Determination 239878
Pool surround tile cracking claim denied
Summary
Pool surround tiles cracked after heavy rain and the FSP denied the claim as a tile installation defect not covered by the policy. AFCA overruled the Case Manager's recommendation in the applicant's favour and upheld the denial, but ordered the FSP to pay the applicant's contractor report fees if incurred.
The FSP's supplementary engineering report showed the cracking was caused by inadequate expansion joints at original construction, which the policy does not cover.
Subjects and remedies
home or building damagepay compensation
Text of the determination
Case No: 239878 Determination Page 1 of 5
Case number: 239878
General Insurance - Domestic Insurance - Home Building - Service - Service
quality
26 September 2011
Background
1. This is a review of a Recommendation by the Service dated 28 July 2011,
wherein the Case Manager made a finding in favour of the Applicant. The
Financial Services Provider (FSP), has rejected the Recommendation and in
accordance with the Terms of Reference (TOR), the matter has been referred
to me for Determination.
2. The relevant background, summaries of the parties’ positions and the issues
have been set out in paragraphs one to 11 of the Recommendation and in the
interest of clarity and completeness I will restate same.
The Applicant holds a home building and contents policy with the FSP, with sums
insured of $594,500 for the building and $142,500 for the contents. There is a
policy excess of $250.
The Applicant has a swimming pool which is located to the rear of the property. The
Applicant returned to his home on 13 June 2010 after a time away and found
his pool water was over flowing. He said this was due to the heavy rain which
had fallen during his absence. He subsequently discovered some of the tiles
beside the pool were damaged.
The Applicant lodged a claim under his policy, however the FSP has denied the
claim on the basis the cause of the cracking was due to the characteristics of
the tiles themselves and not as a result of a listed event under the policy.
The Applicant has lodged the dispute with the Financial Ombudsman Service (FOS).
Summary of Applicant’s Position
There was very heavy rain during the Applicant’s ten day absence from home, which
resulted in water continuously spilling over the top of the pool on to the area
surrounding it.
Determination
Case No: 239878 Determination Page 2 of 5
He contacted the tile company and the glue manufacturer as well as the tile layer
after receiving the FSP’s denial of the claim. He said the installation work was
in accordance with the manufacturer’s recommendations.
The Applicant also arranged for a building consultant to carry out an assessment
and, as a result, the consultant has provided a report which the Applicant has
submitted.
Only a very small percentage of the tiles are affected, with the balance still in good
order.
Summary of FSP’s Position
The FSP obtained a report from a company of consulting engineers on the likely
cause of the Applicant’s loss. The report indicated that the loss was due to the
terracotta tiles absorbing moisture over time and this led to brick growth.
Due to the inadequate provision for brick growth in the tiles, the tiles cracked. This is
not a listed event under the policy and therefore the FSP contends it was
correct in its decision to deny the claim.
Issue
3. Whether the FSP is entitled to deny the Applicant’s claim.
Reasons for Decision
4. There has been a full exchange of information between the parties and each
party has had the opportunity to address the issues that have been raised.
5. I have read the file and I have considered the submission by the parties and in
particular the further submission from the FSP’s expert provided under cover of
letter from the FSP dated 24 August 2011.
6. The facts are not in dispute. During the Applicant’s absence from his home
property for a period of approximately 10 ten days, there occurred a very heavy
rainfall. This resulted in overflowing of his swimming pool, which he addressed
by pumping out the excess water and bringing it back to its usual level.
7. A few days later the Applicant observed that cracking had occurred to a number
of tiles in the area surrounding the pool and he submitted a claim under the
policy.
8. The Case Manager in making his Recommendation correctly found that the
Applicant had a prima facie claim under the policy and the FSP then had the
onus of establishing that the claim falls within a policy exclusion. The FSP
relied upon a report from a firm of consulting engineers. Somewhat regrettably,
the FSP did not supply with the report the usual details as to the expert’s
Case No: 239878 Determination Page 3 of 5
qualification, expertise and experience. The Case Manager noted that the
pattern of failure was consistent with “t ile growth” and the steps which should
be taken to address the problem by appropriate remediation.
9. The Applicant provided a detailed report from a building contractor that
concluded the damage to the files was caused by either pool water over normal
use or inundation cause by storm water. The aetiology of events influenced the
contractor to opine that the storm may have induced the result in damage.
10. Had I have been provided with only those reports I believe I would have come
to the same conclusion as the Case Manager.
11. However, prior to this review the FSP has provided a further report from the
engineer that has addressed in detail matter which were lacking in the earlier
report. Suffice to say, it is very disappointing that a report of this quality that
incl uded provision of the necessary details to prove the engineer’s
qualifications and experience which were missing from the earlier report. I
believe the Case Manage may have taken a different view had he had the
advantage of the supplementary report.
12. In particular this further report from the expert states:
“The pool surround is tiled with terra cotta/ceramic tiles. They have been laid
continuously around the perimeter of the pool without inclusion of jointing.
Australian Standard AS3958.1 — 1991 Ceramic Tiles Part 1: Guide to the
installation of ceramic tiles was the Australian Standard for installation of ceramic
tiles applying at the time these tiles were installed. That Standard specifies
'Intermediate movement joints ... should be Inserted at intermediate positions to
accommodate deflections of the base and movement of the flooring' — Clause
5.4.5.2 (e). It further specifies thatIntermediate (sic) movement joints should be
provided in evenly-spaced positions at approximately 4,5m centres ... " — Clause
5.4.5.2 (b).
I did not measure the length of the pool perimeter, but my recollections are that it
is at least 25 metres, some five (5).times the maximum length without joints.
This lack of Intermediate joints Is compounded by the fact that the tiles are a
continuous band around the whole perimeter so, effectively, have no edge. The
Code specification of 4.5 metres is predicated on there also being a movement
joint t the edge and, as there Is no edge within the intent of the Code, some
engineers (including me) would argue that even the 4.5 metres is too.great (sic)
a spacing In a pool surround.
I can recollect a substantial number of pool surround ceramic tile failures similar
to the mechanism of this failure. I have not searched our electronic files to collate
a list of these failures but, whilst that can be done if requested, I estimate the
number would be between 10 and 20. The common factor In every failure is lack
of jointing.
I have not seen a single failure.of (sic) perimeter tiles on any pool where joints
have been properly installed.
I am very surprised by the owners expert's statement that 'sufficient control joints
have been used throughout this tiled.area' (sic), when, quite clearly, the spacing
of joints does not comply with Australian Standard 3958.1 — 1991. I did not
undertake destructive investigation of the joints, but my belief, from visual
Case No: 239878 Determination Page 4 of 5
Inspection, Is that the joints that. do exist also do not comply with the Australian
Standard.
The extent of damage is correctly identified in the report by the owners expert as
being 'Other than for the damage seen at the mitre of the western corners out to
the control joint, the damage appears to be restricted to the bullnosed (sic)
capping tile.' This pattem (sic), location and extent of damage is very consistent
with the mode of failure caused by release of compressive stresses within the
tiles, and whereas in a properly installed tiled floor with joints at 4'.5 metres,
these stresses would release at the Joints, in this tiled area the compression has
required a dislodgment and delamination of tiles from their substrate to initiate
the release of the stresses.
The owner's expert makes a point of the fact that other tiled areas using similar
tiles have not failed, and this supports my argument that the pool coping,
continuous unjointed (sic) band of tiles around the perimeter of the pool, and
therefore the most vulnerable tiles to fail, have in fact been where failure has
occurred.
The owner's expert advises that, 'Based on documents supplied by' the owner, 'it
appears that the original contractor and the company who supplied him the glue
and associated additives are satisfied that the system used was of high quality,
met the manufacturer's recommendations ... and was installed correctly'. I, have
no evidence or reason to believe that the adequacy or otherwise of the' adhesive
was a factor in this failure.
The owners expert also alludes to the quality of the tiles and, whilst different tiles
exhibit different expansive properties, I do not believe the quality of the tiles Is in
question.
I do not, however, believe the tiler understood the need for Jointing of tiles, nor
the reasons behind that need and, further, I believe if the tiler had installed the
Jointing in accordance with AS 3958.1 — 1991, the failure would not have
occurred.
In regards the relevance of the storm event, these tiles are an external situation
and must be installed in a manner that enables them to perform satisfactodly
(sic) whether they are wet or dry. Once the tiles are. saturated, it is irrelevant
how much more wet they become, so the intensity of any particular storm event
in.the life of the tiles is not relevant beyond the point of saturation. The Australian
Standard
' takes account of the increased exposure in Clause 5.4.5.2 (b), where It
differentiates the maximum ' length of unjoinled (sic) file areas in extemal(sic)
structures as 4.5 metres, versus 9 metres (or 6 metres where exposed to
sunlight) intemally (sic). It is a fundamental obligation of any tiler to meet the
minimum standards specified in the Australian Standard, and. my observation of
a very large number of failures of non compliant tiles areas has substantiated the
need to comply with the Australian Standard.
The Financial Ombudsman Service commentary states, In Clause 20, that my
report provides a general narration on the problems facing terra colta (sic) tile,
without actually specifying whether this is in fact the problem with respect to the
applicant's tiles.' I now clarify that the cause of the failure of the tiles around the
Case No: 239878 Determination Page 5 of 5
pool at 2 Tower Close Valentine is In fact failure to provide adequate expansion
Joints to accommodate movements that Inevitably occur in this type of tiling, and
specifically failure to provide jointing in accordance with AS 3958.1 -1991.
To enable a better understanding of the mechanism of failure, I have included
some photographs (in Appendix D) and, In particular, photograph 4 clearly
demonstrates the compression failure at one of the corners as. the tiles 'have
expanded from each direction towards that comer. I- believe this photograph
also_provides (sic) clear evidence that, had an expansion joint been installed at
that corner, that expansion would have released into the expansion joint rather
than causing failure of the tiles.
I would further state that, if the tiles are reinstated without the required jointing,
there-is a high probability that a similar failure will occur.
I would also like to clarify that the small amount or extent of failure is consistent
with the type of failure. Once sufficient failure has occurred to release the
compressive stresses in the tile's, the failure slows ”
13. Having had the opportunity to consider that material and notwithstanding my
disappointment that it has been provided so late, I am of the opinion that the
FSP has discharged the onus to show that the cracking was caused by the
failure at original construction to provide adequate expansion joints to
accommodate movement in the tiling and that was the primary cause of the
cracking of the tiles. I repeat as stated above it is a great pity that this detail
was omitted from the earlier report.
Determination
14. Accordingly, I overrule the Recommendation and determine that the FSP was
entitled to deny the claim.
15. In the event that the Applicant incurred fees in respect of the report from his
original contractor, such fees should be paid by the FSP.