Determination 239878

Pool surround tile cracking claim denied

FirmFinancial Firm (Unknown - Insurer)
Decided2011-10-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Pool surround tiles cracked after heavy rain and the FSP denied the claim as a tile installation defect not covered by the policy. AFCA overruled the Case Manager's recommendation in the applicant's favour and upheld the denial, but ordered the FSP to pay the applicant's contractor report fees if incurred.

The FSP's supplementary engineering report showed the cracking was caused by inadequate expansion joints at original construction, which the policy does not cover.

Issues

Subjects and remedies

home or building damagepay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 239878 Determination Page 1 of 5 Case number: 239878 General Insurance - Domestic Insurance - Home Building - Service - Service quality 26 September 2011 Background 1. This is a review of a Recommendation by the Service dated 28 July 2011, wherein the Case Manager made a finding in favour of the Applicant. The Financial Services Provider (FSP), has rejected the Recommendation and in accordance with the Terms of Reference (TOR), the matter has been referred to me for Determination. 2. The relevant background, summaries of the parties’ positions and the issues have been set out in paragraphs one to 11 of the Recommendation and in the interest of clarity and completeness I will restate same. The Applicant holds a home building and contents policy with the FSP, with sums insured of $594,500 for the building and $142,500 for the contents. There is a policy excess of $250. The Applicant has a swimming pool which is located to the rear of the property. The Applicant returned to his home on 13 June 2010 after a time away and found his pool water was over flowing. He said this was due to the heavy rain which had fallen during his absence. He subsequently discovered some of the tiles beside the pool were damaged. The Applicant lodged a claim under his policy, however the FSP has denied the claim on the basis the cause of the cracking was due to the characteristics of the tiles themselves and not as a result of a listed event under the policy. The Applicant has lodged the dispute with the Financial Ombudsman Service (FOS). Summary of Applicant’s Position There was very heavy rain during the Applicant’s ten day absence from home, which resulted in water continuously spilling over the top of the pool on to the area surrounding it. Determination Case No: 239878 Determination Page 2 of 5 He contacted the tile company and the glue manufacturer as well as the tile layer after receiving the FSP’s denial of the claim. He said the installation work was in accordance with the manufacturer’s recommendations. The Applicant also arranged for a building consultant to carry out an assessment and, as a result, the consultant has provided a report which the Applicant has submitted. Only a very small percentage of the tiles are affected, with the balance still in good order. Summary of FSP’s Position The FSP obtained a report from a company of consulting engineers on the likely cause of the Applicant’s loss. The report indicated that the loss was due to the terracotta tiles absorbing moisture over time and this led to brick growth. Due to the inadequate provision for brick growth in the tiles, the tiles cracked. This is not a listed event under the policy and therefore the FSP contends it was correct in its decision to deny the claim. Issue 3. Whether the FSP is entitled to deny the Applicant’s claim. Reasons for Decision 4. There has been a full exchange of information between the parties and each party has had the opportunity to address the issues that have been raised. 5. I have read the file and I have considered the submission by the parties and in particular the further submission from the FSP’s expert provided under cover of letter from the FSP dated 24 August 2011. 6. The facts are not in dispute. During the Applicant’s absence from his home property for a period of approximately 10 ten days, there occurred a very heavy rainfall. This resulted in overflowing of his swimming pool, which he addressed by pumping out the excess water and bringing it back to its usual level. 7. A few days later the Applicant observed that cracking had occurred to a number of tiles in the area surrounding the pool and he submitted a claim under the policy. 8. The Case Manager in making his Recommendation correctly found that the Applicant had a prima facie claim under the policy and the FSP then had the onus of establishing that the claim falls within a policy exclusion. The FSP relied upon a report from a firm of consulting engineers. Somewhat regrettably, the FSP did not supply with the report the usual details as to the expert’s Case No: 239878 Determination Page 3 of 5 qualification, expertise and experience. The Case Manager noted that the pattern of failure was consistent with “t ile growth” and the steps which should be taken to address the problem by appropriate remediation. 9. The Applicant provided a detailed report from a building contractor that concluded the damage to the files was caused by either pool water over normal use or inundation cause by storm water. The aetiology of events influenced the contractor to opine that the storm may have induced the result in damage. 10. Had I have been provided with only those reports I believe I would have come to the same conclusion as the Case Manager. 11. However, prior to this review the FSP has provided a further report from the engineer that has addressed in detail matter which were lacking in the earlier report. Suffice to say, it is very disappointing that a report of this quality that incl uded provision of the necessary details to prove the engineer’s qualifications and experience which were missing from the earlier report. I believe the Case Manage may have taken a different view had he had the advantage of the supplementary report. 12. In particular this further report from the expert states: “The pool surround is tiled with terra cotta/ceramic tiles. They have been laid continuously around the perimeter of the pool without inclusion of jointing. Australian Standard AS3958.1 — 1991 Ceramic Tiles Part 1: Guide to the installation of ceramic tiles was the Australian Standard for installation of ceramic tiles applying at the time these tiles were installed. That Standard specifies 'Intermediate movement joints ... should be Inserted at intermediate positions to accommodate deflections of the base and movement of the flooring' — Clause 5.4.5.2 (e). It further specifies thatIntermediate (sic) movement joints should be provided in evenly-spaced positions at approximately 4,5m centres ... " — Clause 5.4.5.2 (b). I did not measure the length of the pool perimeter, but my recollections are that it is at least 25 metres, some five (5).times the maximum length without joints. This lack of Intermediate joints Is compounded by the fact that the tiles are a continuous band around the whole perimeter so, effectively, have no edge. The Code specification of 4.5 metres is predicated on there also being a movement joint t the edge and, as there Is no edge within the intent of the Code, some engineers (including me) would argue that even the 4.5 metres is too.great (sic) a spacing In a pool surround. I can recollect a substantial number of pool surround ceramic tile failures similar to the mechanism of this failure. I have not searched our electronic files to collate a list of these failures but, whilst that can be done if requested, I estimate the number would be between 10 and 20. The common factor In every failure is lack of jointing. I have not seen a single failure.of (sic) perimeter tiles on any pool where joints have been properly installed. I am very surprised by the owners expert's statement that 'sufficient control joints have been used throughout this tiled.area' (sic), when, quite clearly, the spacing of joints does not comply with Australian Standard 3958.1 — 1991. I did not undertake destructive investigation of the joints, but my belief, from visual Case No: 239878 Determination Page 4 of 5 Inspection, Is that the joints that. do exist also do not comply with the Australian Standard. The extent of damage is correctly identified in the report by the owners expert as being 'Other than for the damage seen at the mitre of the western corners out to the control joint, the damage appears to be restricted to the bullnosed (sic) capping tile.' This pattem (sic), location and extent of damage is very consistent with the mode of failure caused by release of compressive stresses within the tiles, and whereas in a properly installed tiled floor with joints at 4'.5 metres, these stresses would release at the Joints, in this tiled area the compression has required a dislodgment and delamination of tiles from their substrate to initiate the release of the stresses. The owner's expert makes a point of the fact that other tiled areas using similar tiles have not failed, and this supports my argument that the pool coping, continuous unjointed (sic) band of tiles around the perimeter of the pool, and therefore the most vulnerable tiles to fail, have in fact been where failure has occurred. The owner's expert advises that, 'Based on documents supplied by' the owner, 'it appears that the original contractor and the company who supplied him the glue and associated additives are satisfied that the system used was of high quality, met the manufacturer's recommendations ... and was installed correctly'. I, have no evidence or reason to believe that the adequacy or otherwise of the' adhesive was a factor in this failure. The owners expert also alludes to the quality of the tiles and, whilst different tiles exhibit different expansive properties, I do not believe the quality of the tiles Is in question. I do not, however, believe the tiler understood the need for Jointing of tiles, nor the reasons behind that need and, further, I believe if the tiler had installed the Jointing in accordance with AS 3958.1 — 1991, the failure would not have occurred. In regards the relevance of the storm event, these tiles are an external situation and must be installed in a manner that enables them to perform satisfactodly (sic) whether they are wet or dry. Once the tiles are. saturated, it is irrelevant how much more wet they become, so the intensity of any particular storm event in.the life of the tiles is not relevant beyond the point of saturation. The Australian Standard ' takes account of the increased exposure in Clause 5.4.5.2 (b), where It differentiates the maximum ' length of unjoinled (sic) file areas in extemal(sic) structures as 4.5 metres, versus 9 metres (or 6 metres where exposed to sunlight) intemally (sic). It is a fundamental obligation of any tiler to meet the minimum standards specified in the Australian Standard, and. my observation of a very large number of failures of non compliant tiles areas has substantiated the need to comply with the Australian Standard. The Financial Ombudsman Service commentary states, In Clause 20, that my report provides a general narration on the problems facing terra colta (sic) tile, without actually specifying whether this is in fact the problem with respect to the applicant's tiles.' I now clarify that the cause of the failure of the tiles around the Case No: 239878 Determination Page 5 of 5 pool at 2 Tower Close Valentine is In fact failure to provide adequate expansion Joints to accommodate movements that Inevitably occur in this type of tiling, and specifically failure to provide jointing in accordance with AS 3958.1 -1991. To enable a better understanding of the mechanism of failure, I have included some photographs (in Appendix D) and, In particular, photograph 4 clearly demonstrates the compression failure at one of the corners as. the tiles 'have expanded from each direction towards that comer. I- believe this photograph also_provides (sic) clear evidence that, had an expansion joint been installed at that corner, that expansion would have released into the expansion joint rather than causing failure of the tiles. I would further state that, if the tiles are reinstated without the required jointing, there-is a high probability that a similar failure will occur. I would also like to clarify that the small amount or extent of failure is consistent with the type of failure. Once sufficient failure has occurred to release the compressive stresses in the tile's, the failure slows ” 13. Having had the opportunity to consider that material and notwithstanding my disappointment that it has been provided so late, I am of the opinion that the FSP has discharged the onus to show that the cracking was caused by the failure at original construction to provide adequate expansion joints to accommodate movement in the tiling and that was the primary cause of the cracking of the tiles. I repeat as stated above it is a great pity that this detail was omitted from the earlier report. Determination 14. Accordingly, I overrule the Recommendation and determine that the FSP was entitled to deny the claim. 15. In the event that the Applicant incurred fees in respect of the report from his original contractor, such fees should be paid by the FSP.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.