Text of the determination
Case No: 239653 Determination Page 1 of 19
Case number: 239653
General Insurance - Domestic Insurance - Home Building - Service - Delay in
claim handling
14 December 2011
Background
1. The Applicant holds a home building and contents policy with the Financial
Services Provider (FSP), including optional ‘accidental damage’ cover on t he
home building and contents.
2. The Applicant lodged a claim with the FSP for damage to her home and
contents following heavy rain on 11 January 2011.
3. The FSP partially accepted her claim, agreeing to cover contents items in the
open air damaged by heavy rain, but denied liability for the rest of the damage
claimed saying that there was no evidence of the damage being caused by an
insured event.
4. The Applicant requested a review of the partial decline of her claim, but after
reviewing the case the FSP maintained its decision.
Summary of Applicant’s Position
5. The Applicant says that her home was devastated by the floods in January
2011.
6. A flash flood arose from the rear of her property, entered the back of her house
and caused damage to her home and contents.
7. A range of health and safety issues have arisen since that time, including some
caused by contaminated water and the damaged septic system. The FSP has
failed to provide emergency accommodation or attend to the repairs, despite
the Department of Communities expressing concerns about her family’s living
conditions, and recommending that she and her family be provided with
alternative accommodation until the house is repaired.
8. The FSP’s appointed asses sor was intimidating towards her, and was
judgemental and dismissive of her account of the contents that were lost and
damaged.
Determination
Case No: 239653 Determination Page 2 of 19
9. The FSP’s builder did not properly assess the damage, and instead of taking
notes and photographs, he relied on memory and ‘line of sight’ measurements.
The resultant builders report was incomplete and inaccurate.
10. The FSP’s assessor initially accepted the flash flood claim, and even though
there is plenty of evidence of the damage to her property, the FSP is now
denying the major portion of the claim saying that flash flood did not cause the
damage.
Summary of FSP’ s Position
11. There is no evidence of water entering the Applicant’s home, either by a flash
flood or through a storm-created opening.
12. The home is 600 mm above ground level at the rear and sloping to 2m across
the front. The elevation of the home, combined with the steep slope of the land,
means that any water flowing from the rear of the property would follow a path
around and under the house, rather than through the house as the Applicant
has claimed.
13. The majority of the issues with the building are related to inherent defects,
inappropriate building materials and incorrect building techniques, and general
lack of maintenance.
14. The part of the Applicant’s claim for damage to contents items on the back deck
or under the house has been accepted. The remainder of the claim has been
denied, as no water damage has been identified in the house and the Applicant
has failed to prove that any damage was caused by an insured event.
15. The FSP relies on the following policy provisions:
“ Words with special meanings
Word/ term Meaning
Flash flood and stormwater run -
off
A sudden flood cause by heavy rain that fell no
more than 24 hours prior to the flash flood or
stormwater run - off
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightning,
heavy rain, hail or snow, but not continuous bad
weather by itself.
...
Case No: 239653 Determination Page 3 of 19
Insured events you are covered for
Damage caused by weather ...
What is covered What is not covered
Storm Loss or damage:
x caused by rain, hail or snow after it has reached
the ground;
x caused by rain or wind entering the home
unless it entered through an opening in the
windows, walls or roof made by a storm;
x to garden borders, paths, driveways, paving,
free standing or retaining walls (whether or no t
part of the home), tennis courts and other playing
surfaces;
x to paint and/or external coatings of buildings
when there is no structural storm damage to other
parts of the home;
...
x caused by storm surge;
x caused by power surge.
...
Insured even ts you are covered for
Damage caused by weather
...
What is covered What is not covered
Flash flood and stormwater
run - off
Loss or damage caused:
x by flood;
...
x by water being absorbed through floors, external
and internal walls of your home (including rising
damp) and any subsequent loss or damage to
contents including carpets;
...
x to garden borders, paths, driveways, paving, free
standing or retaining walls (whether or not part of
the home), tennis courts and other playing surfaces;
x to paint and/or external coatings of buildings when
there is no structural storm damage to other parts of
the home;
...
x by storm surge or any other action of the sea;
Case No: 239653 Determination Page 4 of 19
x by power surge;
...
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run - off
We will pay up to 50% of your sum
insured or $25,000, whichever is
higher
...”
Issues
16. Whether the damage claimed by the Applicant was caused as a result of the
insured event of flash flood and stormwater run-off, or was otherwise covered
under the Applicant’s optional ‘accidental damage’ cover.
Reasons for Decision
17. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service’s Terms of Reference.
18. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
19. There has been an exchange of information between the parties and the Panel
is satisfied that each party has had an opportunity to address the issues raised.
20. The Applicant has claimed that water entered her home during a flash flood on
11 January 2011, and caused damage to the home building and to her home
contents.
21. There is no dispute that severe weather, including heavy rain and storms, were
experienced over the period encompassing the date of loss.
22. The FSP has conceded that a flash flood (as defined under its policy) occurred,
however has said that the circumstances of this event were such that the
majority of the loss and damage claimed by the Applicant could not have been
caused by the flash flooding as rainwater run-off could not have entered her
home due to its elevation, and that rain water did not enter through a storm
created opening.
23. The Panel notes that the Applicant’s policy in cludes optional cover for
“Advanced cover”, viz:
Case No: 239653 Determination Page 5 of 19
What is covered
In addition to insured events cover, advanced cover also covers you for accidental
damage to:
your home when it is insured by this policy;
the contents described below when contents are insured by this policy
…
What is not covered
Accidental loss or damage caused:
…
By any insured event other than to the extent provided by this policy
…
24. Accidental damage cover for contents is limited to a range of contents items,
including indoor and outdoor furnishings, kitchen, dining room, lounge room,
bedroom and bathroom are and floor carpets, and household and domestic
electrical and household goods. With the exception of the outdoor furniture,
accidental damage for the contents is covered providing the items are located
inside the lockable and fully enclosed part of the home.
25. The policy booklet defines accidental damage as being damage which is
‘unexpected and unintentional from your point of view’.
26. The onus of proof for accidental damage cover requires the Applicant to
establish on the balance of probabilities that she has suffered a loss or damage
to the items or risk which is insured.
27. Once the Applicant has established that the loss was accidental, the onus shifts
to the FSP to prove that the claimed loss falls within a policy exclusion.
28. In this instance the circumstances of the loss appears to relate to the insured
event ‘Storm’ and/or ‘Flash flood and stormwater run - off’. It is unclear to the
Panel what aspects of the Applicant’s loss are claimed not to have resulted
from the storm/flash flood event, but rather have resulted from some other
cause which is encompassed by the “Advanced cover” option.
Damage to the Home Building
Extent of Damage Caused By Flash Flood Insured Event
29. The Panel has consider ed the Applicant’s account of the flash flood event. The
Applicant has said that the initial ingress of water was 300mm, but added that
this was increased by steady rain water flows, which arrived from multiple entry
points.
30. The Panel notes the opinion of the licensed building consultant from building
firm ‘SB’ who inspected the property on 9 March 2011. The SB First Report
Case No: 239653 Determination Page 6 of 19
provides a treatment of various elements of the Applicant’s claim, and relevant
aspects of this are outlined below:
Water entry through rear and front door
“ There was no evidence of rain water flowing through the house, and apparently
no resultant damage as claimed. ”
Would rainwater run-off from hillside have been able to enter the house?
“This house if 0.6m above ground at the rear, sloping to 2.0m across the front,
with a steep gradient fall of land, between 20 and 25 degrees. This would
suggest rain water is more likely to flow down hill than through the house. Storm
water would flow away from the building, pooling 80m away at the entrance of
the property. However, due to the amount of household items ... under the
house, there will be minor storm water accumulation.
...”
31. The FSP’s appointed loss adjustor ‘MF’, first inspected the property on 7
February 2011, and after the Applica nt disputed the FSP’s position regarding
the claim, reinspected the property on 23 May 2011. In the re-inspection report,
MF acknowledges that by 23 May, the Applicant had already removed and
disposed of all the internal floor coverings and most of the damaged contents,
and that this may have prejudiced the inspection. Regardless, the report notes
that:
“Based on our observation and video footage observed on the insured’s mobile
telephone we consider it highly unlikely for the loss to have occurred as claimed
by the insured. This is supported by lack of evidence of water damage observed
through the dwelling (including minimal to no water marking to flooring, or
smooth edging)...
...
We were unable to identify any water lines to skirting boards, although the
insured advised that she has attended to cleaning. No water damage to wall
linings or skirting boards has been identified.’
While it is possible that some water ingression will have occurred, we consider it
would be limited to water which penetrated the doorway from torrential rainfall
and localized pooling on the patio area. It would be very unlikely that the extent
of water entry would have entered the bedroom areas.
...
Whilst we cannot confirm/deny water ingression...we would suggest extending
the benefit of the doubt for floating timber flooring through the open plan kitchen,
dining room, lounge room and hallway (no doorway). We acknowledge that your
Insured has already attended to laying of tiles through theses (sic) areas ”
32. A different building con sultant from SB, accompanied by the FSP’s loss
adjustor, inspected the property on 19 July 2011. The findings of the reports
from this inspection corroborate the findings of the initial SB report in terms of
the damage to the Applicant’s home and contents from flash flood.
33. The Panel notes that the Applicant, in her response to the FSP’s submission
regarding the dispute, said (SB) is correct in saying that the water “ did not rise
above this level upwards ”, but she also added that it certainly inundated
everything on the veranda where it came off the hill.
Case No: 239653 Determination Page 7 of 19
34. The Panel has also reviewed a number of photos of the insured home and
notes that the property appears to be raised by some 600mm above the ground
at the rear and some 2m above the ground at the front.
35. After reviewing all the evidence regarding the damage to the property, the
Panel is satisfied that although flash flooding occurred on the Applicant’s
property, on the balance of probabilities, the flash flood (rainwater run-off) was
unlikely to have entered the home.
36. There is sufficient evidence, however, to indicate that water from torrential
rainfall and localised pooling on the patio/veranda entered the home, and
caused damage to the floating timber floor in the kitchen, dining room, lounge
room and hallwa y. This is conceded by the FSP’s loss adjuster. The Panel finds
that the FSP is liable for the cost of replacement of this timber floor.
Other Sources of Water Entry
37. The Applicant has said that water entered her home through multiple entry
points, and has indicated that some roof sheeting was detached during the
storm, causing water to run down through the walls and to wet the battens.
38. The Applicant has provided photographs depicting various aspects of her home
that appear water damaged. This includes photographs of removed flooring
and carpets, discoloured light fittings, ceiling insulation, and gaps formed
between fixtures and adjacent walls.
39. The Applicant has also provided a ‘Structural Assistance Assessment Report’,
prepared by Q-Build, after an inspection of the property on 29 January 2011.
40. The FSP has presented several reports that address the possible entry points
for water into the home, including the chimney flue, the air-conditioning ducting,
and an open window to the bedroom.
41. The Panel notes the concerns expressed by the Applicant about possible flaws
in the report from the SB building consultant, who according to the Applicant
took no notes during the 9 March 2011 inspection of the property and instead
committed everything to memory.
42. All of the reports from the FSP appeared to be focussed on establishing
whether the claimed damage was consistent with that caused by the insured
event of flash flood and stormwater run-off, and several references were made
in the reports to the absence of a ‘s torm- created opening’.
43. Again it is not clear whether any of the internal damage claimed has been
caused by means other than Flash flood or Storm, such as may be covered by
the Advanced cover option.
Water Entry Through Open Window
Case No: 239653 Determination Page 8 of 19
44. After reviewing the evidence presented, the Panel accepts that water entered
the Applicant’s home through an open window in a bedroom during the storm
event and caused damage.
45. However, storm damage not caused as a result of a storm created opening is
specifically excluded under the policy and therefore the FSP is not liable for
damage to the queen sized bed, blankets, doona and carpet in the bedroom
where the water entered through the open window.
Water Entry Through Roof
46. The Applicant submits that she suffered damage to her home during the
weather event in January 2011 as a result of water which entered through the
roof, including but not limited to the area around the chimney flue.
47. Throughout the claim process, the FSP’s representatives and agents have
indicated that no storm created opening could be seen and that no water
damage through the roof around the chimney flue was evident.
48. The Panel has considered the thoroughness of the inspection of the property in
March 2011 by the SB building consultant, who did not at that stage inspect the
roof around the chimney flue, and did not remove the air-conditioning unit
diffuser and, according to the Applicant, did not take notes of his findings.
49. On balance, the Panel is not convinced that the FSP has discharged the onus
that rests with it to show that the storm did not create an opening through which
water entered and caused damage to the home.
50. The Panel determines that the FSP is required to engage a qualified building
consultant (other than those used by the FSP for this claim) to examine the roof
and to report on any damage to roof and the home building that has occurred
from identified water ingress. Further, the Panel finds that the FSP is liable for
any damage identified in the report.
Water Entry through Air Conditioning Unit
51. The reports provided by the FSP state that water entry through the air-
conditioning unit was caused by a removed diverter pipe. One suggestion in
the reports is that the FSP ‘may wish to engage a specialist to ascertain the
cause’, but it appears that the FSP has chosen not to do so.
52. The Panel is not persuaded that the FSP’s investigations into the possible
water entry via the air conditioning unit were sufficiently thorough to either
eliminate the possibility of water ingress, identify its proximate cause, or
establish the extent of any resulting damage.
53. The Panel therefore determines that the FSP is required to engage an air
conditioning specialist to examine the air-conditioning unit, to report on any
damage to the unit caused by the storm, and on the likelihood of water ingress
to the interior of the home through the air-conditioning unit.
Case No: 239653 Determination Page 9 of 19
54. The Panel also finds that the FSP is liable for any damage identified as having
been caused by storm to the air-conditioning unit itself, and for any damage
reported by the building consultant to which the previous paragraph refers.
Patio Deck
55. The Applicant has claimed that the storm and rain event has damaged the rear
patio deck.
56. The reports from the FSP remark that the deck is constructed of particle board,
and that this material is unsuitable for exterior use. The reports also show that
the decking material was left un-sealed and exposed to the weather since
installation.
57. The loss adjustor noted that while it cannot be denied that some damage was
caused to the patio decking from the storm event, had the deck been
constructed of a building product approved for external use, it is unlikely that
the loss/damage would have occurred.
58. The Panel notes that the Applicant’s policy excludes cover for inherent defects
or defective or faulty workmanship, design or manufacture.
59. The Panel therefore determines that the FSP is not required to indemnify the
Applicant for the damage to the patio deck.
Patio Roofing, Flashing between Patio & Gutters
60. The Applicant has claimed that the roofing on the patio lifted during the storm.
61. The report from SB indicates that the roof on the patio, and the flashings
between the patio roof and the gutters have been incorrectly installed with
faulty workmanship, incorrect lap joins, incorrect screws, and wind rating screw
patterns showing an ‘ad - hoc’ insecure installation.
62. In addition, SB advises that the battens to the patio area do not comply with
Building Code of Australia (BCA) requirements.
63. The Panel accepts that any damage to the patio roof, and to the flashing
between the patio and the guttering, resulted from issues with its construction
and materials, and not from the storm event and did not experience any other
form of accidental damage.
64. The Panel notes that the Applicant’s policy exclude s cover for inherent defects
or defective or faulty workmanship, design or manufacture.
65. Accordingly, the Panel finds that the FSP is not liable for the damage to the
patio roof and its flashing to the guttering, claimed by the Applicant.
Front Stair Treads and Rails
Case No: 239653 Determination Page 10 of 19
66. After reviewing the photographic and other evidence presented, the Panel is
not persuaded that the condition of the front steps balustrades and railing is the
result the result of flash flood, stormwater run-off, or storm, or any other
accidental means.
67. Rather, the condition is considered to have arisen as a result of wear and tear
over an extended period of time, evidenced by cracking, splitting and rot.
68. The Applicant has also conceded that the hole in one of the treads was caused
over a period of several weeks, as a result of the traffic over it, and the Panel
considers this damage to be wear and tear.
69. As wear and tear is excluded from cover, the Panel finds that the FSP is not
liable for the cost of repairing or replacing the front stairs, rails or balustrades.
Front Door
70. While the door may need some minor maintenance adjustment, the FSP’s
reports suggest that the door is in reasonable working order.
71. The Panel does not believe that the evidence indicates that any damage was
caused to the front door as a result of the storm or any other insured event, and
was not accidental as defined under the policy.
72. Accordingly, the Panel finds that the FSP is not liable for the claimed damage
to the Applicant’s front door.
Laundry Door
73. The evidence available indicates that the laundry door is made from a hollow
veneer product which is not suitable for external locations, and is situated such
that it is exposed to all year round weather conditions.
74. As a result of this the paint on the door is peeling and the surface has become
detached.
75. The FSP’s evidence also indicated that the laundry door displayed no sign of
storm damage when it was inspected.
76. Further, the Applicant has conceded that this door was already worn; at the
same time as noting that prior to the patio roof being blown away the door had
been under cover.
77. On balance, the Panel finds that the FSP is not liable for the claimed damage to
the Applicant’s laundry door.
Lock of Rear Sliding Door
Case No: 239653 Determination Page 11 of 19
78. The Panel accepts the evidence of the FSP’s reports, which indicat e that the
damage to the rear sliding door lock mechanism was not caused by the
pressure of the water and mud against it, as is claimed.
79. Rather, it would appear that the fault in the lock is the result of a broken (or
missing) screw.
80. Consequently, the Panel finds that the FSP is not liable for the damage to the
rear sliding door lock mechanism.
Hot Water System
81. The reports provided by the FSP indicate that the hot water system is in
satisfactory working order.
82. However the first report by SB, after their inspection on 9 March 2011,
suggested the possible appointment of a plumbing specialist or electrician, and
it appears that the FSP has not arranged for this to occur.
83. The Applicant has indicated that the hot water system has intermittently
stopped working. She has also been advised by an electrician that water
inundation of the unit is the source of electric shocks to her and her family, and
has provided a quote for the replacement of (among other things) the entire hot
water system.
84. The Panel therefore finds that the FSP is liable for the cost of repairing or
replacing the hot water system.
Safety Switch in Power Box
85. The Applicant has claimed that as a result of water inundation, the safety switch
in the home’s power box no longer operates.
86. The FSP has not addressed this matter through its reports, its correspondence
with the Applicant, or anywhere in its submission.
87. Accordingly, the Panel finds that the FSP is liable for the cost of repairing the
safety switch in the power box.
Septic System
88. The septic syst em at the Applicant’s property is reported to be malfunctioning,
and the Applicant has repeatedly expressed concerns regarding the health
risks that this is presenting.
89. Concerns about the health risks have also been voiced by the representative
from the De partment of Communities, who has attended the Applicant’s
property.
Case No: 239653 Determination Page 12 of 19
90. The Panel notes that the FSP has obtained a ‘make safe’ report for the septic
system. This report notes that the trench was full of water and therefore not
working or coping.
91. The report also comments that the failure of the septic trench could have
occurred due to a range of factors, one of which being the grey water hose
draining into the trench. In addition, the trees around the trench may have
prevented the area from properly drying out.
92. The Panel notes that the Applicant has advised that the grey water hose has
been removed, and has also advised that the trees have since died and no
longer provide shade over the area.
93. According to the report, another factor that could contribute to the failure of the
septic trench is the filling of the trench with water during the rain event.
94. That report also advised that trench replacement (involving removal of the old
trench, drying out the area, and installing a new trench to current specifications)
is necessary to rectify the issue.
95. The Panel considers that water from the flash flood and storm may have
contributed to the failure of the septic system.
96. Consequently, the Panel determines that the FSP is liable to contribute 50%
towards a cost of replacement of the trench, in line with the make- safe report’s
description.
Water Tank
97. The Applicant has advised that the water tank has become contaminated by
water from the council and the council advised residents to have tanks cleaned
and refilled. The Applicant also noted that the tank has sunk into the left hand
side, and has a photograph showing this movement.
98. The reports from the FSP advise that the inlet to the tank is too high for any
contamination from the septic system to enter. One of the reports also advised
that there is no sign of movement of the ground surrounding the tank.
99. However, there is no evidence in the photographs provided by the Applicant
conclusively showing that the tank has sunk or that the ground around the tank
has obviously moved, and no liability arises as a result.
100. In the absence of any other likely cause, the Panel considers that
contamination of the water in the tank was caused by water from the town
water supply which is an accidental loss in line with the cover provided by the
policy.
101. Therefore, the Panel finds that the FSP is liable for the cost of cleaning and
refilling the Applicant’s water tank.
Case No: 239653 Determination Page 13 of 19
Pressure Pump
102. The Applicant has claimed that the pressure pump is not working, and was not
working in May 2011 (presumably in reference to the time of an inspection by
the FSP’s appointed loss adjustor).
103. The Applicant has also provided a photograph of the pump which shows that it
is leaking, and the Applicant has attributed this leak to inundation by water
during the storm and flash flood event.
104. The ‘Structural Assistance Assessment Report’ prepared by Q -Build and
provided by the Applicant, also notes that the tank water pump is not working
properly.
105. Conversely, both FSP’s appointed loss adjustor and SB (who inspected the
property in May and July 2011 respectively) advised that the pressure pump
was working satisfactorily at the time of inspection.
106. In the absence of any conclusive evidence the Panel accepts that the pump
may have suffered some damage as a result of the storm and determines that
the FSP is to contribute 50% towards the cost of repairing or replacing the
pump.
Gate Posts / Lock
107. The Applicant has claimed that the gate to her property no longer operates
properly, and that this is because the fence post to which the gate is attached
has moved as a result of the flash flood and stormwater run-off event.
108. The report from SB indicates that issue with the gate is that a nut has simply
detached or unscrewed from the top bolt supporting the gate, and that post has
graduall y deteriorated. The report states that the post’s foundation soil has
become loose and unstable due to wear and tear from the opening and closing
of the gate.
109. Noting that wear and tear is excluded under the Applicant’s policy, the Panel
finds that the FSP is not liable for the cost of repairing the damage to the post
and its locking mechanism.
Retaining Wall
110. The Applicant has claimed for damage to the retaining wall at the rear of the
house as a result of flash flood and stormwater run-off.
111. The Panel no tes that the definition of ‘home’ under the policy excludes retaining
walls.
112. As a result, the Panel finds that the FSP is not liable for any damage to the
retaining wall.
Case No: 239653 Determination Page 14 of 19
Footings
113. The Applicant has claimed that the flash flood and stormwater run-off has
caused erosion to the footings of her house, and that the water has washed
away anything that was left to make it stable.
114. The Panel notes that erosion, no matter how caused, is a general exclusion.
115. As a result, the Panel finds that regardless of how any erosion was caused to
the house’s footings, the FSP is not liable for this damage.
Driveway
116. The Applicant has claimed for damage caused to the driveway. In support of
this claim, a photograph has been provided depicting water clearly flowing
down the driveway, and the description on the reverse of the photograph
indicates that was taken as the water flow was starting to slow down
117. The Panel accepts that flash flood and stormwater run-off, on the balance of
probability, damaged the driveway.
118. However, the insured event of flash flood and stormwater run-off under the
policy excludes loss or damage to driveways, and to free standing or retaining
walls (whether or not they are part of the home).
119. The Panel notes that the accidental damage optional cover excludes loss or
damage cause ‘by any insured event other than to the extent provided for under
this policy’.
120. The Panel interprets this to mean that accidental damage, that would otherwise
be covered under as an insured event under the policy, is limited by any
exclusions, caps, or conditions applicable to the insured event cover.
121. As a result, the Panel finds that the FSP is not liable for any damage caused to
the Applicant’s driveway.
Internal Walls
122. The Applicant has provided photographs of damage to the internal walls to the
house, including a shot of an area in the kitchen where tiles have been
removed due the walls being wet.
123. The Applicant also obtained and provided to the Financial Ombudsman Service
a quote prepared by Master Builder ‘BW’ for work to various pa rts of the home.
124. This report makes mention of the possible need to remove ‘affected wall
sheeting (possibly swollen and mouldy)’.
125. The Panel is aware that this report by BW was not prepared for the purpose of
identifying the cause of the damage to the App licant’s home.
Case No: 239653 Determination Page 15 of 19
126. By contrast, the FSP’s reports did not note any damage to the internal walls.
127. In addition, the ‘Structural Assistant Assessment Report’ prepared by from Q -
Build after an inspection of the home on 29 January 2011, also noted that the
internal walls to the home were ‘operational’ (ie: not in need of repair or
replacement).
128. Should the inspection reports relating to the roof and air-conditioning unit noted
earlier in this determination identify storm related damage and resultant internal
damage, the FSP will be liable for such damage to the extent attributed to the
ingress via the roof and/or air-conditioner.
Contents Under House and on Patio
129. The Panel acknowledges that the FSP has accepted liability for damage to the
Applicant’s contents items under house, which it deemed were exposed to the
flash flood and stormwater run-off. The FSP has also accepted liability for
damage to other contents items in the open air on the back patio deck, which
were exposed to rain and possible pooling of water, as they are covered under
the insured event of ‘Flash flood and stormwater run - off’.
130. However, the Applicant has disputed the settlement amounts provided by the
FSP with respect to the lost and damaged contents items that were under the
house, and on the patio, saying the value of the contents in each location was
far greater than the settlement offered.
131. There is no evidence presented by the FSP regarding the breakdown of the
settlement amount of the under house and patio contents items. At the same
time, the Applicant has not substantiated why she believes the items subject to
this settlement were worth more that the amount offered.
132. The Panel notes that the FSP arrived at the settlement amount after receiving
quotes from the Applicant for the said items.
133. After reviewing the photographic evidence relating to the contents on the patio
and under the house, and noting that the items were not kept in ideal conditions
(ie: sheltered, away from moisture and the weather), the Panel considers that
the settlement amount of $16,340 offered by the FSP is fair and reasonable
under the circumstances.
Garden Shed and Contents
134. The Applicant has claimed for the loss of her 3m x 3m garden shed, which she
says was washed away by the flash flood and stormwater run-off. The
Applicant has also claimed for damage to contents stored inside the shed.
Garden Shed
135. According to the report from MF, the Applicant advised that the garden shed
was placed on a levelled earth pad. The damaged shed had been removed
Case No: 239653 Determination Page 16 of 19
and disposed of prior to the inspection by MF, and no photographs of the shed
were available, although one photograph is presented of the shed’s location on
the property.
136. The report from MF provided the opinion that because the shed was placed on
an earthen pad, it was not adequately secured and that this was the cause of
the loss. The Panel however notes that neither MF nor the FSP have provided
any information as to why the shed was considered inadequately secured, or to
what standard the shed should have been secured.
137. The Panel has reviewed the correspondence from the FSP to the Applicant,
and finds that the FSP has not provided any information to the Applicant with
regard to its liability for the damage to the shed. In addition, the submission
from the FSP does not address the issue of its liability for the damage to the
garden shed. The FSP has not sought to challenge that the Applicant has
suffered a loss in this regard.
138. Consequently, the Panel finds that the FSP is liable for the replacement of the
Applicant’s 3m x 3m garden shed, subject to the Applicant providing suitable
evidence as to the design and quality of the lost shed
Shed Contents
139. The report from MF indicates that because the garden shed was not adequately
secured, the contents of the shed would have been subject to exposure to rain
events that occurred over late 2010 and early 2011, and thus would have
suffered gradual deterioration.
140. In addition, the Applicant has stated that the contents of the shed were not
affected by earlier weather events.
141. The Panel believes that the MF report is overly speculative in its conclusions
regarding the possible gradual deterioration of the sheds contents as a result of
earlier rain events. Further, as with the evidence provided in relation to the loss
of the shed itself, the FSP has not established the standard to which the shed
should have been secured.
142. Consequently, the Panel finds that the FSP is liable for the damage to the
contents items that were stored in the Applicant’s shed, subject to the Applicant
providing appropriate evidence as to the list of contents and values.
Advise by FSP to Cease Repairs
143. The Applicant has claimed that she had commenced repairs to various parts of
her home in order to reduce further loss, but ceased work because of advice
from the FSP that if this work continued, it would jeopardise her claim.
144. The FSP has stated that a review of its correspondence shows no evidence
that such advice was provided to the Applicant. The FSP concedes that its
normal practice is to advise its customers that if they conduct repairs prior to
Case No: 239653 Determination Page 17 of 19
the claim being accepted, coverage of repair costs are not guaranteed but
would be considered as part of the claim process.
145. The Applicant also stated that when she lodged the claim, the FSP’s
representative advised her that it was better to remove and destroy all flood
affected items as they would have been contaminated, and could cause illness.
146. The Panel is satisfied that the FSP acted appropriately in advising the Applicant
to dispose of items that were possibly contaminated.
147. The Panel is not persuaded that the FSP provided any advice or guidance
regarding repairs underway that were not appropriate under the circumstances,
and does not believe that the Applicant suffered any detriment as a result of
following this advice.
Emergency Rental Accommodation
148. The Applicant has expressed concern that the FSP failed to assist with
arrangement or provision of emergency accommodation for her and her family,
even though she had repeatedly advised that there were health risks
associated with the occurrence of the storm event.
149. The Panel has reviewed the policy provision for the additional benefit of
‘Emergency and alternative accommodation’, and notes that is only applies if
an insured event renders the home unfit to live in.
150. The Panel acknowledges that storm event significantly contributed to the
damage to the septic trench. Further the Panel acknowledges that the FSP
bears liability for repairing and replacing numerous items including safety
switch to the power box.
151. The Panel is most concerned at the manner in which the FSP dismissed the
Applicant’s claim that there were health risks and that consideration be given to
providing alternative accommodation. In the Notice of Response, the FSP has
observed that it takes a medical certificate provided by the Applicant with great
reservation. The FSP has not obtained alternative medical material. The
information exchanged supports a view that there was damage to the septic
tank, contamination to the water supplies and issues with the electrical items.
The medical certificate is quite clear that the Applicant and children suffered
from respiratory conditions and bowel disorders caused by the contamination of
the house having left serious bacterium fungi.
152. The Panel finds there is no basis for the FSP to simply dismiss this certificate in
the manner it has. The Panel also notes the FSP has questioned the comments
made by the Community Recovery Worker. The evidence confirms that a
Community Recovery Worker attended the Applicant’s property on 7 July. T he
report identifies concerns regarding the family’s living conditions, concerns that
the septic tank had been damaged posing a health risk and makes
recommendation that the family be re-housed until the current home is repaired
to a safe and habitable standard.
Case No: 239653 Determination Page 18 of 19
153. In the Notice of Response, the FSP has stated the report does not disclose any
qualifications of the attending persons. There is no evidence that the FSP
sought to contact the Community Recovery Worker or follow up the
recommendations of the Community Recovery Worker. The response by the
FSP is in the Panel’s opinion inadequate and indicates a lack of understanding
of the issue in dispute. The FSP in support of its position, has made the
following comment with respect to the Community Recovery Worke r’s report:
“This is further reinforced by the only doctor’s report o n file being dated 14 July
2011” .
154. Other than having an urgent make safe requested for the septic system, the
FSP has taken no action with respect to the medical report or the Community
Re covery Worker’s Report.
155. In the Panel’s view insofar as the need for emergency accommodation is
related to the events in particular the events for which the Panel finds the FSP
is at least partially liable, the FSP should have met the cost of emergency
accommodation.
156. It is unclear from the information exchanged whether or not the Applicant was
able to obtain emergency accommodation and if so, what costs were involved.
157. Insofar as emergency accommodation, rental accommodation was utilised and
expenses were incurred by the Applicant with respect to this, then the Panel
finds the FSP is liable with regard to the costs incurred.
Determination
158. On the basis of the available information the Panel determines that the FSP is
to indemnify the Applicant for:
The cost of the replacement of the timber floating floor to the open
kitchen, dining room, lounge room and hallway.
50% of the cost of replacing the septic trench, in line with the make-
safe report.
The cost of cleaning and re-filling the water tank.
The cost of replacing the 3m x 3m garden shed (subject to appropriate
evidence)
The cost of the replacement of the damaged contents of the garden
shed (subject to appropriate evidence).
The cost of repairing or replacing the hot water system.
The cost of repairing or replacing the safety switch in the power box.
50% of the cost of repairing or replacing the water tank pressure pump.
The cost of engaging a building consultant (other than those used
previously for this claim) to examine and report on the extent of storm
to the roof and damage to the home building from water ingress
Case No: 239653 Determination Page 19 of 19
through the roof, and the cost of repair of any damage so indentified
(including to damage to internal walls).
The cost of engaging an air-conditioning specialist to examine the
home’s air -conditioning unit, to report on any storm damage to the unit
The cost of engaging a building consultant (other than those already
used for this claim) to identify any damage caused to the interior of the
home through any water ingress resulting from storm damage to the air
conditioning unit (if identified by the air-conditioning specialist) and the
cost of repair of any internal damage so identified.
The Panel determines that the settlement amount of $16,340 offered by
the FSP for the Applicant’s claim for con tents under the house and on
the patio is fair and reasonable in the circumstances.
The Panel determines the FSP is liable to meet the costs if any
incurred by the Applicant with respect to emergency or alternative
accommodation in accordance with the terms of the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.