes this website referred to by the Applicant is not an FSP website but a
general website run by a third party. Further, the Applicant was informed of the
flood exclusion. The FSP further has a document entitled „[FSP name]
Insurance Queensland‟ which provides the cover for FSP customers in
Queensland. The FSP contends a reasonable person would not have been
confused regarding the documents provided.
29. The FSP has enclosed screen shots of its website which depicts a page
heading of “Which [FSP name] company website are you looking for?” with one
of the sub- headings stating “[FSP name] Insurance QLD”.
Issues
30. Whether the FSP is entitled to rely on the policy terms and conditions.
31. Whether the FSP has appropriately declined the Applicant‟s claim for loss
arising from the inundation of the property.
Reasons for Decision
Case No: 240469 Determination Page 8 of 11
32. The Determination will be made by a Panel consisting of a Panel Chair
Ombudsman, a representative with extensive experience in the insurance
industry and a representative with extensive experience in consumer claims.
33. The Panel Chair Ombudsman attended at the Applicant‟s property where he
met with the Applicant and a representative of the FSP. The Applicant
confirmed the details previously provided to the Service.
34. There has been an exchange of material between each party, and the Panel is
satisfied each party has had an opportunity to reply to the issues raised.
35. The P anel has read each party‟s submissions and materials and will only refer
to the relevant submissions and materials raised.
36. The Panel considers there are two issues (as noted above) for it to consider
and it shall address each separately.
Whether policy terms and conditions apply
37. The Applicant has claimed that the FSP has breached its obligations under
section 35 of the Act and therefore the policy should revert to the standard
provisions contained under the Regulations. The Applicant has further alleged
that the FSP failed to provide the PDS approximately a decade ago when she
first insured with the FSP and that the website states that flood is covered.
38. In contrast the FSP states that the relevant policy was incepted on 28
September 2010, that it was not reasonably practicable to read out the policy
on the telephone, that the Applicant was verbally informed there was no flood
cover and the policy documents were demonstrably forwarded in the postal
mail on 29 September 2010. Further, as there was no returned mail on this
policy this meets the requirements under section 69 and 77 of the Act to
provide notification of the policy terms and conditions.
39. The Panel considers a policy period which significantly pre-dates the annual
contract against which the Applicant is claiming has no relevance. The issue is
whether the FSP has complied with the Act for the policy period against which
the Applicant is claiming.
40. The evidence presented to the Panel confirms:
The Applicant was verbally informed of the flood exclusion whilst incepting
the policy over the telephone.
The policy documents were posted in the Australia Post mail and the
Statutory Declaration of G indicates the item went out.
The Statutory Declaration of D confirms there was no mail return for the
postage of these policy documents.
41. Based on the material before it, the Panel considers that it was not reasonably
practicable to verbally recite the 72 page PDS. In any event the Applicant was
still informed of the relevant exclusion under which the Applicant‟s clai m has
been declined. In any event, the Panel observes it is the written provision of the
relevant terms and conditions of the policy that qualifies whether the FSP‟s
Case No: 240469 Determination Page 9 of 11
obligations under section 35 have been discharged; in the absence of gross
verbal misinformation (which is not an issue here) at policy inception, the only
relevance of such verbal advice as may have be given, arises where a claim on
the policy is made within the 14 day „grace period‟ provided by the ICA. In such
an instance the FSP must be able to demonstrate its verbal advice was
adequate such as to „clearly inform‟ as mandated by section 35. As the claim
under consideration in this matter fell well outside the 14 day period of policy
inception, provision of the printed PDS is the sole determi nant of the FSP‟s
compliance with section 35.
42. The Panel further accepts that the FSP has met its obligations under sections
69 and 77 of the Act to provide written notification (per a PDS) by postal mail.
43. The Panel has considered the allegations regarding the website. The Panel
notes that any information on the website does not override the provisions of
the policy directly provided to the Applicant. It does appear that the FSP
website defaults to NSW, ACT and Tasmania but there is a separate sub -
heading en titled „[FSP name] Home and Contents Insurance QLD‟ .
44. Given the above, the Panel determines the FSP was entitled to rely on the
policy terms and conditions.
Was the FSP entitled to decline the Applicant’s claim ?
45. The Panel accepts that the FSP does not cover flood, further that the PDS
defines flood as:
“Is the covering of normally dry land by water escaping or released from the normal
confines of a watercourse or lake, whether or not it is altered or modified. Flood also
includes water escaping from the confines of any reservoir, channel, canal or dam.
Flood is not covered by this Policy.”
46. The Panel notes that the terms canal, channel and watercourse have not been
defined by the policy and accordingly the Panel will apply the plain English
ordinary meaning. The Macquarie dictionary defines these terms as follows:
“ canal
/ / (say kuh'nal)
noun 1. an artificial waterway for navigation, drainage, irrigation, etc.
2. a long, narrow arm of the sea penetrating far inland.
3. a tubular passage or cavity for food, air, etc., especially in an animal or plant;
a duct.
4. Astronomy one of the long, narrow, dark lines on the surface of the planet
Mars.
5. Obsolete a channel or watercourse.
– verb (t) ( canalled , canalling ) 6. to make a canal through.
7. to furnish with canals. [late Middle English, from Latin canālis pipe, groove,
channel] ”
...
“ channel
Case No: 240469 Determination Page 10 of 11
/ / (say 'chanuhl)
noun 1. the bed and banks of a river, stream, creek or gully.
2. the deeper part of a waterway.
3. a wide strait, as between a continent and an island.
4. Nautical a navigable route between two bodies of water.
5. a means of access.
6. a course into which something may be directed.
7. a route through which anything passes or progresses ”
...
“ watercourse
/ / (say 'wawtuhkaws)
noun 1. a stream of water, as a river or brook.
2. the bed of such a stream: *But if he stays until it rains – and this may mean
years – he will see that these dry watercourses at least have a function. – HAROLD
LEWIS , 1973.
3. a natural channel conveying water.
4. a channel or canal made for the conveyance of water. ”
47. The evidence before the Panel indicates that the rainfall in the Applicant‟s
locale was of low rainfall intensity at 1-2 years. This would suggest a low
likelihood that the inundation was caused by stormwater run-off.
48. The hydrologist and ICA reports both confirm that the upper catchments had
high rainfall intensities which, combined with the releases from the Wivenhoe
Dam, resulted in the high water volume in the Brisbane River.
49. Further, the significant outflows from Lockyer Creek and the Brisbane River
created high tail water levels which in turn created backflow into the drainage
systems and resulted in inundation.
50. The Panel notes that inundation caused by the backflow up drainage systems
(being a channel or canal) and water escaping over the river banks
(watercourse) would all be covered by the flood exclusion contained within the
policy.
51. However, the Panel regards the FSP‟s policy definition concerning the “ flood
exclusion‟‟ and its reference to “water escaping from [a] dam”, is ineffective in
describing the agreed circumstances of a deliberate controlled release of
waters from Wivenhoe Dam; so to the extent that a property, in close proximity
to Wivenhoe Dam, was inundated by waters on 11 January 2011 (that being
the day of the category W4 releases) then the Panel may view such an
inundation as not encapsulated by the FSP‟s flood exclusion.
52. In the circumstances of this matter, the Panel notes the Applicant, through no
fault of her own, is unable to provide any guidance as to when inundation of her
property occurred other than „late 11 January or early 12 January 2011‟; nor is
the property in close proximity to Wivenhoe Dam. In these circumstances, the
Panel is satisfied, on the balance of probabilities, that the reservations
expressed by it in the previous paragraph regarding the efficacy of the FSP‟s
flood exclusion and Wivenhoe Dam releases on 11 January 2011, do not apply
to the circumstances of the inundation of the Applicant‟ s property.
Case No: 240469 Determination Page 11 of 11
53. Furthermore, there is no contradictory information suggesting the Applicant‟s
property was inundated by anything other than flood water. In fact, the
Applicant does not allege her property was inundated by any alternative source
and in so doing appears to accept the property was inundated by flood waters.
54. The Panel therefore accepts the source of inundation is deemed a flood under
this policy.
Determination
55. On the basis of the available information the Panel determines that the FSP
was entitled to rely on the policy terms and conditions.
56. On the basis of the available information the Panel determines that the FSP
was entitled to decline the Applicant‟s inundation claim under the flood
exclusion.