Flood exclusion applied to January 2011 water inundation of business premises and dwelling

FirmFinancial Firm (Unknown - Insurer)
Decided2012-02-21
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' business premises and home were inundated in January 2011 and the insurer denied the claim as flood damage. AFCA found the initial inundation was stormwater run-off covered by the policy, so the insurer must meet its liability for that damage, with an assessor to determine its extent; business interruption was outside AFCA's jurisdiction.

Based on the evidence and a site inspection, the initial inundation came from stormwater run-off, which the policy covers, while damage from later floodwater remains excluded.

Issues

Subjects and remedies

home or building damagenatural disastersmall businesspay claimreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 240024 Determination Page 1 of 9 Case number: 240024 General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of claim-Exclusion/ condition 09 February 2012 Background 1. The Applicants hold a small business policy, incorporating cover for business property damage, with the Financial Services Provider (FSP). The buildings insured under the policy include the business premises and connected domestic dwelling. 2. After heavy rain in January 2011, the Applicants‘ business premises and domestic dwelling were inundated with water, with damage occurring to the building and their business stock as a result. 3. A claim for the damage was lodged by the Applicants, but the FSP denied liability for the damage on the basis that it was caused by flood. 4. The Applicants sought a review of the claim decision, saying that the cause of the damage was stormwater. 5. The FSP reviewed the matter, and upheld its decision to de ny liability for the damage. Summary of Applicants ’ Position 6. In September 2010, the FSP accepted a claim for water inundation, finding on that occasion that the cause of the damage was stormwater. 7. They say that the water inundation in September 2010 occurred in the same way as in January 2011. 8. They also say that their January 2011 claim for stormwater damage to the contents of their home was accepted by the relevant insurer and several of their neighbours has also had their claims paid by their insurers. 9. They have stateme nts from several witnesses who corroborate the Applicants‘ version of events and photographs of the overflowing stormwater channel near their house on the day of the inundation. All this evidence points to stormwater Determination Case No: 240024 Determination Page 2 of 9 being the cause of the inundation, which directly contradicts the evidence put forward by the FSP‘s hydrologist. Summary of FSP’s Position 10. The expert evidence from the hydrologist ‗W‘ indicates the water that caused the inundation of the Applicants‘ busin ess premises came from McCallum Creek surcharging up the stormwater channel which is nearby to the Applicants‘ property. 11. Floodwater from McCallum Creek and Tullaroop Creek also would have flowed overland to the Applicants‘ property sometime after the initi al inundation by water from the surcharged stormwater channel. 12. The circumstances of the September 2010 claim were fundamentally different to those of the January 2011 claim, and therefore one cannot be directly compared to the other. The September 2010 claim was accepted on the basis that the hydrology report clearly indicated that stormwater was the cause, and that floodwater from the McCallum Creek would not have been a factor. 13. The decisions by other insurers to accept claims for damages are based on the policy wordings applicable to those contracts of insurance, and the circumstances of those claims (e.g. topography of the premises), so should not be used to benchmarks for the decision for the Applicants‘ Ja nuary 2011 claim with the FSP. 14. Much of the content of the statements provided by the Applicants in support of their position is not inconsistent with the position of the FSP. 15. In the absence of expert evidence to the contrary, the FSP is entitled to rely on the expert evidence from its hydrologist ‗W‘. 16. The FSP relies on the following policy provisions: ― The events You are insured against: This policy insures You for physical loss of or physical damage to:  a Building, if ‗Buildings‘ is shown on the certificate of insurance ...  Stock, if ‗Stock‘ is shown on the certificate of insurance  Other Property, if ‗Other Property‘ is shown on the certificate of insurance. This policy only insures You if the loss or damage is directly caused by an event listed below and occurs during the Period of Insurance and in the case of:  Buildings, Stock and Other Property, occurs at the Business Premises. 1 accident but not for : Case No: 240024 Determination Page 3 of 9  loss or damage directly or indirectly caused by or arising out of:  fire, lightning, explosion or implosion, earthquake, subterranean fire or volcanic eruption, wind, rain, hail, snow or escape of liquid, damage directly caused by a burglar or thief, riot or civil commotion, vandalism or impact ... 6 wind, rain, hail, snow or escape of liquid but not for :  Loss or damage directly caused by Flood General definitions applying to words We use in this Plan (Policy) as follows:- ... Flood means the escape or release of water from the normal confines of a pond, lake, reservoir, canal, dam or uncovered watercourse. ‖ Issues 17. Whether the water that caused the inu ndation of the Applicants‘ business premises was stormwater run-off, or water overflowing from McCallum Creek and surcharging the stormwater channel, and overflowing the Creek banks and flowing overland to later cause further inundation of the Applicants‘ premises. Reasons for Decision 18. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‘s Terms of Reference. 19. This decision has been made by a Pa nel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 20. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. 21. The Panel notes that the FSP has accepted the portion of the Applicants‘ claim that relates to damage to the air-conditioning units on the roof, which were damaged by rainwater. 22. The following issues are not in dispute:  The Applicants claim for damage to their business premises in September 2010 was accepted by the FSP as having been caused by stormwater, after the nearby stormwater channel overflowed.  The Applicants‘ business premise s and domestic dwelling experienced inundation by water in January 2011. Case No: 240024 Determination Page 4 of 9  In the days leading up to the inundation, heavy rain fell over the local catchments, and across western Victoria.  The nearby stormwater channel, which is designed to capture stormwater from the surrounding land to the south and west and discharge into McCallum Creek, filled with water and overflowed during the January 2011 event.  Tullaroop Creek, and its tributary McCallum Creek, broke their banks and flooded the township of Carisbrook on Friday 14 January 2011. Date and Time of Inundation 23. There is some contention regarding the date time of inundation of the Applicants‘ business premises. 24. The FSP‘s assessor, ‗M‘, spok e to the Applicants on 1 February 2011, and reported that between 6am and 6:30am on Friday 14 January 2011, water was lying in the laneway (of their business premises), on the floor of the storeroom, and coming through the rear door and front door of the main shop. 25. The report from ‗M‘ goes on to state that at around 9am, water had risen higher and started to enter through the rear residential door and that by 9:30am the Applicants were evacuated from the property. 26. The Panel notes that the Applicants‘ reside nce adjoins the business premises. The floor elevation of the house is approximately 200-300mm higher than the floor of the business premises. 27. The hydrologist ‗W‘ spoke to the Applicants and inspected their property (date unknown), and in a report dated 5 August 2011 stated that by 6:30am, water had started to enter the lower shop premises through the door on the south side of the building. 28. According to ‗W‘, the Applicants had also advised that the peak rainfall event occurred on Thursday night (13 January 2011). 29. The Applicants have not directly disputed the dates and times as presented by the assessor ‗M‘, or by the hydrologist ‗W‘. 30. However, the Applicants have provided a copy of a statement from the Captain of the local fire brigade ‗I‘, which includes a timeline of events relevant to the inundation of the Applicants‘ premises. 31. According to ‗I‘ the following occurred at the times indicated: Thursday 13 January 2011:  1900 – Sandbagging drain [Be] St (to the south of the Applicants‘ business premises)  2000 ( text of time not completely legible; possibly 2030 – Panel comment) – Sandbags to Applicants‘ street Case No: 240024 Determination Page 5 of 9  2058 – Applicants‘ street impacted  2306 – residents evacuated (from premises opposite the Applicants‘) Friday 14 January 2011  0430 – water over road at [U] St and Applicants‘ St (to the east of the Applicants‘ business premises)  0735 – Houses and Applicants‘ business premises impacted with flooding along Applicants‘ street  0850 – [P] Hwy to be closed  0910 – Evacuations to begin along [P] Hwy between [C] Rd and [L] Rd (to the west and east of Applicants‘ business premises)  0917 – [P] Hwy breached at several places between Applicants‘ business premises and [P] Lane (to the west of the Applicants‘ business premises) 32. The statement from ‗I‘ also indicated that the Applicants‘ home was sandbagged on Thursday 13 January 2011 as it was being impacted by overland flow (stormwater), and that McCallum Creek did not flood ‗I‘s‘ fire station until 1010 on Friday 14 January 2011. 33. The FSP has raised a concern that the statement by ‗I‘ that the inundation of the Applicants‘ premises occurred on 14 January 2011 is inconsistent with the information provided by the Applicants to its assessor ‗M‘ and hydrologist ‗W‘. 34. In the Panel‘s view, the sandbagging of the Applicants‘ premises to protect it from stormwater run-off (on Thursday 13 January 2011) does not of itself demonstrate that water from any source had entered the premises. 35. A Site inspection was conducted by the Panel Chair Omb udsman on 20 January 2012. In attendance were the Applicants and representatives from the FSP. The Applicants confirmed that the property was first inundated at approximately 6:00am on 14 January 2011. According to the Applicants, the water that inundated the property came from the west in the direction of the Pyrenees Highway from the Maryborough area. According to the Applicants, the water entered the front of the building and down the sideway of the building. Water also came from paddocks at the back of the building. These paddocks are slightly elevated to the Applicants‘ property. Water eventually rose to a height of about 300mm entering through the shop and then into their domestic dwelling. 36. The floor of the house is two steps (about 200mm) higher than the shop. The shop is on a concrete floor set at ground level. There is no elevation above ground level at all in the shop. The shop also sits significantly below the crest of the road. 37. According to the Applicants, they received notification to evacuate the property at approximately 10:20am on 14 January 2011. By that time they had already evacuated the property and were in the heart of town. Their property, as they have stated, was inundated from 6:00am. Case No: 240024 Determination Page 6 of 9 38. The Applicants accept that at a later time the water from McCallum Creek, Big Creek and Tullaroop Creek merged and would have flooded the town. They maintain strongly that the water that initially inundated their property did not come from the creeks but came from the opposite direction. 39. The Panel notes that the description of flow of water provided by the Applicants is consistent with other information of the flow of water in the Carisbrook area. There is no doubt that there would have been significant stormwater run-off as the area had been saturated after four days of heavy rain. The area is largely red clay soil which does not absorb a lot of water. The Panel also notes that the hydrology reports refer to the lack of accuracy in flows in the creeks, the river gauges and the inability to accurately estimate the creek levels or when the creek overtopped. There was also a lack of data concerning flood levels within the Carisbrook area. 40. After reviewing the other information provided by the Applicants, the Panel is satisfied that the Applicants‘ business premis es were first inundated by water at approximately 6:30am on 14 January 2011, and all the evidence is consistent in this respect. September 2010 Claim for Storm Damage 41. The Applicants have pointed to the claim they made with the FSP for storm damage, including some water inundation, in September 2010, saying that the FSP accepted the 2010 claim and the circumstances in the September 2010 and January 2011 weather events were similar. 42. If anything, according to the Applicants, the rainfall during the January 2011 event was heavier that in September 2010, and so it stands to reason that the likelihood of stormwater run-off during the 2011 event would be even greater than for the 2010 event. 43. The FSP says that the circumstances of the earlier claim were similar but not identical to those of the later claim. 44. The FSP has provided a copy of the hydrology report for the earlier claim, which indicates that after heavy rain the stormwater drain running alongside the Applicants‘ street filled with run-off, then overflowed t owards the Applicants‘ house and business premises, and water also entered through the roof. 45. The FSP has also highlighted the fact that the hydrology report for the September 2010 claim specifically concluded that floodwater from McCallum Creek could not h ave inundated the Applicants‘ property. 46. The FSP has submitted that as such, the September 2010 claim is not relevant to the current dispute. 47. The Panel has reviewed the material available, and agrees with the FSP that the circumstances of the 2010 claim are such that it is not relevant to the current dispute, and cannot be used as a benchmark against which other decisions should be measured. Case No: 240024 Determination Page 7 of 9 Other Claims for January 2011 Event 48. The Applicants have indicated that the insurer for the contents of their home (which is the adjoining building to their business premises), has accepted their claim for water inundation damage to their home contents. 49. The Applicants have also pointed to the claims acceptances of several neighbours for the January 2011 event, including one claim for the property adjacent to the stormwater channel nearby to the Applicants. 50. The Applicants say that all these claims have been accepted by the relevant insurers, and therefore the FSP should also accept their claim for stormwater damage. 51. The FSP argues that it is not aware of the terms and conditions of the policies against which these other claims have been made, or the particular circumstances surrounding the claims (e.g. topography of the premises), and / or the bases for the decisions by the other insurers to accept those claims. 52. The FSP argues that because of the likely differences involved, it would not be appropriate to draw any comparison between those claims‘ decisions and the FSP‘s own decision regarding the Applicants‘ claim. 53. It shoul d be noted that the Panel‘s decision regarding the Applicants‘ dispute with the FSP is made with reference to the evidence presented by the parties. 54. The Panel accepts that other claims may have been accepted by other insurers for damage to neighbouring pro perties, and for damage to the Applicants‘ home contents in the house adjoining their business premises. 55. The Panel has reviewed the information relating to the claim for a neighbour, ‗KM‘, who resided adjacent to the stormwater drain, and notes that a copy of a Final Decision Letter (FDL) from the insurer for that claim has been presented by the Applicants, and that this FDL makes reference to a hydrology report produced by ‗F‘. 56. In addition, a copy of a Statutory Declaration from ‗KM‘ — attesting to the timi ng of the water entering her property, the direction from which the water approached, and the timing of the inundation of her home — has also been presented by the Applicants in support of their case. 57. The Panel notes that the insurer for ‗KM‘ was persuaded that the evidence available was sufficient for it to accept a claim for stormwater damage to the home involved. 58. Although the FDL from the insurer for ‗KM‘ makes reference to a hydrology report from ‗F‘, a copy of this report was not made available to the F SP or the Panel for review. 59. The Panel has considered the information in the Statutory Declaration from ‗KM‘ regarding the timing of the water entry to her property and the inundation of her home, and finds that is broadly consistent with the position of the FSP. Case No: 240024 Determination Page 8 of 9 60. In relation to the path taken by the water that caused the inundation of the home of ‗KM‘, the Panel notes that the Statutory Declaration states that this water flowed through property and into the adjacent stormwater drain. Source of Water in Stormwater Channel 61. The Applicants have said that the stormwater drain nearby to their property filled with stormwater then overflowed, and that it was this overflowing stormwater that entered their property and inundated their business premises. 62. The Applicants have provided photographs of the vicinity around their property at the time of the inundation event, showing that the stormwater drain filled and then overflowed with water. According to the Applicants, these photographs show that the water in the stormwater drain was flowing towards the Creek, not away from it. 63. The FSP has said that the stormwater drain became surcharged with water ‗back - flooding‘ from McCallum Creek, and that this overflowing floodwater was responsible for the inundation of the Appl icants‘ business premises. 64. The Panel has considered the evidence from both parties in relation to the source of the water in the stormwater drain at the time of the inundation of the Applicants‘ business premises. 65. The Panel notes that the hydrology report by ‗W‘ dated 5 August 2011 concedes that at approximately 7am on 14 January 2011, some run-off from the catchments to the west of the township would have surcharged the stormwater drain, but that by this time McCallum Creek would have already started to back-flood. 66. The photographs provided by the Applicants give an indication of the extent of the water inundation around the vicinity of the Applicants‘ property ; however the Panel is not satisfied that they represent conclusive evidence of the source of the water in the drain. 67. Based on the information that has been exchanged and with the benefit of having conducted a site inspection of the property, the Panel is satisfied that the initial inundation of the Applicants‘ property was due to stormwater run-off. The Panel is satisfied that the stormwater run-off was at such a level that it led to the Applicants‘ need to evacuate the premises at approximately 6.00am prior to the 10.20am flood warning being received and notice to evacuate. The Panel accepts the Applic ants‘ evidence that most likely the stormwater run-off commenced inundating the property around 6:00am The Panel accepts that ultimately water from McCallum Creek, Big Creek and Tullaroop Creek merged and flooded the town. It is impossible based on the information exchanged to determine precisely the level of damage caused by the initial inundation by stormwater as against the damage subsequently caused by the ultimate inundation of the property by floodwater. 68. Under the Terms of Reference, it is appropriate for the Panel to consider what is fair in all the circumstances having regard to the relevant legal principles, Case No: 240024 Determination Page 9 of 9 terms of the policy, good insurance practice and any prior determinations although not binding. In this dispute, again with the benefit of having conducted a site inspection and discussions with the parties, the Panel is satisfied that the initial stormwater inundation contributed to damage up to 300mm throughout the shop. At such level, it would have also led to damage of the Applicants‘ domestic dwelling although the Panel accepts that damage through the domestic dwelling would have been limited to a height of no more than 100mm throughout. 69. Insofar as the Applicants have sought compensation with respect to business interruption, this is not within the jurisdiction of FOS. The Panel has been advised however by the FSP that in the event of FOS accepting the Applicants‘ submission for loss of income, the FSP will review its decision in relation to the claim under business interruption. Determination 70. Accordingly, the Panel determines the FSP meet its liability in accordance with the terms of the policy with respect to the property damage and loss of stock. 71. In this regard the Panel notes the FSP has not had sufficient opportunity to assess the extent of damage caused by stormwater as against floodwater in accordance with this determination. The Panel determines it is appropriate for the FSP to appoint an Assessor to determine the extent of the damage to the business and domestic dwelling. 72. The Panel further notes that the Applicants are to provide a detailed list identifying the loss of stock. The parties are asked to work cooperatively in order to determine the extent of the loss of stock.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.