Home / Financial Firm (Unknown - Insurer) / Determination 239628

Determination 239628

Flood exclusion applied to storm-damaged home claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-07-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$50,000
SourceAFCA PDF

Summary

The applicants' home was inundated in January 2011 and the FSP declined the claim as flood. AFCA found the initial inundation to 100mm came from drains and surface water covered by the policy, ordered the FSP to pay that loss with interest if cash settled, and held the rest excluded as flood.

Water escaping from drains, pipes or surface is covered under the storm and rainwater insured event, while flood above the initial 100mm level is excluded under the policy definition.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 239628 Determination Page 1 of 14 Case number: 239628 General Insurance - Domestic Insurance - Home Building - FSP Decision – Flood - Denial of claim – Ss 35 and 69 Insurance Contracts Act 1984 18 July 2012 Background 1. The Applicants held a Home Building and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP). 2. The insured property (building and contents) suffered extensive damage due to the significant weather events experienced in Queensland (Qld) in January 2011. 3. A claim was lodged under the policy seeking indemnity for the loss, however the FSP declined indemnity on the basis the loss was due to the excluded event “Flood”. 4. The Applicants remain dissatisfied with the FSP‟s decision and are seeking complete indemnity for their loss under the policy. Summary of Applicants’ position 5. The Applicants in disputing the FSP‟s decision to decline the claim have sought the assistance of legal representatives “L”. For the sake of brevity both L and the Applicants will be referred to as “the Applicants” for the purpose of this determination. 6. The Applicants maintain:  The FSP failed to discharge its obligations under Section 35 of the Insurance Contracts Act 1984 (the Act).  In respect to the definitions of flood, stormwater and stormwater run-off within the Product Disclosure Statement (PDS), the definitions are likely to cause confusion for a reasonable consumer.  The Corporation Act 2001 also requires “clear, concise and effective” disclosure. In certain circumstances merely providing the policy documents may not be enough to clearly inform a consumer of the relevant policy provision. Determination Case No: 239628 Determination Page 2 of 14  The Applicants were given misleading information by a representative “A” of the FSP when contact was made with the FSP on 11 January 2011 prior to evacuating the insured property. Further, the FSP has failed to adequately investigate their claim in respect to the misleading information provided to them.  The Applicants acted to their detriment having relied on the inaccurate information provided to them as they could have arranged appropriate cover on the day and also removed a number of items from the property.  Prior to evacuating the property at around lunchtime on 11 January 2011, the Applicants noted that water had inundated the back yard at around 9.30am-10.00am.  The FSP has failed to adequately discharge its obligation to show that the initial inundation of the property was caused by the excluded event of “Flood”.  The damage to their property was caused by “Storm and/or Stormwater run- off”, an event covered under the policy.  The Applicants are seeking compensation in the amount of $3,000 in line with Service‟s Terms of Reference (TOR) due to the unusual time it took the FSP to resolve the claim, physical inconvenience and/or interference with their expectation of enjoyment or peace of mind. Summary of FSP’s position 7. The FSP maintains that the policy provides indemnity for loss or damage arising from the specified events listed in the policy and does not provide cover for all types of risks. 8. The FSP maintains that the information it provides its policyholders comprises product specific policy wording in the PDS and client specific information in the notices i.e. Certificate of Insurance (COI) renewal notices etc. The information describes the events that will or will not be covered under a particular product. 9. The onus is on the Applicants to read the policy terms to ensure it met their needs and that the relevant policy documents adequately draw the Applicants‟ attention to the need to review and consider the pol icy terms and inform themselves of its extent, limitations and exclusions. 10. The FSP rejects the Applicants‟ allegation that it had failed to fulfil its obligations as set out by Section 35 of the Act. 11. The policy wording is presented in an uncluttered format, written in plain English and clearly laid out. The information is present in large font with clear and bold headings and sub-headings. 12. The PDS immediately draws attention to the fact that cover is subject to “General Exclusions” and the fact that cover for damage due to flood is Case No: 239628 Determination Page 3 of 14 excluded. Further, the terms clearly advise that flood is not included within cover under the insured event “Storm and Rainwater”. 13. The FSP rejects the Applicants‟ contention that they were given the incorrect information by A on 11 January 2011. The FSP maintains:  The FSP requires all representatives to enter into its Claim and Policy Management Systems contemporaneous notes of their conversations with policyholders, including details of any enquiries made.  The Applicants have been unable to provide sufficient details of the representative they allegedly spoke to and therefore the FSP is unable to identify the representative and/or undertake further inquiries in this respect.  Its representatives were provided with an “Event Respon se Information” memorandum, which provided clear directions on what information to provide customers in relation to enquiries arising from flood events. There is no evidence that A would have deviated from this directive. The directive clearly and unambiguously provides that: “ 4. Flood Coverage: Advice to Customers Please ensure that you advise customers that flood damage is not covered under the [FSP’s name] policy. However, still lodge a claim, and advise IO, that an assessor would be in contact to discuss the claim. ” 14. The Applicants‟ contention that they would have been able to arrange appropriate insurance cover on the morning of 11 January 2011 is speculative. No evidence has been made available to support this position and although the FSP unaware of other insurers‟ underwriting guidelines, it maintains it is unlikely the Applicants would have been able to arrange flood cover in the wake of the imminent flood event. 15. The FSP contends that the policy wording defines what flood means and conversely what flood does not mean. The definition of flood is necessarily broad to ensure it covers phenomena consistent with overland floodwater flow. 16. The FSP does not accept the proposition that the policy wording in relation to flood, and the separate type of inundation known as storm and rainwater, is unclear, nor that the reader of its policy wording would be confused by the cover available under the policy. 17. The FSP only determines its liability for a water damage claim once it has adequately assessed the full circumstances of the claim, such that it understands the nature of the water inundation which took place. 18. The FSP disputes the Applicants‟ contention that the damage arose from stormwater run-off. The FSP submits that high rainfall in the area on 11 January 2011 is not relevant to the inundation of the property which occurred on 12 January 2011. There is no suggestion that water entered the home on 11 January 2011 during the heavy rainfall period. Case No: 239628 Determination Page 4 of 14 19. The FSP submits that the available evidence indicates that the insured property was inundated by floodwaters from Oxley Creek which overflowed its banks due to the backwater flooding from Brisbane River. Accordingly, its decision to decline the claim is accurate. 20. The FSP maintains it position to decline the claim is in line with the available hydrology evidence made available by the hydrologists it appointed to the claim, namely “W” and the relevant ICA Hydrology Report. 21. The FSP further contends the Applicants have not produced evidence which would support their position that storm or rainwater run-off caused the inundation damage. The FSP notes the Applicants were not present at the property as they had evacuated at around lunch time on 11 January 2011. 22. The FSP relies on the following [policy/contract provisions etc]: “ Home Building Insurance Policy Page 8-13 What we cover – insured events You are covered for damage or loss to your home building occurring during the period of cover and caused by the following events: Yes Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. No Damage or loss caused by flood. Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. … Page 14 What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: flood, … Home Contents Insurance Policy Page 16-21 What we cover – insured events You are covered for damage or loss to your contents while they are in your home or at the site, occurring during the period of cover, caused by the following events: Case No: 239628 Determination Page 5 of 14 Yes Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. No Damage or loss caused by flood. Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. … Page 22 What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: flood” Relevant Law Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. Section 69 provides that section 35 will be deemed to have been complied with if it is not reasonably practicable to give the information in writing before the contract is entered into but it is reasonably practical to give the information orally. If the insurer gives the information orally, the insurer is deemed to have complied with section 35 if the information is given in writing within 14 days after the contract of insurance (including an interim contract) has been entered into. Provided the oral information is confirmed in writing within 14 days, compliance with section 35 will be established. Issues 23. Whether the cause of damage to the Applican ts‟ home can be attributed to an insured event. Case No: 239628 Determination Page 6 of 14 24. Whether the FSP clearly informed the Applicants of its flood exclusion by provision of a current PDS. 25. Whether the FSP‟s policy wording is adequate to define flood and how it is excluded from cover. 26. Whether the FSP misrepresented to the Applicants that their loss would be covered, such that they relied on that misrepresentation to their detriment. Reasons for decision 27. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 28. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 29. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. In these circumstances the details contained in the relevant hydrological reports will not be recited in this determination except where considered relevant. 30. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 31. Having considered the available evidence the Panel is satisfied the parties do not dispute the following:  The insured property suffered extensive damage arising from the significant weather events experienced in Qld.  The property is located in close proximity to the Oxley Creek and in reasonably close proximity to the Brisbane River.  There was no damage to the property arising from rainwater getting through the roof or the overflowing of internal gutters.  It appears that the water responsible for the inundation of the home came from both the rear and front of the property.  The policy excludes indemnity for loss or damage arising from the event flood, however, provides cover for loss or damage arising from the insured event storm, rainwater and stormwater run-off. Section 35 of the Act and Clearly Inform 32. The Applicants hold the opinion that the FSP has failed to satisfy its onus to clearly inform them of the relevant provisions of the policy as: Case No: 239628 Determination Page 7 of 14  The Applicants cannot recall being provided with the PDS by the FSP in line with its obligations under Section 35 of the Act.  In the alternative, the FSP‟s policy wording is confusing and beyond the understanding of a person of reasonable intelligence and education.  The Applicants were provided with misleading information by a representative of a FSP, which prejudiced them as they could have arranged alternative insurance cover and/or removed certain items from the home prior to the loss. Provision of PDS 33. Section 35 of the Act imposes the obligation on the insurer to clearly inform the insured in writing before the contract is entered into. However, section 69(2) of the Act provides that if it was not reasonably practicable for the information to be so given orally or in writing at policy inception, the information shall be deemed to have been given if it is given in writing 14 days after the day on which the contract was entered into. 34. The Panel has also reviewed the FSP‟s c omprehensive documentary evidence in respect to providing the Applicants with the PDS and is satisfied the FSP has reasonably established that the relevant policy documentation was provided to the Applicants in line with its obligations under the Act. Clear and unambiguous provisions 35. Having reviewed the form and content of the FSP‟s „policy documents‟, the Panel is of the view that by reference to the index of the policy, and the reading of policy sections „What do we mean by that?‟, „What we cover - Insu red events‟, and „What we do not cover – general exclusions‟ is sufficient to meet the FSP‟s obligations to clearly inform. 36. The Panel is satisfied that the wording of the definitions is not only clear in its intention but also clearly informs the consumer that water escaping or overflowing from the normal confines of any watercourse including those that have been modified by human intervention is excluded from cover. 37. The Panel is satisfied the FSP‟s policy does not provide flood cover, as distinct from stormwater run-off and/or the inundation of the property by water escaping from any water main, drain, pipe, street gutter, guttering or surface. 38. Accordingly, the Panel is satisfied that the FSP, in providing the Applicants with the relevant policy terms and conditions, has fulfilled its obligations under Section 35 of the Act. Verbal Misrepresentation 39. The Applicants maintain that on 11 January 2011 having been advised that their area was to be inundated by the floods, they contacted the FSP to make inquiries whether their policy covered loss arising from flood. The Case No: 239628 Determination Page 8 of 14 Applicants further allege the FSP‟s re presentative A advised them that they were covered and on this basis the Applicants have suffered detriment, having lost the opportunity to arrange alternative insurance cover and/or remove contents from the property. 40. The FSP does not accept the Applicants ‟ position in this respect and maintains that it has not been provided with sufficient details regarding A, such as to identify this person. Its representatives were provided with very specific instructions in relation to the information that was to be provided to policyholders. Further, the Applicants have not provided any evidence to support their contention that they would/could have obtained appropriate insurance cover for the imminent floods. 41. The Panel has considered the Applicants‟ position in respec t to the alleged misrepresentation, however, prior to determining this component of the Applicants‟ dispute the Panel wishes to address the matter of prejudice alleged by the Applicants in this regard. 42. The Panel notes the Applicants‟ contention that they would have arranged for alternative insurance, providing flood cover, had they not been misled by the FSP‟s representative on 11 January 2011. However, the Panel notes that no evidence has been made available by the Applicants to establish that such an option was available to them. The Panel accepts that they may have been able to obtain alternative insurance; however, it is highly unlikely that any insurer would have accepted to provide indemnity for the imminent floods already underway and which were about to inundate the insured property. 43. Further, in the absence of substantiating evidence in relation to the nature and content of the alleged conversation between the Applicants and A, the Panel is not in a position to make a determination in this regard. It can only rely on the available evidence, which it notes confirms that the Applicants were provided with the relevant policy documents prior to the loss and which, as noted above, clearly provide that cover for flood damage is not available under the policy. Proximate Cause for the loss 44. The Applicants maintain that the initial inundation of their home was due to stormwater run-off as opposed to floodwater and as such they are entitled to indemnity under the policy. 45. It is an accepted principle of insurance law that the onus rests with an insured to prove, upon the balance of probabilities, that they have sustained a loss caused by an event insured for under the policy in force at the date of loss [Regina Fur Co. Ltd v Bossom (1957) 2 Lloyd‟s Rep 466]. 46. The FS P has relied upon the its appointed assessors‟ report “C”, the relevant ICA Hydrology Report and reports submitted by the commissioned hydrologists “W” following inspection of the property. Case No: 239628 Determination Page 9 of 14 47. The Panel notes that there has been an exchange of information between the parties and therefore in the interest of brevity will limit its reference to matters within these reports it considers relevant to this determination. ICA Hydrology Panel report (ICA report) “Flooding in the Brisbane River Catchment January 2011, Volume 2”. 48. The hydrological report commissioned by the Insurance Council of Australia (ICA) titled „Flooding in the Brisbane River Catchment January 2011 Volume 2 Flooding in Brisbane City LGA” dated 20 February 2011, provides a detailed analysis for the flooding experienced in that region. Of particular relevance is the following information:  Floodwaters moving down the Brisbane River over the period 9 to 14 January were made up of releases from Wivenhoe Dam and floodwaters from Lockyer Creek and the Bremer River. (page 1 para 3)  Water level response to these „normal‟ flood events in the lower Brisbane River was dwarfed by the subsequent water level rise associated with the releases from Wivenhoe Dam over the period 0600 hours on 11 January and 0300 hours on 12 January. (page 1 para 3)  Based on the recorded water level behaviour it was concluded that releases from Wivenhoe Dam were the principal immediate cause for flooding along the reach of the Brisbane River downstream of the dam. (page i para 4)  Rain ceased over the Brisbane City area around 1800 hours on 11 January being about 24 -30 hours before flood levels in the Brisbane River peaked. (page ii para 3)  Given the rainfall across Brisbane City LGA ceased by 1800 hours on 11 January 2011 any flooding after this time will have been caused by water flow inundation from the Brisbane River and its tributary creeks it being noted that inundation along the tributaries was associated with backwater flooding from the Brisbane River which in turn was principally caused by the dam release flood from Wivenhoe Dam. (page ii para 6)  The following factors affected and exacerbated the nature of flooding in the Brisbane City LGA over the period 10-14 January 2011. – Intense rainfalls that occurred over the catchment areas upstream of Wivenhoe and Somerset Dams. – A „wet‟ catchment that maximised the rate of delivery and volume of surface run-off resulting in large volumes of floodwater flowing into the Wivenhoe and Somerset Dams. – Significant releases from the Wivenhoe Dam made over the period 11-12 January together with significant out flows from Lockyer Creek and the Brisbane River. – In a number of instances high tail water levels in the Brisbane River and its creeks resulted in backflow, up piped drainage systems. The backflow led to inundation, with waterway floodwaters of low-lying Case No: 239628 Determination Page 10 of 14 areas, normally drained by the piped drainage system (pipe backflow inundation.) 49. Section 10 of the ICA report discussed factors affecting flooding in Brisbane City LGA and included the following: “… However it is clear that the dam release flood from Wivenhoe Dam was the immediate cause of flooding in Br isbane City LGA.” (para 4) Assessor’s Report 28 January 2011  The assessor attended the property on 24 January 2011.  The property is situated at the low point of the street with storm drainage area to the rear of the property which swings around the right a nd crosses the road at the front.  Oxley Creek is approximately 720m from the rear of the property and Brisbane River is approximately 1290m from the front.  The Applicant‟s premises is a double storey premises. Water first inundated the property between 9.30 and 10.00am on 11 January 2011 and eventually inundated the property to a height of approximately 1.75m on the lower level.  The assessor estimated the building claim at $50,000 but recommended the appointment of a building consultant in the event that the claim was to proceed. The assessment questionnaire accompanying the report notes that the inundation at 9.30 to 10.00am on 11 January 2011 was from the storm drain. W’s Hydrology Report dated 24 August 2011  W provided a general hydrology report dealing with the rainfall and local stormwater behaviour. The hydrologist did not attend the property nor speak directly with the Applicants.  Rainfall data obtained from the Corinda High School Alert gauge approximately 1.5km to the north east of the property indicates a total rainfall of approximately 128mm between 0000 hours on 9 January to 1800 hours on 11 January 2011.  The maximum rainfall intensity of 14.8mm/hr occurred in the hour till 1100 hours on 11 January, with peak stormwater run-off occurring within 30-60 minutes of the peak rainfall intensity.  The peak rainfall intensity was not extreme and was less than a 1 year ARI for the area.  No significant rainfall was recorded in the subject area after about 1700 hours on 11 January 2011.  Ground levels at the property range from 7m AHD to 7.9m AHD, which indicates that the entire property would have been inundated by the water level of 9.2mAHD (flood peak level) with the initial inundation by water from Oxley Creek occurring at 0700-0800 hours on 12 January 2011. Case No: 239628 Determination Page 11 of 14  Stormwater flows from upstream of the property would drain around either side of the property.  The hydrologist concluded that any inundation that commenced on Tuesday night, 11 January or Wednesday 12 January 2011 would have been due to backwater flooding from the Brisbane River. Significantly the report does not comment on the Applicant‟s statements that there was initial flooding to the property between 9.30 and 10.00am on 11 January 2011 during the peak rainfall. W’s (additional) Site Specific Inundati on Assessment Report dated 1 February 2012.  W was asked to review the Applicant‟s submission but again did not conduct a site specific inspection of the property or discuss the matter with the Applicants. W has relied upon the loss adjuster‟s report and the Applicant‟s submissions.  W concludes that it is likely that stormwater run-off would have inundated the property‟s backyard within 30 minutes of the peak intensity rainfall at approximately 10.40am on 11 January 2011. However, this would not have been high enough to have entered the insured home and sheds on the morning of 11 January.  The property is located within the flood event of Brisbane River. Inundation of the lowest point of the yard would have occurred at around 0500 hours on 12 January 2011 by direct flow of floodwaters from Oxley Creek, about 18 hours after the peak rainfall intensity occurred. 50. The Panel notes that the report does not comment on whether flood waters from the Brisbane River and Oxley Creek would have backed flowed through the relevant stormwater drains and sewerage systems to cause initial inundation of the Applicant‟s property. 51. The Panel notes in respect of the Applicant‟s policy it is most important to identify when the initial inundation occurred and whether that initial inundation was caused by storm and rainwater including stormwater runoff from areas surrounding the site or water escaping from any water main, drain, pipe, street gutter, guttering or surface. The FSP has previously acknowledged that this includes backwater flooding through the water mains, drains, pipes, street gutter, guttering or surface that would otherwise be classified as floodwater. 52. The information provided in the material exchanged does not clearly identify the source of the initial inundation. As a result, the Panel Chair Ombudsman conducted a site inspection with the Applicant and representatives of the FSP on 7 June 2012. During the inspection the Applicant provided the Panel Chair Ombudsman with a USB stick that contained numerous photos of the property during the inundation. Those photos do not assist in determining the initial cause of inundation but do support the finding that the property was eventually inundated by flood waters. Case No: 239628 Determination Page 12 of 14 53. The Applicant advised that he believes the water came from the side of his house through drains that were at a neighbouring property. He advised that there was a very large drain plus a number of inspection pits and he believed the water backed up through this area and ran down towards the creek. He claimed there was a video showing water spouting as high as 16 feet from this drain although no such video has been located. 54. According to the Applicant it was raining on the morning when he was informed by the Police to leave the premises. It was around 10.30 to 11.00am and water started entering the lower part of the property. This was on 11 January 2012. As far as he was aware the Oxley Creek had not at that time breached its banks and there was no water coming into the property from the direction of the Oxley Creek. 55. He does not know what time the water significantly increased as he had left the property but he can say that in the 15 minutes from taking one of his vehicles to higher ground and returning to the home to get a generator, water had risen from ankle height to shin height. This water was at the front of the house and would have been flowing through the house into the outdoor area. This was around midday 11 January 2011. 56. The Applicant advised that the river is to the north of his property whilst the Oxley Creek is to the south. There is a stormwater drain at the back of the property that runs towards Oxley Creek. The Applicant believes that the water that inundated his property was stormwater and/or water backfilling through the stormwater drains that could not escape into the rivers. The Applicant also showed a number of photos of where the water had settled. There were some marks and sediment left. 57. According to the Applicant there were three air conditioners that were at ground level destroyed and a retaining wall destroyed. The FSP advise that no site specific inspection was conducted by a hydrologist as the hydrology company was very familiar with the area. 58. The timing of the inundation is crucial to consideration of whether the loss was flood or whether some of the loss may have been attributable to inundation from the water escaping the water mains, drains, pipes etc . It is apparent from the hydrology information and the Applicant‟s statements that water entered the property on the morning of 11 January 2011. The hydrology suggests that water would have entered from the stormwater drains as runoff at 11.40am. The Applicant records water approaching the home at a slightly earlier time. Based on the Applicant‟s evidence as provided during the site inspection, it is likely that water was entering the Applicant‟s home as early as midday on 11 January 2011. 59. There are no witnesses to indicate at what time the water rose from the Oxley Creek to first inundate the property. There is no doubt however based on the hydrology information provided that the substantial inundation of the property occurred in the early hours of 12 January 2011 and at that time the inundation of the property would have been due to floodwaters and overland flow from the Oxley Creek and Brisbane River. Case No: 239628 Determination Page 13 of 14 60. Whilst the Panel is satisfied that the ultimate inundation of the Applicant‟s property was due to flood waters and therefore excluded under the terms of the policy, the Panel accepts on the basis of the current information available that the initial inundation of the home has occurred some stage between 11am and 12midday on 11 January 2011and that such inundation was due to water escaping from the water mains, pipes, drains, street gutter or guttering or surface. 61. There is no method by which the Panel is able to precisely measure the level of such inundation that would have impacted on the Applicant‟s proper ty. Again from the site inspection and the comments provided by the Applicant together with the hydrology, the Panel has formed the view that most likely such inundation would have only been to a limited height of somewhere in the order of 50mm to 100mm. The Panel accepts that it would be fair in the circumstances to assess the initial inundation due to the insured event to a height of 100mm but inundation above that height to be excluded under the flood exclusion. Non financial Loss 62. The Panel has further c onsidered the compensation claim for “hardship, duress and stress”, noting that the limit provided for under the Terms of Reference is $3,000. Whilst it is conceded that the Applicants have suffered through a very stressful period, as a result of a catastrophic event, it is not satisfied that the FSP should be compelled to provide compensation for this. The Panel is satisfied in this dispute that the FSP has responded to the Applicants‟ claim within a reasonable period given the nature of the catastrophic event that occurred. Determination 63. Accordingly the Panel determines that the FSP is required to meet its liability in accordance with the policy, for the initial inundation of the Applicant‟s property to the height of 100mm. 64. Insofar as there is no assessment of the damage to this height and the Panel does not have a precise estimate as to the loss sustained, the Panel asks that the parties work cooperatively together to determine the loss that has occurred at that level. In the event that the parties are unable to resolve the amount, the parties may return to FOS for a supplementary determination. 65. Insofar as the FSP determines to cash settle any part of the Applicant‟s claim, the FSP is to pay interest in accordance with section 57 of the Insurance Contracts Act 1984 from 23 May 2011 being the date of rejection of the Applicant‟s claim to date of payment of the claim. Case No: 239628 Determination Page 14 of 14 66. Insofar as the damage to the Applicant‟s property sustained as a result of inundation beyond 100mm, the Panel accepts that the FSP is entitled to rely upon the flood exclusion to refuse payment of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.