Flood exclusion applied to Charlton premises of not-for-profit organisation

FirmFinancial Firm (Unknown - Insurer)
Decided2013-02-13
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$20,000
SourceAFCA PDF

Summary

The not-for-profit organisation's Charlton premises were inundated in January 2011 and the FSP declined the claim as flood. The Panel found the initial stormwater runoff reached floor level and ordered payment for the wooden flooring, with interest if cash settled.

Surface runoff water inundated the property to about floor level before Avoca River floodwater arrived, so that part is covered, while later river floodwater is excluded.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 239539 Determination Page 1 of 11 Case number: 239539 General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of claim 10 January 2013 Background 1. The insured is a not-for-profit community organisation and the Applicant is the organisation‟s authorised officer. The Applicant‟s property was insured under a business insurance policy issued by the Financial Services Provider (FSP) insuring the building for $90,000 and contents for $30,000. 2. The policy provides for defined events cover for both building and contents, and also extends to provide accidental damage cover for contents up to a sub-limit of $25,000. 3. On 14 January 2011 following intense rainfall in the area, the property was inundated with water. The Applicant estimates the cost of rectifying the damage was about $20,000. 4. The FSP denied a claim under the policy on the ground the damage was a result of flood water and excluded from cover provided by the policy. Summary of Applicant’s position 5. The Applicant is represented by a lawyer. References to the Applicant in this determination will include the Applicant‟s representative. 6. The Applicant believes the property was inundated with local stormwater long before the river water arrived in Charlton. 7. The flood was caused by both a very high river and water generated from local rain from 9 to 14 January 2011 which caused a build up of water in the streets and water from the Yeungroon/Gower catchment which reached Charlton 12 to 15 hours before the water from the Avoca River arrived. 8. Just prior to 4.00pm on 14 January a huge volume/flow of water was observed at the former floodway location out from the St Arnaud Road. This water was flowing towards the river. This levy bank had been constructed in the 1950s to prevent water flow from the river flowing down Armstrong Street (which becomes St Arnaud Road) and flooding the town. It was not until about 9.00pm on 14 January the Avoca catchment waters arrived in Charlton. However, the town was well flooded by the time the Avoca water Determination Case No: 239539 Determination Page 2 of 11 arrived which suggests the initial inundation was from stormwater which was later supplemented by river water, which was dirty and caused most of the damage. The colour of the water was distinctive and could not be confused. 9. The Applicant relies substantially on a hydrological report provided by “M”. 10. The Applicant states that because the upper aspect of Yeungroon Creek has no banks it is impossible for water to escape as required by the policy definition of „flood‟. Accordingly any early inundation sourced from the upper part of Yeungroon Creek area cannot be flood as defined and so is stormwater which is covered by the policy. Summary of FSP’s position 11. The FSP submits the Applicant‟s premises were inundated with overflow from the Avoca/Yeungroon Rivers (sic) and not by stormwater runoff. 12. The FSP relies substantially on hydrological reports by WT. 13. The WT report confirms the Applicant‟s property was flooded firstly by breakouts from the Charlton- St Arnaud tributary caused by water exceeding the capacity of culverts under the Charlton- St Arnaud Road backing up behind the road and flowing down Armstrong Road towards the town. 14. Water in the Charlton-St Arnaud Road tributary was combined flow from breakout flows of Yeungroon Creek and Avoca River further upstream. The property was flooded later by water from the Avoca River. 15. The FSP relies on the following policy terms: “ Words with special meaning … “Flood” means the inundation of normally dry land by water escaping or being released from the normal confines of any natural watercourse or lake, whether or not they have been altered or modified. Flood also includes water discharge from any sewage or waste water systems due to pressure induced by Flood water. … Section A – Business Property Cover What you are not covered for 1 We will not pay for loss or damage caused by: … l. Flood Flood, the action of the sea, high water, tidal action or tsunami.” Case No: 239539 Determination Page 3 of 11 Issue 16. Whether the damage was caused by flood water as defined by the policy. Reasons for decision 17. Due to the complex nature of this dispute, FOS has considered it appropriate to elevate the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. The dispute has not been the subject of a FOS Recommendation and has proceeded direct to Determination. 18. The decision had been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 19. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to respond. 20. On 27 June 2012, the Panel Chair Ombudsman and Case Manager attended on site where they met with members of the Applicant‟s organisation and a representative of the FSP. 21. Prior to arriving at a determination, the Panel has read and considered all the material submitted by the parties to FOS. In addition FOS representatives have carried out site visits and met with local residents. 22. The Panel has been provided with a number of expert reports. As these have been exchanged between the parties the Panel will only refer to sections of the reports in this determination considered relevant to the issues. Hydrologist report WT dated 18 February 2011 commissioned by the FSP  Historically Charlton has been flooded from two directions in a north south plane with an area remaining flood free through the centre of town along St Arnaud- Charlton road.  Heavy rainfall was recorded in Charlton between 10 th and 14 January 2011.  The town received the largest total on 13 January with 66mm collected on 9am on 14 January.  The most intense rainfall was experienced in the morning of 11 and early morning on 13 January.  The peak flood level of 8.05m was reached early morning on 15 January being 2 days after the most intense rainfall.  Given the timing of the flooding on the eastern edge of town was similar to the gauge readings this suggests the Yeungroon Creek and Avoca River merged. Case No: 239539 Determination Page 4 of 11  Any flooding occurring after lunchtime can be directly attributed to Avoca River/Yeungroon flooding.  Flood inundation that occurred east of Armstrong Street early morning on 14 January can be attributed to stormwater flooding.  The Applicant‟s property was inundated by flood water. Hydrological report WT dated 20 September 2012 commissioned by the FSP.  The property was flooded firstly by breakout flows from the Charlton-St Arnaud tributary caused by water exceeding the capacity of the culverts under the Charlton-St Arnaud Road backing up behind this road and flowing down Armstrong Road toward Charlton. Water in the Charlton- St Arnaud Road tributary was combined flow from breakout flows from Yeungroon Creek and the Avoca River further upstream. The property was flooded later by water from the Avoca River directly. Stream flow data  River levels in the Avoca River at Charlton began to rise steeply from about midday on 12 January 2011 continuing to rise through the afternoon and reaching Minor flood level at 4am on 13 January. Water levels continued to rise sharply to Moderate flood level at 8.45pm on 13 January. Major flood level was reached at 5.15pm on 14 January.  There is no separate stream flow data available for Yeungroon Creek, the Charlton St Arnaud Road tributary or the Calder Highway tributary. Flooding from breakouts and transferred flows from the St Arnaud-Charlton tributary, Yeungroon Creek and Avoca River  Most of the flows caused by direct stormwater runoff generated from within the town and Calder Highway tributary catchment would have passed through the town by about 8am on 14 January.  Continuing flows from the Calder Highway and other depressions leading into Charlton after 8am would have been caused by overland flows from breakouts from the Charlton St Arnaud Road tributary, Yeungroon Creek and later from the Avoca River further upstream.  Modelling suggests that the Avoca River and Yeungroon Creek transferred flows across the flood plain upstream of town which occurred from about 5am on 14 January. Flooding directly by overflows from the Avoca River  The Avoca River reached Major flood level at about 5pm on 14 January.  The last burst of rainfall was 81.4mm in total from 6.21 am on 13 January to 6.24 am on 14 January. Therefore flooding directly from overflows from the river at Charlton occurred about 10 ½ -11 hours after the rainfall event. Case No: 239539 Determination Page 5 of 11  There were also breakouts from the river upstream of Charlton. Modelling results  Flooding through the centre of town was due to water from Yeungroon Creek catchment and a breakout from the Avoca River flowing through the Calder Highway tributary of the Avoca River. The insured property  The property is located about 200m south west of the Avoca River. Site inspection of Applicant’s property  There were no witnesses to provide direct observations of the inundation. Additional information was available from assessments conducted at nearby affected properties.  J. McC (High St) first saw water coming out of the drain in the early afternoon. Water was backing up from the river. At about 3pm water was coming along Armstrong Street.  RG (High St) observed water had flooded the property at corner of Learmonth Street and Wright Street by 7am. At 4.20pm water was observed bubbling up from the drain pit in the centre of his yard. Within 10 minutes the yard was full to the level of the concrete path. By 5/5.30pm water was through the place Flooding mechanisms at Applicant’s property  Although the property is located within the LSIO (Land Subject to Inundation Overlay) the water which initially flooded the property did not come directly from water flowing out of the Avoca River in Charlton  Water is likely to have first approached the property from a south westerly direction. This water was flowing along Armstrong Road.  Most of the flow caused by runoff garne red from the tributary catchment of the Calder Highway tributary would have flowed downstream by about 8am. Therefore local runoff or stormwater did not cause any inundation at the site.  Water approaching the property down Armstrong Road is related to overland flows and flows through the Charlton-St Arnaud Road tributary resulting from breakouts from the Yeungroon Creek and from the Avoca River further upstream  It is likely that flows in the Charlton-St Arnaud Road tributary were banking up in the area between the Charlton- St Arnaud Road and Back St Arnaud Road.  By 4.00pm water flowing through this tributary would have been combined flow from breakouts from Yeungroon Creek and the Avoca River upstream of Charlton.  Water did not initially come directly from the Avoca River. It came initially from the Charlton-St Arnaud Road tributary, breakout from the Case No: 239539 Determination Page 6 of 11 Yeungroon Creek and Avoca River further upstream and only later from the Avoca River.  Clear water is not necessarily an indicator of stormwater. It is more an indicator of where the water has come from, in this case a flat vegetated catchment with little opportunity to pick up sediment, rather than a bare river channel. Hydrologist report (M) dated 3 November 2011 commissioned by the Applicant Rainfall  The highest rainfall was 15mm per hour from 1700 to 0800 on 13 January 2011. Rainfall rates were persistently high from 2300 hours on 13 January to 0600 on 14 January. No rain fell after 0800 on 14 January.  The radar data for Charlton indicates the rainfall was highly concentrated in short duration bursts. The rainfall which produced the 15mm/hour actually occurred over a period of about 12 minutes.  This situation is similar for the rainfall over night on 13-14 January. Overflow from local drainage systems  Given the intensity of rainfall which was much more than hourly rainfall rates overflow from local drainage systems and culverts was highly likely. Especially given that the drainage system was already close to capacity from earlier rainfall bursts.  The timing of overflow would correspond closely to the timing of the rainfall.  The first possible incident of stormwater drainage overflow would have occurred around 0700 on 13 January. Any of the intense rainfall periods recorded between 13 and 14 January could have been responsible for overflow of stormwater drainage systems. The g reater probability being from midnight to 0400 on 14 January.  Direct overflow is less likely after this time.  Without augmentation from other sources stormwater drainage overflow would be short lived. Runoff from surrounding areas  Runoff was possible from Charlton which does not enter the drainage systems and runoff from rural areas.  During periods of heavy rainfall bursts, water would have overflowed and contributed to surface runoff. Without augmentation from other sources stormwater drainage overflow would have been short-lived.  It is highly likely that rainfall which fell on 13 and 14 January was saturation overland flow, and would have led to inundation of Charlton on 13 and 14 January before floodwater from Avoca entered the town. Case No: 239539 Determination Page 7 of 11  Water runoff as overland flow would concentrate water in the eastern part of Charlton.  The combination of surface runoff being directed toward east Charlton combined with periodic overflow from drainage systems in other parts of the town would lead to inundation by stormwater and locally derived surface water on the morning of 14 January.  That inundation from locally derived rather than Avoca River water is further supported by the changing sediment loads of water seen in Charlton. Flooding from Avoca River 23. Minor flood level was reached at 0400 on 13 January 2011. Moderate flood levels were reached at 2045 on 13 January. Major flood level was reached at 1715 on 14 January 2011. 24. Significant inundation of Charlton from the Avoca River did not begin until late afternoon on 14 January 2011 and became more severe through the evening and night. Some outlying parts of Charlton would have been inundated mid-afternoon. Summary 25. The FSP seeks to rely on a clause in the policy to deny liability for the claim and therefore has the burden of establishing on the balance of probabilities that the terms of the relevant clause apply to defeat the claim. 26. The evidence in relation to the source of the water which initially inundated areas of Charlton is divided. The Panel accepts that both authors of the reports were highly competent professionals and well qualified to assess and report on the likely source of water which inundated the town and in turn the Applicant‟s property. 27. The Panel is placed in a difficult position when two expert witnesses provide substantially opposing versions based on the same technical data. 28. In view of the complex issues and conflicting views, the Panel Chair Ombudsman and Case Manager visited a number of sites on several occasions and discussed the event with policy holders, including in this case the Applicant as well as FSP representatives, experts and a range of local residents. 29. Having considered all of the expert evidence and information gained from its site visits, the Panel is satisfied that ultimately the Appl icant‟s property was flooded by water from the Avoca River in Charlton. Given the terms of the policy the Panel accepts that water from the Avoca River is properly categorised as flood water and damage arising from this water is excluded from cover provided by the policy. Case No: 239539 Determination Page 8 of 11 30. The central issue to this dispute, then, is whether the water which first entered the Applicant‟s property was water from the river, surface runoff water from surrounding areas or a combination of runoff from surrounding areas and from the Avoca River. 31. The evidence is that the Avoca River reached major flood level in Charlton at about 5.15pm on 14 January 2011. The evidence is also consistent in relation to the direction of water which entered the town prior to the river reaching major flood level. 32. Transfer flow paths imposed on photographs and relief maps prepared by WT clearly show flow emanating from the southeast of the town. WT is of the opinion that this water would have inundated the Applicant‟s property prior to the arrival of water which had overtopped the Avoca River banks in Charlton. 33. According to WT, this water was a combination of flows from breakouts of the Yeungroon Creek and Avoca River further upstream of Charlton. According to the report, the Avoca River stream flow data from which the river level was based, were taken at Charlton (fig 3-4 report 20/9/12). This gauge was located downstream of the confluence of the Avoca River and Yeungroon Creek and measures the combined flow from these waterways. 34. Further WT (report 18/2/11 paragraph 7) stated flooding of the town followed the September 2010 event but with much higher volumes of water. This suggested that either the Yeungroon Creek transferred flows across the floodplain upstream of Charlton or the Avoca River, pushed more water into the flood plain upstream of the town. 35. That report further, based on timing of the flooding on the eastern edge of town, consistent with gauged readings, suggests that the Yeungroon Creek and Avoca River flows merged to become one system. 36. In the Panel‟s opinion, two matters arise from this suggestion. 37. First, according to the reports, the gauge on which the finding was made, was located at the Charlton weir downstream of Charlton thus measuring overland flows from Yeungroon Creek catchment which had combined with river water downstream of Charlton. There was no separate stream flow data available for Yeungroon Creek, the Charlton-St Arnaud Road tributary or the Calder Highway tributary. 38. Secondly, both experts comment that breakouts from the Avoca River upstream of Charlton occurred later. (WT 4.2 report 20/9/12) 39. Although a gauge is located at Coonooer (fig 3.1 report 20/9/12), no information had been provided to show the river levels further upstream, the level at which the river would breach its banks, the timing of any breakouts and the delay which may occur for these breakouts to mix with water in the Yeungroon catchment. 40. In discussing stream flow data WT states: Case No: 239539 Determination Page 9 of 11 ““There is no stream flow data available for Yeungroon Cree k, the Charlton St Arnaud Road tributary or the Calder Highway tributary. It is important to note that while the recorded water level at the gauge can be used to indicate when water came directly from the Avoca River in the channel to Charlton, it will not provide any indication of timing flows across Charlton – namely from any breakouts upstream of the town from Yeungroon Creek or either the Charlton St Arnaud Road tributary or the Calder Highway tributary.” 41. Significantly, WT stated the flow measured at the stream flow gauge on the Avoca River at Charlton is the combined flows of the Avoca River and Yeungroon Creek. 42. Given the source of the water and timing is critical to the outcome of this matter, the Panel is of the opinion that any reference to unsubstantiated breakouts from the Avoca River further upstream of Charlton must be regarded with caution. Where evidence is to the contrary, the contrary evidence is to be preferred. 43. The M report discussed the movement of runoff from surrounding areas and the Yeungroon Creek catchment, indicating that that water would concentrate on the eastern edge of Charlton. M went on to say that the combination of water from the surrounding area directed to Charlton would overload the stormwater drainage networks in that part of the town. Combined with periodic addition of overflow from stormwater drainage systems in other parts of the town would lead to parts of Charlton to be inundated with stormwater and locally derived surface water on the morning of 14 January. M considered this assessment was supported by the changing sediment loads of water seen in the town. (M page 9) 44. Following a visit to the area by FOS representatives, the Panel is of the opinion the landscape over which the water flowed from the south and south east of the town cannot be regarded as a natural watercourse. Although the area from which the water flowed is designated as “Yeungroon Creek”, that appellation alone cannot be taken as evidence of a watercourse. 45. The following ruling was made by the High Court in Gartner v Kidman [1962] HCA 27: 108 CLR 12 (30 May 1962): “This distinction between watercourse and depression follows the language of Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a depression which took rainwater for about three months of a year fell short of the legal definition of a natural watercourse. To constitute such a watercourse as a matter of law, there must be a stream of water flowing in a defined channel or between something in the nature of banks. The stream may be very small and need not run, nor need the banks be clearly or sharply defined. But there must be a course, marked on earth by visible signs, along which water usually flows in order to constitute a watercourse such as creates riparian rights (1899VLR at p485 (at p16) 46. The landscape to the south and south east of the town does not have evidence of visible banks between which water flows and further, water does not usually flow along this stretch of land, which is only vaguely described by a range of indentations and vegetation. In the Panel‟s view, the landscape Case No: 239539 Determination Page 10 of 11 may best be described as a flood plain over which water flows in a direction determined by the rise and fall of the land. 47. This view is further supported by the description given by M who observed Yeungroon Creek has been infilled with flood deposits over many years. The course of the creek to the south of the town is marked by linear depressions and vegetation. 48. Accordingly, the Panel accepts that water which came from the Yeungroon Creek area to the south and south east of the town may not be regarded as water which escaped from the normal confines of a natural watercourse. Presence of clear water 49. There is evidence that water which initially entered the town, before the river at Charlton overtopped its banks, was clear. 50. According to the M report the presence of clear water was indicative that it was not water from the Avoca River. While WT accepted the general principle of clear water discussed by the M report, WT did not accept that water from Yeungroon Creek would contain high levels of sediment to colour the water. 51. The Panel accepts that clear water is not of itself definitive that the water was not flood water. River water which has mixed with runoff rainwater is regarded as flood water. Further, once the river had over topped its banks the river water will affect the levels of the clear water taking some time to mix with the clear water. This circumstance is also regarded as flood water. 52. While the M report stated (summary paragraph 4) it was possible that flooding could have been caused by stormwater/intense rainfall and runoff early on 14 January 2011, he cautioned that properties will have been affected by overbank flooding from the river from about 5 .00pm. 53. Significantly, M reported that depending on the location of the property, they will have begun to be inundated from overbank flooding of the Avoca River sometime in the afternoon and early evening of 14 January 2011. This view is consistent with WT in that WT reported direct flooding from breakouts of the Avoca River in Charlton would have occurred at about 6.00pm on 14 January 2011. Conclusion 54. The evidence has established:  Clear water was running overland from the south and southeast of town during 14 January 2011.  This water inundated the town before the Avoca River in Charlton overtopped its banks at about 5.15pm. Case No: 239539 Determination Page 11 of 11  Neighbouring properties were inundated before 6pm being the accepted time direct water from the Avoca River at Charlton influenced the water level in Charlton. 55. After careful analysis of the material the Panel concludes on balance that the Applicant‟s property was initially inundated by surface runoff rainwater before water from the Avoca River arrived. 56. In any event the policy provides cover for accidental damage up to a maximum sum of $25,000; it is not in dispute that damage to the premises was caused accidentally and as such the onus is on the FSP to prove that the damage was caused by an excluded event, in this instance flood. 57. In the Panel‟s view floodwater would have been unlikely to have inundated the property until sometime after 5.30pm on 14 January 2011; conversely on the balance of probabilities the surface water runoff would have inundated the property before that time. 58. Given there were no eyewitnesses to the inundation events, the Panel, will have regard to its mandate to do what is fair in all the circumstances. Having noted the ground level and topography in the vicinity of the property and the floor level of the building, the Panel is inclined to the view that the surface runoff would have inundated the property to about floor level before the arrival of the floodwater. Therefore, in the Panel‟s view the Applicant is entitled to reimbursement for the cost of rectifying any water damage up to the level of the wooden flooring of the building. Determination 59. Based on the available material the Panel determines the FSP is not liable for the cost of rectifying damage caused by water to the building or contents above floor level. 60. The FSP is liable for the cost of rectifying water damage to the wooden flooring of the building. 61. In the event the FSP settles the claim by cash payment to the Applicant, the FSP is to pay interest in accordance with Section 57 of the Act from 23 February 2011 being the date the claim was denied, until the date of payment.