Insurer denied home and contents flood damage claim as flood was excluded; AFCA found the loss was flash flood and covered up to the policy limit
Text of the determination
Case No: 239848 Determination Page 1 of 12
Case number: 239848
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
23 December 2011
Background
1. The Applicants are insured with the Financial Services Provider (FSP) to cover
loss or damage to home buildings contents caused by insured events as
described in the policy. The relevant period of insurance is 27 March 2010 to 27
March 2011. The home buildings were insured for the sum of $163,000 and
contents for $60,000.
2. On 12 January 2011, a claim was lodged on the policy as a result of water
inundation which occurred at the property.
3. The FSP deemed investigation was required to determine the cause of water
inundation which required a hydrologist‟s opinion. The hydrologist was
appointed on 27 January 2011 and his report was completed on 4 May 2011.
4. On 10 May 2011, the FSP wrote to the Applicants advising the claim had been
denied as the damage to the home and contents had been caused by flood
which is otherwise excluded by the policy.
5. Solicitors acting on behalf of the Applicants wrote to the FSP on 9 June 2011
seeking a review of the FSP‟s decision to deny the claim. Although the
Applicants‟ solicitor raised several issues for consideration, the FSP maintained
its decision to deny the claim.
Summ ary of Applicants’ Position
6. The Applicants are seeking cover under the policy for the damage caused to
the home building and contents.
7. The issues raised by the Applicants‟ solicitor in its letter dated 9 June 2011
included:
Following lodgement of the claim, the FSP represented that the Applicants
would be covered. The Applicants relied on this representation in not
salvaging goods that would otherwise be salvageable had they been
correctly informed they were not covered for flood.
Determination
Case No: 239848 Determination Page 2 of 12
The Applicants did not receive a Product Disclosure Statement (PDS) for
the 2010 – 2011 insurance period. They acknowledge they received a
PDS for the 2009 – 2010 insurance period.
They were aware the policy provided cover for flash flood. They recall
hav ing a conversation regarding flood cover at the FSP‟s branch office.
There was no explanation of full flood or information regarding how to
separately apply for full flood cover.
The FSP‟s misrepresentation by silence led the Applicants to believe they
had full flood cover. It is incumbent upon the FSP to clearly inform the
Applicants that the insurance they had purchased was not comprehensive
unless they filled out extra paperwork.
The representation was that the Applicants would be covered and they
acted to their detriment based on this advice. The Applicants would have
sought alternative cover had this misrepresentation not occurred.
The Applicants were not clearly informed of the exclusion relied upon by
the FSP. The Applicants were not informed of unusual policy terms.
The policy definition of “flood” is too broad and does not meet the FSP‟s
obligation to clearly communicate the exclusion.
The definition of “flood” and “flash flood” are contradictory and confusing
and do not meet the requirements to clearly inform under section 35 of the
Insurance Contracts Act 1984 (the Act) or the requirements of disclosure
under the Corporations Act .
The FSP failed to advise of the policy limitations and capped payments
regarding flash flooding and stormwater runoff.
The FSP has acted incorrectly in relying upon the hydrologist report to
deny the claim when the eyewitness evidence suggests the damage to
the property was caused by storm or a flash flood as defined by the policy.
The heavy rain that fell during the morning of 11 January 2011 resulted in
an escalation of the Wivenhoe Dam Strategy to W4. The resultant release
in water led to the inundation of the Applicants‟ property and this
inundation fits the FSP‟s definition of flash flooding as “a sudden flood
caused by heavy rain that fell no more than 24 hours prior to the flash
flood or storm water run- off.”
Summary of FSP’s Position
8. The FSP states in relation to the alleged misleading statements:
the alleged statements were not made;
the statements alleged were not misleading;
the statements alleged were not relied upon by the Applicants;
any reliance on the alleged statements was not causative of any loss;
Case No: 239848 Determination Page 3 of 12
The PDS, in conjunction with the certificate of insurance, made clear the
scope of the Applicants‟ flood cover .
9. The FSP states that in relation to “clearly informing”:
The PDS is sufficient to clearly inform the Applicants about the scope of
flood cover.
The PDS clearly states the policy does not cover flood.
The PDS clearly states the monetary cap applicable to pay-outs for flash
flood and stormwater run-off claims.
Further and alternatively, the Applicants were in fact aware of the scope of
cover.
10. The FSP states that in regards to the cause of loss:
The Applicants have not discharged the onus of proving that the cause of
the loss was by “flash flood and stormwater run- off”.
If flash flood was a proximate cause (which is denied), then “flood” was
also a proximate cause of the loss and, by application of the Wayne Tank
principle, the policy does not respond.
The cause of the Applicants‟ loss was “flood” as defined.
The proximate cause of the loss is not the cause which was the most
recent in time but instead is the cause which a reasonable person would
conclude was the cause of the loss. The rain that commenced falling on 9
January 2011 (and indeed earlier) was the proximate cause of the
inundation suffered at the Applicants‟ property.
11. The FSP relies on the following policy provisions:
“ “Certificate of Insurance
What optional covers are included and not included
Home Contents
…
Flood and storm surge not included not included
…
Please refer to your Product Disclosure Statement (PDS) and any Supplementary
Product Disclosure Statement (SPDS) for full details of the optional covers available
If you would like to vary your cover please call us on [telephone no.]
…
Product Disclosure Statement
Words / terms with special meanings
Word / term Meaning
Case No: 239848 Determination Page 4 of 12
…
Flood rising water which enters your home as a result of it running off
or overflowing from any origin or cause. This policy does not
cover flood unless we have agreed and it is shown on your
certificate of insurance
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more than 24
hours prior to the flash flood or stormwater run - off.
…
Storm A violent disturbance of the atmosphere associated with strong
winds including a cyclone, lightning, heavy rain, hail or snow
but not continuous bad weather by itself.
…
Insured events you are covered for
Damage caused by the weather ….
What is covered What is not covered
storm Loss or damage:
caused by rain, hail or snow after it has reached the
ground;
caused by rain or wind entering the home unless it
enters through an opening in the windows, walls or roof
made by a storm;
to garden borders, paths, driveways, paving, free
standing or retaining walls (whether or not part of the
home), tennis courts an d playing surfaces;
…
caused by storm surge
…
Flash flood and
stormwater run off
A sudden flood caused by
heavy rain that fell no
more than 24 hours prior
to the flash flood or
stormwater run - off
Loss or damage caused:
by flood;
…
to garden borders, paths, driveways, paving, free
standing or retaining walls (whether or not part of the
home), tennis courts and playing surfaces;
…
Your home
The most we will pay for home claims
Case No: 239848 Determination Page 5 of 12
What is covered What is not covered
Flash flood and stormwater
run - off
We will pay up to 50% of your
home sum insured or $25,000,
whichever is higher.
…
Your contents
The most we will pay for contents claims
What is covered What is not covered
…
Flash flood and stormwater
run-off
We will pay up to 50% of your
home sum insured or $25,000,
whichever is higher.
…
Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you asked for
them and we agree to cover you. Additional premiums apply for each cover. Your
certificate of insurance will show which covers operate. All optional covers are subject
to the terms and conditions of this policy.
What is covered What is not covered
Flood and storm surge
This policy does not cover flood unless
we have agreed and it is shown on
your certificate of insurance.
Home and/or contents cover
We cover you for loss or damage to
your home or contents caused by flood
or storm surge which happens during
the period of insurance at the property
address
…
We will not pay for loss or damage to:
to garden borders, paths, driveways,
paving, free standing or retaining walls
(whether or not part of the home), tennis
courts and playing surfaces;
…”
Issue
12. Whether the FSP was entitled to deny the claim on the basis the damag e was
caused by flood.
Case No: 239848 Determination Page 6 of 12
Reasons for Decision
13. FOS has considered it is appropriate to expedite the dispute in accordance with
clause 8.6 of the FOS Terms of Reference. This is because of the issue in
dispute and substantive quantum involved. This dispute has not been subject of
a FOS Recommendation and has proceeded directly to Determination.
14. This decision has been made by a Panel consisting of an Ombudsman, an
industry representative and a consumer representative.
15. There has been an exchange of material between the parties. It therefore is not
intended to recite details of the various reports in this Determination except
where considered relevant.
16. The Panel Chair Ombudsman attended on site with the Applicants and
representatives of the FSP. The Applicants confirmed the details previously
provided to the Service.
Misrepresentation
17. It is unclear as to what misrepresentation is being relied upon by the
Applicants. Firstly, there is no indication that the Applicants were advised at
anytime during the period of insurance, prior to lodging the claim that they were
covered for flood. They were however, aware that the policy provided cover for
“flash flood”.
18. The Panel notes it has been argued that the Applicants did not receive the PDS
for the 2010-2011 period, but acknowledge that a PDS was received for the
prior insurance period. The FSP states the extent of flood cover provided by the
policy during the periods of insurance has been the same. In any event,
pursuant to section 11(10)(a) of the Insurance Contracts Act 1984 (ICA), once
PDS provision is established at policy inception or renewal, the FSP is relieved
of further obligation in respect of a subsequent renewal of that policy from the
requirements mandated by sections 22, 35, 37, 40, 44, 49 or 68 of the ICA. As
any potential prejudice to the Applicants could only arise pursuant to section
35, the Panel determines their admission in respect of provision of an earlier
PDS, obviates any actionable cause by them in this regard.
19. The policy does not provide “flood” cover unless it is noted on the Certificate of
Insurance (CoI). However, the Applicants‟ CoI notes there is no cover for flood
for the home and contents.
20. Further, it is noted the PDS clearly outlines the monetary cap for flash flood and
stormwater claims
21. Moreover, it is the Applicants‟ responsibility to read the policy and relevant
material to ensure they have obtained the appropriate cover for their needs.
Case No: 239848 Determination Page 7 of 12
22. The Panel is therefore satisfied the Applicants were not covered for flood and
either were, or had the opportunity to be, appraised of that fact. The same
applies to the monetary caps applying to the insured event „flash flood‟ .
However, in the alternative the Applicants have argued that the damage was
not the result of flood but was caused by stor m and stormwater run - off.
23. It is alleged by the Applicants‟ solicitor that the Applicants were told they were
covered during the claim process and because of this misrepresentation they
were denied the opportunity to salvage goods.
24. However, the Panel note s the commentary in the Applicants‟ solicitor‟s letter
that the Applicants were told on 7 February 2011 to wait for the final definite
yes in writing. At this time, it would appear the FSP was still waiting on its
hydrologist‟s report.
25. Nevertheless it is unclear as to what goods the Applicants believed were
salvageable and as to why those goods were disposed of. There is no
indication the FSP advised the Applicants to dispose of any contents.
Storm event
26. It is not in dispute that an extreme weather event took place in the region. It is
asserted by the Applicants and their solicitor that the damage was either the
result of a storm or flash flood using the definitions contained within their policy.
27. The Panel notes the FSP, in its letter dated 4 July 2011 to maintain its decision
to deny the claim, also relied upon a hydrology report.
28. The evidence from the hydrologist was in the form of a statement dated 4
August 2011 which included graphs and photographs. It is unclear as to why
this statement post dates the denial letter of 4 July 2011.
29. Nevertheless, the Panel noted that according to the hydrologist he performed a
site specific review of the subject property on 6 April 2011 to consider whether
the inundation may have been the result of stormwater run-off.
30. The hydrologist advised he considered the terrain data as to whether the
subject property is higher than the surrounding areas or vice versa.
31. He noted the subject property varied from approximately RL 42.5 AHD at the
Titmarsh Circuit side of the property to slightly under RL 42 AHD at the rear of
the property. There is stormwater infrastructure along Titmarsh Cct which
drains run-off to the gully at the rear of the property which in turn drains to the
south into Ferny Gully.
32. Ferny Gully is 700 metres to the so uth east of the subject property. Ferny Gully
flows into the Brisbane River, approximately 2.5 kms to the north east. The
hydrologist reported the gully had a fairly substantial catchment area.
Case No: 239848 Determination Page 8 of 12
33. According to the FSP‟s hydrologist, the female Applicant adv ised the following:
On the morning of 11 January 2011 there was a line of storms.
At approximately 8.00am on 11 January 2011 the subject property lost
power.
On the morning of 11 January there was water in the rear gully at the rear
of the subject property.
This water reached the water tank at the rear of the subject property.
This water had receded by approximately 2.00pm
At about 4.30pm on 11 January 2011 the water had begun to appear in
the rear gully again at the rear of the subject property.
By 5.00pm on 11 January 2011 the water had risen half way up the fence
on the subject property and by 5.30pm the water was touching the water
tank.
This water came into the yard sideways.
The water (both in the morning and afternoon) travelled uphill.
In the afternoon the water was rushing onto the subject property.
The Applicants left the subject property at 5.45pm on 11 January 2011.
34. The hydrologist attributed the water that approached but did not enter the home
on the morning of 11 January 2011 to local run off caused by heavy rain.
35. However, the hydrologist attributed the inundation of the house which occurred
in the late afternoon of 11 January 2011 to be breakout flow from the Brisbane
River. This was attributed to the elevated flow in the Brisbane River caused by
the release of water from Wivenhoe Dam which in turn was attributable to the
rainfall in the Wivenhoe Dam catchment area that occurred more than 24 hours
earlier.
36. The Panel is aware of the Hydrological report obtained by the Insurance
Council of Australia (ICA). The report is very extensive as it relates to an
extreme weather event which caused flooding to the Brisbane regi on. In
Volume 3 of the report “Flooding in the Brisbane River Catchment” January
2011 the following information is available which needs to be considered:
Wivenhoe Dam release (9.3)
Large releases were made from Wivenhoe Dam over the period from
06:00 hours, possibly as early as 03:00 hours on 11 January 2011,
until around 03:00 hours on 12 January 2011.
Releases from Wivenhoe Dam caused a flood wave in the Brisbane
River. Water levels in the lower reaches of the Bremer River and its
tributaries draining Ipswich City LGA were affected by backwater
flooding and backwater effects from the Brisbane River.
Case No: 239848 Determination Page 9 of 12
It was concluded that the dam release flood from Wivenhoe Dam
was the immediate cause of flooding along the reach of the Brisbane
River downstream of the dam and along tributaries through the
Ipswich City LGA.
37. In developing their respective positions, the parties have provided a number of
additional submissions including letters and attachments from the
representatives of the Applicants dated 28 September 2011 and 17 November
2011 and letters and attachments from the FSP dated 28 October 2011 and 28
November 2011. The Panel has considered all of this material as part of this
Determination.
38. The material provided by the representatives of the Applicants includes a
Statutory Declaration from the female Applicant and a statement from a
neighbour (RD) who lives across the road from the Applicants‟ property.
39. The eye witness evidence presented by the Applicants confirms the details
provided by the FSP‟s hydrologist a s recited above at paragraph 33.
40. Whilst the Panel is satisfied that the evidence suggests that there was
stormwater inundation in the area at the time, on the basis of the evidence
presented, the Panel is satisfied that the Applicants‟ property was inunda ted in
the late afternoon of 11 January 2011 and that the water which inundated the
Applicants‟ property came from the Brisbane River to the north and east of the
Applicants‟ property.
41. On the basis of the evidence presented, the Panel is also satisfied that the
break- out flow from the Brisbane River which inundated the Applicants‟
property can be attributed to the elevated flow in the Brisbane River caused by
the release of water by the Wivenhoe Dam.
42. The submissions provided by the representatives on the part of the Applicants
include the witness statement of the Senior Flood Operations Engineer of the
Wivenhoe Dam (RA) who gave evidence at the Queensland Flood Commission
of Inquiry.
43. It is the contention of the Applicants that had there been no rain in the
Wivenhoe Dam area on the morning of 11 January 2011, the amount of water
that would have been released from the dam would have been far lower and
the Applicants‟ property would not have been affected.
44. It is the Applicants‟ contention that only the heavy ra in that fell during the
morning of 11 January 2011 resulted in an escalation to strategy W4 and that
the strategy of W4 in regard to Wivenhoe dam led to a significant change in the
dam gate settings with vastly elevated levels in the Brisbane River. The
Ap plicants refer to the evidence of RA that “the heavy rainf all between 4.00am
and 8.00am meant that releases had to be increased to protect the structural
safety of the dam....Strategy W4 was implemented at 8.00am, once significant
rainfall had fallen between 4.00am and 8.00am...Strategy W4 was not required
to be implemented prior to that point... Once that rainfall had started to
Case No: 239848 Determination Page 10 of 12
accumulate, strategy W4 was implemented, and the primary consideration
became protecting the structural safety of the dam”.
45. In response, the FSP argues that rainfall which occurred over the dam between
4.00am and 8.00am on 11 January 2011 cannot be looked at in isolation.
46. The FSP argues that there were in fact two distinct flood peaks entering the
Wivenhoe Dam, and without the substantial increase in the level of the dam
caused by rainfall from 9 January 2011 (and arguably earlier) there would have
been no need to increase the rate of release from the dam on the morning of 11
January 2011.
47. The FSP argues that the proximate cause of the loss is not the cause which
was the most recent in time but instead was the cause which a reasonable
person would conclude is the cause of the loss. The FSP argues it is absurd to
look at the rainfall on the 11 January 2011 in isolation from the days of heavy
rainfall which preceded it. The FSP says that such an approach is entirely
artificial and not in accordance with the reasonable person test.
48. The FSP‟s position is that the rain that commenced falling on 9 January 2011
(and indeed earlier) was the proximate cause of the inundation of the
Applicants‟ property and this is because the rain that fell greater than 24 hours
prior to the inundation of the Applicants ‟ property taken together was more
substantial than the rain that fell in the 24 hours immediately prior to the
inundation of the Applicants‟ property.
49. Further, the FSP says even if that were not the case and rain within the
immediate 24 hours was the proximate cause of Wivenhoe Dam releases, rain
that fell outside the 24 hours at the very least would also have contributed to
the releases and inundation would fall outside the scope of the policy because
of the operation and the principle of Wayne Tank & Pump Co LTD v Employers
liability Corporation ltd.
50. When considering all of the evidence, but having particular regard to the expert
opinion of the Wivenhoe Dam, Senior Flood Engineer RA, the Panel is satisfied
that it was the rainfall which fell over the Wivenhoe Dam between 4.00am and
8.00am on 11 January 2011 which caused a change in strategy from W3 to
W4.
51. Whilst not ignoring the FSP‟s argument that the rain that fell during the period
of 4.00am to 8.00am on the 11 January 2011 combined with the enormous
amount of earlier rain, the Panel notes that at 2.7.7 of the interim report of the
Queensland Flood Commission of Inquiry, the Commission found that the
inflows into the dam had continued to decrease until approximately 2.00am on
11 January 2011.
52. It is clear to the Panel from the evidence presented to the Queensland Flood
Commission of Inquiry that the W3 strategy adopted by relevant engineers was
thought to be sufficient to handle the water situation until such time as the
heavy rainfall which fell over the Wivenhoe Dam between 4.00am and 8.00am
on 11 January 2011.
Case No: 239848 Determination Page 11 of 12
53. It is clear to the Panel that it is the rain that fell during that period that forced the
engineers to change the strategy which resulted in the significant increase in
outflow of water from the Wivenhoe Dam.
54. The Interim Report confirms that the flood gates were open to 6 metres by
12.00pm then all five gates opened to 7 metres by 1.00pm, 7.5 metres by
2.00pm and 8.5 metres by 3.00pm. This increase continued with the gates
being opened by 12 metres from 7.00pm to 9.00pm.
55. In those circumstances, the Panel is satisfied the rain which fell between
4.00am and 8.00am on 11 January 2011 was the proximate cause of the loss
because the reasonable person would see that rainfall that fell between 4.00am
and 8.00am was the reason the relevant engineers were forced to alter the
strategy from one where consideration is given to a variety of factors to one
where the only consideration is the safety of the dam. That is from W3 strategy
to W4 strategy.
56. It follows therefore that the Panel is satisfied that the cause of the inundation to
the Applicants ‟ property in the late afternoon of 11 January 2011 was the
rainfall which fell over the Wivenhoe Dam during the period of 4.00am to
8.00am on 11 January 2011.
57. The relevant clause of the FSP‟s policy held by the Applicants provides
coverage for flash flood and storm water run- off which is defined as “a sudden
flood caused by heavy rain that fell no more than 24 hours prior to the flash
flood or storm water runoff”.
58. It is not disputed, and on the basis of the evidence presented, the Panel is
satisfied that the Applicants‟ property was inundated in the late afternoon of 11
January 2011.
59. As indicated, the Panel is satisfied that the cause of the inundation was the
rainfall which fell over the Wivenhoe Dam in the hours 4.00am and 8.00am on
the 11 January 2011.
60. It follows therefore that the flood at the Applicants ‟ property was caused by
heavy rain that fell no more than 24 hours prior to the flood as required by the
definition contained within the FSP‟s policy held by the Applicants.
61. The FSP is therefore required to indemnify the Applicants for their loss under
the heading flash flood.
62. The Panel notes that the policy contains a limitation in respect to the extent of
coverage for flash flood.
Case No: 239848 Determination Page 12 of 12
Determination
63. The Panel determines that the FSP is required to indemnify the Applicants for
their loss up to the limit of their policy under the heading of flash flood.
64. The Panel further determines that the FSP pay interest at the statutory rate
from the date of initial denial of the claim until settlement
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.