Home / Financial Firm (Unknown - Insurer) / Determination 240049
Determination 240049
Flood exclusion denial of home damage claim
Summary
The FSP denied a home building and contents claim for January 2011 water inundation as flood, which is excluded. The Panel found the exclusion was clearly disclosed but that the cause was uncertain, and ordered the FSP to pay 50% of the damage with statutory interest on any cash settlement.
Flood exclusion was clearly communicated under section 35 of the Insurance Contracts Act, but the causation evidence was equivocal, so the FSP was ordered to bear half the loss.
Issues
- Claim denial primary · upheld
“the Panel determines that the FSP is liable for 50% of the damage to the Applicant's home building and home contents”
- Failure to disclose secondary · not upheld
“the Panel is satisfied the FSP in this case has met its obligations to clearly inform the Applicant of the derogation from standard cover”
Subjects and remedies
natural disasterpay claimpay interest
Text of the determination
Case No: 240049 Determination Page 1 of 7
Case number: 240049
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
16 July 2012
Note: The Policy is in the name of Mr KV; however all representations via the legal
advisers, were made by Mrs J; as outlined below, all submissions, whether by Mrs J,
on behalf of Mr KV, or their legal advisers will hereinafter be referenced as „the
Applicant‟.
Background
1. The Applicant held a home and contents insurance policy with the Financial
Services Provider (FSP).
2. After the home in Westlake, Queensland was inundated with water in
January 2011, a claim was lodged with the FSP for the resultant damage.
3. The FSP denied the claim on the basis that the damage was caused by
flood, which is specifically excluded under the policy.
4. The Applicant disagrees with the decision and wants the FSP to honour the
claim.
Summary of Applicant’s position
5. The Applicant is represented and for convenience, hereafter throughout this
Determination both the Applicant and the legal representative will be referred
to as “the Applicant”.
6. The Applicant says that the water entered the home in the early hours of 12
January 2011 through the sewer system. This is similar to inundations which
occurred in 1989, 2008 and 2009.
7. Around mid-morning, water from the storm water drain added to the
inundation of the home.
8. Since 1978, the Applicant‟s insurance has been arranged through the female
Applicant‟s credit union and even though the insurer has changed several
times, the Applicant understood she had comprehensive insurance
coverage.
Determination
Case No: 240049 Determination Page 2 of 7
9. The Applicant cannot recall ever receiving a Product Disclosure Statement
(PDS) or policy wording from the FSP, or from the credit union. Because of
this, the Applicant believes that standard cover should apply, and the FSP
should pay her claim.
Summary of FSP’s position
10. The FSP says that the hydrological evidence shows that the damage to the
Applicant‟s home was due to flooding from the Brisbane River, which lies
100m to the north.
11. The evidence also indicates that the sewerage system may have been
inundated by rising water levels of the Brisbane River at about 2.00am on 12
January 2011. This may have caused water to backup through the sewer,
possibly resulting in overflow of water from the sewerage system into the
Applicant‟s home. Any such inundation occurring as a result would still be
regarded as flood.
12. A policy wording was provided to the Applicant in 2002 when the policy was
incepted. The Applicant‟s credit union, acting as the FSP‟s intermediary
would have provided her with a copy of the policy booklet in 2004, and again
in 2006, at renewal. The exclusion of flood has remained unchanged in all
the policy wordings.
13. The FSP relies on the following policy provisions:
“Page 36 of the PDS
“ Exclusions to your cover
...
We will NOT cover any loss or damage as a result of, or caused by
...
flood...”
Page 40 of the PDS
“We will NOT cover any loss or damage... arising from
...
fl ood or storm surge...”
Page 62 of the PDS
“ GLOSSARY OF WORDS WITH A SPECIAL MEANING
...
flood
the covering of normally dry land by water escaping or released from the
normal confines of a watercourse or lake, whether or not it is altered or
modified. Flood also includes water escaping from the confines of any
reservoir, channel, canal or dam.”
Case No: 240049 Determination Page 3 of 7
Issues
14. Whether the FSP clearly informed the Applicant of the exclusion of flood
from cover.
15. Whether the damage to the Applicant‟s home and contents was caused by
flood, or by an event to which the policy responds.
16. Whether the FSP is entitled to deny liability for the damage to the Applicant‟s
home and contents.
Reasons for decision
17. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
18. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
19. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
20. It is not in dispute that the Applicant‟s home and contents were damaged by
water inundation.
Did the FSP clearly inform the Applicant of the exclusion of flood from cover?
21. The Applicant has provided a statutory declaration saying that she does not
recall getting a PDS from either her credit union (which arranged the policy
for her), or from the FSP. No one has ever gone over the terms of the policy
or discussed its coverage and she has only received renewal notices from
the credit union on behalf of the FSP.
22. The FSP has sought to prove that the PDS was provided to the Applicant at
the time of policy inception.
23. The FSP initially claimed the policy was incepted in 2002, and that it was „a
requirement that a copy of the Policy (as it was at the time) be given to the
insured at the time of completion of the contract‟. In support of this position, it
has submitted a copy of a „Compliance Manual‟, which provides instructions
for its intermediaries regarding when to provide PDSs (among other things)
to customers.
24. However, as the „Compliance Manual‟ is dated May 2010 and refers to PDSs
(which, according to its submission, were not being produced by the FSP
until 2004), the Panel does not accept that the submitted „Complianc e
Manual‟ serves as evidence of a process in existence in 2002.
Case No: 240049 Determination Page 4 of 7
25. The FSP has also submitted a statutory declaration from NF, an Account
Support Officer with the FSP.
26. NF attests that the Applicant‟s home contents policy was incepted on 17 May
2003. It was part of a merged portfolio of cover under a previous insurer
which was incorporated into the FSP‟s business. A “centralized conversion
unit” was set up in Melbourne to provide documents to applicable
policyholders, which included a new PDS document. The App licant‟s policy
was amongst those involved in the conversion and it would have been
subject to this process.
27. The statutory declaration by NF refers to certain documents which were
included in the “Invitation to Insure” pack sent to all customers affected b y
the portfolio conversion, including the Applicant. These documents were:
A welcome letter explaining the conversion, a „Difference in Conditions‟
clause, and a change to the deduction payment date.
An invitation to insure schedule detailing the FSP‟s ren ewal offer.
A copy of the FSP‟s policy wording (PDS).
An „Easypay‟ brochure explaining how a customer who was interested
in taking up the renewal offer could make payments for the policy
premium.
28. According to NF, as a result of receiving the payment brochure in the
„Invitation to Insure‟ pack, the Applicant contacted the FSP to authorise
direct debits to commence, and this confirms that the pack — including the
PDS — was received by the Applicant.
29. However, while NF states that „appropriate evidence from ou r files is
attached to support this Declaration‟, the only supporting document provided
was a high level description of the key elements of the conversion project for
the policies from the Applicant‟s previous insurer to the FSP.
30. The Panel notes that ther e is a clear inconsistency between the FSP‟s initial
submission to the Service (which states that the policy was incepted in 2002)
and the statutory declaration by NF (which states that the home contents
policy was incepted on 17 May 2003).
31. In addition, although the statutory declaration addresses the process for the
dispatch of the Applicant‟s home contents policy, it makes no reference to
the Applicant‟s home building policy.
Is proof of the existence of a process sufficient?
32. The FSP relies on the evidence it has presented to attest to the existence of
a process being in place to confirm the provision of the documents, on the
balance of probabilities, to the Applicant in this instance. Such a test was
established in the matter of Marsh (the Marsh matter).
Case No: 240049 Determination Page 5 of 7
33. The Panel notes that in the Marsh matter, Mildren J considered the issue of
what was an „ordinary process‟ for an insurer to complete and establish that
documents were likely provided:
“Evidence of the general course of business or of an office system was
admissible in order to show what would ordinarily have been done in a
particular set of circumstances. From this, a court may be entitled to infer that
what would ordinarily have been done, was done on this occasion, it being
more probable than not that the general course would have been followed in
the particular case.”
34. The court‟s finding accepts that where an insurer can establish an „ordinary‟
process for the provision of information to its policyholders, it might be
considered that such documents have been provided except where
established otherwise. This should be distinguished from an „extraordinary‟
process, where a mail out is undertaken that is not within the normal
arrangements of the business.
35. The Panel is of the opinion that the process cited in this example was a „one -
off‟ exercise to enable the transition of business from a prior entity to the
FSP. This process would have involved the creation and provision of
information to policyholders that was atypical of the FSP‟s usual processes.
36. The affidavit provided by NF describes the process that took place during the
portfolio conversion. The attached conversion document gives further detail
as to the process that was adopted and in the Panel‟s view, sufficient to
establish that the FSP had a course of business or office system in place to
monitor the conversion process.
37. Whilst the Panel is concerned that the FSP has provided inconsistent
information as to the date of inception of the policy, the Panel notes that as
part of the conversion process, the Applicant was required to either complete
the enclosed direct debit authorisation within the „E asy pay‟ brochure or
provide telephone authorisation via the customer care centre.
38. The Applicant does not dispute that she authorised payment for the policy
from her bank account. In the circumstances, although the Panel does not
dispute the Applicant‟s genuine belief that she cannot recall receiving the
documentation, the Panel is satisfied that most likely the documentation was
posted to the Applicant as part of the conversion process and would have
been received by the Applicant along with the direct debit authorisation
documentation.
39. The Panel has also considered whether the provision of the document is
sufficient to meet the obligation under Section 35 of the Insurance Contracts
Act 1984 (the Act) to clearly inform. The Panel has previously considered the
wording of these policies and in particular the applicable definition of flood.
The Panel is satisfied that a reasonable person having read the policy would
be aware of the flood exclusion. Accordingly the Panel is satisfied the FSP in
this case has met its obligations to clearly inform the Applicant of the
derogation from standard cover.
Case No: 240049 Determination Page 6 of 7
Causation
40. It is the Applicant‟s argument that the inundation of the Applicant‟s property
was due to the heavy rain and storms which affected the Brisbane and
Ipswich areas all day on 11 January 2011. The Applicant maintains that the
property was first affected by sewerage with the Applicant noting that she left
her property at 2am on 12 January 2011 because the sewerage water was
starting to come up through their toilets, bath, showers and the bathroom
floor grates. When she was leaving the property she saw no water in the
yard or street and in fact could not see water coming out of anywhere except
through the sewer system in the house.
41. Eventually the water went about knee deep throughout the house.
42. The Applicant has provided a statutory declaration referring to problems with
sewerage inundation in 1989, 2008, and 2009 and of discussions with Urban
Utilities in January 2011 about fitting non return valves. The statutory
declaration also refers to discussions with an engineer from Brisbane City
Council (BCC) that the discharging sewerage was from storm water from
other sewerage lines discharging into the system.
43. The Applicant has correctly noted that the FSP initially relied upon a
hydrology report for a property approximately 800 metres from the
Applicant‟s address.
44. The Panel notes that the FSP although initially relied upon a site specific
report for a property some distance from the Applicant‟s property , it has
subsequently obtained a relevant site specific report from its hydrologist.
That report is dated 31 October 2011. The report notes the property is
located approximately 100 metres south of the Brisbane River and according
to the BCC Floodwise property report has a minimum ground level elevation
of 11.9m AHD along the northern boundary and 13.5m AHD along the
southern boundary. The minimum habitable area of the property is 13.8m
AHD.
45. According to the report, the Brisbane River in this area would have first
affected catchment inflows as early as Sunday 9 January 2011. The river
reached peak level of approximately 13.1m AHD by 5.30pm on Wednesday
12 January 2011. According to the hydrologist, this peak level would have
caused the flood waters from the Brisbane River to have risen through storm
water drains in the street. The Panel notes however that this is some 15½
hours after the Applicant first observed sewerage entering the property. The
hydrologist has considered this and believes that the water levels in the
Brisbane River in the vicinity of the property at around 2am would have been
approximately 10 metres which would have reached the inward level of the
sewerage line at the rear of the property. The hydrologist could not explain
however the reason for the water escaping from the sewerage system into
the property. The report is equivocal as to the cause of the local sewerage
system inundation and notes as follows:
“It is likely that water could have initially entered the property via the local
sewerage system. This could have been the result of rising water levels in the
Case No: 240049 Determination Page 7 of 7
Brisbane River causing water to backup into the sewerage system or through
faults in the sewerage system.”
46. In a subsequent submission, the FSP has argued that the connection
between the storm drains and backflow of sewerage is that the backflow of
sewerage occurs because of flood water pushing the water backwards in the
manner described. With all respect to the FSP‟s submission, that is not the
finding of the hydrologist and does not take into account the levels of the
Brisbane River at the time of initial inundation.
47. The FSP has not addressed the Applicant‟s information relating to prior
sewerage inundation or the possible inundation due to storm water from
other lines discharging into the system.
48. The Panel is satisfied that the Applicant has established a prima facie claim
within the terms of the policy for inundation arising from the sewerage.
49. Whilst the Panel has no doubt that the Applicant‟s property was ultimately
inundated by flood waters, the Panel is unable based on the material
exchanged to determine at what point the flood waters would have first
inundated the property or whether the flood water caused the sewerage
backflow.
50. The Applicant has described the inundation to approximately knee level. It is
unlikely that sewerage inundation would have reached this level. The current
information does not allow any accurate assessment of the level of initial
inundation although it is reasonable to accept the inundation from the
sewerage system would cause considerable contamination.
51. In the Panel‟s view, given the time that has elapsed since the initial
inundation, it would be fair in the circumstances for the FSP to meet the cost
of repair for 50% of the damage sustained to the Applicant ‟s property.
Determination
52. On the basis of the available information the Panel determines that the FSP
is liable for 50% of the damage to the Applicant‟s home building and home
contents.
53. Where the FSP cash settles any portion of the claim, the Panel confirms that
statutory interest is payable, calculated from 4 March 2011, being the date of
the FSP‟s letter to the Applicant in which it formally denied her claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.