Home / Financial Firm (Unknown - Insurer) / Determination 239504

Determination 239504

Cash settlement amount for flood repairs - scope of works

FirmFinancial Firm (Unknown - Insurer)
Decided2011-09-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$5,776
Non-financial loss—
Amount claimed$187,144
SourceAFCA PDF

Summary

The applicants wanted the FSP to cash settle the flood repair claim at $187,144 based on their builder's quote. AFCA found the FSP could cash settle on its own builder's quote, but ordered it to add several omitted repair items.

The policy lets the insurer choose cash settlement at its own cost of repair, but the scope of works omitted items that the policy requires to be covered.

Issues

Subjects and remedies

pay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 239504 Determination Page 1 of 8 Case number: 239504 General Insurance – Domestic Insurance – Home Building – Flood – Service – Scope of Work 10 August 2011 Background 1. The Applicants held a Home Building and Contents Insurance policy (the policy) with the Financial Services Provider (FSP). The policy covered the building up to $349,400 and contents up to $88,400. The policy was subject to a $300 excess. 2. The Applicants lodged a claim against the policy on 15 January 2011, for extensive damage to the insured property as a result of flood water inundation during a severe weather event in the region. 3. The FSP accepted the claim and proceeded to obtain estimates for the cost of repairs (building) associated with the loss. In line with the Applicants wish to authorise repairs through their preferred builder, the FSP offered to cash settle the claim on the basis of what it would cost it to undertake the repairs. 4. The Applicants remain dissatisfied with settlement offer put to them by the FSP and maintain that it falls short of covering the extent of damage to the insured building and does not meet their builder‟s quote. Summary of Applicants ’ Position 5. The FSP has failed to provide the Applicants with a detailed copy of the quote which included the cost of each item and based upon which it seeks to cash settle the claim. 6. A representative from “B” the FSP‟s appointed builder attended the insured property with a quote in hand. When asked to disclose the quantum of the quote B‟s response was “I cannot tell you”. 7. The FSP‟ s representatives were very rude to the Applicants and treated them as if they were a nuisance. Due to the lack of transparency on behalf of the FSP, the Applicants decided to obtain a quote from their preferred builder “M”. 8. Once provided with a copy of B ‟s quote , the Applicants noted that it only provided a final cost estimate and also did not cater for all the repairs required to the property. Determination Case No: 239504 Determination Page 2 of 8 9. The Applicants fail to understand why the FSP would prefer to pay two separate builders to undertake the repairs when “ M ” is prepared to undertake all the required repairs under the one quote. “ M ” is suitably qualified and maintains that his quote is fair and reasonable. 10. The Applicants have all their money and business with the FSP and believe due to the FSP being aware of their financial history, it is taking advantage of them and in the process trying to save money. 11. The Applicants wish for the FSP to cash settle the claim in line with the quote submitted by “ M ” which is in the amount of $187,144. Summary of FSP’s Position 12. The latest revised scope of works provided by “ B ” on 6 July 2011 addressed all but four concerns raised by the Applicants in their complaint to the Service. 13. Therefore, the concerns raised in respect to the scope of work have, for the most part been resolved, pending repair costs requested from “ M ” in relation to the repairs not accounted for in “B‟s” quote. 14. The FSP is prepared to undertake the repairs through its builder and restore the building to the condition it was in prior to the loss. However, due to the Applicants‟ wish to use their own builder and to make some changes to their home in addition to the repairs, the FSP has agreed to cash settle the claim in line with “B‟s” quote. 15. Although the Applicants have alleged that the quality of work to be carried out by “ B ” would be sub-standard, no evidence has been made available to substantiate this claim. In addition, the FSP under the policy provides a “Lifetime guarantee” on repairs it arranges and authorises. 16. There is no dispute in respect to the contents portion of the claim. The Applicants have been settled in the amount of $76,503 having deducted the $300 policy excess. 17. The FSP has also paid the Applicants $7,200 to cover the cost of temporary accommodation between 18 April 2011 and 31 July 2011. 18. The FSP acknowledges that the Applicants wish to make some changes to the design of the home during the course of the repair process. In line with the terms of the policy, it is prepared to authorise “ B ” to carry out these changes at the cost to the Applicants. 19. In the instance that, the Applicants maintain their request to be cash settled, the FSP is not obliged to cover the additional costs associated with desired changes in the design of the home. 20. The FSP relies on the following policy provisions: “Page 19 - What you are covered for Case No: 239504 Determination Page 3 of 8 1. Storm and flood We cover Loss or damage caused by storm and flood e.g. rain, wind, hail, storm and damage caused by flooding from rivers, streets and canals. … Page 27 – Additional features When we accept a claim under your policy for an insured incident that happens in the period of insurance, you may also be entitled to these additional features. 1a. Temporary accommodation costs when you have home cover We cover When you have home cover and ad insured incident damages your home to the extent you cannot live there, we will pay for your temporary accommodation costs for the time it takes to repair or rebuild your home to a liveable condition. We will pay: Up to 2 weeks in short term accommodation agreed to by us (e.g. standard rates for a hotel, motel or serviced apartment), then if necessary: Up to another 50 weeks in residential accommodation of a similar standard to your home. The amount we will pay is based on the weekly rent you would receive for your home had it not been damaged. We will ask a licensed local property manager to assess this amount. The limit for temporary accommodation is 10% of your home sum insured and the longest period you can claim for is 52 weeks. We will pay this in addition to the sum insured for your home. … Page 62 – How we settle your claim We choose how your claim is settled If we agree to pay a claim for loss, theft or damage to your home, contents or landlord’s fixtures and fittings, we will decide if we will: … pay you what it would cost us to repair or replace your home or contents new for old. We will not pay extra to replace your home, contents or landlord‟s fixtures ad fittings to a better standard, specification or quality that it was before the loss or damage occurred except as stated in „new for old‟ below. … Page 64 – Home claims How we settle home claims If we agree to pay a claim for loss, theft or damage to your home, contents or landlord’s fixtures and fittings, we will decide if we will: … pay you what it would cost us to repair or replace your home or contents new for old. Case No: 239504 Determination Page 4 of 8 … Page 68 – Changes to your home If you want to change the design of your home When rebuilding your home, if we agree, you can choose to change the design of your home or upgrade parts of it, providing you pay the extra costs of doing this. If you want to downsize your home for less cost than you are entitled to claim, we will not pay more than this costs us to rebuild the downsized home. … Page 68 – Lifetime guarantee on home repairs When we repair or rebuild your home, we guarantee the quality of materials and workmanship of that work for the lifetime of your home if we: authorise and arrange and pay the builder or repairer directly for this work What we guarantee We guarantee the material used and standard of the workmanship to be free of defects. If a defect arises in the lifetime of your home as a result of poor quality workmanship or use of incorrect materials, then we will rectify the problem.” Issues 21. Whether the FSP is entitled to cash settle the Applicants in line with what it would cost the FSP to undertake the repairs to the insured property. 22. Whether the offer put to the Applicants by the FSP is fair in line with the terms of the policy. Reasons for Decision 23. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 24. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the FOS Terms of Reference. This is due to the circumstances of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 25. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 26. The Applicants maintain that due to the treatment of the FSP‟s representatives and lack of transparency during the assessment of the building damage, they wish to use their preferred builder “ M ” to carry out the repairs. Therefore, the Case No: 239504 Determination Page 5 of 8 FSP should cash settle the claim in line with the quote submitted by “ M ” in the amount of $187,144. 27. The FSP maintains that it is prepared to undertake the necessary repairs through its repairer “ B ” to restore the insured property to the condition it was in prior to the loss. 28. However, in line with the Applicants, wish it is also prepared to cash settle the claim but this would be in line with “B‟s” quote as this is what it would cost the FSP to undertake the repairs. 29. Consideration has been given to the relevant provision of the policy, where on page 62 it states: “ How we settle your claim We choose how your claim is settled If we agree to pay a claim for loss, theft or damage to your home, contents or landlord’s fixtures and fittings, we will decide if we will: … pay you what it would cost us to repair or replace your home or contents new for old.” 30. In line with the above noted provision in the policy, the Panel is satisfied this allows the FSP to elect to cash settle a claim on the basis of what it would cost it to undertake the necessary repairs on a new for old basis. 31. However the Applicants contend that this basis of settlement is inappropriate as they have concerns with the FSP‟s builder “B” undertaking the repairs. They therefore submit that the FSP should pay her a cash settlement equivalent to “M‟s” quote so that they can appoint “ M ” directly to undertake the work. 32. In response to the Applica nts‟ concerns, the FSP has offered to undertake the repairs directly through its builder and to support these with its „lifetime guarantee‟ for the quality of workmanship and materials used. 33. The Panel is mindful of the FSP‟s policy provision and also of the Applicants‟ concerns. However, the Applicants have not offered any evidence to show that the FSP‟s builder “B” is not capable of undertaking the work in an appropriate manner and further the FSP‟s lifetime guarantee provides a safeguard for the Applicants. 34. On this basis, the Panel determines that the FSP is entitled to cash settle the Applicants‟ claim on the basis of what it would cost it to undertake the repairs. 35. However, on review of the evidence made available by the parties to this dispute, the Panel notes that there were a significant number of issues raised by the Applicants in respect to “B‟s” quote. 36. A majority of these issues have since been addressed by the FSP, however, a number of concerns remain unresolved and the Panel has addressed these issues below: Case No: 239504 Determination Page 6 of 8 Painting of external walls 37. “ B ” formed the opinion that the external walls of the home could be cleaned and would not require re-painting. However, the Applicants did not accept this and maintained that the external walls would need to be re-painted. 38. It was agreed between the parties on 6 July 2011 that “ M ” carry out a test and confirm whether the external walls could be cleaned and if this was not possible the FSP would accept to cover the costs associated with the re-painting. 39. The Case Manager contacted “ M ” in this regard on 26 July 2011 to confirm whether the testing had been undertaken. “ M ” confirmed that he had undertaken the testing and a majority of external walls had been successfully cleaned. However, there are two walls in the back corner of the home that will require sanding down and re-painting. 40. The Panel is satisfied that the FSP‟s liability in this regard is limited to the cost of cleaning the external surface of the home and re-painting of the two walls at the back of the property. 41. “ M ” confirmed that the cost of repainting these walls would come to approximately $3,300. The FSP is therefore required to cash settle on the basis of “ M‟s ” advice w ith respect to cleaning and painting. Water tank pump 42. The Applicants maintain that the scope of work approved by the FSP did not make an allowance for the water tank pump damaged as a result of the flood. 43. During the course of the Service‟s review the FSP has contacted the Service and confirmed that it will cover the costs associated with replacement and instalment of a water tank pump at a cost of $451. Sanding and re-painting of Veranda Floor 44. The Applicants maintain that the scope for work approved by the FSP did not include costs associated with the sanding and re-painting of the veranda floor damaged as a result of the flood. 45. During the course of the Service‟s review of this matter, the FSP has confirmed that it will cover the costs associated with the sanding down and re-painting of the veranda floor, estimated at $1,695. Sound and Fireproof Wall Insulation 46. The Applicants have raised concerns in respect to the scope of work relied upon by the FSP allowing the installation of R 2.5 insulation, this, however, is not the same insulation that was installed prior to the loss. Case No: 239504 Determination Page 7 of 8 47. The FSP acknowledges the Applicants‟ concern in this regard and in its submission has stated that the policy allows for like for like replacement and as such this matter will be dealt with in line with the policy. 48. The Case Manager has confirmed that the insulation present prior to the event was of an R 3 rating and therefore the Panel is satisfied that the FSP‟s obligation in this regard is to replace the damaged insulation with R 3 rating insulation. Cast iron Lacework 49. The Applicants have identified damage to the cast iron lacework at the insured property and maintain that this should be included within the scope of works. 50. The FSP has acknowledged the concern raised by the Applicants in this regard and informed the Case Manager that it has requested M to inspect and submit a report to the FSP for review. 51. The Case Manager has confirmed with “ M ” that the cast iron lacework has been damaged as a result of the floodwater and will need to be cleaned down and repainted. 52. The Panel in this matter determines that the FSP is obliged to cover the Applicants for the cleaning and subsequent repainting of the cast iron lacing at the property, however as established above, it is entitled to cash settle the Applicants for this in line with what it would cost the FSP to undertake the repairs. Entry 2 - Floor Preparation 53. During the course of the Service‟s review the FSP has confirmed the scope of works submitted by “ B ” did not include the costs associated with floor preparation in the entry 2 area of the insured property. It has accepted to cover the costs associated with this aspect of the claim in the amount of $330. 54. Having considered the evidence made available by the parties to this dispute, the Panel notes that it is evident that the original quote submitted by “ B ” did not cover the full extent of repairs required to restore the property to the condition it was in prior to the loss. 55. “ M ” informed the Case Manager that, on the basis of the advice he has received from two flooring experts, the majority of flooring in the insured property may need to be replaced. This is due to the fact that it may not be possible to further sand it down, as this had previously been carried out after the 1974 flood event. 56. The Panel notes that this is a new issue which has not been referred to the FSP at this stage and as such the FSP is entitled to carry out its own investigation into this issue. Case No: 239504 Determination Page 8 of 8 57. In the instance that the parties are not able to come to a settlement in respect to the above noted matter (possible replacement of flooring), the Applicants are entitled to refer this matter to the Service as a new dispute. Determination 58. On the basis of the available information the Panel determines that the FSP is entitled under the terms of the policy to cash settle the claim in line with what it would cost it to undertake the required repairs at the insured property. 59. The Panel determines that the FSP increase the cash settlement offered to the Applicants to include the costs of repairs for: Cleaning (all external walls) and re-painting (two back walls) of the external walls. Replacement and installation of the Water tank pump. Sanding and re-painting of the Veranda floor. Cleaning and re-painting of the Cast Iron lacework. Floor preparation for Entry 2 of the property. Installation of R 3 rating soundproof and fire insulation. 60. In the event that the parties are not able to come to an agreed settlement in respect to the possible requirement to replace the flooring of the insured property, the Applicants are entitled to raise this as a new dispute and refer it to the Service for determination.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.