Home / Financial Firm (Unknown - Insurer) / Determination 240421
Determination 240421
Flood water inundation claim declined under flood exclusion and 48-hour restriction; emotional distress compensation refused
Summary
The insured bought a policy and was inundated the next day, and the FSP declined under the flood exclusion and a 48-hour restriction. AFCA found the loss fell within the 48-hour restriction and refused emotional distress compensation, despite the FSP's delayed release of hydrology information, noting a $12,500 compassionate payment had already been made.
The loss occurred within 48 hours of inception, which the applicant was likely told about, and compensation for distress is not fair given the compassionate payment already made.
Issues
- Claim denial primary · not upheld
“the Panel is satisfied that the FSP is entitled to decline liability for the claim”
- Delay secondary · not upheld
“the time taken is not sufficiently inordinate so as to justify compensation for delay”
- Failure to disclose secondary · not upheld
“the Applicant was likely to have been aware that he was not covered for any claims arising from storm, stormwater run-off, flash flood or flood within the first 48 hours”
- Poor communication secondary · upheld
“the Applicant had been significantly hampered by the FSP's initial refusal to disclose the hydrological information it relied on”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 240421 Determination Page 1 of 9
Case number: 240421
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim - Exclusion/ condition - Insurance Contracts Act 1984, Ss 35,
69, 77 – Terms of Reference, 9.3(b)
27 January 2012
Background
1. The Applicant took out a household policy with the Financial Services Provider
(FSP) on 12 January 2011which covered his home and contents.
2. He claimed for damage to his home and contents as a result of water
inundation between 13 and 14 January 2011.
3. The FSP declined liability on the basis:
The damage was caused by flood which is excluded under the policy.
The policy does not cover losses for certain specified insured events
arising within 48 hours of policy inception.
4. The Applicant disputes the denial of his claim.
Summary of Applicant ’ s Position
5. He was never made aware he was not covered for flood damage and as such,
is entitled to the benefit of standard cover under the Insurance Contracts
Regulations, 1985 (the Regulations).
6. He purchased the policy at a branch of the FSP on 12 January 2011, and was
only given a receipt and a policy number. He was never provided a copy of the
product disclosure statement (PDS) or informed that the policy excluded flood
damage.
7. In any case, the policy terms are unclear because:
The definitions of “flood” and “flash flood” overlap, and are confusing and
contradictory to a lay person.
The definition of flood – “rising water which enters your home as a result
of it running off or overflowing from any origin or cause” – is too broad.
Determination
Case No: 240421 Determination Page 2 of 9
8. His home was inundated by stormwater before it was flooded by water from the
Brisbane River. Furthermore, he has cover for “flash flood” and there was
heavy rainfall no more than 24 hours before his home was damaged.
His area experienced significant storms and rainfall in early January 2011.
He saw water spilling onto the road from a drain near his home on the
morning of 12 January 2011 and decided to evacuate his home.
He believes his home was inundated on 13 and 14 January 2011.
9. The FSP failed to act with utmost good faith and had breached the General
Insurance Code of Practice; which required it to conduct claims handling in a
fair, transparent, and timely manner, and provide written reasons for declining a
claim.
10. The FSP initially refused to provide him with a copy of the hydrology report it
relies on which made it difficult for him to fully participate in its internal dispute
resolution process.
11. Irrespective of the claim outcome, he is entitled to compensation because the
FSP‟s conduct of the c laim had caused him significant emotional distress.
Summary of FSP’s Position
12. The Applicant was provided with a copy of the PDS and a Certificate of
Insurance when he took out the policy.
13. The policy terms are clear and unambiguous. In any case, the Applica nt‟s
Certificate of Insurance is sufficient to clearly inform him of the terms of cover.
14. The Applicant has not shown that his home was damaged by flash flood or
stormwater run-off.
15. His home was damaged by “flood” as defined in the policy.
16. If “flash flood” was the proximate cause of the damage, then “flood” would also
be a proximate cause of the damage. Therefore, the loss would be excluded on
the basis of the Wayne Tank principle in any event.
17. It has not failed to act with utmost good faith or breached the Code. It withheld
the hydrology report on the basis of legal professional privilege and special
circumstances. In any case, it has since provided the report.
18. The FSP relies on the following provision in the Certificate of Insurance:
“What optional covers a re included and not included
Home Contents
…
Case No: 240421 Determination Page 3 of 9
Flood and storm surge Not included Not included
19. The FSP relies on the following provisions in the PDS
“ Words / terms with special meanings
Word / term Meaning
…
Flood Rising water which enters your home as a result of it running off
or overflowing from any origin or cause.
This policy does not cover flood unless we have agreed and it
is shown on your certificate of insurance
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more than 24
hours prior to the flash flood or stormwater run - off.
…
Storm A violent disturbance of the atmosphere associated with strong
winds including a cyclone, lightning, heavy rain, hail or snow
but not continuous bad weather by itself.
…
Insured events you are covered for
Damage caused by the weather ….
What is covered What is not covered
Storm Loss or damage:
…
during the first 48 hours of the initial period of
insurance of this policy unless we have issued it to
you:
in conjunction with your signing a contract to
purchase the home; or
to replace a policy with us or another insurer
from the date and time that other policy
expired.
…
Flash flood and
stormwater run-off
A sudden flood caused by
heavy rain that fell no
more than 24 hours prior
to the flash flood or
stormwater run - off
Loss or damage caused:
by flood;
…
during the first 48 hours of the initial period of
insurance of this policy unless we have issued it to
you:
Case No: 240421 Determination Page 4 of 9
in conjunction with your signing a contract to
purchase the home; or
to replace a policy with us or another insurer
from the date and time that other policy
expired.
…
Your home
…
The most we will pay for home claims
What is covered What is not covered
Flash flood and stormwater
run-off
We will pay up to 50% of your
home sum insured or $25,000,
whichever is higher.
…
…
Your contents
…
The most we will pay for contents claims
What is covered What is not covered
…
Flash flood and stormwater
run-off
We will pay up to 50% of your
home sum insured or $25,000,
whichever is higher.
…
Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you asked for
them and we agree to cover you. Additional premiums apply for each cover. Your
certificate of insurance will show which covers operate. All optional covers are subject
to the terms and conditions of this policy.
What is covered What is not covered
Flood and storm surge
This policy does not cover flood unless
we have agreed and it is shown on
your certificate of insurance.
Home and/or contents cover: We cover
you for loss or damage to your home or
We will not pay for loss or damage to:
…
during the first 48 hours of the initial
period of insurance of this policy
unless we have issued it to you:
Case No: 240421 Determination Page 5 of 9
contents caused by flood or storm
surge which happens during the period
of insurance at the property address
…
in conjunction with your signing a
contract to purchase the home; or
to replace a policy with us or
another insurer from the date and
time that other policy ex pired.”
20. The FSP refers to Schedule 2 of the Competition and Consumer Act 2010 as
well as to sections 35 and 69 of the Insurance Contracts Act 1984 (the Act).
Issues
21. Whether the Applicant was provided with a PDS or clearly informed of the
terms of cover before the contract was entered into;
22. Whether the damage to the Applicant‟s property was caused by storm,
stormwater run-off, flash flood and/or flood; and
23. Whether the Applicant is entitled to compensation for emotional distress.
Reasons for Decision
Preliminaries
24. Due to the nature and urgency of the dispute, it has been directly referred to the
Panel for Determination in accordance with the Operational Guidelines to the
Financial Ombudsman Service‟s (FOS) Terms of Reference.
25. The Panel consists of an Ombudsman, a representative with extensive
experience in the insurance industry and a representative with extensive
experience in consumer claims.
26. The Panel is satisfied that the material has been exchanged and the parties
have had the opportunity to respond to the issues raised.
27. The Panel has taken note of section 77 of the Act in addition to the statutory
provisions referred to by the FSP.
Threshold issue – was Applicant informed of terms of cover
28. Whilst this dispute raises a number of issues, the threshold issue on the
question of policy liability is whether the FSP had provided the Applicant with a
copy of the PDS and the relevant Certificate of Insurance when the policy was
incepted on 12 January 2011, and if so, whether its provisions were misleading
and/or ambiguous.
29. As the FSP purports to exclude flood damage (which is ordinarily covered
under standard cover provisions), it has the onus to show that it had provided
Case No: 240421 Determination Page 6 of 9
the Applicant with a proper derogation notice before or at the time the contract
was entered into.
30. The Panel was also unable to find any provision (in the standard cover
provisions) that operates in a similar fashion to the 48 hour restriction on
claims.
31. In addition, the Panel has borne in mind that:
The Applicant‟s policy (like most policies of s imilar nature) would ordinarily
run for a full year, so it is plain that the 48 hour claim restriction had
effectively reduced the period of cover to less than a year for the first year
for certain insured events such as „Storm‟ and „Flash flood and stormw ater
run- off‟, although cover was provided for the full year for other insured
events such as „Theft‟ and „Fire‟ (in certain circumstances).
It is not an unreasonable proposition that claims can sometimes occur
shortly after inception.
A policyholder may not have had sufficient opportunity to read a PDS
before the claim occurs.
32. Given such circumstances, the Panel considers it to be somewhat an
imperative (and at the very least, good insurance practice and consistent with
an obligation to act with utmost good faith) that the FSP should make the 48
hour claim restriction known to the Applicant before or at the time he took out
the policy.
33. The FSP maintains that the Applicant was provided with a PDS and a
Certificate of Insurance on the day he took out the policy. It provided a signed
statement from its sales consultant “ DG ” to substantiate the assertion. The
Applicant flatly denies receiving these documents and says he was only given a
receipt and a policy number.
34. Whilst “DG” cannot specifically recall details of the actual transaction, she was
confident she would have provided the Applicant with a copy of the PDS and
Certificate of Insurance because:
She is sufficiently experienced in her role as a sales consultant.
She has been in that role for nearly 4 years and had been trained to give
over the counter customers a copy of their PDS and Certificate of
Insurance.
She had physically printed the Certificate of Insurance for the Applicant‟s
policy on 12 January 2011.
She was apparently able to recall this by referring to the fact the
Certificate of Insurance shows that it was issued on 12 January 2011 and
the FSP‟s system records show her user identification code next to a
particular 12 January 2011 entry. She says this entry indicates that she
printed the Certificate of Insurance.
Case No: 240421 Determination Page 7 of 9
She would explain the key aspects of the policy (including pointing out
options which have or have not been taken out), and provide them with a
copy of the PDS and Certificate of Insurance in face to face transactions.
She always follows a standard process/framework when issuing a policy.
As such, she believes she would have asked the Applicant:
“How likely is it that your property would be affected by flood? ”
She has provided a copy of the process/framework she follows and says
that her compliance with such a process/framework is one of her key
performance indicators and is tied directly to her bonus. For this reason,
she would not depart from the process/framework and believes that she
would have asked the Applicant the above question.
She would ordinarily use the PDS to explain the features of a policy in
face to face transactions.
She always makes it a point to make it clear that the policy does not cover
flood and that a customer would have to apply for such cover in writing.
The FSP‟s process is that an application for flood cover has to be in
writing and referred to the underwriters.
The Applicant was unlikely to have asked about flood cover.
If he had, she would have noted words stating to the effect that the
Applicant had requested for flood cover and was provided with an
application on the FSP‟s system. There were no notations to that effect on
the FSP‟s system.
She would also have read out the definitions of “flood”, “flash flood and
stormwater run- off” and “flood and storm surge” if a customer had asked
about flood.
She had specifically informed the Applicant of the 48 hour limitation on
claims for previously uninsured properties.
She refers to a contemporaneous entry she made on the FSP‟s system at
11.42 am on 12 January 2011.
In explaining the 48 hour claim restriction, she says that she would have
stated:
“Due to not having existing insurance, there is a 48 hour exclusion on loss or
damage arising from bush fire, flash flood and stormwater run-off or storm for the
first 48 hours of the initial period of insurance.”
35. Whilst the Panel has given careful consideration to “DG‟s” statement and the
material that has been provided in support of her statement, it remains
uncertain as to what had transpired between the parties on the question of
flood.
36. “DG” says the Applicant was unlikely to have asked anything about flood
because of an absence of a notation she would normally make on the FSP‟s
system had the question been brought up. However, she also says that she
would have asked the Applicant as to how likely his home would be affected by
flood which, as a normal consequence, ought to have prompted an answer on
Case No: 240421 Determination Page 8 of 9
the issue of flood. If her evidence on this point is doubtful, it casts doubt as to
whether the remainder of her evidence could be safely relied on.
37. Having said that, the evidence satisfies the Panel that “DG” was likely to have
orally informed the Applicant that he had a 48 hour restriction on claims. The
contemporaneous record on the FSP‟s system lends substantive support to this
proposition.
38. Accordingly, although it is inconclusive as to whether the Applicant was
provided with a copy of the PDS and Certificate of Insurance at policy inception,
the Panel is satisfied that the Applicant was likely to have been aware that he
was not covered for any claims arising from storm, stormwater run-off, flash
flood or flood within the first 48 hours of cover.
39. The evidence shows that the policy was incepted at 9.48am on 12 January
2011. It is the Applicant‟s own evidence that his home was likely to have been
first inundated on 13 January 2011. This establishes that the loss being the
subject of the claim in question occurred within 48 hours of policy inception and
was therefore excluded.
40. For this reason, the Panel is satisfied that the FSP is entitled to decline liability
for the claim and it is unnecessary to consider whether the relevant terms with
respect to “flood” and “flash flood” were ambiguous or misleading, or for that
matter, whether the Applicant‟s property was damaged by storm, stormwa ter
run-off, flash flood and/or flood.
Compensation for emotional distress
41. Turning to the Applicant‟s request for compensation for emotional distress, the
Panel notes that the request is primarily premised on a suggestion the FSP had
significantly delayed his claim and withheld hydrological information from him.
With respect to the latter, he argues that the denial of such information had
made it difficult for him to fully participate in the FSP‟s internal dispute
resolution process.
42. The Panel has previously accepted that the significant flooding events in
January 2011 were unprec edented and that the insurance industry‟s capacity
and resources to deal with a sudden and significant influx of claims had been
stretched. The Panel is also aware that hydrological information was not readily
available at the time; so much of the delay of the numerous claims decisions
was due to a lack of such information.
43. Apart from submissions, the FSP has provided limited material with respect to
its handling of the claim. However, the Panel was able to gather that the
Applicant lodged his claim on 7 February 2011 and was informed that it had
been declined on 9 May 2011, 3 months later. Considering the factors
impacting the industry‟s capacity at the time, the Panel does not consider the
time taken is sufficiently inordinate so as to justify compensation for delay.
Case No: 240421 Determination Page 9 of 9
44. Having said that, the Panel accepts that the Applicant had been significantly
hampered by the FSP‟s initial refusal to disclose the hydrological information it
relied on for the purposes of declining the claim.
45. The Panel understands that the FSP had initially claimed legal professional
privilege over such information, but was informed (by the Service) that the
information was sought predominantly for the purposes of determining liability
under insurance policies and as such, was not protected by privilege.
46. The Panel notes that the FSP only released the hydrological information it
relied upon on/about 19 August 2011, more than 3 months after the claim had
been declined.
47. The Panel accepts that the Applicant was likely to have been inconvenienced
an d delayed in assessing his position and options in response to the FSP‟s
position on the flood question during this time, so there is an arguable cause for
the Applicant to seek compensation under clause 9.3(b) of the Terms of
Reference.
48. However, in determining if compensation should ultimately be given, the Panel
must consider what is fair in all the circumstances. The Panel notes that the
FSP had availed the Applicant to its compassionate fund, out of which he
received a $12,500 benefit; although he was only insured with the FSP for a
day.
49. In light of the FSP‟s conduct, the Panel does not consider it appropriate or for
that matter fair in all the circumstances, to require the FSP to compensate the
Applicant any further.
Determination
50. The Panel determines that the FSP is entitled to decline liability in response to
the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.