Home / Financial Firm (Unknown - Insurer) / Determination 240451

Determination 240451

Partial refusal of storm damage to roof and ground movement cracking

FirmFinancial Firm (Unknown - Insurer)
Decided2011-10-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home was damaged by intense rain in January 2011 and the FSP denied the roof and ground movement damage. AFCA upheld those denials, but found the alternate accommodation was delayed and ordered 11 more weeks of accommodation costs and $1,000 for distress.

The roof damage was not shown to be caused by storm, and ground movement is excluded, though unreasonable delay in accepting accommodation costs warranted compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 240451 Determination Page 1 of 13 Case number: 240451 General Insurance - Domestic Insurance - Home Building - Service - Delay in claim handling – Storm – Gradual deterioration 17 October 2011 Background 1. On 11 January 2011 the Applicant‟s home suffered damage as a result of the ingress of water during an intense rainfall event in the area. 2. The Financial Services Provider (FSP) accepted a claim under the Applicant‟s home insurance policy but limited its liability for damage to the interior of the building. The FSP denied that part of the claim for damage to the roof as arising from ground movement, an exclusion under the policy. 3. The Applicant maintains that the condition of the roof was a result of the storm event and that the damage she is claiming from ground movement is damage which occurred following the storm event. Summary of Applicant’s Position Roof damage 4. In the 36 hours leading to the damage, 160mm of rain fell and damaged the property. Approximately 4 weeks before the damage occurred there was storm activity. However during the earlier weather event no water penetrated the roof or anywhere else on the property. The roof was water tight prior to 10 January 2011. 5. The FSP has not explained how the maintenance factors on which it relied to dent the claim demonstrate the inadequate roof maintenance. For example the narrow valleys are a necessary structural facet of decramatsic tile roofs. The lack of sarking is an insulation aide and irrelevant to roof maintenance and the FSP‟s contractor failed to show how crack s in the skylights or gaps in the tiles led to the damage. 6. The Applicant asserts the damage resulted from the sheer volume of water on 10 January 2011. 7. The house was purchased in 2009 and a building inspection report obtained at that time and conducted during heavy rainfall found the roof to be in good repair. Determination Case No: 240451 Determination Page 2 of 13 8. The objective evidence is that the roof was in good condition and water tight prior to 10 January 2011 and the weather event on 10 January was such that it caused the damage. 9. The FSP‟s refusal of the claim in circumstances where the roof could withstand the intensity of the deluge is a breach of section 54 of the Insurance Contracts Act 1984 (the Act). Supplementary PDS (SPDS) 10. The changes to the Product Disclosure Statement (PDS) as per the SPDS to storm cover are substantial. The FSP did not cite the SPDS as ground for denial of the roof damage prior to 26 July 2011. 11. The Applicant does not recall receiving an SPDS. 12. The FSP asserts that the SPDS applied to new polices from 1 April 2010 and to renewals from 4 May 2010. In this case it did not apply to her claim on 10 January 2011 as her renewal was in February 2010 and February 2011. 13. Given that the SPDS has a preparation date of 1 April 2010 it is clear that she could not have received it before that date and therefore could not have received it with her policy renewal in February 2010. 14. The FSP‟s reliance on the exclusion clause breaches section 35 of the Act and she remains entitled to cover for the roof pursuant to the Insurance Contracts Regulations. 15. It is evident that water entered the roof as a result of the storm and that it had not occurred previously despite 2010 being the wettest year in the State on record. The only conclusion that can be drawn is that the openings were storm created. Electrical wiring 16. A power problem occurred following the January weather event resulting in all power being switched off. The FSP has neither accepted nor refused this aspect of the claim at the time of referring the matter to FOS. Alternate accommodation 17. At the time of referring this matter to FOS, the FSP has offered payment of temporary accommodation costs for 18 weeks. However the policy provides alternate accommodation cover up to 12 months. 18. The Applicant is seeking ongoing payment for this benefit for the period the house remains uninhabitable. Case No: 240451 Determination Page 3 of 13 Movement 19. The Applicant does not dispute the presence of minor cracking in the brickwork prior to the January storm event. 20. However, the claim is for movement that occurred after 10 January 2011 and therefore cannot be excluded by natural movement that may have occurred prior to that time. Unfairness/Unjustness 21. The FSP‟s partial refusal of the claim is baseless in fact and a breach of its duty under section 14 of the Act as well as its obligation to deal with disasters in a fast, professional and compassionate manner pursuant to 4.2 of the General Insurance Code of Practice. 22. In addition to the cost of rectifying the roof and movement damage, the Applicant is seeking compensation for distress and inconvenience caused by delay and pursuant to section 57 of the Insurance Contract Act is seeking interest on the entire claim from 11 January 2011 being the date the claim was made. Summary of FSP’s Position 23. The FSP asserts it is entitled to deny liability for the following reasons; The internal damage was only accepted based on the inundation of water. There was no storm created opening; There was no evidence to support the Applicant‟s claim that the storm caused damage to the roof; Reports obtained by it state the roof is in need of maintenance; The Applicant has not provided independent reports which refute its findings; Information obtained by it and supported by the Applicant‟s pre -purchase inspection report confirms that ground movement has been ongoing for a considerable amount of time prior to the storm event and prior to the start of the policy. 24. The cause for the damage was a result of a poorly maintained roof. Due to the extreme inundation of water that fell during the storm event, the claim for internal damage was accepted. 25. The cracks and inability to close doors was caused by ongoing ground movement. This was confirmed by the pre-purchase inspection report. 26. The FSP relies on the following policy terms: “ The policy doesn’t cover everything Case No: 240451 Determination Page 4 of 13 General exclusions – apply to the overall policy Unless included in additional cover we will not cover loss, damage or legal liability caused by: ... wear and tear and lack of maintenance, including rust, corrosion, deterioration ... . gradual loss or damage of any kind; ... erosion or earth movement including shrinkage; ... Events you are covered for Storm (Source SPDS) ... You are not covered for storm damage to: ... the building or contents where the water, wind or hail has entered the building through an op ening not made by the storm,” Issues 27. Whether the FSP was entitled to deny the claim for damage to the roof and damage from ground movement. Reasons for Decision 28. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 29. This decision has been made by a Panel consisting of an Ombudsman, a Panel member with extensive experience in insurance industry matters and a Panel member with extensive experience in consumer claims. 30. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. 31. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. Case No: 240451 Determination Page 5 of 13 Relevant Law 32. Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 33. Section 54 of the Insurance Contracts Act 1984 (insofar as it is relevant to this claim) provides that where but for this section an insurer may refuse to pay a claim, either in whole or in part by reason of some act of the insured or another person, being an act that occurred after the contract was entered into, the insurer may not refuse to pay that claim by reason only of that act, but its liability in respect of the claim is reduced by the amount that fairly represents the extent to which the insurer‟s interests were prejudiced by that act, and where the act could reasonably be regarded as being capable of causing or contributing to a loss in respect of which cover is provided by the contract, the insurer may refuse to pay the claim. Policy terms applicable for roof damage claim 34. The Applicant states that she has not received the SPDS containing the policy terms on which the FSP relies to deny the claim for the roof damage. The relevant policy term included in paragraph 27 above in this determination excludes cover caused to the building by storm when the storm does not make its own opening. 35. The Applicant argues that in these circumstances the FSP is in breach of section 35 of the Act and that the prescribed events according to the standard cover for home buildings insurance set out in the Regulations made pursuant to the Act apply. 36. Regulation 10 Prescribed Events of the Act Home buildings insurance includes cover for: “ storm, tempest, flood, the action of the sea, high water, tsuna mi, erosion or landslide or subsidence. 37. The FSP submits that an SPDS was sent to the Applicant on 5 November 2010 with her renewal notice on expiry of the policy on 10 December 2010. On the other hand, the Applicant states that the annual expiry date of her policy is in February. As such the FSP‟s submission is in error as it could not have provided her with the SPDS before 10 January 2011 when the loss occurred. 38. A copy of the Applicant‟s renewal notice provided to the Panel insuring the building notes: “Your insurance policy is due for renewal at 4:00pm on 10 December 2010” Case No: 240451 Determination Page 6 of 13 39. Further, a copy of a screen print for the Applicant‟s policy record held in the FSP‟s files shows the period of insurance from “10/12/10 to 10/12/11”. 40. No documentation which contradicts the annual expiry date of 10 December 2010 has been presented. Accordingly the Panel accepts the Applicant‟s policy insuring her building had an annual expiry date of 10 December. The relevant expiry date in this matter is therefore 10 December 2010. 41. In any event, the FSP accepted liability for the internal damage to the home. In doing so it has waived the clause excluding cover when the water enters the building by an opening not created by the storm. 42. It follows that there is no dispute in relation to the internal damage caused by the ingress of water whether or not it entered the building by an opening not created by the storm. The dispute centres on the condition of the roof itself and the cause for that condition. 43. For the claim in relation to the roof to succeed, there must be evidence the condition of the roof was caused by the storm. “Storm” is defined by the policy to mean: “A violent wind including cyclones, sometimes combined with thunder, heavy falls of rain, hail or snow; or Thunderstorms or hailstorms, sometimes accompanied by heavy falls of rain or snow.” 44. Given this meaning, the Panel considers there is no basis for application of the terms requiring an opening to have been made by the storm when considering the evidence in relation to the condition of the roof. This is demonstrated by an example of damage caused by hail. Damage by hail is included in the policy definition of „storm‟. 45. Damage to roofs caused by hail is often in the form of multiple denting without necessarily breaking through the thickness of the roofing material and is limited to the roof material alone with no resultant internal damage. 46. Such damage falls within the meaning of “storm” given by the policy notwithstanding the damage was not the result of hail that has entered the building through an opening created by the storm. To give the terms of the policy any other meaning in the context of external damage to the building, in this matter the roof, would render the policy impotent for all claims of this nature. 47. The Panel therefore concludes that the Applicant has not been prejudiced by the variation to cover provided by the SPDS in relation to the roof damage and that the roof damage component of the claim may be considered in the context of damage caused by storm as defined. Case No: 240451 Determination Page 7 of 13 Internal damage 48. The FSP has accepted responsibility for the internal damage caused to the building by the ingress of water during the storm event on 10 January 2011. This includes the cost of rectifying the wiring. 49. The Panel therefore will not consider the issues raised by the parties in relation to the internal damage. Roof damage 50. The property was inspected by a consultant contractor MC. Its report of 12 April 2011 contains the following: “there is no sarking in the roof There is a lack of texture coating on the roof tiles In my opinion wind driven rain to the front entry door has caused the water damage In my opinion water ingress to the ceiling cavity and porch area is due to the roof being in poor condition There is movement on the architrave joins in the doorframes in the hallway but in my opinion no damage to these items The temporary flashing SES services” 51. Captioned photographs accompanying the report show barge capping, cracks in skylight surround, debris in valleys, gaps in roof tiles, lack of coating on tiles, loose fittings, narrow valleys, ridge capping in poor condition, roof in poor condition , temporary flashing around skylight, tiles screwed down. 52. By email dated 26 July 2011, the contractor provided the following additional information in relation to the roof damage: Water entry occurred as a result of non storm related damage to the roof sheeting; The lack of texture coating on the roof was not caused by the storm in January 2011. Texture coating to the Decramastic sheeting takes several years to erode from the roof sheeting surface. It would take many years for this lack of texture coating to wear. It was possible for the roof to deteriorate in the two years since the Applicant‟s pre -purchase inspection report was issued. Inspection photos indicate the damage appears to have been caused by foot traffic from other trades as was evident from the temporary flashing around one of the skylights and new fixing screws installed in some of the roofing sheets. As can be seen in the photos there were a number of tile sheets that have been damaged by roof traffic leaving open gaps, temporary flashings around at least 1 skylight indicating previous water entry in that area, cracks in existing skylight flashings, damaged barge capping and raised or missing roof fixings. Case No: 240451 Determination Page 8 of 13 It was possible debris in the roof valleys caused the valleys to overflow. At the time of installation it appears as though the gaps between the valley tiles (narrow valleys) have been installed with insufficient space to handle large volumes of heavy rainfall water. As water ingress to the property was from the roof area in their opinion had the roof been in good/fair condition without the items/areas of damage listed, that water ingress to the property would have greatly reduced. The narrow valleys may still have overflowed. There were no storm related openings evident at the time of the inspection. 53. At the time the Applicant purchased the property, she obtained a pre-purchase inspection report. The report dated 14 February 2009 contained the following comments in relation to the roof condition: “The decramastic metal tiled roof and the colourbond trim -deck roof sheeting to the garage, appear to be well fixed and water tight. There was no visual evidence of any water ingress through the tiles during the heavy rain at the time of inspection. Generally the lower tiles around the fascia gutter area have been subject to denting from foot traffic (typical). All dented tiles appear to be water tight, but could be replaced if desired. Ridge and hip capping and relevant apron flashings to skylights etc appear to be well seated and sealed.” 54. According to the evidence at the time the Applicant purchased the property, in February 2009 the roof was water tight. About two years later in January 2011, water entered the premises. 55. However, the roof was inspected contemporaneously to the damage occurring and a number of issues were identified at that time. The loss of the texture coating and the issues in relation to sarking are not pertinent to the claim for roof damage. Although the contractor identified a number of issues with the roof, he did not identify any damage which he attributed to the storm. 56. Both reports noted damage due to foot traffic. However, the contractor MC reported the damage caused by foot traffic left open gaps. The gap seen in a photograph appears substantial and would in the Panel‟s opinion allow water to escape from the roof to the area below the tile. 57. In the Panel‟s opinion, the condition of the roof described by the contra ctor MC is not damage which could reasonably be regarded as having been caused by an intense rainfall event but is on balance the result of ongoing wear and foot traffic. 58. The Panel is also persuaded that having regard to the intense rainfall at the time of the damage, the size of the roof valleys gives weight to the contractor‟s observation that the narrow valleys may have overflowed had the roof been in good to fair condition. 59. After analysis of the material, the Panel is of the opinion that the available evidence does not establish that the condition of the roof was caused by the storm on about 10 January 2011. Case No: 240451 Determination Page 9 of 13 60. The Panel accepts that the roof which was otherwise water tight evidently could not withstand the extent of the deluge which gave rise to the internal damage. It therefore is arguable that the storm found openings which would otherwise have resisted normal or less intense rainfall than that experienced on 10 January. 61. Nevertheless the fact that water may have penetrated the roof in this manner does not establish that the roof material sustained damage as a result of the rainfall event or the ingress of water as a result of the rainfall event. 62. The Panel has considered the Applicant‟s argument that in circumstances where no roof could withstand the intensity of the deluge, section 54 of the Act applies to assist the Applicant. Section 54 (1) of the Act states the following: “Subject to this section, where the effect of a contract of insurance would, but for this section, be that the insurer may refuse to pay a claim, either in whole or part, by reason of some act of the insured or of some other person, being an act that occurred after the contract was entered into but not being an act in respect of which subsection (2) applies, the insurer may not refuse to pay the claim by reason only of that act but the insurer’s liability in respect of the claim is reduced by the amount that fairly represents the extent to which the insurer’s interests were prejudiced as a result of that act. 63. Section 54 (5) states: “Where: (a) ... (b) It was not reasonably possible for the insured or other person not to do the act; The insurer may not refuse to pay the claim by reason only of the act.” 64. The FSP has accepted the claim for internal damage arising from the ingress of water during the rainfall event. There is therefore no dispute in relation to the internal damage and as such there is no need to consider application of section 54 to that part of the claim. 65. The failure of the roof, valleys and guttering to cope with the intense rainfall in the context of roof damage, is not of itself a peril for which insurance is offered by the policy. Accordingly the Panel does not consider that the Applicant is entitled to relief pursuant to section 54 of the Act in relation to the roof. 66. For these reasons, the Panel considers the evidence has not established that the condition of the roof was caused by the storm event on 10 January 2011. Alternate accommodation costs 67. By email dated 18 May 2011 the FSP informed the Applicant the claim for alternate accommodation costs had been accepted and that a payment for 18 weeks from 11 January to 16 May would be made. 68. By email dated 11 July 2011 the FSP confirmed the alternate accommodation expenses had not been capped at 18 weeks. The FSP explained that at the Case No: 240451 Determination Page 10 of 13 time the offer was made the file had been open for that period of time and accordingly the offer of 18 weeks payment was based on that period of time. 69. The FSP further advised that in the event the claim was cash settled payment for the additional accommodation expenses would be calculated based on the estimated time the repairs would take to be completed. 70. The Panel notes that 22 weeks of additional alternate accommodation is extant even after payment of the 18 weeks referred to previously; at the time of finalising this Determination, the Panel is further aware that a „Mexican stand - off‟ de facto exists between the FSP and the Applicant, in that subject to what this Panel determines, the Applicant has indicated her finances do not permit of her completing the roof repairs, while the FSP has indicated its functional inability to attend to the electrical refurbishments, until the roof repairs are completed. 71. As the Panel has now determined the storm, on the balance of probabilities, did not cause the roof damage, the Applicant is now appraised of her obligation in that regard. Clearly, additional alternate accommodation will still be required while the Applicant attends to the roof repairs. Accordingly, pursuant to the Panel‟s mandate of „fair in all the circumstances‟ the Panel directs the FSP to cash settle an additional 11 weeks of alternate accommodation costs on the Applicant; she is required in turn to attend to the roof repairs. At the completion of the roof repairs, the FSP is then required to attend to the electrical refurbishment. Ground movement 72. The Applicant is claiming for the damage caused by ground movement since the storm on 10 January 2011. 73. According to the pre-purchase report obtained by the Applicant, in February 2009 the premises displayed cracks in the brickwork in the vicinity of the northern corner/eastern wall and northern corner/western wall. The cracks were described as minor long term settlement cracking. 74. A report commissioned by the FSP provided by JL contained the following details: Several cracks were found in all four exterior walls from movement. The cracks had been there for some time and in some cases had been re- mortared and cracked again. There was also evidence of movement inside the house. There was evidence this had been occurring for some time. The report concluded: “Overall the property shows substantial signs of movement. It is obvious that this has been an issue long before the storm but it is also possible that there has been movement since the storm.” Case No: 240451 Determination Page 11 of 13 75. The Panel is satisfied that the property has been subject to ground movement over a period of time commencing prior to the January 2011 weather event. This movement has caused damage to the premises prior to the weather event, albeit of a minor nature. 76. The evide nce of prior repairs with further cracking is in the Panel‟s opinion indicative that the damage was such that it required attention and was ongoing. In these circumstances the Panel concludes that the cracking damage claimed by the Applicant is the result of ongoing ground movement/settlement and an exacerbation of pre-existing damage. 77. The policy does not cover loss or damage caused by earth movement including shrinkage. 78. It is established law that when there are two efficient causes for the damage claimed and one of them is within an insuring clause and the other is not, the FSP is not liable for the claim. Hence even if the cracking was partially caused by the storm event and partially caused by ground movement, as ground movement is excluded from cover provided by the contract, the claim for the cracking does not succeed. 79. The Applicant does not dispute that she received a PDS. Accordingly the FSP is entitled to rely on the relevant policy term. 80. Based on the available evidence the Panel considers the cracking damage claimed does not fall within the cover provided by the policy. Systemic issues 81. The Applicant‟s compliant in relation to unacceptable delays in the management of her claim has been referred to the Code Compliance Manager for investigation. Compensation 82. The Applicant has asked that compensation be considered on the ground the FSP partially denied a valid claim and in doing so breached the Insurance Contract Regulations and the General Insurance Code of Practice. The Applicant considered the decision was unreasonable, unjust and delayed resolution of the claim. She is seeking compensation for the distress, delay and inconvenience caused by the delay. 83. Notwithstanding there was no evidence the water entered the building through an opening made by the storm, the FSP agreed to accept the claim for the internal damage as a gesture of goodwill. 84. The FSP denied that part of the claim for damage to the roof and for damage caused by ground movement. FOS has upheld the FSP‟s decisions in this regard. Case No: 240451 Determination Page 12 of 13 85. The FSP initially refused payment for alternative accommodation based on the evidence before it at that time. On 12 April 2011 the Applicant informed the FSP the home was uninhabitable. She said the electricals were flickering. The FSP subsequently received a report on 13 May 2011 which deemed the house uninhabitable. The claim for additional accommodation costs was then accepted. 86. The claim was lodged with the FSP on 19 January 2011. In the Panel‟s opinion, the delay in accepting the alternate accommodation costs was unreasonable. 87. The FOS Terms of Reference provide: “9.3 Other compensation ... c) Notwithstanding paragraphs 9.3 a) and b) FOS will not provide compensation for: (i) consequential financial loss; or (j) non-financial loss. in a dispute arising as result of a claim under a General Insurance policy that expressly excludes such liability. 88. The PDS contains the following clause: “Unless it is stated specifically in the policy, this policy does not provide cover for: consequential losses or loss of pr ofit;” 89. However, in the circumstances of this matter, the Panel considers the Applicant has experienced a degree of unnecessary discomfiture as per the FSP‟s dilatory handling of some aspects of the claim; accordingly it is appropriate to allow her $1,000 in recognition of these occurrences. Interest 90. By email dated 18 May 2011 the FSP informed the Applicant it has accepted the claim for alternate accommodation costs and payment for 18 weeks in the sum of $9,288 would be made. 91. By email dated 11 July 2011 the FSP informed the Applicant that the payment would not be capped at 18 weeks and should a cash settlement be made, a further sum will be paid based on the estimated time to complete the agreed repairs. 92. By email dated 3 August 2011 the FSP advised that payment of $15,480 was made for 30 weeks alternate accommodation and that another 22 weeks remained. Case No: 240451 Determination Page 13 of 13 Determination 93. For the reasons expressed above the Panel determines: a. The FSP was entitled to deny liability for the roof claim and for the damage arising from ground movement; b. The FSP is to pay the Applicant an additional 11 weeks of alternative accommodation; the Applicant meanwhile, is to attend to the roof restoration. At the conclusion of the roof restoration (however long that may take), the FSP will affect the required electrical refurbishments. c. The FSP is to further cash settle her $1,000; recognising that some aspects of its claim management process, as it related to this Applicant, constituted less than industry best practice.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.