Home / Financial Firm (Unknown - Insurer) / Determination 239539
Determination 239539
Flood exclusion applied to Charlton premises of not-for-profit organisation
Summary
The not-for-profit organisation's Charlton premises were inundated in January 2011 and the FSP declined the claim as flood. The Panel found the initial stormwater runoff reached floor level and ordered payment for the wooden flooring, with interest if cash settled.
Surface runoff water inundated the property to about floor level before Avoca River floodwater arrived, so that part is covered, while later river floodwater is excluded.
Issues
- Claim denial primary · upheld
“The FSP is liable for the cost of rectifying water damage to the wooden flooring of the building. Damage above floor level is not covered.”
- Product terms interpretation secondary · not upheld
“The Panel accepts that water from the Avoca River is properly categorised as flood water and damage arising from this water is excluded from cover.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 239539 Determination Page 1 of 11
Case number: 239539
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim
10 January 2013
Background
1. The insured is a not-for-profit community organisation and the Applicant is
the organisation‟s authorised officer. The Applicant‟s property was insured
under a business insurance policy issued by the Financial Services Provider
(FSP) insuring the building for $90,000 and contents for $30,000.
2. The policy provides for defined events cover for both building and contents,
and also extends to provide accidental damage cover for contents up to a
sub-limit of $25,000.
3. On 14 January 2011 following intense rainfall in the area, the property was
inundated with water. The Applicant estimates the cost of rectifying the
damage was about $20,000.
4. The FSP denied a claim under the policy on the ground the damage was a
result of flood water and excluded from cover provided by the policy.
Summary of Applicant’s position
5. The Applicant is represented by a lawyer. References to the Applicant in this
determination will include the Applicant‟s representative.
6. The Applicant believes the property was inundated with local stormwater
long before the river water arrived in Charlton.
7. The flood was caused by both a very high river and water generated from
local rain from 9 to 14 January 2011 which caused a build up of water in the
streets and water from the Yeungroon/Gower catchment which reached
Charlton 12 to 15 hours before the water from the Avoca River arrived.
8. Just prior to 4.00pm on 14 January a huge volume/flow of water was
observed at the former floodway location out from the St Arnaud Road. This
water was flowing towards the river. This levy bank had been constructed in
the 1950s to prevent water flow from the river flowing down Armstrong Street
(which becomes St Arnaud Road) and flooding the town. It was not until
about 9.00pm on 14 January the Avoca catchment waters arrived in
Charlton. However, the town was well flooded by the time the Avoca water
Determination
Case No: 239539 Determination Page 2 of 11
arrived which suggests the initial inundation was from stormwater which was
later supplemented by river water, which was dirty and caused most of the
damage. The colour of the water was distinctive and could not be confused.
9. The Applicant relies substantially on a hydrological report provided by “M”.
10. The Applicant states that because the upper aspect of Yeungroon Creek has
no banks it is impossible for water to escape as required by the policy
definition of „flood‟. Accordingly any early inundation sourced from the upper
part of Yeungroon Creek area cannot be flood as defined and so is
stormwater which is covered by the policy.
Summary of FSP’s position
11. The FSP submits the Applicant‟s premises were inundated with overflow
from the Avoca/Yeungroon Rivers (sic) and not by stormwater runoff.
12. The FSP relies substantially on hydrological reports by WT.
13. The WT report confirms the Applicant‟s property was flooded firstly by
breakouts from the Charlton- St Arnaud tributary caused by water exceeding
the capacity of culverts under the Charlton- St Arnaud Road backing up
behind the road and flowing down Armstrong Road towards the town.
14. Water in the Charlton-St Arnaud Road tributary was combined flow from
breakout flows of Yeungroon Creek and Avoca River further upstream. The
property was flooded later by water from the Avoca River.
15. The FSP relies on the following policy terms:
“ Words with special meaning
…
“Flood” means the inundation of normally dry land by water escaping or
being released from the normal confines of any natural watercourse or lake,
whether or not they have been altered or modified. Flood also includes water
discharge from any sewage or waste water systems due to pressure induced
by Flood water.
…
Section A – Business Property Cover
What you are not covered for
1 We will not pay for loss or damage caused by:
…
l. Flood
Flood, the action of the sea, high water, tidal action or
tsunami.”
Case No: 239539 Determination Page 3 of 11
Issue
16. Whether the damage was caused by flood water as defined by the policy.
Reasons for decision
17. Due to the complex nature of this dispute, FOS has considered it appropriate
to elevate the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. The dispute has not been the subject of a FOS
Recommendation and has proceeded direct to Determination.
18. The decision had been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
19. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to respond.
20. On 27 June 2012, the Panel Chair Ombudsman and Case Manager
attended on site where they met with members of the Applicant‟s
organisation and a representative of the FSP.
21. Prior to arriving at a determination, the Panel has read and considered all
the material submitted by the parties to FOS. In addition FOS
representatives have carried out site visits and met with local residents.
22. The Panel has been provided with a number of expert reports. As these
have been exchanged between the parties the Panel will only refer to
sections of the reports in this determination considered relevant to the
issues.
Hydrologist report WT dated 18 February 2011 commissioned by the FSP
Historically Charlton has been flooded from two directions in a north
south plane with an area remaining flood free through the centre of
town along St Arnaud- Charlton road.
Heavy rainfall was recorded in Charlton between 10 th and 14 January
2011.
The town received the largest total on 13 January with 66mm collected
on 9am on 14 January.
The most intense rainfall was experienced in the morning of 11 and
early morning on 13 January.
The peak flood level of 8.05m was reached early morning on 15
January being 2 days after the most intense rainfall.
Given the timing of the flooding on the eastern edge of town was similar
to the gauge readings this suggests the Yeungroon Creek and Avoca
River merged.
Case No: 239539 Determination Page 4 of 11
Any flooding occurring after lunchtime can be directly attributed to
Avoca River/Yeungroon flooding.
Flood inundation that occurred east of Armstrong Street early morning
on 14 January can be attributed to stormwater flooding.
The Applicant‟s property was inundated by flood water.
Hydrological report WT dated 20 September 2012 commissioned by the FSP.
The property was flooded firstly by breakout flows from the Charlton-St
Arnaud tributary caused by water exceeding the capacity of the culverts
under the Charlton-St Arnaud Road backing up behind this road and
flowing down Armstrong Road toward Charlton. Water in the Charlton-
St Arnaud Road tributary was combined flow from breakout flows from
Yeungroon Creek and the Avoca River further upstream. The property
was flooded later by water from the Avoca River directly.
Stream flow data
River levels in the Avoca River at Charlton began to rise steeply from
about midday on 12 January 2011 continuing to rise through the
afternoon and reaching Minor flood level at 4am on 13 January. Water
levels continued to rise sharply to Moderate flood level at 8.45pm on 13
January. Major flood level was reached at 5.15pm on 14 January.
There is no separate stream flow data available for Yeungroon Creek,
the Charlton St Arnaud Road tributary or the Calder Highway tributary.
Flooding from breakouts and transferred flows from the St Arnaud-Charlton tributary,
Yeungroon Creek and Avoca River
Most of the flows caused by direct stormwater runoff generated from
within the town and Calder Highway tributary catchment would have
passed through the town by about 8am on 14 January.
Continuing flows from the Calder Highway and other depressions
leading into Charlton after 8am would have been caused by overland
flows from breakouts from the Charlton St Arnaud Road tributary,
Yeungroon Creek and later from the Avoca River further upstream.
Modelling suggests that the Avoca River and Yeungroon Creek
transferred flows across the flood plain upstream of town which
occurred from about 5am on 14 January.
Flooding directly by overflows from the Avoca River
The Avoca River reached Major flood level at about 5pm on 14
January.
The last burst of rainfall was 81.4mm in total from 6.21 am on 13
January to 6.24 am on 14 January. Therefore flooding directly from
overflows from the river at Charlton occurred about 10 ½ -11 hours
after the rainfall event.
Case No: 239539 Determination Page 5 of 11
There were also breakouts from the river upstream of Charlton.
Modelling results
Flooding through the centre of town was due to water from Yeungroon
Creek catchment and a breakout from the Avoca River flowing through
the Calder Highway tributary of the Avoca River.
The insured property
The property is located about 200m south west of the Avoca River.
Site inspection of Applicant’s property
There were no witnesses to provide direct observations of the
inundation. Additional information was available from assessments
conducted at nearby affected properties.
J. McC (High St) first saw water coming out of the drain in the early
afternoon. Water was backing up from the river. At about 3pm water
was coming along Armstrong Street.
RG (High St) observed water had flooded the property at corner of
Learmonth Street and Wright Street by 7am. At 4.20pm water was
observed bubbling up from the drain pit in the centre of his yard. Within
10 minutes the yard was full to the level of the concrete path. By
5/5.30pm water was through the place
Flooding mechanisms at Applicant’s property
Although the property is located within the LSIO (Land Subject to
Inundation Overlay) the water which initially flooded the property did not
come directly from water flowing out of the Avoca River in Charlton
Water is likely to have first approached the property from a south
westerly direction. This water was flowing along Armstrong Road.
Most of the flow caused by runoff garne red from the tributary
catchment of the Calder Highway tributary would have flowed
downstream by about 8am. Therefore local runoff or stormwater did not
cause any inundation at the site.
Water approaching the property down Armstrong Road is related to
overland flows and flows through the Charlton-St Arnaud Road tributary
resulting from breakouts from the Yeungroon Creek and from the
Avoca River further upstream
It is likely that flows in the Charlton-St Arnaud Road tributary were
banking up in the area between the Charlton- St Arnaud Road and
Back St Arnaud Road.
By 4.00pm water flowing through this tributary would have been
combined flow from breakouts from Yeungroon Creek and the Avoca
River upstream of Charlton.
Water did not initially come directly from the Avoca River. It came
initially from the Charlton-St Arnaud Road tributary, breakout from the
Case No: 239539 Determination Page 6 of 11
Yeungroon Creek and Avoca River further upstream and only later from
the Avoca River.
Clear water is not necessarily an indicator of stormwater. It is more an
indicator of where the water has come from, in this case a flat
vegetated catchment with little opportunity to pick up sediment, rather
than a bare river channel.
Hydrologist report (M) dated 3 November 2011 commissioned by the Applicant
Rainfall
The highest rainfall was 15mm per hour from 1700 to 0800 on 13
January 2011. Rainfall rates were persistently high from 2300 hours on
13 January to 0600 on 14 January. No rain fell after 0800 on 14
January.
The radar data for Charlton indicates the rainfall was highly
concentrated in short duration bursts. The rainfall which produced the
15mm/hour actually occurred over a period of about 12 minutes.
This situation is similar for the rainfall over night on 13-14 January.
Overflow from local drainage systems
Given the intensity of rainfall which was much more than hourly rainfall
rates overflow from local drainage systems and culverts was highly
likely. Especially given that the drainage system was already close to
capacity from earlier rainfall bursts.
The timing of overflow would correspond closely to the timing of the
rainfall.
The first possible incident of stormwater drainage overflow would have
occurred around 0700 on 13 January. Any of the intense rainfall
periods recorded between 13 and 14 January could have been
responsible for overflow of stormwater drainage systems. The g reater
probability being from midnight to 0400 on 14 January.
Direct overflow is less likely after this time.
Without augmentation from other sources stormwater drainage
overflow would be short lived.
Runoff from surrounding areas
Runoff was possible from Charlton which does not enter the drainage
systems and runoff from rural areas.
During periods of heavy rainfall bursts, water would have overflowed
and contributed to surface runoff. Without augmentation from other
sources stormwater drainage overflow would have been short-lived.
It is highly likely that rainfall which fell on 13 and 14 January was
saturation overland flow, and would have led to inundation of Charlton
on 13 and 14 January before floodwater from Avoca entered the town.
Case No: 239539 Determination Page 7 of 11
Water runoff as overland flow would concentrate water in the eastern
part of Charlton.
The combination of surface runoff being directed toward east Charlton
combined with periodic overflow from drainage systems in other parts
of the town would lead to inundation by stormwater and locally derived
surface water on the morning of 14 January.
That inundation from locally derived rather than Avoca River water is
further supported by the changing sediment loads of water seen in
Charlton.
Flooding from Avoca River
23. Minor flood level was reached at 0400 on 13 January 2011. Moderate flood
levels were reached at 2045 on 13 January. Major flood level was reached at
1715 on 14 January 2011.
24. Significant inundation of Charlton from the Avoca River did not begin until
late afternoon on 14 January 2011 and became more severe through the
evening and night. Some outlying parts of Charlton would have been
inundated mid-afternoon.
Summary
25. The FSP seeks to rely on a clause in the policy to deny liability for the claim
and therefore has the burden of establishing on the balance of probabilities
that the terms of the relevant clause apply to defeat the claim.
26. The evidence in relation to the source of the water which initially inundated
areas of Charlton is divided. The Panel accepts that both authors of the
reports were highly competent professionals and well qualified to assess and
report on the likely source of water which inundated the town and in turn the
Applicant‟s property.
27. The Panel is placed in a difficult position when two expert witnesses provide
substantially opposing versions based on the same technical data.
28. In view of the complex issues and conflicting views, the Panel Chair
Ombudsman and Case Manager visited a number of sites on several
occasions and discussed the event with policy holders, including in this case
the Applicant as well as FSP representatives, experts and a range of local
residents.
29. Having considered all of the expert evidence and information gained from its
site visits, the Panel is satisfied that ultimately the Appl icant‟s property was
flooded by water from the Avoca River in Charlton. Given the terms of the
policy the Panel accepts that water from the Avoca River is properly
categorised as flood water and damage arising from this water is excluded
from cover provided by the policy.
Case No: 239539 Determination Page 8 of 11
30. The central issue to this dispute, then, is whether the water which first
entered the Applicant‟s property was water from the river, surface runoff
water from surrounding areas or a combination of runoff from surrounding
areas and from the Avoca River.
31. The evidence is that the Avoca River reached major flood level in Charlton at
about 5.15pm on 14 January 2011. The evidence is also consistent in
relation to the direction of water which entered the town prior to the river
reaching major flood level.
32. Transfer flow paths imposed on photographs and relief maps prepared by
WT clearly show flow emanating from the southeast of the town. WT is of the
opinion that this water would have inundated the Applicant‟s property prior to
the arrival of water which had overtopped the Avoca River banks in Charlton.
33. According to WT, this water was a combination of flows from breakouts of
the Yeungroon Creek and Avoca River further upstream of Charlton.
According to the report, the Avoca River stream flow data from which the
river level was based, were taken at Charlton (fig 3-4 report 20/9/12). This
gauge was located downstream of the confluence of the Avoca River and
Yeungroon Creek and measures the combined flow from these waterways.
34. Further WT (report 18/2/11 paragraph 7) stated flooding of the town followed
the September 2010 event but with much higher volumes of water. This
suggested that either the Yeungroon Creek transferred flows across the
floodplain upstream of Charlton or the Avoca River, pushed more water into
the flood plain upstream of the town.
35. That report further, based on timing of the flooding on the eastern edge of
town, consistent with gauged readings, suggests that the Yeungroon Creek
and Avoca River flows merged to become one system.
36. In the Panel‟s opinion, two matters arise from this suggestion.
37. First, according to the reports, the gauge on which the finding was made,
was located at the Charlton weir downstream of Charlton thus measuring
overland flows from Yeungroon Creek catchment which had combined with
river water downstream of Charlton. There was no separate stream flow data
available for Yeungroon Creek, the Charlton-St Arnaud Road tributary or the
Calder Highway tributary.
38. Secondly, both experts comment that breakouts from the Avoca River
upstream of Charlton occurred later. (WT 4.2 report 20/9/12)
39. Although a gauge is located at Coonooer (fig 3.1 report 20/9/12), no
information had been provided to show the river levels further upstream, the
level at which the river would breach its banks, the timing of any breakouts
and the delay which may occur for these breakouts to mix with water in the
Yeungroon catchment.
40. In discussing stream flow data WT states:
Case No: 239539 Determination Page 9 of 11
““There is no stream flow data available for Yeungroon Cree k, the Charlton St
Arnaud Road tributary or the Calder Highway tributary. It is important to note
that while the recorded water level at the gauge can be used to indicate when
water came directly from the Avoca River in the channel to Charlton, it will not
provide any indication of timing flows across Charlton – namely from any
breakouts upstream of the town from Yeungroon Creek or either the Charlton
St Arnaud Road tributary or the Calder Highway tributary.”
41. Significantly, WT stated the flow measured at the stream flow gauge on the
Avoca River at Charlton is the combined flows of the Avoca River and
Yeungroon Creek.
42. Given the source of the water and timing is critical to the outcome of this
matter, the Panel is of the opinion that any reference to unsubstantiated
breakouts from the Avoca River further upstream of Charlton must be
regarded with caution. Where evidence is to the contrary, the contrary
evidence is to be preferred.
43. The M report discussed the movement of runoff from surrounding areas and
the Yeungroon Creek catchment, indicating that that water would
concentrate on the eastern edge of Charlton. M went on to say that the
combination of water from the surrounding area directed to Charlton would
overload the stormwater drainage networks in that part of the town.
Combined with periodic addition of overflow from stormwater drainage
systems in other parts of the town would lead to parts of Charlton to be
inundated with stormwater and locally derived surface water on the morning
of 14 January. M considered this assessment was supported by the
changing sediment loads of water seen in the town. (M page 9)
44. Following a visit to the area by FOS representatives, the Panel is of the
opinion the landscape over which the water flowed from the south and south
east of the town cannot be regarded as a natural watercourse. Although the
area from which the water flowed is designated as “Yeungroon Creek”, that
appellation alone cannot be taken as evidence of a watercourse.
45. The following ruling was made by the High Court in Gartner v Kidman [1962]
HCA 27: 108 CLR 12 (30 May 1962):
“This distinction between watercourse and depression follows the language of
Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a
depression which took rainwater for about three months of a year fell short of
the legal definition of a natural watercourse. To constitute such a watercourse
as a matter of law, there must be a stream of water flowing in a defined
channel or between something in the nature of banks. The stream may be
very small and need not run, nor need the banks be clearly or sharply defined.
But there must be a course, marked on earth by visible signs, along which
water usually flows in order to constitute a watercourse such as creates
riparian rights (1899VLR at p485 (at p16)
46. The landscape to the south and south east of the town does not have
evidence of visible banks between which water flows and further, water does
not usually flow along this stretch of land, which is only vaguely described by
a range of indentations and vegetation. In the Panel‟s view, the landscape
Case No: 239539 Determination Page 10 of 11
may best be described as a flood plain over which water flows in a direction
determined by the rise and fall of the land.
47. This view is further supported by the description given by M who observed
Yeungroon Creek has been infilled with flood deposits over many years. The
course of the creek to the south of the town is marked by linear depressions
and vegetation.
48. Accordingly, the Panel accepts that water which came from the Yeungroon
Creek area to the south and south east of the town may not be regarded as
water which escaped from the normal confines of a natural watercourse.
Presence of clear water
49. There is evidence that water which initially entered the town, before the river
at Charlton overtopped its banks, was clear.
50. According to the M report the presence of clear water was indicative that it
was not water from the Avoca River. While WT accepted the general
principle of clear water discussed by the M report, WT did not accept that
water from Yeungroon Creek would contain high levels of sediment to colour
the water.
51. The Panel accepts that clear water is not of itself definitive that the water
was not flood water. River water which has mixed with runoff rainwater is
regarded as flood water. Further, once the river had over topped its banks
the river water will affect the levels of the clear water taking some time to mix
with the clear water. This circumstance is also regarded as flood water.
52. While the M report stated (summary paragraph 4) it was possible that
flooding could have been caused by stormwater/intense rainfall and runoff
early on 14 January 2011, he cautioned that properties will have been
affected by overbank flooding from the river from about 5 .00pm.
53. Significantly, M reported that depending on the location of the property, they
will have begun to be inundated from overbank flooding of the Avoca River
sometime in the afternoon and early evening of 14 January 2011. This view
is consistent with WT in that WT reported direct flooding from breakouts of
the Avoca River in Charlton would have occurred at about 6.00pm on 14
January 2011.
Conclusion
54. The evidence has established:
Clear water was running overland from the south and southeast of town
during 14 January 2011.
This water inundated the town before the Avoca River in Charlton
overtopped its banks at about 5.15pm.
Case No: 239539 Determination Page 11 of 11
Neighbouring properties were inundated before 6pm being the
accepted time direct water from the Avoca River at Charlton influenced
the water level in Charlton.
55. After careful analysis of the material the Panel concludes on balance that the
Applicant‟s property was initially inundated by surface runoff rainwater before
water from the Avoca River arrived.
56. In any event the policy provides cover for accidental damage up to a
maximum sum of $25,000; it is not in dispute that damage to the premises
was caused accidentally and as such the onus is on the FSP to prove that
the damage was caused by an excluded event, in this instance flood.
57. In the Panel‟s view floodwater would have been unlikely to have inundated
the property until sometime after 5.30pm on 14 January 2011; conversely on
the balance of probabilities the surface water runoff would have inundated
the property before that time.
58. Given there were no eyewitnesses to the inundation events, the Panel, will
have regard to its mandate to do what is fair in all the circumstances. Having
noted the ground level and topography in the vicinity of the property and the
floor level of the building, the Panel is inclined to the view that the surface
runoff would have inundated the property to about floor level before the
arrival of the floodwater. Therefore, in the Panel‟s view the Applicant is
entitled to reimbursement for the cost of rectifying any water damage up to
the level of the wooden flooring of the building.
Determination
59. Based on the available material the Panel determines the FSP is not liable
for the cost of rectifying damage caused by water to the building or contents
above floor level.
60. The FSP is liable for the cost of rectifying water damage to the wooden
flooring of the building.
61. In the event the FSP settles the claim by cash payment to the Applicant, the
FSP is to pay interest in accordance with Section 57 of the Act from 23
February 2011 being the date the claim was denied, until the date of
payment.