Home / Financial Firm (Unknown - Insurer) / Determination 239851
Determination 239851
Denial of storm damage claim - storm created opening exclusion
Summary
The applicant claimed storm damage to his rumpus room and hallway floor after the FSP denied the claim because the water did not enter through a storm created opening. AFCA determined the FSP was entitled to deny the claim.
The storm created opening exclusion in the supplementary PDS applied, and the applicant either had or could have had that document with his renewal.
Issues
- Claim denial primary · not upheld“As I am of the view that the FSP can rely upon the policy exclusion contained within the SPDS... then the Applicant's claim fails.”
- Poor claim handling secondary · not upheld“I am of the view the matter has been handled in an adequate fashion.”
- Failure to disclose secondary · not upheld“In the absence of anything further from the Applicant, I am of the view the Applicant either had or could have had the SPDS.”
- Third-party or outsourcing failure secondary · not upheld“it is not the responsibility of the FSP and its contractors to provide a detailed maintenance check of the property.”
Subjects and remedies
no remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 239851 Determination Page 1 of 7
Case number: 239851
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Storm Created Opening
28 November 2011
Background
I have reviewed all the material submitted by the parties and save where I make note
specifically, I am satisfied the Background as set out in the Recommendation is
accurate and is as follows.
The Applicant held a home building insurance policy with the Financial Services
Provider (FSP) from 2 September 2009.
The Applicant lodged two claims for storm damage in October 2010 with the FSP.
These claims were handled as one but with two excesses applicable.
The FSP denied the claims on the basis that stormwater had been able to enter the
property through a failure of the waterproofing membrane and not a storm
created opening.
The Applicant sought a review of the FSP‟s decision to deny the claims.
The review was the subject of a Recommendation. The Recommendation was in
favour of the FSP and was not accepted by the Applicant. The FSP accepted
the Recommendation. In the circumstances, the matter has been referred to me
for Determination.
Summary of Applicant’s Position
I have reviewed all the material submitted by the parties and save where I make note
specifically, I am satisfied the Applicant‟s position as set out in the
Recommendation is accurate and is as follows.
The Applicant says that the FSP accepted a claim in similar circumstances in March
2010.
The Applicant further says that the contractors employed by the FSP in March did
not inform him of a waterproofing membrane issue but advised that the
rainwater was able to enter the property through other means, which he
promptly attended to.
D e termination
Case No: 239851 Determination Page 2 of 7
Additionally, the Applicant contends that he was unaware of an additional exclusion
clause, which was added to his policy at renewal in September 2010.
As such, the Applicant submits that cover should be provided under the terms of his
policy.
The Applicant rejected the Recommendation and wrote a letter to the Service dated
5 October 2011, which has been considered carefully as part of this
Determination.
Summary of FSP’s Position
I have reviewed all the material submitted by the parties and save where I make note
specifically, I am satisfied the FSP‟s position as set out in the Recommendation
is accurate and is as follows.
The FSP says that it provided a Supplementary Product Disclosure Statement
(SPDS) when renewal was offered to the Applicant.
The FSP further says that there is no evidence of a storm created opening to the
Applicant‟s property a nd contends that the damage was caused by a failure in
the waterproofing membrane.
The FSP relies on the following policy provisions contained within the SPDS:
“ Page 22 – ‘Storm. You are not covered for storm damage to:’ replace the 5 th
bullet point with:
the building or contents where the water, wind or hail has entered the building
through an opening not created by the storm; or”
The FSP further relies upon the following policy provisions contained within the
Product Disclosure Statement (PDS) which the Applicant does confirm
receiving:
“ General exclusions – apply to the overall policy
Unless included in additional cover, we will not cover loss, damage or legal liability
caused by:
...
wear and tear and lack of maintenance, including rust, corrosion, deterioration...
gradual loss or damage of any kind;
structural defects and faulty workmanship in the construction of the building or lack of
maintenance to the building and/or contents”
The FSP accepted the Recommendation and did not provide any further
documentary information in support of its position.
Case No: 239851 Determination Page 3 of 7
Issue
Whether the FSP is entitled to deny the Applicant‟s claims.
Reasons for Decision
There has been an exchange of material between each party, and I am satisfied
each party has had an opportunity to reply to the issues raised.
Each FOS case is decided on its merits, taking into account the facts of the case. I
have reviewed all the material submitted by the parties both before and after
the Recommendation was issued, in order to reach my decision. I will only
refer to the relevant submissions and materials raised.
The Applicant has raised four issues. The damage itself, the issuing of the SPDS,
the failure of the FSP‟s contractors to advise him of the waterproofing issue
following a claim in March and the actual handling of the claim by the FSP.
Issuing of SPDS
The Applicant does not address this issue in his letter dated 5 October 2011. He did
admit he received the PDS dated 8 May 2007, which details the terms and
conditions attached to the policy. He denies he received the SPDS, which
details amendments to the original policy wording, and, in particular, the
exclusion upon which the FSP relies to deny his claims.
The FSP contends the SPDS was included in the Applicant‟s renewal invitation
dated 29 July 2010 and has provided a Statutory Declaration and evidence
from its postal provider that this document was successfully sent to the
Applicant. In view of this evidence, I am satisfied that this document was sent to
the Applicant.
The Applicant has not denied he received the renewal invitation. The renewal said:
“ Step 2 – Evaluate your cover
The Policy Schedule outlines the various cover options you have selected as
part of your insurance. We have made some changes to our policy wording –
these are detailed in the enclosed Supplementary Product Disclosure Statement.
You should read this together with your Product Disclosure Statement to make
s ure you have selected the most appropriate cover for your needs.”
In the absence of anything further from the Applicant, I am of the view the Applicant
either had or could have had the SPDS and that the FSP is entitled to rely upon
the relevant exclusions contained in the SPDS.
Case No: 239851 Determination Page 4 of 7
Storm Damage
The Applicant must prove on the balance of probabilities that the loss claimed is as a
result of an insured event, in this case, storm.
If he established this, then the onus shifts to the FSP to prove on the balance of
probabilities that the loss claimed falls within an exclusion of the policy.
The FSP investigated the claim and appointed a building consultant, S, to attend the
Applicant‟s property and provide a report on the extent and cause of the
damage which he did in November 2010 after inspecting the property.
I have read and considered carefully this report and the reports from the Applicant. S
confirms water damage. He eliminated it coming from the roof, which he says
was “generally good”. Extracts have been set out in the Recommendation and
where relevant I have included them in this Determination as follows;
“Insured stated that water flowed from the rumpus room on to the timber floor of
the rear hallway and into the study damaging the floor.
...
The Insured stated that since approximately the second half of 2008 they noticed
water seeping in under the skirting board onto the floor tiles on the northern and
rear eastern wall elevations of the rumpus room. The amount of water was
initially minimal and they were always able to mop it up.
...
An inspection of the northern and eastern external elevations of the room viewed
from the neighbouring properties revealed the floor level of the rumpus room to
be approximately 1m below the surrounding ground level.
It was noted that the soil on the neighbouring properties abutted the external
brick walls of the rumpus room.
...
I am of the opinion that the cause of the damage to the timber flooring in the rear
hallway and study is due to the absence or failure of a waterproofing system to
the northern and eastern external elevations of the rumpus room where the soil
from the adjoining properties abut (sic) the external walls of the room. This has
allowed surface and sub-surface water from the neighbouring properties to
breach the northern and eastern external brick walls and enter the room. This in
turn has resulted in water eventually entering the adjoining rear hallway and
study.
Therefore I consider the absence or failure of a waterproofing system to be a
maintenance related issue.”
On the basis of the report from S, the FSP denied the claim.
In response, the Applicant then engaged RB who inspected the property and a
CCTV survey of the stormwater in February 2011. R reported:
“Our initial inspection was a CCTV survey of the storm water downstream from
trench grate outside back door of hallway. (This) is in reasonable condition.
Case No: 239851 Determination Page 5 of 7
...
A further survey was conducted downstream from downpipe on northern side of
house adjacent external door to Rumpus Room. This survey revealed that the
drain is partly obstructed on front elevation under shrub in garden bed and it
appears tree roots have entered drain.
It was noted that the floor level of the Rumpus Room is below that of the north
side pathway where stormwater drain is routed. It may be possible that in heavy
rain the stormwater may not handle the water flow and may escape the drain
below concrete level to flood the Rumpus Room.
We would recommend that the shrub on front elevation be removed and the
stormwater drain repaired and replaced with PVC material for the full length of
the garden bed. It should also be ensured that the remainder of drain across to
main run at front of garage is free of any obstruction.
During our inspection we did not observe any connection points for sub-soil
drainage to walls surrounding Rumpus Room. If there is no sub-soil drain at base
of wall or adequate water proofing to wall we would expect that in normal
conditions some moisture would penetrate the wall however, would not expect
flooding as described in [S] Report. It seems likely that the flooding has occurred
from a damaged of blocked stormwater however, this could be the drains on side
or from neighbouring properties.”(sic)
The Applicant also asked H to inspect the property and he wrote a report 15 April
2011. Relevant extracts are as follows:
“Further to our inspection of the water seeping into the Rumpus Room at your
Residence, we feel that some water may be related to broken or damaged
Drains. A viewing of the Video previously taken, would confirm that conclusion.
There is also the issue of up to a metre of soil, in the adjoining property to the
north & also the adjoining property to the east, directly up against the Rumpus
Room walls.
We conclude that there must be a waterproof seal applied to the external face of
the Rumpus Room, due to lack of visible water stains on the inside faces of the
walls.”
In summary, S says the property was damaged when there was a storm as surface
and subsurface water seeped through the walls of the rumpus room as there
was an absence or failure of a waterproofing system to the northern and
eastern walls of the room. RB agreed that some moisture would penetrate the
walls but RB would not expect the flooding as described by S if the inadequate
or lack of waterproofing ca used the damage. RB thought “it may be possible”
that the stormwater didn‟t handle the water flow and caused the flood in the
rumpus room. H identifies both the broken or damaged drains and the soil next
to the walls. H talks mainly about how to fix the problem and the costs of doing
so. H is not definitive in his opinion and says a viewing of the video would
confirm the conclusion that some water may be related to broken or damaged
drains. Although H doesn‟t expressly rebut S‟s opinion, it may be inferred as H
has concluded there must be waterproofing as there is no visible water stains
on the inside faces of the walls.
Case No: 239851 Determination Page 6 of 7
Clearly, there is disagreement about how the damage was caused but none of S, RB
or H says that the damage to the Applicant‟s property was caused from water
entering the property through a storm created opening.
As I am of the view that the FSP can rely upon the policy exclusion contained within
the SPDS that excludes loss or damage where the rainwater does not enter the
property through a st orm created opening, then the Applicant„s claim fails.
Further, whether the obstructed drains caused the damage or the lack of or
inadequate waterproofing caused damage, these are both maintenance issues
and other policy exclusions apply.
Failure to advise of Waterproofing Issues
Following a storm claim in March 2010, the FSP appointed contractors to repair the
damage. Those contractors told the Applicant to keep his gutters clean and
repair (or remove) a skylight, which was done.
The Applicant says the contractor should have also told him that there was a
potential issue with the waterproofing of the property. Had the contractor done
so, the Applicant says that he would have ensured that this issue was
addressed to prevent further damage.
This argument assumes that the lack of waterproofing and not the drains caused the
damage and that the waterproofing is not in place, which is contrary to the view
of H.
Even so, I of the view it is not the responsibility of the FSP and its contractors to
provide a detailed maintenance check of the property in the circumstances of
the earlier claim.
FSP Claims Handling
In his letter written after the Recommendation, the Applicant points out that the
Recommendation did not deal with the “inconsiderate and erratic ways” in
which the FSP handling the claim which has caused stress to the Applicant and
his wife. The Applicant has set these complaints out in detail in earlier
correspondence and the FSP has addressed the complaints in its Response.
I have read all material provided to me carefully on this point. I am of the view the
matter has been handled in an adequate fashion. The matter was assessed
and investigated in a reasonable time frame. The Internal Dispute process
addressed the salient points. The change of personnel was unfortunate but not
unusual in a large office when individual workloads dictate change. I do not
accept the FSP has been inconsiderate or erratic in the handling of the claim.
Case No: 239851 Determination Page 7 of 7
Determination
On the basis of the available information, I determine that the FSP is entitled to deny
the Applicant‟s claim.